HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design...

12
UP UP UP 1183 SF Freight Room 141 SF Main Electrical 209 SF Storage 127 SF IT Room 71 SF Elevator Hydr. 443 SF Freight Elevator 358 SF Fire Stair 216 SF Elevators 68 SF Elevator Hydr. 2402 SF Lobby 94 SF Water 87 SF S. Electrical 259 SF Womens RR 263 SF Mens RR 8315 SF Classroom FIRST FLOOR Coats (under stair) PLAN - TO BE CHECKED HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2 1

Transcript of HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design...

Page 1: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

UP

UP

UP

1183 SFFreight Room

141 SFMain Electrical

209 SFStorage

127 SFIT Room

71 SFElevator Hydr.

443 SFFreight Elevator

358 SFFire Stair

216 SFElevators

68 SFElevator Hydr.

2402 SFLobby

94 SFWater

87 SFS. Electrical

259 SFWomens RR263 SF

Mens RR

8315 SFClassroom

FIRST FLOOR

Coats(under stair)

PLAN - TO BE CHECKED

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

1

Page 2: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

PLAN - TO BE CHECKED

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

DN

DN

DN

450 SFCooling Tower

174 SFFans (2)

347 SFChiller

159 SFBoiler

443 SFFreight Elevator

264 SFMEP Hallway

337 SFFire Stairs

219 SFElevators

171 SFFire Stairs

(open to above)

156 SFS. Electrical

130 SFIT Room

(may be convertedto mechanical chase)

800 SFOffice

8292 SFMuseum

SECOND FLOOR

2

Page 3: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

UP

UP

UP

1183 SFFreight Room

141 SFMain Electrical

209 SFStorage

127 SFIT Room

71 SFElevator Hydr.

443 SFFreight Elevator

358 SFFire Stair

216 SFElevators

68 SFElevator Hydr.

2402 SFLobby

94 SFWater

87 SFS. Electrical

259 SFWomens RR263 SF

Mens RR

8315 SFClassroom

FIRST FLOOR

Coats(under stair)

x?

??

PLAN - PROBLEM AREAS

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

3

Page 4: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

DN

DN

DN

450 SFCooling Tower

174 SFFans (2)

347 SFChiller

159 SFBoiler

443 SFFreight Elevator

264 SFMEP Hallway

337 SFFire Stairs

219 SFElevators

171 SFFire Stairs

(open to above)

156 SFS. Electrical

130 SFIT Room

(may be convertedto mechanical chase)

800 SFOffice

8292 SFMuseum

SECOND FLOOR

x

?

?

?? ? ?

PLAN - PROBLEM AREAS

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

4

Page 5: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

UP

UP

1183 SFFreight Room

141 SFMain Electrical

209 SFStorage

127 SFIT Room

71 SFElevator Hydr.

443 SFFreight Elevator

216 SFElevators

2402 SFLobby

94 SFWater

87 SF

Elev.Hydr.

259 SFWomens RR263 SF

Mens RR

8315 SFClassroom

FIRST FLOOR

Coats(under stair)

358 SFFire Stair

PLAN - REVISED

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

5

Page 6: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

DN

DN

450 SFCooling Tower

Fans (2)

Chiller

HW Heaters

443 SFFreight Elevator

171 SFFire Stairs

(open to SKY)

S. Electrical

550 SFOffice

8292 SFMuseum

SECOND FLOOR

216 SFElevators

358 SFFire Stair

PLAN - REVISED

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

Pumps

6

Page 7: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

1 unit serving both floor(upper floor option)

1 unit per level 1 unit serving both floor(ground floor option)

1 unit serving both floor(basement option)

All-in-one unit(industrial applications)

AIR-HANDLING UNIT LOCATION OPTIONS

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P1

7

Page 8: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

DIFFUSER OPTIONS

Ceiling diffuser (supply)

DUCT VELOCITY THROWAssume 100 to 200 cfm

per diffuser

Wall diffuser (supply)

Floor diffuser (supply)

Note:Similar strategies apply forReturn Air diffuser locations.

Discuss:-Locate lighting first-Noise Control-Aesthetics-Throw / Distribution-Air convection / stratification-Efficiency / fan power

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

ACTIVITY VELOCITYIndustrial 1500 - 2000 fpmOffice, Classroom 1000 fpmMuseium, Library, Auditorium 600 - 800 fpm

DIFFUSER TYPE THROWSlot (clg.) 8' to 20'Jet Slot (wall) 8' to 20'Jet Nozzle 20' to 200'Square (clg) 12' to 25'Grille (wall) 12' to 25'

8

Page 9: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

UP

UP

1183 SFFreight Room

141 SFMain Electrical

209 SFStorage

127 SFIT Room

71 SFElevator Hydr.

443 SFFreight Elevator

216 SFElevators

2402 SFLobby

94 SFWater

87 SF

Elev.Hydr.

259 SFWomens RR263 SF

Mens RR

8315 SFClassroom

FIRST FLOOR

Coats(under stair)

358 SFFire Stair

Porch

PLAN - HVAC SUPPLY / RETURN STRATEGY

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

9supply airslot in under-sideof Lobby catwalk

(see 2nd floor plan)

Page 10: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

DN

DN

450 SFCooling Tower

Fans (2)

Chiller

HW Heaters

443 SFFreight Elevator

171 SFFire Stairs

(open to SKY)

S. Electrical

550 SFOffice

8292 SFMuseum

SECOND FLOOR

216 SFElevators

358 SFFire Stair

PLAN - HVAC SUPPLY / RETURN STRATEGY

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

Pumps

10

continuous return airslot in ceilinginto plenum

continuous supply airslot in ceiling

continuous supply airslot in ceiling

supply airjet slot in sideof Lobby catwalk

return airslot in Lobby ceilinginto plenum

Porch

Page 11: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

UP

UP

1183 SFFreight Room

141 SFMain Electrical

209 SFStorage

127 SFIT Room

71 SFElevator Hydr.

443 SFFreight Elevator

216 SFElevators

2402 SFLobby

94 SFWater

87 SF

Elev.Hydr.

259 SFWomens RR263 SF

Mens RR

FIRST FLOOR

Coats(under stair)

358 SFFire Stair

Porch

PLAN - HVAC REGISTERS + DUCTS

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

11

(see 2nd floor plan)

In class:

1. Draw lines for:-Primary Ducts-Secondary Ducts-Tertiary Ducts

2. Run simple calculationsto determine duct sizeand show use of onlinecatalog to choose diffusermodels.

8315 SFClassroom

0 4 10 20 50 100'

Page 12: HVAC PRELIMINARY DESIGN STRATEGIES: · PDF fileplan - to be checked hvac preliminary design strategies: diffusers and ducts p2 dn dn dn 450 sf cooling tower 174 sf fans (2) 347 sf

DN

DN

450 SFCooling Tower

Fans (2)

Chiller

HW Heaters

443 SFFreight Elevator

171 SFFire Stairs

(open to SKY)

S. Electrical

550 SFOffice

8292 SFMuseum

SECOND FLOOR

216 SFElevators

358 SFFire Stair

PLAN - HVAC REGISTERS + DUCTS

HVAC PRELIMINARY DESIGN STRATEGIES: DIFFUSERS AND DUCTS P2

Pumps

12

Porch

In class:

1. Draw lines for:-Primary Ducts-Secondary Ducts-Tertiary Ducts

2. Run simple calculationsto determine duct sizeand show use of onlinecatalog to choose diffusermodels.

0 4 10 20 50 100'