HVAC - King Contractors of Niagara Ltd
Transcript of HVAC - King Contractors of Niagara Ltd
T
T
2
1
1
3
3
4
4
5
1
2
VERIFY EXISTING CONNECTIONS
3
4
CONTRACTOR TO REMOVE EXISTING 12/10
DUCT AND CAP AS REQUIRED.
CONTRACTOR TO USE EXISTING DIFFUSERS
WHERE POSSIBLE. NEW DIFFUSERS TO
MATCH EXISTING.
CONTRACTOR TO RELOCATE EXISTING
THERMOSTATS TO LOCATIONS SHOWN.
5
CONTRACTOR TO VERIFY EXISTING GAS
SERVICE IS ADEQUATE TO ACCOMMODATE
PROPOSED GAS FIRED WATER HEATER.
Revisions
READ THIS DRAWING IN CONJUNCTION
WITH THE ARCHITECTURAL DRAWINGS
M-1FEB , 2014
S.B
1/4" = 1' - 0"
DateNo Remarks
HVAC
MECHANICAL FLOOR PLAN
14-028
1 ISSUED FOR PERMIT 17-03-14
N
S Patel
17-03-14
MECHANICAL SPECIFICATIONS
Revisions
READ THIS DRAWING IN CONJUNCTION
WITH THE ARCHITECTURAL DRAWINGS
S Patel
17-03-14
DateNo Remarks
- - -
MECHANICAL NOTES
M-2
NTS
1 ISSUED FOR PERMIT 17-03-14
S.B
FEB , 2014
14-028
6" MIN. RADIUS
BY THIS DIV.
COUNTER FLASHING
ROOF
24" MIN
30°
DUCT
BY OTHER DIV.
FLASHED CURBED OPG
1/2"x1/2"BIRDSCREEN
12"
NOTE: REFER TO ARCHITECTURAL FOR
ROOF PENETRATIONS AND TIE-INS.
(TYP.)
GOOSENECK DETAIL SPIN-ON FITTING DETAIL4
4 TYPICAL HANGERS FOR WATER PIPESM-3
TYPICAL SUPPLY AIR DIFFUSER CONNECTION DETAIL
MECHANICAL SPECIFICATIONS (cont'd)
Revisions
READ THIS DRAWING IN CONJUNCTION
WITH THE ARCHITECTURAL DRAWINGS
S Patel
17-03-14
DateNo Remarks
- - -
DETAILS
M-3
NOTES
1 ISSUED FOR PERMIT 17-03-14
S.B
FEB , 2014
14-028
CONTRACTOR TO SUPPLY 3/4"Ï INDIRECT
DRAIN TO UNDER SINK FOR HYDRIM WASHER.
CONTRACTOR TO SUPPLY AND INSTALL AN AIR
LINE C/W SHUT OFF & VACUUM LINE AT CHAIR
AS REQUIRED. (SEE MANUFACTURERS SPECS)
CONTRACTOR TO SUPPLY AND INSTALL
VACUUM LINE FROM MECHANICAL ROOM AND
TERMINATE IN MILLWORK AS REQUIRED.
CONTRACTOR TO SUPPLY AND INSTALL
WATTS 007 DOUBLE CHECK VALVE
ASSEMBLIES AT ALL DENTAL EQUIPMENT
& SUCTION PUMP WATER LINE.
CONTRACTOR TO PROVIDE & INSTALL
PLASTER TRAP IN PLACE OF 'P' TRAP.
C.O
T-1
L-4
F-3
L-4
F-3
L-4
F-3
L-4
F-3
L-3
F-2
L-3
F-2
L-3
F-2
L-3
F-2
L-3
F-2
L-2
F-1
L-1
F-1
L-4
F-3
F.D
F.D
PLUMBING FIXTURE SCHEDULE
ITEM DESCRIPTION
COLD
WATER
HOT
WATER
SAN.VENT
REMARKS
T-1
1
2
" - 3" 1-
1
2
"
L-1
ABOVE COUNTER
1
2
"
1
2
" 1-
1
2
" 1-
1
2
"
F-1
SINK FAUCET
1
2
"
1
2
" - -
DELTA "TRINSIC COLLECTION" SINGLE HANDLE DECK MOUNT
MODEL #9159-DST
CAROMA "LEDA VASQUE ABOVE COUNTER"
COLOR WHITE MODEL#651048W/B1
17" DIAMETER VITREOUS CHINA, REAR OVERFLOW
L-4
1
2
"
1"
2
2"
L-2
INSET COUNTER SINK
1
2
"
1
2
" 1-
1
2
" 1-
1
2
"
L-3
1
2
"
1
2
" 1-
1
2
" 1-
1
2
"
F-2
SINK FAUCET
1
2
"
1
2
" - -
1-
1
2
"
GOURMET SINGLE
SINK
UNDERMOUNT SINK
F-3
SINK FAUCET
1
2
"
1
2
" - -
CAROMA "LEDA VASQUE INSET"
MODEL#661048W
17" DIAMETER VITREOUS CHINA, REAR OVERFLOW
KOHLER "UNDERMOUNT BATHROOM SINK"
COLOR WHITE MODEL#K-2883
13-3/4" DIAMETER VITREOUS CHINA, WITH OVERFLOW
BOWL SINK
ELKAY "GOURMET SINGLE BOWL SINK"
MODEL#LR2522
HIGHEST QUALITY SINK FORMED OF #18 GAUGE, TYPE 304 NICKEL BEARING SS
KOHLER "ELECTRONIC FAUCET" MODEL#K-11839
BRASS CONSTRUCTION WITH STAINLESS STEEL FINISH
USE WITH "F-1"
USE WITH "F-2"
KOHLER "TOUCHLESS WALL MOUNTED FAUCET TRIM" MODEL#K-7518
BRASS CONSTRUCTION WITH STAINLESS STEEL FINISH
TOILET-FLOOR MTD.
AMERICAN STANDARD "CADET RIGHT HEIGHT"
MODEL#2467.100
LOW-CONSUMPTION 1.1 GAL. PRESSURE ASSITED SIPHON JET FLUSH ACTION.
(BARRIER FREE)
Revisions
READ THIS DRAWING IN CONJUNCTION
WITH THE ARCHITECTURAL DRAWINGS
S Patel
17-03-14
DateNo Remarks
PLUMBING
&
DRAINAGE
WATER CLOSET (Tank Type)
- PLUMBING FIXTURE CONNECTIONS -
SHOWER STALL
SLOP SINK
URINAL
DISHWASHER
FLOOR DRAIN
DRINKING FOUNTAIN
HUB DRAIN
FUNNEL FLOOR DRAIN
GREASE INTERCEPTOR
SINK
FIXTURES
LAVATORY
1-1/2" 1-1/4" 1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"2"
3"
3"
3"
3"
2"
2"
2"
-
-
-
-
-
-
-
-
-
1/2"
1/2"
3/4"
-
1/2"
1/2"
-
1/2"
VENT
1-1/4"
1-1/4"
1-1/2"3"
WASTE
1-1/2"
1-1/2"
COLD
WATER
HOT
WATER
1/2"
1/2"
1/2"-
1/2"
1/2"
P-1
S.B
1/4" = 1' - 0"
SUPPLY
DRAINAGE
1 ISSUED FOR PERMIT 17-03-14
N
FEB , 2014
14-028
PANEL A
39
41
40
42
PH
35
33
37
27
29
31
23
25
15
21
17
19
DESCRIPTION
9
3
13
7
11
5
34
36
38
32
28
30
26
22
24
18
16
20
10
12
4
14
6
8
DESCRIPTIONBRKR
2
1
BRKR
15
15
43
45
47
15
15
15
15
44
51
49
46
50
52
53
48
54
15
15
56
59
55
60
5857
20
64
62
66
72
70
61
63
68
71
67
69
65
20
20
20
15
20
15
15
20
15
15
2P
15
15
20
VESTIBULE/WAITING
15
15
15
15
15
7473
75
80
76
77 78
81
79
82
84
CORRIDOR LIGHTING
15
83
RECEPTION LIGHTING
15
15
OFFICE
15
STAFF AREA
15
MECH ROOM
15
XRAY LIGHTING/RECEPTS
15
OPERATORY 6 LIGHTING/RECEPTS
LAB
15
15
15
15
20
20
15
15
20
15
20 15
20
15
15
20
20
30
20
20
15
15
20
20
15
20
20
15
20
20
20
WASHROOM
RTU-1
RTU-2
3P
40
3P
40
E-LIGHTING
OUTDOOR SIGNS
(CONTROLLED BY
PHOTO CELL)
E
X
I
S
T
I
N
G
EX. CONTACTOR COIL
WASHROOM LIGHTING/EF-1
WAITING RECEPTS
POWERED DOOR OPERATOR
RECEPTION RECEPTS
RECEPTION RECEPTACLES
OFFICE RECEPTACLE
15
15
REFRIGERATOR
15
STAFF AREA GFCI
COMPRESSOR
2P
GAS WATER HEATER(WH-1)
10
2P
PAN/CEPH
PAN/CEPH GFCI
OPERATORY 6 XRAY GFI
20
OPERATORY 1 XRAY
OPERATORY 1 CHAIR
OPERATORY 1 RECEPT
EF-2
HAIR DRYER
HYDRIM WASHER
2P
STERILIZER
STERILIZATION RECEPTS
CONSULT
VACUUM
20
2P
OPERATORY 5 LIGHTING/RECEPTS
OPERATORY 4 LIGHTING/RECEPTS
OPERATORY 3 LIGHTING/RECEPTS
OPERATORY 2 LIGHTING/RECEPTS
OPERATORY 1 LIGHTING/RECEPTS
20
15
CONSULT GFCI
OPERATORY 2 XRAY
OPERATORY 2 CHAIR
OPERATORY 2 RECEPT
OPERATORY 3 CHAIR
OPERATORY 3 RECEPT
OPERATORY 3 XRAY
OPERATORY 4 XRAY
OPERATORY 4 CHAIR
OPERATORY 4 RECEPT
OPERATORY 5 XRAY
OPERATORY 5 CHAIR
OPERATORY 5 RECEPT
OPERATORY 6 XRAY
OPERATORY 6 CHAIR
OPERATORY 6 RECEPT
STEREO SYSTEM
EXIT
EXIT
Revisions
READ THIS DRAWING IN CONJUNCTION
WITH THE ARCHITECTURAL DRAWINGS
S Patel
17-03-14
DateNo Remarks
ELECTRICAL
E-1
1 ISSUED FOR PERMIT 17-03-14
POWER & COMM
S.B
1/4" = 1' - 0"
FEB , 2014
14-028
N
EXIT
EXIT
EX
IT
E
EXIT
E
EXIT
PANEL A
39
41
40
42
PH
35
33
37
27
29
31
23
25
15
21
17
19
DESCRIPTION
9
3
13
7
11
5
34
36
38
32
28
30
26
22
24
18
16
20
10
12
4
14
6
8
DESCRIPTIONBRKR
2
1
BRKR
15
15
43
45
47
15
15
15
15
44
51
49
46
50
52
53
48
54
15
15
56
59
55
60
5857
20
64
62
66
72
70
61
63
68
71
67
69
65
20
20
20
15
20
15
15
20
15
15
2P
15
15
20
VESTIBULE/WAITING
15
15
15
15
15
7473
75
80
76
77 78
81
79
82
84
CORRIDOR LIGHTING
15
83
RECEPTION LIGHTING
15
15
OFFICE
15
STAFF AREA
15
MECH ROOM
15
XRAY LIGHTING/RECEPTS
15
OPERATORY 6 LIGHTING/RECEPTS
LAB
15
15
15
15
20
20
15
15
20
15
20 15
20
15
15
20
20
30
20
20
15
15
20
20
15
20
20
15
20
20
20
WASHROOM
RTU-1
RTU-2
3P
40
3P
40
E-LIGHTING
OUTDOOR SIGNS
(CONTROLLED BY
PHOTO CELL)
E
X
I
S
T
I
N
G
EX. CONTACTOR COIL
WASHROOM LIGHTING/EF-1
WAITING RECEPTS
POWERED DOOR OPERATOR
RECEPTION RECEPTS
RECEPTION RECEPTACLES
OFFICE RECEPTACLE
15
15
REFRIGERATOR
15
STAFF AREA GFCI
COMPRESSOR
2P
GAS WATER HEATER(WH-1)
10
2P
PAN/CEPH
PAN/CEPH GFCI
OPERATORY 6 XRAY GFI
20
OPERATORY 1 XRAY
OPERATORY 1 CHAIR
OPERATORY 1 RECEPT
EF-2
HAIR DRYER
HYDRIM WASHER
2P
STERILIZER
STERILIZATION RECEPTS
CONSULT
VACUUM
20
2P
OPERATORY 5 LIGHTING/RECEPTS
OPERATORY 4 LIGHTING/RECEPTS
OPERATORY 3 LIGHTING/RECEPTS
OPERATORY 2 LIGHTING/RECEPTS
OPERATORY 1 LIGHTING/RECEPTS
20
15
CONSULT GFCI
OPERATORY 2 XRAY
OPERATORY 2 CHAIR
OPERATORY 2 RECEPT
OPERATORY 3 CHAIR
OPERATORY 3 RECEPT
OPERATORY 3 XRAY
OPERATORY 4 XRAY
OPERATORY 4 CHAIR
OPERATORY 4 RECEPT
OPERATORY 5 XRAY
OPERATORY 5 CHAIR
OPERATORY 5 RECEPT
OPERATORY 6 XRAY
OPERATORY 6 CHAIR
OPERATORY 6 RECEPT
STEREO SYSTEM
EXIT
EXIT
Revisions
READ THIS DRAWING IN CONJUNCTION
WITH THE ARCHITECTURAL DRAWINGS
S Patel
17-03-14
DateNo Remarks
LIGHTING
E-2
1 ISSUED FOR PERMIT 17-03-14
S.B
1/4" = 1' - 0"
LIGHTING
FEB , 2014
14-028
N