Husum, 19 September 2012 SIDE Event Bureau de coordination ... · Wind industry in France, a true...
Transcript of Husum, 19 September 2012 SIDE Event Bureau de coordination ... · Wind industry in France, a true...
Title slide/end slide image dimensions:
Title slide images must always fit this size:
Height: 10.6 cm; Width: 25.4 cm
Title slide images must always follow this position:
Horizontal: 0 cm; Vertical: 0 cm
To change title slide/end slide image:
Contact Communication Support
Tip:
Vestas drawing guides will help you position and
crop images and objects. Images and objects will
snap to drawing guides when repositioned or
cropped.
To add drawing guides:
• Right-click on next to slide
• Select „Grid and Guides…‟
• Check „Display drawing guides on screen‟
• Press „OK‟
Husum, 19 September 2012
Current status and perspectives of the French wind energy market.
Husum, 19 September 2012 SIDE Event Bureau de coordination énergies renouvelables Nicolas Wolff, VP General Manager Vestas France
President of the French Wind Energy Association, France Energie Eolienne
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Agenda
Evolution of the wind energy situation in France
Barriers and challenges
Future perspectives and conclusion
An international perspective…
The global context: wind sector outlook
The wind sector is not expected to grow the coming years
Global total wind power capacity added GW
-13%
+1%
+26%
17E
47.8
16E
46.9
15E
45.3
14E
44.0
13E
18.9
06
15.1
05
11.1
2004
7.3
39.9
12E
46.1
11
41.1
10
39.9
09
36.7
08
30.5
07
• 1% growth is expected
the coming years –
According to EER, we
are no longer in a
growth industry.
• Focus needs to shift
from growth to
profitability.
Source: EER
• A mature but slow market.
• Growth on Emerging market.
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Wind Energy market situation in France
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
6
Champagne-Ardenne 980
Picardie 883
Bretagne 681
Centre 672
Lorraine 653
Pays de la Loire 443
Languedoc-Roussillon 435
Nord-pas-de-calais 417
Midi-Pyrenées 384
Poitou-Charentes 280
TOP 10 regions:
*Sources: France Energie Eolienne
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
An increase in nominal power
Nominal power 10 times bigger from 1997 to 2007
The average nominal power is now over 2,1MW per machine
*Sources: France Energie Eolienne
2.1 MW per machine
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Suppliers in the French market at the end of 2011 Cumulative installed capacity* by the end of 2011
*Source France Energie Eolienne
8
Repower
Nordex
Gamesa
Siemens
Alstom
GE
Vergnet
Other
Vestas trend for product development by 2015 9
Wind types per region in France
30 kW 3 000 kW
Towards larger rotors and higher hub heights
Wind Turbines
Adapted to site conditions:
• complex sites
• regulated sites
Vestas Corporate presentation 10 Vestas trend for product development by 2015 10
Wind industry in France, a true potential
French wind energy association:
250 active members / 11000 direct jobs
Commercial balance
€ 950M export out of € 1050M import
France already has 170 companies,
supplying the world market: • Rollix Defontaine,
• Mersen,
• EADS Astrium,
• SKF, Converteam,
• Schneider Electric,
• Ceole,
• Baudin ChateauNeuf
Training and growth opportunities for
technicians via several collaborations in
France: Nimes, Charleville-Mezieres, Le
Mans, Amiens…
12
Bienvenue
Barriers and challenges
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Evolution of the installed capacities in France Another decrease expected in 2012…
13
MW
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
The European context France is not the only country experiencing regulatory uncertainties*
* Source: EmerginegEnergy Research 2012 14
FR
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Two kinds of barriers
1/ Regulatory barriers linked to GRENELLE II
ICPE classification
5 machines minimum
Zone de Developpement Eolien
Recent decrees:
• Regional grid sketches
• Radars constraints and ICPE
2/ Feeding Tariff
The high court of justice, further to an anti wind appeal, has decided in May to transfer the case to the European court of Justice
Decision to be taken towards mid 2013 to end of 2013
Vestas trend for product development by 2015 15
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Time-to-market: one of the longest in Europe
Building permits ZDE &
Regional Schemes ICPE requirements
Very long journey to get a project completed…
Submitting
Instruction
Approval / Refusal / Appeal Rate 37%
*Sources: France Energie Eolienne
Compared to Germany*…:
France Germany
Average development time: 6,5 Years 2,5 Years
Instruction phase (lenght) 1,5 Years 0,5 Years
Appeals max.length 12,5 Years 5,5 Years
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
However…
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
French public opinion is positively evolving…
18
Sondage exclusif BVA
Pour Agir pour l‟Environnement
Effectué les 7 et 8 septembre 2012
Selon vous, à l’avenir, quelle source d’énergie faudrait-il développer en priorité ?
French wind market: French consumers believe in it!! Global Consumer Study 2011 mapped the preferences of 31,000
consumers across 26 markets
For the whole study click here.
46% of consumers say that climate change is in the top three concerns currently facing the world
81% think the manufacturing industry is to a high or very high degree a cause of human induced climate change
78% state renewable energy as their preferred energy source
58% think that fossil fuel use should be diminished
87% support an increase in renewable energy
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
2020: still a long way to go…but promising targets
Vestas trend for product development by 2015 20
Today
2012
Offshore
Onshore
19 GW
6 GW
6833 MW
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
German banks are leading
German financial institutions
Sarre Landesbank
Bremnen Landesbank
Baden Wurttemberg LB
Nordbank HSH
Vestas trend for product development by 2015 21
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Environnemental conference 14th and 15th of September
Proposed Regulations:
ZDE to be cancelled
2nd offshore tender late 2012
Work in progress:
Support schemes to become stable (ICPE,
5 wtg constraints)
Feeding Tariff:
Work in progress, the government is
currently studying the different options
including a notification to the European
Commission.
Some insights :
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Conclusion
Vestas Corporate presentation 23 Vestas trend for product development by 2015 23
France stays an attractive market
2012 and 2013 will be under our
expectations
However, improvements expected during
the Big Debate around Energetic
transition (end 2012/ early 2013)
National Wind Industry conference
Paris, 18th of October
20% EU target still valid
Title slide/end slide image dimensions:
Title slide images must always fit this size:
Height: 10.6 cm; Width: 25.4 cm
Title slide images must always follow this position:
Horizontal: 0 cm; Vertical: 0 cm
To change title slide/end slide image:
Contact Communication Support
Tip:
Vestas drawing guides will help you position and
crop images and objects. Images and objects will
snap to drawing guides when repositioned or
cropped.
To add drawing guides:
• Right-click on next to slide
• Select „Grid and Guides…‟
• Check „Display drawing guides on screen‟
• Press „OK‟
Add Title and Date via 'View/Header and Footer'. E.g.: Corporate Presentation, November 12, 2008
Copyright Notice
The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any
means - such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or
anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and
Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.