Agenda
1. Background of Completed Facilities Needs Assessments
2. Overview of District Wide Recommended Priorities
3. Preliminary Goals and Objectives
4. Model Classroom and School, 21st Century Learning
Overview
5. Individual Campus Priorities and Existing Conditions
6. Q&A
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Background of Completed Faci l i t ies Needs Assessments
1. Site Visits Were Conducted on 8/3/16 to Understand the
District's Campuses
2. BCA Analyzed Findings From the Site Visits
3. Preliminary Priorities For Each Campus Were Established
with the Superintendent and Multiple Members of the
M&O Staff.
4. Completed Facilities Needs Assessment Reports that
Summarized BCA Findings and Recommendations
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Dist r ict Wide Recommended Pr ior i t ies
Priority 1: 21st Century Classrooms and upgrades to portables, AB300
[DSA will require it to be in this phase], ADA, electrical gear/service
upgrades, abatement, restroom and ADA upgrades, roof replacement,
plaster repair at Dwyer.
Priority 2: Multipurpose and STEAM Labs at the [2] Middle Schools, LED
lighting and lighting controls, air conditioning and controls, new
playground at Smith, Admin. rework, replace concealed spline ceilings
at Sowers, upgrade Auditorium at Dwyer.
Priority 3: Learning Commons.
Priority 4: Safety and security single point of entry/exit at Admin., site fencing, remove/modify walkway canopies, restrict roof access, and
portables to permanent.
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Prel iminary Goals and Object ives
1. Modernize Classrooms and Create 21st Century
Standard for Huntington Beach City SD.
2. Code, Health, Infrastructure, Safety and Security.
3. Creating 21st Century Learning Environments.
• Outdoor Learning, Maker’s Labs, STEAM Labs,
Learning commons
4. Repurpose Buildings/Rooms where necessary
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
BCA Model Classroom 2 1 s t C E N T UR Y C L A S S R O OM
“Good”
• 1 Interactive Display
• Rectangular Desks
• White Board Wall
“Better”
• 2 Interactive Displays (1 Display and 1 Interactive White Board)
• Triangular Desks
• Soft Seating
“Best”
• 2 Interactive Displays (1 Display and 1 Interactive White Board)
• Triangular Desks & Soft Seating
• Nanowalls between Classrooms
• Sliding Doors that open up to Outdoor Learning
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
BCA Model Classroom 2 1 s t C E N T UR Y C L A S S R O OM
Other Considerations
Ceiling Speakers, Control Station, Carpet Improvement, Wall Surface Improvement, New Cabinetry, New Windows and Doors.
Primary Presentation Area: (Interactive Display Screen with Pen and Touch Capability)
Teacher Station: (Teacher Station
along side of Classroom with storage space above)
Flexible Desk(s) and Chair(s): Triangular Desks allow
for a wider variety of configurations and Ergonomic Chairs that promote comfort and allow students to move and stay focused.
Secondary Presentation Area: (Digital Collaboration Presentation Area that also acts as Dry Erase Board)
Wireless Device(s): (Devices that not only connect to the Interactive Screens, but also reduce the need for textbooks)
Presentation Station
Collaboration Station
Soft Seating
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
BCA Model School L E A RN I N G C O M M O N S
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
BCA Model School O UT D O O R L E A RN I N G
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
BCA Model School M A KER ’S L A B S
The Makers Learning Labs allow
students to collaborate and work together on various projects. The Makers Labs fit into 21st Century Learning due to the flexibility in its structure and the ways in which it allows students to learn from one another.
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
BCA Model School B UE N A P A R K D E M O N S TRA T I O N C L A S S R O OM
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Exist ing Campus Condit ions E A D E R E L E M E N T A R Y S C H O O L
Campus AnalysisSite 13.91 acres
Year Built 1965
Last Modified 2005
Grade Levels Preschool, K-5
Permanent Classrooms 25
Portable Classrooms 7
Special Day Class [Daycare] 1 of 7 portables
YMCA Portable 1 [owned by YMCA]
Campus CapacityCurrent Enrollment 610
Permanent Classroom Capacity 700 [28 students /
classroom]
Permanent Classrooms Needed 0
Summary of Findings• Roof overhangs require reconstruction due to water
damage, [roof is repaired].
• New windows needed.
• Admin. requires rework.
• Playground requires replacement.
• New electrical service needed to solve grounding
issues.
• Lighting is not Title 24 compliant, provide interior LED
fixtures. Exterior LED fixture complete.
• Remove lead tile.
• Phones needed.
• Need additional Boy’s restrooms.
• Parking needs rework and ADA upgrades.
• Multipurpose floor requires replacement.
• Need site access control/fencing.
Administration
Library/ Media Center
Multipurpose
Permanent Classroom
Portable Classroom
LEGEND
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Exist ing Campus Condit ions H A W E S E L E M E N T A R Y S C H O O L
Campus AnalysisSite 8.01 acres
Year Built 1975
Last Modified 2003
Grade Levels K-5
Permanent Classrooms 23
Portable Classrooms 13
Special Day Class [Daycare] 1 of 13 portables
YMCA Portable 1 [owned by YMCA]
Campus CapacityCurrent Enrollment 668
Permanent Classroom Capacity 644 [28 students /
classroom]
Permanent Classrooms Needed 1
Summary of Findings• New switch gear and electrical infrastructure required.
• Buildings are on the AB 300 list.
• Handball wall requires reconstruction.
• Need to replace 4X4 fixtures in Admin. with 2X4’s.
• Lighting is not Title 24 compliant, provide LED fixtures.
• Roof requires replacement.
• Need site access control/fencing.
• Clocks, phones, and bells needed.
Administration
Media Center
Multipurpose
Permanent Classroom
Portable Classroom
LEGEND
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Exist ing Campus Condit ions M O F F E T T E L E M E N T A R Y S C H O O L
Campus AnalysisSite 8.12 acres
Year Built 1975
Last Modified 2005
Grade Levels K-5
Permanent Classrooms 23
Portable Classrooms 5
Special Day Class [Daycare] 1 of 5 portables
YMCA Portable 2 [owned by YMCA]
Campus CapacityCurrent Enrollment 553
Permanent Classroom Capacity 644 [28 students /
classroom]
Permanent Classrooms Needed 0
Summary of Findings• Need new switch gear electrical infrastructure and
panels.
• Need to reconstruct hand ball walls.
• Roof replacement required.
• Need site access control/fencing.
• Clocks, phones, bells and cameras required.
• Lighting is not Title 24 compliant, provide LED fixtures.
Administration
Media Center
Kitchen
Permanent Classroom
Portable Classroom
LEGEND
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Exist ing Campus Condit ions P E R R Y E L E M E N T A R Y S C H O O L
Campus AnalysisSite 10.18 acres
Year Built 1964
Last Modified 2003
Grade Levels Preschool, Preppy,
K-5
Permanent Classrooms 29
Portable Classrooms 5
Special Day Class 1 of 5 portables
Campus CapacityCurrent Enrollment 467
Permanent Classroom Capacity 812 [28 students /
classroom]
Permanent Classrooms Needed 0
Summary of Findings• New windows required.
• Hardscape requires replacement.
• Need new electrical service to Admin. and
Multipurpose.
• Admin. office requires reconstruction.
• Site access control/fencing needed.
• Clocks, phones, bells and cameras required.
• Lighting is not Title 24 compliant, provide interior LED’s.
Exterior LED fixtures complete.
• Roof replacement needed.
Administration
Library/ Media Center
Multipurpose
Permanent Classroom
Portable Classroom
LEGEND
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Exist ing Campus Condit ions P E T E R S O N E L E M E N T A R Y S C H O O L
Campus AnalysisSite 15.42 acres
Year Built 1961
Last Modified 2001
Grade Levels Preschool, TK-5
Permanent Classrooms 31
Portable Classrooms 4
Special Ed., CLAPP 9 of 31
YMCA Portable 1 [owned by YMCA]
Campus CapacityCurrent Enrollment 723
Permanent Classroom Capacity 868 [28 students /
classroom]
Permanent Classrooms Needed 0
Summary of Findings• New transformer, switch gear and electrical
infrastructure needed.
• CLAPP wing façade needs update.
• North parking lot needs to be reconstructed.
• District food service space is moving to Kettler,
repurpose food service space and provide small
warming kitchen.
• Restrooms in CLAPP wing require ADA upgrade and
ceiling repair.
• Add parking stalls in adjacent lot.
• Site access control/fencing required.
• Need new clocks, phones, and bells.
• Lighting is not Title 24 compliant, provide interior LED
fixtures. Exterior LED fixtures complete.
• There is no air conditioning, District is adding fans.
Administration
Library/ Media Center
Multipurpose
Permanent Classroom
Portable Classroom
Special Education
LEGEND
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Exist ing Campus Condit ions S E A C L I F F E L E M E N T A R Y S C H O O L
Campus AnalysisSite 8.29 acres
Year Built 1999
Last Modified 2005
Grade levels K-5
Permanent Classrooms 28
Portable Classrooms 2
Campus CapacityCurrent Enrollment 745
Permanent Classroom Capacity 784 [28 students /
classroom]
Permanent Classrooms Needed 0
Summary of Findings• Fields require renovation.
• Library Courtyard low wall to be rebuilt.
• Roof replacement needed.
• Site access control/fencing required, add cameras.
• Lighting control not Title 24 compliant, install interior LED
fixtures. Exterior LED fixtures complete.
• Clocks, phones, bells and cameras needed.
Administration
Library/ Media Center
Multipurpose
Permanent Classroom
Portable Classroom
LEGEND
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Exist ing Campus Condit ions S M I T H E L E M E N T A R Y S C H O O L
Campus AnalysisSite 9.70 acres
Year Built 1951
Last Modified 2003
Grade Levels K-5
Permanent Classrooms 23
Portable Classrooms 9
Campus CapacityCurrent Enrollment 840
Permanent Classroom Capacity 644 [28 students /
classroom]
Permanent Classrooms Needed 7
Summary of Findings• Playground hardscape requires reconstruction.
• Bus drop off requires rework.
• Admin. requires relocation to 17th, demo. portables.
Access control/fencing required.
• New switch gear, panels and electrical infrastructure
needed.
• No existing air conditioning, District is adding fans.
• Multipurpose needs reconstruction inclusive of a
warming kitchen.
• Remove canopies at walkways and provide roof
access control.
• Clocks, phones, bells and cameras are needed.
• Lighting does not meet Title 24 requirements, install
interior LED fixtures. Exterior LED fixtures in process.
• Roof replacement needed.
Administration
Library/ Media Center
Multipurpose
Permanent Classroom
Portable Classroom
LEGEND
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Exist ing Campus Condit ions D W Y E R M I D D L E S C H O O L
Campus AnalysisSite 10.09 acres
Year Built 1936
Last Modified 2005
Grade Levels 6 – 8
Permanent Classrooms 43
Portable Classrooms 0
Campus Capacity Current Enrollment 1,296
Permanent Classroom Capacity 1,204 [28 students /
classroom]
Permanent Classrooms Needed 4
Summary of Findings• Auditorium requires renovation, new electrical switch
gear, infrastructure and panels, and new lighting.
• Upgrade second floor Staff restroom ADA.
• District adding fan to main building.
• Upgrade parking and drop off.
• Repair/replace exterior plaster.
• New Multipurpose with STEAM Labs to share with Smith
Elementary.
• Electrical panel replacement.
• Rework roof access, remove exterior metal stair.
• Eliminate covered walkways.
• Upgrade lighting, not Title 24 compliant, LED fixtures.
• Site access control, fencing, path of travel to Admin.
• Need clocks, phones, and bells.
• ADA compliant handrails at stairs and ramps.
• Roof areas need replacement.
Administration
Library/ Media Center
Multipurpose
Permanent Classroom
Auditorium
Boys / Girls PE
LEGEND
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Campus AnalysisSite 14.38 acres
Year Built 1974
Last Modified 2005
Grade Levels 6-8
Permanent Classrooms 31
Portable Classrooms 14
Campus CapacityCurrent Enrollment 1,156
Permanent Classroom Capacity 868 [28 students /
classroom]
Permanent Classrooms Needed 10
Summary of Findings• Need Multipurpose with STEAM Lab in location of three
portables adjacent park.
• Need portables to permanent buildings.
• Buildings are on the AB 300 list.
• Need new electrical switch gear, infrastructure and
panels.
• Replace concealed spline ceilings with standard.
• Add Staff Restrooms. Rework existing Staff Restrooms to
be ADA compliant.
• Lighting is not Title 24 compliant, provide LED fixtures.
• Need to reconfigure Admin.
• Two old portables adjacent parking lot need to be
demolished.
• Provide site access control/fencing.
• Need phones and bells.
• Roof areas need replacement.
Exist ing Campus Condit ions S O W E R S M I D D L E S C H O O L
Administration
Library/ Media
Center
Boys / Girls PE
Permanent
Classroom
Portable
Classroom
Stage
Kitchen
LEGEND
H u n t i n g t o n B e a c h C i t y S c h o o l D i s t r i c t C o n c e p t u a l D i s t r i c t V i s i o n – E L T P r e s e n t a t i o n 9 / 2 8 / 2 0 1 6
Q&A