HBO+EMTB SEPTEMBER 2011 SYU-002251 HUNTER EXPRESSWAY: KURRI KURRI TO BRANXTON - FINAL URBAN + LANDSCAPE DESIGN SUB PLAN REPORT (100%) 231 Appendix A APPENDIX A: DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT SYU-002251-DR-03 02 September 2011

Transcript of HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL...

Page 1: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 231

Appendix AAPPENDIX A:

DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%)

HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON

DESIGN LOT U6

DESIGN REPORT FOR LANDSCAPE

FINAL DETAILED DESIGN (100%) REPORT

SYU-002251-DR-03

02 September 2011

Page 2: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )232

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |ii

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |iii

TABLE OF CONTENTS1 INTRODUCTION .......................................................................................................................................... 1

1.1 Project Background ........................................................................................................................ 1 1.2 Scope of Report .............................................................................................................................. 1 1.3 Deliverables .................................................................................................................................... 2 1.4 Design Submissions ........................................................................................................................ 2

1.4.1 Urban and Landscape Design Sub Plan and 15% Noise Wall Drawing Package .................... 2 1.4.2 Preliminary Detailed Design Report (85%) ............................................................................ 2 1.4.3 Final Design Report (100%) ................................................................................................... 2

2 DESIGN INPUTS .......................................................................................................................................... 3

2.1 Design Requirements and Performance Criteria ........................................................................... 3

2.1.1 Standards .............................................................................................................................. 3 2.1.2 Order of Precedence ............................................................................................................. 3

2.2 Related Design Lots ........................................................................................................................ 3

3 DESIGN DEVELOPMENT ............................................................................................................................. 5

3.1 Design Description ......................................................................................................................... 6

3.1.1 Landscape Character Zones .................................................................................................. 7

4 LANDSCAPE REHABILITATION AREAS ......................................................................................................... 9

4.1 Landscape Rehabilitation Areas Disturbed by Construction Activities .......................................... 9 4.2 Bushland Regeneration Areas ...................................................................................................... 10 4.3 Bushland Reconstruction Areas ................................................................................................... 10

5 TOPSOIL MANAGEMENT .......................................................................................................................... 12

5.1 Landscape Topsoils ...................................................................................................................... 12 5.2 Bushland Topsoils ........................................................................................................................ 12 5.3 Topsoil Management Zones ......................................................................................................... 15 5.4 Topsoil Management in Landscape Rehabilitation Areas ............................................................ 15

5.4.1 Stripping .............................................................................................................................. 15 5.4.2 Direct Return ....................................................................................................................... 16 5.4.3 Stockpiling ........................................................................................................................... 16 5.4.4 Preparation for bushland topsoil application ..................................................................... 16 5.4.5 Application of bushland topsoil .......................................................................................... 17

5.5 Topsoil Application ....................................................................................................................... 18 5.6 Cover Crop ................................................................................................................................... 20

6 AREAS OF SPECIAL CONSIDERATION ........................................................................................................ 21

6.1 Fauna Crossings ............................................................................................................................ 21 6.2 Water Quality Basins and Vegetated Drainage Channels ............................................................ 21 6.3 Scour Protection .......................................................................................................................... 23 6.4 Landscape Medians ...................................................................................................................... 23

Page 3: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 233

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |iv

6.5 Slopes Exceeding 2H:1V ............................................................................................................... 23 6.6 Advanced tree planting ................................................................................................................ 23 6.7 Maintenance and Monitoring ...................................................................................................... 23 6.8 Long Batters ................................................................................................................................. 23

7 DESIGN INTEGRATION.............................................................................................................................. 25

7.1 Key Interfaces ............................................................................................................................... 25

7.1.1 Road Alignments and Earthworks ....................................................................................... 25 7.1.2 Drainage .............................................................................................................................. 25 7.1.3 Pavements........................................................................................................................... 25 7.1.4 Geotechnical ....................................................................................................................... 25 7.1.5 Utilities ................................................................................................................................ 25 7.1.6 Property Access and Adjustments ...................................................................................... 25 7.1.7 Environment ....................................................................................................................... 26 7.1.8 Signage and Roadside Furniture ......................................................................................... 26 7.1.9 Urban Design ....................................................................................................................... 26

7.2 Changes from Preliminary Detailed Design Submission .............................................................. 26 7.3 Changes from Final Design Submission ........................................................................................ 26 7.4 Ongoing and/or Outstanding Issues ............................................................................................ 27

8 CONSTRUCTION CONSIDERATIONS ......................................................................................................... 28

8.1 Key Constructability Issues........................................................................................................... 28 8.2 Constructability and Staging ........................................................................................................ 28

9 SAFETY IN DESIGN .................................................................................................................................... 29

9.1 Key Safety Issues .......................................................................................................................... 29 9.2 Safety in Design ............................................................................................................................ 29

10 DURABILITY .............................................................................................................................................. 30 11 DESIGN COMPLIANCE .............................................................................................................................. 31

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |v

LIST OF APPENDICESAppendix A LIST OF DRAWINGS Appendix B RESPONSES TO PROJECT VERIFIER COMMENTS Appendix C RESPONSES TO RTA COMMENTS Appendix D ENVIRONMENTAL COMPLIANCE REGISTER

LIST OF FIGURESFIGURE 4.1 EXTENT OF LANDSCAPE REHABILITION AREAS ...................................................................................... 9 FIGURE 5.1 LANDSCAPE TOPSOIL PROCEDURES ..................................................................................................... 13 FIGURE 5.2 BUSHLAND TOPSOIL PROCEDURES ...................................................................................................... 14 FIGURE 5.3 TOPSOIL EXTENTS................................................................................................................................. 15 FIGURE 5.4 SUGGESTIONS FOR WINDROWING TOPSOILS AND MULCH FOR LATER SPREADING ON BATTERS ..... 18 FIGURE 6.1 WATER QUALITY BASIN LANDSCAPE SECTION ..................................................................................... 22

Page 4: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )234

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |vi

DOCUMENT HISTORY AND STATUS

Revision Date Issued

Reviewed By

Approved By

Revision Type

01 26/05/2011 D.Mansfield J.Kemp 85% Submission

02 16/06/11 D.Mansfield J.Kemp 85% Submission

03 2/09/11 D.Mansfield J.Kemp 100% Submission

Revision Copy Number

Quantity Issued to

01 01 01 Brendon Johnson - Abigroup

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |1

1 INT R ODUC T ION

1.1 P rojec t B ac kground

The northern section of the Hunter Expressway Project will provide a high standard 27km length of dual carriageway between Kurri Kurri and Branxton that will improve safety, reduce highway congestion, and provide a safer local road network. The Kurri Kurri to Branxton section of the Hunter Expressway connects the Alliance section of the Hunter Expressway at Station 12900 to Branxton at Station 39500. The scope of the project includes four interchanges connecting the local road network at Kurri Kurri, Loxford, Allandale and Branxton. It also includes grade separated road and rail crossings, local road adjustments, and the provision of heavy vehicle stops and rest areas.

The RTA has awarded a design and construct (D&C) contract to AbiGroup Contractors Pty Ltd to build the western section of the Hunter Expressway.

The following acronyms are used in this report:

DECCW – Department of Environment, Climate Change and Water

DII – Department of Industry and Investment

DJV—Design Joint Venture

HEX – Hunter Expressway

PV – Project Verifier

RC – Reinforced concrete

RCBC – Reinforced concrete box culvert

RDG – Road Design Guide

RS – Reinforced soil

RTA – Roads and Traffic Authority of NSW

SWTC – Scope of Works and Technical Criteria

LHCCREMS- Lower Hunter and Central Coast Regional Environmental Mapping Project

KSSW—Kurri Sand Swamp Woodland

LHSGIF—Lower Hunter Spotted Gum-Ironbark Forest

HLRF—Hunter Lowlands Redgum Forest

CHISGGBF—Central Hunter Ironbark-Spotted Gum-Grey Box Forest

CHRF—Central Hunter Riparian Forest

This report should be read in conjunction with the drawings listed in Appendix A.

1.2 S c ope of R eport

This report describes the Final (100%) Detailed Design of the Landscape required between Kurri Kurri and Branxton. This design lot includes all of the planting and seeding and other design requirements of the scope of works Urban Design including noise walls, bridge treatments retaining walls and rest areas is not documented in this report – refer Lot U3 and U5 drawing packages.

The 85% detail landscape design reinforces and incorporates the output of related disciplines such as road geometry, drainage, geotechnical, environment and urban design and requirements of the SWTC including additional requirements described in Appendix 4, 5 and 15 and 17 of the SWTC. As described in this report, the landscape design covers all the landscape requirements for:

General landscaping of the entire alignment including planting and seeding;

Landscaping at interchanges;

Page 5: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 235

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |2

Landscape treatments at creek crossings;

Creek re-alignment and water quality basins;

Topsoil treatments to improve the success of the landscape establishment;

Rest area including additional earth mounding to visually incorporate the basins in this vicinity with the landscape; and

Seed Collection.

Specifications

Landscape Management Plan

This report describes the methodology for these landscape works. This report also details any major changes made since the 85% design and the reasoning and assumptions behind such changes. Also detailed are comments and responses documented since the 85% design submission.

1.3 Deliverables

This design lot comprises of the following deliverables:

Design Report – This document including Appendices.

Design Drawings – A list of design drawings are provided in Appendix A.

Specifications R178 and R179

Landscape Management Plan

1.4 Des ign S ubmis s ions

This report forms part of a series of submissions for works on the Hunter Expressway D & C. Report submissions, including the current report, are as follows:

Urban and Landscape Design Sub Plan and 15% landscape design Drawing Package.

Preliminary Detailed Design Report (85% Design Documentation) – Previous report.

Final Design Report (100% Design Documentation) – This report

IFC Design Documentation

1.4.1 Urban and L ands cape Des ign S ub P lan and 15% Nois e Wall Drawing P ackage

Urban and Landscape Design Sub Plan (SYU-002251-DR-01) was issued on 7/2/2011 provided the background information for the 15% Landscape Drawing Package (Design Lot U3) issued on 21/1/2011.

1.4.2 P reliminary Detailed Des ign R eport (85%)

This submission described all design elements and any changes from the previous design submission. It responded to and addresses any external comments from the 15% Landscape Drawing Package review received to date. This report listed a full set of design drawings which demonstrates compliance with the design requirements of the Project Deed, and the SWTC.

1.4.3 F inal Des ign R eport (100%)

This report submitted for Final Design Documentation revises, finalises and summarises those items presented in previous submissions, address inter-discipline integration aspects, and document and address any comments received from the RTA’s Representative or the Project Verifier and the Proof Engineer’s report (where applicable).

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |3

2 DE S IG N INP UT S

2.1 Des ign R equirements and P erformance C riteria

The design of the landscape has been undertaken to comply with the design requirements and criteria listed within Appendices 4, 5, 15 and 17 of the SWTC. And the relevant design standards.

2.1.1 S tandards

The requirements of the following relevant standards have been incorporated into the landscape design:

Reference Documents

Hunter Expressway: Kurri Kurri to Branxton, Appendix 15, Urban Design Scope of Works and Technical Criteria

F3 to Branxton Urban and Landscape Design Report, RTA/Kiah Infranet, May 2007.

Beyond the Pavement: RTA Urban Design Policy, Procedures and Design Principles, 2009.

Procedure for Selecting Treatment Strategies to Control Road Runoff Version 1.1 – RTA, June 2003.

Shotcrete Design Guidelines. RTA guidelines to avoid, minimise and improve the appearance of shotcrete – RTA.

Guidelines for Treatment of Stormwater runoff from the Road Infrastructure – AUSTROADS, 2003.

Noise Wall Design Guidelines, RTA 2007

Designing to Minimise Vandalism – An investigation into planning and design measures to avoid or mitigate vandalism. – Draft - RTA November 2008.

RTA Landscape Guideline April 2008.

Modified RTA specifications R176, R178 and R179

2.1.2 Order of P recedenc e

Unless otherwise stated, the following order of precedence has been applied in the design:

Project Deed

SWTC

Appendix 15

Australian Standards;

Other reference documents and standards.

2.2 R elated Des ign L ots

The following design lots are integrated into the Design Lot U6: Landscape Package – Zone 1, 2 and 3;

Design Lot R1A, R1B and R1C: Alignment and Earthworks – Zone 1, 2 and 3

Design Lot D1A, D1B and D1C: Drainage – Zone 1, 2 and 3

Design Lot U3 : Noise Walls Zone 1, 2 and 3

Design Lot U5 : Rest Areas

Design Lot R4: Pavements & Subsoil Drainage – Zone 1, 2 and 3

Design Lot R5: Street Lighting – Zones 1, 2 and 3

Design Lot R7: Utilities – Zone 1, 2 and 3

Design Lot R3: Signs and Line markings – Zone 1, 2 and 3

Design Lot A2: Noise – Operational Noise Management Report

Page 6: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )236

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |4

Design Lot R2: Road Finishes – Zone 1, 2 and 3

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |5

3 DE S IG N DE V E L OP ME NT

The Kurri Kurri to Branxton section of the Hunter Expressway will pass through an area of high floristic diversity. This contributes to the character of the various landscape zones identified in the landscape concept design. It also provides all of the trees shrubs, groundcovers and sedges required for specific uses (such as screening, filtering and erosion control, batter stabilisation and ornamental plantings) throughout the alignment.

For these reasons we have not found it necessary to include non-endemic native plantings in the project and only one exotic tree species (Olives) which is used as a cultural planting reference to the vineyard/Orchard/agricultural landscape and gateway to the Hunter Wine Region. Therefore the planting and re-vegetation strategy can be regarded as displaying a high level of endemism throughout its 27 kilometres.

The landscape planting plans are based upon the principles outlined in the Urban and Landscape Concept Design Report (Kiah Infranet 2007) and additional requirements outlined in Appendix 4, 5 and 15 of the Scope of Works and Technical Criteria (SWTC) which included LHCCREMS Vegetation Community Profiles mapping April 2000 and subsequent site observations.

Notable aspects of the design are:

1. The planting has been selected from and is designed to conform to the five identified vegetation communities encountered throughout the Kurri Kurri to Branxton section of the proposed alignment.

2. The planting design conforms to, reinforces and maintains the landscape character of the character zones identified in the RTA Concept Design Report.

3. The planting design conforms to context. For example where open pasture is encountered, the planting is generally exotic pasture grasses or native grasses. Where the context is of bushland, the expressway landscape is revegetated with the corresponding bushland species.

4. Planting is carefully placed in relation to identified views from the expressway and importantly, connecting roads (many of which are tourist routes).

5. Planting at the Branxton Rest Areas utilises species from the Central Hunter Ironbark-Spotted Gum-Grey Box Forest and integrates with noise walls and mounding to create character plantings that announce the entry into Branxton township from the west.

6. Throughout only indigenous species from the encountered plant communities have been utilised. Suitable species from each plant community have been used to revegetate the alignment in key areas, while in non-critical areas, all useful plants listed from the plant community have been used (where they are able to be propagated or where seed can be utilised in hydromulch mixes).

8. Planting at noise walls and retaining walls has been maximised to take advantage of the ability to plant non-frangible species between barriers and walls at these locations where space has allowed.

9. Endemic macrophyte and margin zone planting at water quality ponds is designed to allow migration to individual species preferred depth.

10. Where there is a low possibility of scour in swales and drains (between 0.5% and 5% slope), they are vegetated with non-invasive native grasses and sedges in conjunction with Jute Mesh and bitumen emulsion.

11. Feature trees are selected from the vegetation communities occurring within the character zones in which they occur.

12. A hierarchy of intersections has been identified through unique planting.

13. There is a direct relationship between the vegetation communities and soil landscapes, such that soil management as proposed will see areas replanted with species suited to a particular soil landscape.

Page 7: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 237

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |7

In particular, the commitment to apply direct return of topsoils (given the integrity of bushland within the corridor) immediately or soon after stripping, in order to take advantage of soil-stored seed, may well obviate the requirement for much of the hydromulching which has been documented and produce a far superior biodiversity outcome.

3.1.1 L ands cape C haracter Zones

The landscape character zones are derived from the Urban and Landscape Design Report prepared by Kiah Infranet. Character Zones 5 to 11 apply to the works from Kurri Kurri to Branxton. The following is a summary of the landscape treatment for each character zone.

3.1.1.1 Character Zone 5 - Urban Environs at Kurri KurriThis character zone connects to the Alliance stage of the upgrade and as such must display continuity in design with that section. The vegetation community encountered is the Kurri Sand Swamp Woodland, a unique vegetation community over a deep sand soil profile with a unique complement of plant species (many of which are excellent species for highway revegetation purposes). The dominant structure is the Kurri Kurri Interchange connecting to the township of Kurri Kurri in the south and Heddon Greta in the north. However the urban environs are not dominant visually from the new expressway. In this zone the expressway runs parallel to high voltage overhead power lines requiring extensive clearing distances which have influenced planting decisions. To emphasis the presence of the town centre, feature trees selected from the Kurri Sand Swamp Woodland such as Parramatta Red Gum and Narrow-leaved Apple are planted in semi-formal treatments with mass planted KSSW shrubs and Native Sarsasparilla providing colour below.

3.1.1.2 Character Zone 6 – McLeod Road to Old Maitland Road – Industry and PasturelandThe key features of this character zone are the Loxford Interchange and the proximity to the Kurri Kurri Aluminium Refinery to the North which is glimpsed obliquely (sightline via the electricity easement) by road users travelling east.

The landscape design responds to its presence with a striped geometric planting pattern in the median (Banksia spinulosa, Hakea dactyloides, Melaleuca nodosa and Lambertia Formosa) contrasting to the natural setting of the surrounding vegetation.

Significant areas of bushland regeneration and reconstruction will occur in this zone. This will improve the bushland biodiversity, and increase the degree of contrast with open pastureland views. Vegetation changes reflect changes in topography with Kurri Sand Swamp Woodland in the lower areas and Lower Hunter Spotted Gum – Ironbark Forest represented on the higher ground. The Loxford interchange is signified with grid plantings of Parramatta Red Gum.

3.1.1.3 Character Zone 7 –Old Maitland Road to East Allandale Road – Quarry and BushlandThis character zone traverses extensive areas of bushland and is typified by taller vegetation from the Lower Hunter Spotted Gum Ironbark Forest and the Hunter Lowland Redgum Forest with alluvial floodplains and creeks (Sawyers Gully and unnamed watercourse near Allandale Quarry) of Central Hunter Riparian Forest. The Allandale Interchange is planted with roadside avenues of Forest Red Gum (Eucalyptus tereticornis) to match the existing Red Gums on Allandale Road. Pastureland and views to nearby hills (Mount Molly Morgan) are retained while bushland is infilled via bushland reconstruction techniques to improve biodiversity. Creek crossings are reinforced with plantings from the Central Hunter Riparian Forest vegetation which also provide the surroundings for the fauna underpasses and arboreal crossings.

3.1.1.4 Character Zone 8 –East Allandale Road to Mount Molly Morgan – Undulating Rural LandFrom this character zone the views into the hinterland and to the Barrington Tops travelling west and views to Kurri Kurri, the Aluminium Refinery and Mount Sugarloaf to the east become more apparent, and where views occur from existing pastureland, they are retained. Elsewhere, extensive areas of Bushland Reconstruction will infill gaps and re-connect patches of existing bushland. The dominant trees are Forest Red Gum, Spotted Gum and Ironbarks.

3.1.1.5 Character Zone 9 – Mount Molly Morgan to Greta– Rugged TerrainBeginning at the Camp Road Underpass, this character zone enters more rugged terrain at the foothills of Mount Molly Morgan. The Camp Road Underpass is a key feature of this zone and is planted to allow views from both Camp Road, the expressway, and to Mount Molly Morgan. As shown in the aerial perspective, the underpass nestles comfortably in the foothill setting. The obsolete section of Camp Road is reconstructed to match the existing context.

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |6

14. The landscape layout is in accordance with the RTA Road Safety Guidelines including those for maintenance of safe sight distances, screening of headlight glare and clear zones. The landscape is also in accordance with respect to clearances for electricity easements and other clearing requirements - eg. fauna fences. The input of RTA’s Asset Management Team has been taken into consideration in the development of the landscape design.

15. No plant species that are easily propagated through hydroseed/hydromulch application (such as Acacias) have been used in the planting mixes except where required by Appendix 15. This is to ensure that more of the species that are difficult to establish via hydroseeding are represented in the planting schedules.

16. Limit vegetation clearing to a minimum. Due to the occurrence of Endangered Ecological Communities (EEC’s), a priority of the project is to limit vegetation clearing. In addition, many of the plants which make up the vegetation communities are not reliably propagated for use in re-vegetation. This category includes plants such as Exocarpus (Native Cherry) which is a root parasite and requires a host plant to survive, and many Terrestrial Orchids. The effect of limiting vegetation clearing in the vicinity of EEC’s means that the project footprint must be minimised where possible and this has consequences and impacts upon the design of the landscape, such as steeper embankments. All vegetation to be retained will be appropriately protected for the duration of construction works. Where significant stands of vegetation are to be retained, exclusion fencing will be erected before the commencement of construction.

17. Landscaping works will be staged in co-ordination with construction and will be, where practicable, implemented as each construction section is completed. Landscaping of the road reserve will precede construction where practicable.

18. The early and progressive implementation of the landscape installation provides erosion, sedimentation and drainage controls in addition to those provided in the erosion and sedimentation control plans. These measures include; the direct return of topsoil; the use of cover crops for initial stabilisation; organic fibre meshes to prevent erosion on basin embankments, vegetated channels and creek interfaces, and; the appropriate selection of endemic native species for rapid establishment via seeding.

19. The methodology for landscaping of fauna crossings is consistent with Appendix 4 Table 1 of the SWTC. Clearing of existing vegetation near underpasses will be minimised, and the landscaping within approaches to fauna underpasses will commenced as soon as practicable after clearing of existing vegetation and within 3 months of completion of construction of each fauna underpass. The density of vegetation planting or seeding matches the surrounding natural habitat. Vegetation planted or seeded within the approach to underpasses will be endemic and representative of the surrounding natural habitat, be designed to attract native fauna species to the fauna underpass, except where fauna exclusion fences are not present; and not obstruct the views through, or disguise, the entrance to the underpass.

3.1 Des ign Des c ription

The landscape proposal for the Hunter Expressway Western section from Kurri Kurri to Branxton section takes into account the fact that the alignment passes through quite distinct landscape types. The proposed landscape treatments have been broadly influenced by these landscape types, and taken together with the major interchanges at Kurri Kurri, Loxford, Allandale, and Branxton and including the Branxton rest areas, categorise the landscape approaches taken.

Broadly speaking, the general alignment reflects the environment through which it passes and could be considered to be largely a bushland rehabilitation exercise, whilst the interchanges and rest areas and to a lesser extent intersections are landscaped with extensive planting, often in a formal arrangement, to maximize the contrast with the main carriageways and create a different landscape character.

The landscape proposal also represents an ambitious approach to the revegetation of the road corridor in order to improve the environmental and landscape establishment performance through a more scientific approach to topsoil handling, treatment and programming. This approach described in section 5 requires particular coordination with the earthworks team and the Landscape Restoration Manager who will be largely responsible for the correct execution of topsoil management.

Page 8: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )238

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |8

Extensive bushland reconstruction around the interchange will further reduce the impact of the road, and further integrate it with the woodland character. Forest Red Gum is the dominant feature tree, with woodland planting composed of a broad range of up to thirteen other species of Eucalypts.

3.1.1.6 Character Zone 10 –Greta to Branxton Interchange– Spotted Gum DominantExtensive areas of bushland occur in this zone and it is likely that there will be considerable scope for bushland regeneration to improve the biodiversity of the vegetation communities present. A long section of median planting is required in this zone to reduce headlight glare comprising Banksia spinulosa, Hakea dactyloides Melaleuca nodosa and Lambertia Formosa. Taller shrubs for screening noise walls include Callistemon salignus, Melaleuca linarifolia and M.stypheloides. A large cutting at Station 32800 is revegetated with plants from the Lower Hunter Spotted Gum – Ironbark community in order to visually ameliorate the impact of the cutting which occurs within a forest setting. The Tuckers Lane overpass is planted with an avenue of advanced Forest Red Gum (Eucalyptus tereticornis).

3.1.1.7 Character Zone 11 – Branxton – Wine Region and Urban EnvironsThis zone must create an effective visual connection to the town of Branxton at the Branxton Interchange. The Vineyard pattern (derived from the concept design) has been developed in detail design and is now represented by rows of Olives planted in deep furrows to represent agricultural patterns on the landscape. The Olive chosen is a selection called “Swan Hill” which is known to not produce pollen or fruit and does therefore not represent a weed hazard. The Olive species best able to replicate the pattern in a low maintenance environment. The rows will appear pronounced. Strip plantings of native grasses and shrubs complete the effect. A native grass planted median allows clear views of the interchange and the cultural plantings. Avenue planting of Spotted Gum with native grasses in the verge below line the entry road into Branxton.

South of the interchange, bush regeneration will reinforce the existing woodland forest.

At Wine Country Drive the formal landscape treatment is repeated with Avenue plantings lining Wine Country Drive and formal plantings announcing the approaches to the overpass.

The Central Hunter Ironbark Spotted Gum Grey Box Forest which is encountered for the majority of this zone introduces new species which are available for use for various purposes. Screening for noise walls in this zone

include Allocasuarina luehmannii, Melaleuca linarifolia with Lomandra multiflora subsp. multiflora as an understorey. To Corymbia maculata (Spotted Gum) are added the feature trees Eucalyptus crebra (Narrow-leaved Ironbark) and E. moluccana (Grey Box). Each of these species is represented in the Branxton Rest Areas. Scribbly Gums have been co-opted from the KSSW community to specifically cast a shadow effect on noise walls in this zone.

3.1.1.8 Branxton Rest AreasThe rest areas at Branxton are described in the rest area design report. They are an important feature of the highway landscape and the formal planting grid, landforming and gabion walls of the rest areas announce entry to the wine county region for eastbound travelers.

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |9

4 L ANDS C AP E R E HAB IL IT AT ION AR E AS

In addition to the above general aspects of the landscape, the landscape design also includes requirements as set out in Appendix 15 for Landscape Rehabilitation Areas. See Table 4.1 below for the extent of landscape rehabilitation areas. Landscape Rehabilitation Areas are designed to protect and improve the biodiversity of the dominant vegetation communities (especially those listed as EEC’s which include; Central Hunter Riparian Forest, Hunter Lowland Redgum Forest, Kurri Sand Swamp Woodland, Lower Hunter Spotted Gum-Ironbark Forest and post the original mapping now also includes Central Hunter Ironbark-Spotted Gum-Grey Box Forest) within the project area.

Chainage Description Dominant vegetation communities

12900 - 20000 Chainage 12900 to waterway at Chainage 20000

Kurri Sand Swamp Woodland Lower Hunter Spotted Gum Ironbark Forest

20700 - 26600 Waterway at Chainage 20700 to 800m south of Allandale interchange

Lower Hunter Spotted Gum Ironbark Forest Hunter Lowland Redgum Forest

28250 - 35300 750m north of Allandale interchange to Branxton interchange

Lower Hunter Spotted Gum Ironbark Forest Hunter Lowland Redgum Forest

Figure 4.1 Extent of Landscape Rehabilition Areas

Landscape Rehabilitation Areas include the following sub types:

4.1 L ands c ape R ehabilitation Areas Dis turbed by C ons truc tion Ac tivities

These are areas which include de-commissioned side roads and tracks, batching plants, site offices and compounds, construction parking areas, and all other areas with slopes 3:1 or less which require rehabilitation following onstruction. These areas are indicated on the planting and seeding plans and topsoil plans and will be rehabilitated according to Appendix 15.6 and RTA Specification D & C R178 Vegetation which specify measures such as:

The method of stripping of A1 and A2 horizons topsoil for re-use in landscape rehabilitation areas;

Direct return of topsoil where practical;

Stockpiling of bushland topsoil in order to preserve the stored soil seedbank and soil micro-flora;

Preparation of receiving sites for bushland topsoil;

Composting and amelioration of components (site topsoil and woodchip) of bushland topsoil;

Application of bushland topsoil, and;

Application of the appropriate hydromulch seed mix and planting (according to character zone and vegetation community).

Within Landscape Rehabilitation Areas disturbed by construction activities, the Contractor must implement careful management of topsoil stripping, storage and return for the purpose of preserving the native species soil seedbank.

In summary, the soil seedbank from nominated areas is to be salvaged during clearing operations, stored according to vegetation community type, and then spread on batters and road verges to revegetate the site as construction is progressively completed. In optimal circumstances, programming will facilitate the direct return of topsoil.

Page 9: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 239

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |10

Apart from the obvious ecological benefits such as the return of the endemic species composition (the soil seedbank will be composed entirely of native seed in the areas proposed for this treatment), prevention of weeds and improved management of Endangered Ecological Communities (avoiding the introduction of non-local genetic material into EEC’s), the project cost savings could prove to be substantial by reducing the requirement for seed collection, hydromulching, and landscape planting.

Plant propagules other than seed can also be present in the salvaged soil. These can include the roots and tubers of herbaceous native irises, lilies and other plant types which can propogate from below ground plant parts. In the majority of native plant communities, species with soil-stored seed can comprise 20-50% of the total flora. Soil seedbanks are composed mainly of fast growing pioneer species, particularly ground layer species and shrubs. Many of these species are not reliably propagated from seed (eg; Persoonia spp.)

The extent of potential Landscape Rehabilitation Areas Disturbed by Construction are indicated on the Planting and Seeding Plans.

4.2 B us hland R egeneration Areas

These comprise well forested areas within the project boundary where within 12 months of commencement of the work they can be anticipated to have less than 15% weed cover. Regenerating the bushland within the project boundary will improve biodiversity and improve the expressway backdrop of native Australian landscape and pastoral views.

The Bush regeneration approach will utlilise 5 strategies in order to remove weeds:

Selective spraying with herbicides;

Cutting/scraping and painting deep rooted woody weeds and climbers with hand tools, chainsaws and brushcutters and painting cut stumps with herbicide;

Target drilling and injecting large exotic trees with herbicide;

Hand removal, and;

Burning areas dominated by naturalised grasses.

The D and C will make all efforts to exclude access to these areas other than the designated bush regenerators, to prevent disturbance and the introduction of weeds. Access should be strictly policed because the savings in later remedial action are likely to be significant.

This is particularly pertinent because since the LHCCREMS native vegetation mapping by Biosis Research in 2005 upon which the landscape rehabilitation areas and clearing limits are based, ground –truthing has shown that there has been significant increases in the regrowth vegetation cover of bushland.

The extent of potential bushland regeneration areas are indicated on the Planting and Seeding Plans.

4.3 B us hland R ec ons truc tion Areas

These are areas within the project boundary where existing bushland or bushland remnants surround or are in proximity to clearings, and where the new expressway would cause these areas to become “Island” clearings.

These areas will be subject to landscape rehabilitation through active revegetation (called “Bushland Reconstruction”) to “infill” the “gaps” in the existing bushland. This increases the area of each vegetation community, compensates for some of the loss due to clearing for the expressway and improves habitat connectivity for fauna. The majority of bushland reconstruction will be comprised of the five vegetation communities listed as Endangered Ecological Communities.

It is anticipated that many of these areas will have topsoil horizons intact and will not require additional topsoil. In addition there may be remnant trees, shrubs or native grasses present which precludes extensive cultivation. Soil

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |11

preparation will include the addition of ameliorants and cultivation as recommended by the project soil scientist. Direct seeding of natives with the appropriate hydromulch seed mix (according to character zone and vegetation community), and/or mass planting and follow up weed control will contribute to a well vegetated corridor with improved biodiversity;

Areas of bushland reconstruction were identified from aerial mapping. In the intervening period since mapping, ground –truthing has shown that bushland has increased in some areas through regrowth with the introduction of very few weeds. Therefore many of the areas indicated as bushland reconstruction may be best managed as bushland regeneration areas with no planting seeding or mulching required. Such areas will be identified on site by the Landscape Restoration Manager.

As for bushland regeneration areas, it is in the contractors interest to restrict access to these areas wherever possible in order to allow the natural regrowth to continue for the duration of the construction period.

The extent of potential bushland reconstruction areas are indicated on the Planting and Seeding Plans.

Page 10: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )240

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |12

5 T OP S OIL MANAG E ME NT

Topsoil management, as detailed in Appendix 15, Version 6.0, of the SWTC and topsoil drawings HEA-GEN-DRG-LA001-301 to 326, has been carefully considered in respect of opportunities for:

direct return of topsoil;

soil amendments;

the utilization of organic materials and other soil ameliorants as additives to improve soil quality, and;

the stockpiling of topsoil to preserve the soil seed bank and to ensure soils from plant communities remain intact and are returned to areas where those plant communities occur.

The application of these requirements for the Kurri Kurri tio Branxton section are described below.

Landscape Topsoil and Bushland Topsoil.

Two terms are used to describe the topsoils used for this project. Landscape Topsoils and Bushland Topsoils

5.1 L ands c ape T ops oils

All topsoils which are not required for landscape rehabilitation areas are hereafter referred to as “Landscape Topsoils”. Landscape topsoils are generally from areas of the alignment where existing (mainly exotic) pasture is the main vegetation cover but may also include patches of bushland or remnant trees. Generally there is no intact existing vegetation community present.

Unlike Bushland topsoils, there is no requirement to strip, store or apply landscape topsoils according to vegetation community. Therefore landscape topsoils are to be stripped and stored according to RTA specification R44.

The method for treating landscape topsoils is summarised in figure 5.1;

5.2 B us hland T ops oils

App. 15 of the SWTC uses the term “Bushland Topsoil” to describe topsoil to be stripped and re-used in the nominated Landscape Rehabilitation Areas. These are the topsoils where the native soil seedbank is to be preserved. Site visits by the project team have verified the notable absence of weeds in the nominated landscape rehabilitation areas.

The method for treating landscape topsoils is summarised in the figure5.2;

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |13

Figure 5.1 Landscape Topsoil Procedures

LANDSCAPE TOPSOIL

STOCKPILE

SEED WITH COVERCROP TO 2.5m HIGH AND 2:1 BATTER

SLOPES. USE WITHIN 18 MONTHS

SOIL TESTING

PREPARE FOR APPLICATION (ADD COMPOSTED MULCH OR

AMENDMENTS AS PER SOIL SCIENTISTS

RECOMMENDATIONS)

TOPSOILING (TO PREPARED SUB BASE)

DIRECT RETURN

(UNDER SOME CIRCUMSTANCES AND WHERE PROGRAMMING

ALLOWS)

Page 11: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 241

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |14

Figure 5.2 Bushland Topsoil Procedures

BUSHLANDTOPSOIL

SOIL TESTING PRIOR TO STRIPPING EACH VEG. COMM. TYPE IN THREE

LOCATIONS AT THREE DEPTHS

STRIPPING

A1 HORIZON WITH SLASHED TRASH TO A DEPTH OF 100MM. REMAINING TOPSOIL TO THE DEPTH REQUIRED.

STOCKPILE ACCORDING TO VEGETATION COMMUNITY AND

COVERCROP

(A1 TO 1m HIGH x 3m WIDE. A2 AS PER APP.44)

EEC

6 MONTHS

GRETA TO BRANXTON

12 MONTHS

SOIL TESTING

TEST FOR C/N RATIO. VERIFY EXISTING ORGANIC MATTER

CONTENT. ADD ADDITIONAL IF REQUIRED UP TO 30% FOR

STOCKPILES SOILSORGANIC MATTER)

PREPARE FOR APPLICATION

(MIX WITH AMENDMENTS AND COMPOSTED MULCH)

TOPSOILING

ALL OTHER AREAS

18 MONTHS

DIRECT RETURN.

MIX WITH 15% COMPOSTED MULCH

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |15

5.3 T ops oil Management Zones

The nominated chainages where each type occurs, and the vegetation communities that occur within them, are shown in Figure 5.3 below;

Figure 5.3 Topsoil Extents

5.4 T ops oil Management in L ands cape R ehabilitation Areas

The following extract from the SWTC Appendix 15 describes the requirements for stripping, storing and applying bushland topsoils. Any recommendations, proposed changes or comments are shown in red.

5.4.1 S tripping

The Contractor must undertake soil paedology survey and analysis within each soil landscape and vegetation community type. Each soil landscape and vegetation community type must be tested in three locations, each with three sampling depths of A1, A2 and B1 horizon. Soil testing must be undertaken by a National Association of Testing Authorities (NATA) registered laboratory and include pH, salinity, cation exchange capacity, plant available phosphorous, total organic matter, total nitrogen and carbon/nitrogen.

Soil testing and any recommendations must be made by an appropriately qualified soil scientist with expertise in revegetation.

The Contractor must strip at least 50,000m3 of A1 Horizon topsoil from Landscape Rehabilitation Areas, or sufficient topsoil to implement the landscape rehabilitation requirements, whichever is greater, in the manner outlined below. The quantities of topsoil from each vegetation community type stripped must be directly proportional to the areas of each vegetation community subject to landscape rehabilitation activities.

Stripping undertaken for the purpose of generating bushland topsoil must be undertaken by the following process:

Page 12: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )242

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |16

(i) Limit the use of heavy or tracked vehicles and equipment so as not to disturb the A1 horizon surface soil to the extent that it is contaminated with lower layers.

(ii) Where tree density does not allow effective slashing or the stripping of topsoil as described below, remove trees and stumps in a manner that does not mix B Horizon soil with bushland topsoil. Acceptable methods include felling trees and grinding stumps.

(iii) Slash the understorey to within 50mm of ground level, leaving the slashed trash insitu.

(iv) Pause for a period of one (1) week prior to undertaking bushland topsoil stripping.

(v) Strip A1 Horizon bushland topsoil to a depth of 100mm plus the slashed trash.

(vi) Relocate bushland topsoil as either direct return or to stockpile.

(vii) Strip remaining topsoil to extent required. Avoid mixing of B Horizon material.

(viii) Clear any remaining trees (including stumps) and any other remaining vegetation.

5.4.2 Direct R eturn

The construction process must facilitate the immediate re-laying (hereafter referred to as direct return) of stripped topsoil in Landscape Rehabilitation Areas. Where it is not practical to direct return bushland topsoil to batters and embankments of the road formation due to earthworks programming, the Contractor is to direct return an amount of bushland topsoil to Landscape Rehabilitation Areas within the road corridor where bushland restoration is required.

Where it is not possible to undertake direct return of bushland topsoil, bushland topsoil must be stockpiled in areas separate from all other stockpiled material to minimise the potential for weed contamination. Topsoil handling and stockpile contamination are critical factors with regard to the success of the landscape rehabilitation process.

5.4.3 S toc kpiling

Bushland topsoil must be stockpiled separately by vegetation community type. For each vegetation community type, topsoil is to be stockpiled as follows:

(i) A1 Horizon in windrows up to one (1) metre high by a maximum of three (3) metres wide at the base; and

(ii) A2 Horizon in windrows of any stable configuration. (According to R44)

(j) Bushland topsoil (A1 Horizon Only) must not be stockpiled for periods greater than:

(i) Bushland topsoil from Endangered Ecological Communities - 6 months;

(ii) Bushland topsoil from the Greta to Branxton section - 12 months, with the exception of cut batters below the first bench and fill batters above the first bench; and

(iii) All other bushland topsoil – 18 months.

(k) Topsoil stockpile areas must be managed continuously so that weed densities are no greater than 5% over the entire stockpile area. All weeds must be eradicated before setting seed.

(l) Large, clearly legible signs must be placed and maintained on each windrow,nominating vegetation community type, soil horizon, collection area (e.g. by chainage) and date of stockpiling.

5.4.4 P reparation for bus hland tops oil applic ation

(m) All bushland topsoil re-used within landscape rehabilitation areas must be prepared in the following manner:

(i) Soil testing must be carried out to finished sub-grades to address any severe soil deficiencies. Should the test results indicate that subsoils contain contaminants or have chemical properties likely to inhibit the success of the landscape restoration process, additives must be added during ripping, as required by the Soil Scientist;

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |17

(ii) Prior to the placement of topsoil, continuously eradicate weeds to treatment and adjoining areas, until weed growth four (4) weeks after the last spray comprises less than 5% cover, and then eradicate remaining weeds, and;

(iii) Rip the subsoil to a depth ranging from 50-100mm using the tynes on a swivelling head excavator bucket, or by some other means to form a loosened or roughened surface suitable for the application of topsoil and/or seed. Since this procedure is for slopes of 3:1 or less, we recommend ripping to 300mm. During ripping, mix in any materials required by the soil testing into the upper 100 mm layer to the rates specified within the soil testing recommendations. Rip parallel to the final contours where possible. Do not rip within the drip line of trees to be retained. Do not disturb services or tree roots, cultivating these areas by hand if necessary. Remove any weeds, rubbish or other deleterious material brought to the surface by the ripping process.

5.4.5 Application of bus hland tops oil

(n) Application of bushland topsoil in Landscape Rehabilitation Areas must be applied in accordance with the requirements of Specification D&C R178 Vegetation and this Appendix 15.

(o) Application of bushland topsoil in Landscape Restoration Areas with 3:1 slopes or less must be undertaken in the opposite order to stripping, as follows:

(i) A2 Horizon to a depth of 200mm; and

(ii) A1 Horizon to a depth of 100mm. The soil depths noted here are fine for Landscape Rehabilitation Areas outside the formation. However on formations such as fill and cut batters, and in special situations such as at intersections, medians and adjacent to noise walls, this may be varied. Refer to the landscape plans. The general depth for roadworks batter slopes of 2:1 is 50-100mm, however in cases when composted mulch is added at the maximum quantities described here, it would have a greater ability to withstand slippage and erosive forces and could therefore be applied to a full 100mm

(p) A1 and A2 Horizons must be supplemented by site mulch (organic carbon content) derived from a coarsely shredded vegetative material cleared during works, A1 and A2 Horizons must be supplemented as follows:

(i) 15% by volume where it is to be used for direct return; and

30% by volume for topsoil that is to be stockpiled. (The ratio of Organic Carbon content in existing topsoils is likely to be 3-10%. Whilst the project should allow for 30% at this stage as there are likely to be other benefits that come from increased organic content which include wettability, increased porosity, increased resistance to slippage and erosive forces, the final ratio should be determined by the project soil scientist).

(q) Site mulch must be composted for a minimum of 6 weeks Site mulch should be composted until a NDI of 0.5% or less is achieved with a pH range of 6.5 to 8.5. Imported compost can also be utilised provided it achieves the above parameters and the soluble salt concentration is 5 dS/m or less and man made inert physical contaminants are less than 1% dry weight basis and meets the AS4454-2003 definition for a ‘process to further reduce pathogens’ (PFRP), with the following additions:

(i) Urea 600g/cu,m;

(ii) Sulphate of Iron 500g/cu.m; and

(iii) Dolomite or Magrilime 500g/cu.m.

(iv) Sufficient water to dampen product.

These additives may be best added in liquid form especially since they must be added early to assist the composting process and if windrowed in remote locations which make mechanical mixing and turning of dry ingredients impractical.

Given these parameters and also limited areas available for separate stockpiling and composting of mulches due to clearing limits required for Endangered Ecological Communities, one solution may be to stockpile in windrows at the bottom and/or tops of cut and fill batters as in figure 5.4 below to facilitate the composting process, mixing and spreading of bushland topsoils;

Page 13: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 243

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |18

Figure 5.4 Suggestions for Windrowing topsoils and mulch for later spreading on batters Final topsoil treatments will be made in consultation with the project soil scientist. The topsoil treatments may include amelioration with compost, lime, gypsum and fertilizer and other parameters as identified in R178.

5.5 T ops oil Applic ation

The following topsoil applications are required for the various landscape types encountered.

Topsoil Treatment 1: For Areas Flatter than 3H:1V (For planting, hydromulching, turfing and grass seeding all areas other than batters).

Rip the subsoil to a depth of 300mm (except within water quality basins and creek edges which should be ripped to 100mm only, and for medians which should be ripped to 200mm). Rip parallel to contours on slopes.

Do not smooth or compact the roughened subsoil surface prior to the application of topsoil.

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |19

Apply A1 horizon topsoil to a minimum depth of;

100mm generally;

100mm for medians;

150mm where feature trees, shrubs and mass plantings occur at intersections, and;

300mm depth between the noise wall and pavement.

Spread the topsoil but do not otherwise smooth or compact the surface. Trim the surface flush with adjacent surfaces.

Apply appropriate hydromulch seed mix or plant. Where pasture grass or native/pasture seeding is to be applied, level, trim and roll to lightly compact.

For tubestock: prepare 150x150x200mm deep hole.

For advanced tree: prepare 400x400x350mm deep hole.

Apply fertiliser at the recommended rates (refer to relevant version of modified specifications R178 and R179).

Install advanced trees/ tubestock and backfill with topsoil to finish flush with ground level.

Apply 75mm mulch to planted areas.

Topsoil Treatment 2: For Areas Steeper than 3H:1V (For hydromulching batters)

Prepare batter sub-base by ripping to a depth of 100mm using the tynes on a swivelling head excavator bucket, or by some other means to form a loosened or roughened surface suitable for the application of topsoil and/or seed. During ripping, mix in any materials required by the soil testing into the upper 100mm layer to the rates specified within the soil testing recommendations and/or as advised by the Project soil scientist or geotechnical advisor. This may include the mixing of gypsum or any other suitable agent to prevent erosion of subsoil, if dispersivity is identified as an issue for the materials on the cut batter faces to be vegetated.

Apply A1 horizon topsoil to a minimum depth of 50mm, but not more than 100mm.

Spread out the topsoil to an even surface but do not otherwise smooth or compact the surface. (topsoil should have been previously ameliorated and any additional materials required by soil testing mixed at the stockpile.)

Provide 'cleatmarks', 'dimples' or horizontal scores so the sub-base surface. This is best achieved by track rolling with an excavator or bulldozer.

Apply appropriate hydromulch seed mix.

For slopes steeper than 2H:1V and up to 1.5H:1V install Jute Mesh as per the specification over final topsoil preparation and prior to hydromulching.

Topsoil Treatment 3: (Bushland Reconstruction and Landscape Rehabilitation Areas Disturbed by Construction Activities)

Where existing topsoil is absent;

Rip the subsoil/subgrade to a depth of 300mm. Where existing road surface occurs, it is to be removed. Avoid ripping within the dripline of established trees. Where A2 horizon is absent, apply A2 Horizon to a depth of 200mm. Apply A1 horizon bushland topsoil to a depth of 100mm. Apply appropriate hydromulch seed mix or planting in accordance with the landscape plans.

Where existing topsoil is present;

Assess whether there may be seedling regeneration in the area. In such cases, the landscape restoration officer may take no immediate action. If no germination can be observed, Rip the topsoil to a depth of 300mm. Avoid ripping within the dripline of established trees. Apply composted site mulch to the amount as directed by the Alliance soil scientist to augment the organic matter of the site soil. Apply appropriate hydromulch seed mix or planting in accordance with the landscape plans. .

Where existing topsoil and grass or other vegetative cover is also present ;

Page 14: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )244

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |20

Bushland reconstruction in this situation will involve the planting of individual provenance trees mulched and staked to provide a quick landscape effect, and facilitate the reintroduction of specific desirable species.

75mm mulch is to be applied to all planted areas whether group planting or individual tree planting. Individually planted trees will receive 1mx1mx75mm of mulch per tree. Do not apply mulch to areas below water lines. All tubestock shrubs and trees are to be staked with a marker stake as per the planting schedules.

5.6 C over C rop

A cover crop of fast growing annual grasses is to be applied to all disturbed areas of the site. The purpose of the cover crop application is to stabilise the surface material, particularly batters, and to provide an effective barrier to erosion.

Depending upon programming and construction staging, the cover crop may be applied separately or in conjunction with the final native seed mix.

For pasture grass only mixes, the seed of couch and cover crop are best applied simultaneously.

Should the seeding fail at any time it can be reapplied until it establishes.

Cover crop seeding will also be used to minimise erosion and weed establishment on topsoil stockpiles.

The generally accepted rate used by the RTA for cover crops is 65kg/ha. However given the greater emphasis on stockpile procedures and the corresponding likelihood of soil-stored seed, we have reduced this rate to 30kg/ha in order to improve conditions for germination of soil stored seed and native seed applied with cover crop.

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |21

6 AR E AS OF S P E C IAL C ONS IDE R AT ION

The following descriptions provide additional clarification on treatments for specific areas of the project.

6.1 F auna C ros s ings

Other than the Allandale Quarry property access which doubles as a fauna crossing, all fauna crossings (not including arboreal crossings) follow creeklines in crossing the expressway and utilize reinforced concrete box culvert drainage structures. Therefore the landscaping for these areas requires careful consideration to prevent damage from flooding as well as to assist fauna in using the crossings. The fauna underpasses comply with the requirements of Appendix 4. (These requirements include plantings to attract fauna, allowing unobstructed views to, and through the underpass, and strategic tree plantings for fauna refuge). The creeks crossed by the expressway are generally intermittent and respond to seasonal rains.

Measures to assist the landscape establishment include:

Organic fibre mesh pinned to 2H:1V max embankments over 50-100mm depth of additional topsoil through which long stem tubestock or regular tubestock macrophytes and tussocks are planted. The mesh is to cover the embankment to the top of the channel or to the extent of disturbed ground.

Site rocks of various size from 500-1000mm in natural formation to assist holding down mesh and for scour protection where the new work interfaces with the existing creek channel (This treatment is for zones beyond scour protection as described in the drainage package).

Beyond the zone of normal high water begins the typical landscape zone of trees shrubs and groundcovers with 50-100mm additional topsoil if required and 75mm mulch if planted.

Sugar Cane mulch is used in place of site-won tub-ground mulch in the proximity of riparian zones to prevent tannins from leaching into the waterways.

Central Hunter Riparian Forest vegetation community species occur in all riparian zones and will typically include plantings of CHRF trees, CHRF shrubs and planting of macrophytes and tussocks at the interface between the existing creek and culvert with species including: Allocasuarina littoralis, Casuarina glauca, Angophora floribunda, Eucalyptus tereticornis, and Melaleuca decora, shrubs such as Callistemon linearis, Melaleuca nodosa and Leptospernum polygalifolium and, macrophytes and tussocks such as Dianella, Lomandra, Fimbrystilis, Gahnia, Lepidosperma, Schoenus and Themeda.

Fauna escape poles are located on the embankment out of the main channel and approx. 2 metres from the end of the headwall. A second pole is to be provided where existing trees are more than 10 metres from the first pole.

6.2 Water Quality B as ins and V egetated Drainage C hannels

During the 85% design phase, the landscape design for water quality basins accommodated their transferall from “for construction temporary” basins to permanent basins. Water quality basins were designed to be permanently full, therefore the inundated zone of the basin was not to be planted as they may have held water at the time of planting and in most cases would have been too deep for planting (typically 2 metres). However in extended dry periods they may have become dry through leakage and evaporation. Therefore by planting only a percentage of the perimeter of the inundated zone where the highest fluctuations in water level would have occurred, the design anticipated opportunistic migration of sedges into the deeper levels as suits individual species.

However since that time it has been recognised that in order to achieve water quality targets in the initial stages following construction, that topsoiling and planting will be required throughout the basin. It is also recognised that basins must be pumped clean following construction and therefore the planting may proceed following this procedure. The 100% landscape plans document this additional planting.

Page 15: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 245

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |22

All basin plantings are endemic sedges, macrophytes and grasses.

Water Quality basins are to be prepared and planted as follows;

Topsoiling will occur on the basin embankments from the maximum water level to the permanent water level.

Ripping internal batters and floor to 100mm depth.

Applying 50-100mm topsoil on inner embankments, and 50mm on basin floor

Laying and pinning organic fibre mesh over the embankment topsoil.

Cover cropping of entire topsoiled area.

Planting of tubestock macrophytes, sedges and tussocks throughout. 75mm mulch over organic fibre mesh to the extent of the maximum water only. No mulch within inundated zone.

The 1-3m wide access grassed crest and outer embankments of basins will be seeded with native or pasture grasses. In some instances outer embankments are seeded with native shrubs.

Figure 6.1 Water Quality Basin Landscape Section

Figure 6.1 Water Quality Basin Landscape Section showing margin zone planting Spill containment basins are similarly planted. Should a spill occur, the topsoiling and planting within the basin will be stripped out and the basin re-prepared with topsoil and planting.

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |23

For Maintenance of WQB refer to the HEX Landscape Maintenance Plan (Currently in Draft form only).

6.3 S c our P rotec tion

The requirement for at least 75% vegetative cover beneath bridges over creeks (excluding the width of the creek bed) may necessitate either planting directly into the spaces between scour protection rocks or covering scour protection with 300mm depth of topsoil to enable planting. Planting is with appropriate locally endemic species to encourage fauna use. Details have been provided in the 100% landscape drawings (refer drawing details, HEX-LS-20-D805, D811 & D812).

6.4 L ands c ape Medians

Medians throughout the western section of the Hunter Expressway are 12m wide. This leaves 8300mm of landscaped zone. The design takes into consideration the road profile and drainage, surrounding landscape context, ease of maintenance, sightlines and headlight glare.

Where the alignment passes through sensitive vegetation communities, grasses used in the median are native, and where the alignment passes through paddock landscape the median grasses are exotic pasture grasses. Frangible shrubs where they occur are confined to a 4.3m wide strip with a 2 or 4m wide native or exotic mowing strip each side. Where driver sightlines conflict with the median shrub planting and shrub hydromulching, the landscape plans have been modified to ensure no shrub planting occurs within the sightlines.

Shrub planting in medians are selected from the vegetation community through which the alignment passes.

The Native grass mix contains sedges which in median swales are anticipated to predominate.

6.5 S lopes E xceeding 2H: 1V

Slopes exceeding 2H:1V (generally where retaining walls or rock cuts transition to slopes) will be prepared as for topsoil treatment 2 and with 50mm depth topsoil under pinned organic fibre mesh before seeding with the appropriate hydromulch mix. Where pinning is not possible due to rock beneath, the mesh should be extended to natural ground and “trenched as per the detail shown in the landscape plans.

6.6 Advanc ed tree planting

The 100% design incorporates 1516 advanced tree plantings of 35 litre stock and 130 Olive “Swan Hill” as 50 litre stock at the Kurri Kurri and Branxton interchanges and the rest area for feature/marker planting.

6.7 Maintenanc e and Monitoring

All HEX landscaping works will be monitored and maintained by a suitably qualified landscape specialist for a period as specified in R178 and R179.

Any required remediation measure(s) will be implemented to maintain landscaping works as required by Appendix 15 of the SWTC.

A Landscaping Maintenance Plan (LMP), detailing all landscape maintenance actions for the Landscaping Maintenance, will be prepared as a part of the Detailed Design Documentation with the final document available with the IFC documentation.

The landscaping will be cost effective; minimise ongoing maintenance requirements and utilise native species, dense planting, bold simple planting designs and rapid planting establishment.

6.8 L ong B atters

In agreement with the RTA, short benches have been removed where the second batter slope was considered too short to warrant the inclusion of benching. It is not anticipated that special landscape treatments are required other

Page 16: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )246

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |24

than the inclusion of Jute Mesh to the extra length of batter to counter possible increased erosive potential. This will be documented in the IFC design.

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |25

7 DE S IG N INT E G R AT ION

7.1 K ey Interfac es

In the preparation of the landscape design and topsoil strategy the following interfaces have taken place:

Regular interface with the RTA urban, landscape and environment advisors and peer review.

Discussion with DECC and Lands Department via RTA interface officers.

Regular design meetings with DJV disciplines especially drainage and highway design and the DJV Environmental Representatives.

Regular discussion and feedback sessions with construction team.

Interface with cost estimators.

Community Consultation (Focus Group Presentation 110504 Kurri Kurri TAFE)

Utilities for Clearances to underground and overhead easements including utility furniture.

7.1.1 R oad Alignments and E arthworks

The landscape has been designed to 100% using the 100% road design model. Weekly co-ordination meeting have ensured that the landscape interfaces satisfactorily with this version of the design. This interface includes the impact of vegetation on driver sightlines, road furniture, and the treatment for long batters.

7.1.2 Drainage

There are several drainage culvert structures and fauna underpasses crossing the main alignment under noise walls. Special noise wall foundation details have been provided to avoid clashes with underground drainage and culvert structures. Refer to the Structural Design Report.

Surface water drainage where required in front of the noise walls is collected by pits and piped to the back of the noise walls in order to maintain noise attenuation.

7.1.3 P avements

The landscape design has taken into consideration the depth of topsoil and ripping depths in proximity to pavements, particularly in medians. Setbacks from pavement edges have been observed.

7.1.4 G eotechnical

Geotechnical interfaces will be ongoing and focus on the presence of rock batters, coal seams and acid sulphate rock and their impact upon landscape treatments.

7.1.5 Utilities

The detailed landscape plan will be provided to TransGrid, Energy Australia and Jemena and any other relevant service providers for approval before work commences. A 100% co-ordination lot will be used to check vegetation against utilities in respect of power, water, gas, Telstra and private services.

7.1.6 P roperty Ac ces s and Adjus tments

The landscape design includes setbacks and clearances from the various fencing used throughout the project. Design packages are being reviewed by the urban and landscape team prior to release and the interface elements relevant to landscape are checked off as part of the QA system.

Page 17: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 247

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |26

7.1.7 E nvironment

Interfaces with environmental consent conditions have been checked at all phases of the landscape design especially in respect of Appendices 4,5,15 and other requirements of the SWTC. Further interfaces with the respective environmental authorities are anticipated prior to IFC design.

7.1.8 S ignage and R oads ide F urniture

The landscape has been setback to allow for the required deflection from the wire rope safety barriers. The noise walls act and replace the requirements for fauna fences where required as detailed in the Property Works and Fencing Design Lot R6. Trees will not obstruct visibility to road signage.

7.1.9 Urban Des ign

The design of the landscape have been developed with regular input from our Urban designers and the RTA and maintains compliance with Appendix 15 of the SWTC. Noise walls have been integrated with the landscape design in all instances.

7.2 C hanges from P reliminary Detailed Des ign S ubmis s ion

Planting of groundcovers at intersection has been reduced considerably since the 15% design to improve maintenance requirements of these areas.

The Design for Branxton interchange has changed considerably to improve maintenance but also to produce a stronger more legible design for the long term.

The western extents of the expressway have been extended and are now regarded as zone 4. This zone has not been included in this issue.

There has been some rationalisation of the extents of vegetation communities to ensure that species are returned to environments on the new formation that are suited to the subject species. For instance in order to prevent riparian species being placed back on batters.

Hydromulching quantities for native plants per hectare have been reduced to 8kg/ha and cover crops have been reduced to 30kg/ha.

7.3 C hanges from F inal Des ign S ubmis s ion

Seed Collection. Since issue of the 85% design, the RTA have engaged a seed consultant (Geoff Williams, Diversity Seeds) to advise on the seed procurement process, criteria for seed collection zones and quality assurance for seed sourcing. The hydromulching schedules (and hence seed collection schedules) have been adjusted in consultation with the seed consultant to adjust the list according to recommended species, preferred supplementary species and non-preferred supplementary species. Species composition remains largely intact and total quantity of seed remains the same, however quantities of some individual species have changed according to current availability.

Shrub and Tree Planting. Shrub numbers have been reduced in some areas (notably at the Kurri Kurri & Branxton interchange ellipses) to allow for a greater quantity of tubestock tree planting. It was considered that tree planting quantities in some locations was too few, so smaller groups have been aggregated and each group doubled in number. Tubestock tree planting has therefore approximately doubled, while shrub numbers have been reduced by approx.12,300

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |27

Basins. In accordance with the Hunter Alliance, the basin floors are now planted with a lower density (1/m2 as opposed to 3/m2). Select species have been identified that will thrive in potential constant inundation. In the earlier design phases, operational water quality basins were to be planted at the margin zones between the permanent and maximum water levels in anticipation of opportunistic migration by macrophytes to deeper water levels. Also it was anticipated that basins may be full at the time of planting as they are generally serving as “for construction basins”, and therefore difficult to plant. However since that time it has been recognised that in order to achieve water quality targets in the initial stages following construction, that topsoiling and planting will be required throughout the basin. It is also recognised that basins must be pumped clean following construction and therefore the planting may proceed following this procedure. The 100% landscape plans document this additional planting.

Anvil Creek & Swamp Creek Bridges . Scour protection and planting details have been provided at these bridges to include planting of 75% of the space under the bridges.

Alignment Changes. Many minor changes to the alignment have caused a corresponding change to the landscape plans. The landscape plans have also been updated to ensure no trees are within the sight lines and the barrier deflection zones of vehicle control barriers.

Median Planting. The Callistemon salignus has been changed to Callistemon linearis in the median planting zones as a more frangible species.

Northbound Rest Area. On the western side of this rest area, the landscaping and toilet infiltration trench will clash with Cut 28. This will need to be updated in the IFC drawings. Localised topsoil mounding will needed around the trees, and the infiltration trench will need to be relocated outside of the cut.

Other Changes. In response to local residents’ concerns during the consultation process, 200mm pot trees have been added to help screen residents and businesses from the Expressway. In areas where trees were not achievable, shrubs have been specified.

7.4 Ongoing and/or Outs tanding Is s ues

Ongoing and outstanding issues include:

The final extent of clearing limits

Cut 28 on the western side of the Northbound Rest Area

The location of areas to be disturbed by construction needs to be provided in order for a landscape rehabilitation seed schedule to be developed.

Page 18: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )248

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |28

8 C ONS T R UC T ION C ONS IDE R AT IONS

8.1 K ey C ons truc tability Is s ues

As part of the design development process, the designers have been liaising with the construction team to ensure that the design solution is practical and has been optimised for construction. A key constructability issue for the landscape design is the implementation of direct return of topsoil

The design submission process includes reviews by Abigroup. This allows the construction team to review and provide input into the documented design process. This review and input will occur as part of the design development process through formal and informal meetings. Abigroup will conduct a final detailed constructability review at the Substantial Detailed Design submission. Following this review, detailed construction safety plans and procedures will be developed and documented in the Contractor’s Construction Plan. The landscape has been designed for ease of construction. In terms of safety during construction, normal Occupational Health and Safety (OH&S) considerations will apply at the site.

8.2 C ons truc tability and S taging

Landscaping works will be staged in co-ordination with construction and will be, where practicable, implemented as each construction section is completed. Landscaping of the road reserve will precede construction where practicable.

.

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |29

9 S AF E T Y IN DE S IG N

9.1 K ey S afety Is s ues

The key safety issues that were investigated during the design process included:

Safety of road maintenance workers

Safety of workers installing the landscape design

Pedestrian and cyclist safety

Public use when near completion

Passive surveillance

Vandalism and violence

9.2 S afety in Des ign

A Safety in Design workshop was held on the 10 December 2010 following the 15% concept design issue to assess the design elements and maintenance of the rest areas. The outcome of this workshop was a schedule of risk assessments and mitigation strategies for the rest area. A final SIDs workshop was held on 20 May 2011. The results of this workshop will be included in the IFC Design report.

Page 19: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 249

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |30

10 DUR AB IL IT Y

The landscape design has incorporated the ‘Design life’ as defined in the SWTC Section 5.5 as the period over which an asset must perform its intended function, without replacement, refurbishment or significant maintenance.

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |31

11 DE S IG N C OMP L IANC E

The Landscape design has been designed in accordance with the requirements of Appendix 15 of the SWTC. Refer to Environmental Compliance checklist.

Page 20: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )250

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Page 21: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 251

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Appendix A LIST OF DRAWINGS

HEX-LS-20-D001 Cover Sheet HEX-LS-23-D145 Zone 3 - planting plan sheet 45

HEX-LS-20-D002 Sheet layout HEX-LS-23-D146 Zone 3 - planting plan sheet 46

HEX-LS-20-D003 Drawing Index & Notes HEX-LS-23-D147 Zone 3 - planting plan sheet 47

HEX-LS-21-D101 Zone 1 - planting plan sheet 1 HEX-LS-23-D148 Zone 3 - planting plan sheet 48

HEX-LS-21-D102 Zone 1 - planting plan sheet 2 HEX-LS-23-D149 Zone 3 - planting plan sheet 49

HEX-LS-21-D103 Zone 1 - planting plan sheet 3 HEX-LS-23-D150 Zone 3 - planting plan sheet 50

HEX-LS-21-D104 Zone 1 - planting plan sheet 4 HEX-LS-23-D151 Zone 3 - planting plan sheet 51

HEX-LS-21-D105 Zone 1 - planting plan sheet 5 HEX-LS-23-D152 Zone 3 - planting plan sheet 52

HEX-LS-21-D106 Zone 1 - planting plan sheet 6 HEX-LS-21-D156 Zone 1 - planting plan sheet 56

HEX-LS-21-D107 Zone 1 - planting plan sheet 7 HEX-LS-21-D157 Zone 1 - planting plan sheet 57

HEX-LS-21-D108 Zone 1 - planting plan sheet 8 HEX-LS-21-D158 Zone 1 - planting plan sheet 58

HEX-LS-21-D109 Zone 1 - planting plan sheet 9 HEX-LS-21-D159 Zone 1 - planting plan sheet 59

HEX-LS-21-D110 Zone 1 - planting plan sheet 10 HEX-LS-21-D160 Zone 1 - planting plan sheet 60

HEX-LS-21-D111 Zone 1 - planting plan sheet 11 HEX-LS-21-D161 Zone 1 - planting plan sheet 61

HEX-LS-21-D112 Zone 1 - planting plan sheet 12 HEX-LS-22-D162 Zone 2 - planting plan sheet 62

HEX-LS-21-D113 Zone 1 - planting plan sheet 13 HEX-LS-22-D163 Zone 2 - planting plan sheet 63

HEX-LS-21-D114 Zone 1 - planting plan sheet 14 HEX-LS-22-D164 Zone 2 - planting plan sheet 64

HEX-LS-21-D115 Zone 1 - planting plan sheet 15 HEX-LS-23-D165 Zone 3 - planting plan sheet 65

HEX-LS-21-D116 Zone 1 - planting plan sheet 16 HEX-LS-23-D166 Zone 3 - planting plan sheet 66

HEX-LS-21-D117 Zone 1 - planting plan sheet 17 HEX-LS-20-D801 Typical Sections - Landscape treatment for medians

HEX-LS-21-D118 Zone 1 - planting plan sheet 18 HEX-LS-20-D802 Typical Sections - Landscape treatment for verge

HEX-LS-21-D119 Zone 1 - planting plan sheet 19 HEX-LS-20-D803 Typical Landscape Details

HEX-LS-22-D120 Zone 1 - planting plan sheet 20 HEX-LS-20-D804 Typical Landscape Details

HEX-LS-22-D121 Zone 2 - planting plan sheet 21 HEX-LS-20-D805 Typical Fauna Underpass Detail

HEX-LS-22-D122 Zone 2 - planting plan sheet 22 HEX-LS-20-D806 Typical Furrow Detail

HEX-LS-22-D123 Zone 2 - planting plan sheet 23 HEX-LS-20-D807 Typical Landscape Treatment at Noise Wall

HEX-LS-22-D124 Zone 2 - planting plan sheet 24 HEX-LS-20-D808 Typical Basin - Sheet 1

HEX-LS-22-D125 Zone 2 - planting plan sheet 25 HEX-LS-20-D809 Typical Basin - Sheet 2

HEX-LS-22-D126 Zone 2 - planting plan sheet 26 HEX-LS-20-D810 Typical Landscape Detail - Creek Realignment

HEX-LS-22-D127 Zone 2 - planting plan sheet 27 HEX-LS-21-D811 Detail Planting Plan - Bridge Over Swamp Creek

HEX-LS-22-D128 Zone 2 - planting plan sheet 28 HEX-LS-21-D812 Detail Planting Plan - Bridge Over Anvil Creek

HEX-LS-22-D129 Zone 2 - planting plan sheet 29 HEX-LS-20-D901 Landscape Planting Schedule - Sheet 1

HEX-LS-22-D130 Zone 2 - planting plan sheet 30 HEX-LS-20-D902 Landscape Planting Schedule - Sheet 2

HEX-LS-22-D131 Zone 2 - planting plan sheet 31 HEX-LS-20-D903 Landscape Planting Schedule - Sheet 3

HEX-LS-22-D132 Zone 2 - planting plan sheet 32 HEX-LS-20-D904 Landscape Planting Schedule - Sheet 4

HEX-LS-22-D133 Zone 2 - planting plan sheet 33 HEX-LS-20-D905 Landscape Planting Schedule - Sheet 5

HEX-LS-22-D134 Zone 2 - planting plan sheet 34 HEX-LS-20-D906 Landscape Planting Schedule - Sheet 6

HEX-LS-22-D135 Zone 2 - planting plan sheet 35 HEX-LS-20-D907 Landscape Planting Schedule - Sheet 7

HEX-LS-22-D136 Zone 2 - planting plan sheet 36 HEX-LS-20-D908 Landscape Planting Schedule - Sheet 8

HEX-LS-22-D137 Zone 2 - planting plan sheet 37 HEX-LS-20-D909 Landscape Planting Schedule - Sheet 9

HEX-LS-22-D138 Zone 2 - planting plan sheet 38 HEX-LS-20-D910 Landscape Planting Schedule - Sheet 10

HEX-LS-22-D139 Zone 2 - planting plan sheet 39 HEX-LS-20-D911 Landscape Planting Schedule - Sheet 11

HEX-LS-22-D140 Zone 2 - planting plan sheet 40 HEX-LS-20-D912 Landscape Planting Schedule - Sheet 12

HEX-LS-22-D141 Zone 2 - planting plan sheet 41 HEX-LS-20-D913 Landscape Planting Schedule - Sheet 13

HEX-LS-23-D142 Zone 3 - planting plan sheet 42

HEX-LS-23-D143 Zone 3 - planting plan sheet 43

Page 22: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )252

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Appendix B RESPONSES TO PROJECT VERIFIER COMMENTS

by Noel Corkery

1. Introduction

The section of Hunter Expressway between interchanges at Kurri Kurri and Branxton will cover a distance of 27km. Abigroup Contractors Pty Ltd is to develop this section under a Design and Construct (D&C) contract with the Roads and Traffic Authority of New South Wales (RTA).

Davis Langdon (DL) has been engaged by the RTA and Abigroup as Project Verifier for design and construction of the Expressway. Corkery Consulting has been engaged by DL to carry out verification of the urban and landscape design components of the project, with Noel Corkery as the Nominated Landscape Architect responsible for the verification.

This Report presents the outcomes of the verification process for the 15% documentation, which assesses compliance of the urban and landscape design documentation with the relevant performance criteria.

2. Design Responsibility

HBO+EMTB are engaged by Abigroup to carry out design and documentation of the landscape and urban components of the project. The initial landscape and urban design concept design was prepared for RTA by Kiah Infranet in May 2007 and presented in an Urban and Landscape Design Report.

3. Verification Process & Criteria

Relevant documents have been reviewed to identify issues to be addressed and criteria to be applied through the verification process. Documents reviewed included:

Hunter Expressway Scope of Works and Technical Criteria issued by RTA:

» Appendix 4, Additional Environmental Requirements

» Appendix 15, Urban Design Performance and Design Requirements

» Appendix 17, Rest Area Criteria

» Appendix 31, Contractor’s Urban & Landscape Design

General Urban & Landscape Design Part 1 General Urban & Landscape Design Part 2 Earthworks, Landform & Slope Stabilisation Bridges Landscape Design Noise Barriers & Headlight Screens

Documents prepared by HBO+EMTB in March 2010, which include:

» Planting and Seeding Plans (20 drawings).

» Topsoil Plans (20 drawings).

» Planting and Seeding Schedules (7).

» Landscape Management Report and Maintenance Requirements.

'Beyond the Pavement - RTA Urban Design Policy, Procedures and Design Principles' (2009)

Bridge Aesthetics: Design guidelines to improve the appearance of bridges in NSW, RTA, July 2003.

Shotcrete Design Guidelines: Design guidelines to avoid, minimise and improve the appearance of shotcrete, RTA, June 2005.

Noise wall design guideline: Design guidelines to improve the appearance of noise walls in NSW, RTA , February 2007

Landscape Guideline: Landscape design and maintenance guidelines RTA, June 2008.

4. Summary

Results of the verification confirm that the urban and landscape design documentation generally complies with the relevant criteria as set out in the Hunter Expressway Scope of Works and Technical Criteria issued by RTA and other documents listed in Section 3 above.

However, a number of issues have been identified where the design is inconsistent with the relevant requirements. In some situations the variation has resulted from the more detailed design process that responds to other requirement of the road design in respect of engineering performance and safety requirements. Also, a number of minor noncompliance issues relate to inadequate detail produced for the 15% issue. In these cases it is noted that although the level of information is what would reasonably be expected for 15% issue, further clarification will be required at 85% issue to confirm compliance.

Page 23: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 253

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

A key issue identified is the heavy reliance on hydro-mulching to establish vegetation on the 1:2 slopes and along substantial section of the medians. This will require substantial soil management and subsequent maintenance until vegetation is established. A comprehensive specification and contractual arrangements will be required at the 85% issue to ensure the application of the required level of expertise successfully implement the works. Contractual arrangements also need to be in place to ensure repair works are carried out should there be failures with the proposed hydro-mulching process. The non-compliances are listed in the table below together with comments on their significance and recommended measures to address them in the 85% issue.

Hunter Expressway D&CVerification Response Spreadsheet

Stage:Lot: U6 85%

Description: Urban and Landscape Design Sub Plan prepared by HBO+EMTB #N/ADate Documents Issued: 4/02/2011

Date Documents Received: 5/02/2100 # Key:

Open -item to be resolved

Organisation: Corkery Consulting DJV ResponseClosed -

item resolved

PV Response

Reviewer: Noel Corkery Response By: Response By:Checked By: Terry Boyle Response Date: Response Date:Review Date: 8/07/2011 Response Reviewed By: Response Reviewed By:

Lots Response Reference: Response Reference:

Documents Reviewed Detailed on Transmittals:

Urban and Landscape Design Sub Plan incorporating Planting & Seeding Plans

Item Document Reference Compliance* PV Comments / Conditions DJV Response PV Response PV Status#

Appendix 41 Cross section dimensions (including separation and clearances) - Where provided in Appendix 9 of the

Scope of Works and Technical Criteria, they must be used in the design of the Project Works. 85% Preliminary Detail Design Report Appendix A: Drawings Hex-LS-20-D801 - Hex-LS-20-D802 & Appendix 9

Y Complies. Cross section dimensions provided in Appendix 9 are used in the landscape treatment cross sections

C

2 Culverts and Underpasses - dimensions of required for fauna or fish passage identified in the other Environmental Documents are minimum dimensions and must not be reduced.

85% Preliminary Detail Design Report 6.1 & Typical Fauna Underpass Hex-LS-20-D805

Y Complies. Dimensions meet minimum requirements. C

Page 24: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )254

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

3 Bridges - lengths, locations and positioning of bridge crossings of waterways must: (a) minimise intrusion into and impacts on the creeks or rivers being crossed; (b) minimise intrusion into and impacts on the creek banks and river banks, sensitive environments and riparian zones; (c) maximise available space for fauna movements and as a minimum provide an effective dry passage width for fauna movement of 3 metres;(d) avoid piers within waterways and minimise impacts on waterways; and(e) maximise natural light under bridges.Bridge Minimum Overall Length (between front faces of abutments)1Swamp Creek twin bridges (on Main Carriageways) 60m Black Creek twin bridges (on Main Carriageways) 105m Anvil Creek 35m(on connection between Branxton Interchange and the New England Highway)

B.7.1 BR04 Twin Bridges over Swamp Creek B.7.2 BR21 Bridge over Anvil Creek on Connection to New England Hwy B.7.3 BR25 Twin Bridges over Black Creek

Y Complied at 15% C

4 Bridges - Minimum lengths of crossings of waterways, which act as fauna underpasses, must be in accordance with Table 4.1

B.7.1 BR04 Twin Bridges over Swamp Creek B.7.2 BR21 Bridge over Anvil Creek on Connection to New England Hwy BR25 Twin Bridges over Black Creek

Y Complied at 15% C

5 Bridges - must comply with the requirements of Clause 4.7 of this Appendix. See below

6 Native Vegetation Clearing - the Contractor must not clear more than 108 hectares of native vegetation located within the boundaries determined using Lower Hunter and Central Coast Regional Environmental Management Strategy (LHCCREMS) native vegetation mapping by Biosis Research in 2005 and identified in Figure 14.1 and the electronic file LHCCREMS080206AEP.dxf in Appendix 14 and must comply with monitoring and reporting requirements in section 14.3.2 of Appendix 14.

85% Preliminary Detail Design Report , 4 Landscape Rehabilitation & Appendix A

N Design Report provides chainage of areas to be cleared of native vegetation and areas are indicated on the landscape plans however area measurements need to be provided to allow verification

The 85% and 100% drawings show native vegetation clearing limits. Clearing is updated on a regular basis by the design team to work towards achieving the 108 Ha limit. At 100% design the clearing area is 111.6Ha. However this may be adjusted as the design progresses.

7 Clearing of native vegetation - for the Project Works must include, as a minimum, areas adjacent to the Project Works determined using the following clearing widths and the as constructed locations of the Project Works:: (i) 0.5 m clearing width from the back of all drains and sedimentation basins; (ii) 1.0 m clearing width from the edge of cut and fill earthworks where no drains or fauna fencing is present; (iii) 2.5 m clearing width from the toe of fill batters where fauna fencing is present; (iv) 4.5 m clearing width from the top of cut batters where fauna fencing is present; (v) 1.0 m clearing width from the back of noise walls without an adjacent maintenance access track; and (vi) 2.5 m clearing width from the back of noise walls with an adjacent maintenance access track.

No reference in 85% Preliminary Detail Design Report

N Inadequate information in 85% documents. Relevant information needs to be provided in 100% documents to allow verification

The 85% and 100% drawings show native vegetation clearing limits which account for the clearance distances listed in the requirement.

8 Boundary fencing clearing - not required in areas of Endangered Ecological Communities species, except as may be required to undertake the physical activities associated with the erection of boundary fencing that may include slashing of grass. Where boundary fencing cannot be installed without clearing areas of Endangered Ecological Communities species, this clearing area must be included in the total area of native vegetation that is being cleared for comparison with the clearing limit of 108 hectares of native vegetation. Boundary fencing must be installed using fence installation techniques that minimise disturbance to vegetation by using light plant equivalent to dingo mini diggers.

No reference in 85% Preliminary Detail Design Report

N Inadequate information to verify from 85% documents. A plan together with schedule of areas to be cleared are required to allow verification

Boundary fences have recently been installed by the RTA in EEC areas. (Boundary fencing is not part of the landscape package scope. Fencing is part of the Property Works Package which states that "Fencing Requirements are in accordance with the SWTC Appendix 28")

9 Biodiversity Protection Provisions - the Contractor must implement the biodiversity protection provisions nominated in Appendix 5.

; O To be covered by separate ecological review C

Page 25: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 255

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

10 Fauna Underpasses (a) Notwithstanding the requirements of other Environmental Documents, where fauna access is required through or under structures, the access provided must not include permanent waterway or spill through abutment batters steeper than 10:1 H:V in cross section. (b) Notwithstanding the requirements of other Environmental Documents, fauna underpass structures must be provided, as a minimum, at the locations and in accordance with the requirements detailed in Table 4.2. (c) Fauna underpasses must comply with the fauna underpass requirements in Appendix 5 and the Contractor must consult with the Department of Environment, Climate Change and Water (DECCW) and comply with its requirements in relation to the location, design, installation and landscaping of fauna underpasses. Location Chainage Purpose of structure Type of Structure Minimum Dimensions Tributary of Black Waterholes Creek 17100 Drainage and fauna underpass Reinforced concrete box culvert Width - 3 cells Height - 2.4m Black Waterholes Creek 18320 Drainage and fauna underpass Reinforced concrete box culvert Width - 3 cells Height - 2.4 m Sawyers Gully Creek 22300 Drainage and fauna underpass Reinforced concrete box culvert Width - 4 cells Height - 2.4 m Tributary of Sawyers Gully Creek 23540 Drainage and fauna underpass Reinforced concrete box culvert Width - 3 cells Height - 2.4 m Tributary of Sawyers Gully Creek 23550 Property access and fauna underpass Reinforced concrete box culvert Width - 3.6 m Height - 3.6 m Bishops Creek 24450 Drainage and fauna underpass Reinforced concrete box culvert Width - 2 cells Height - 2.4 m Allandale Quarry property access track 24980 Property access and fauna underpass Bridge Horizontal clearance – 11.0m Vertical Clearance – 4.6m Watercourse 30870 Drainage and fauna underpass Reinforced concrete box culvert Width - 2.4m Height - 2.4 m Note 1- the minimum cell width is 2.4 m. Note 2 - the horizontal clearance of the Allandale Quarry property access track is the minimum clear horizontal opening of the Allandale Quarry access twin bridges. Note 3 -the vertical clearance of the Allandale Quarry property access track is the minimum clear vertical opening from the existing access track level to the underside of the Allandale Quarry access twin bridges.

B (ii) page 33 Other Bridges & Structures; BR06, BR07, BR09, BR10, BR11, BR12, BR13

Y Complied at 15% C

11 Fauna fencing - must be provided, as a minimum, at the locations and for the lengths adjacent to the Main Carriageways as detailed in Table 4.3. Sawyers Gully Creek 22000 - 22600 Bishops Creek 24300 - 24600 Tributary of Anvil Creek near Greta Camp 28400 - 28600 West of Camp Road 30200 - 30500 Watercourse West of Camp Road 30700 - 31000 West of Tuckers Lane 33000 - 33500

D2 14 & Planting & Seedling Plans Figures D1.1 to D1.66

Y Complied at 15% C

12 Nest Boxes - must comply with the requirements of Appendix 14 for the provision, installation, monitoring and maintenance

N/A To be covered in the Ecological Review C

13 Weed Management - the Contractor must comply with the requirements of Appendix 14 for the development of a strategy for weed management and the implementation of procedures to control and manage weeds during the performance of the Contractor’s Work and the Landscaping Maintenance

85% Preliminary Detail Design Report & Appendix 14 & Draft specification

N Requirements of App.14.4 Weed Management not noted in 85% documents. LMP with relevant clauses needs to be provided in the LMP

A Lanscape Maintenance Plan is provided with the 100% documentation which includes weed management

C

Page 26: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )256

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

14 Landscape Rehabilitation - the Contractor must comply the requirements of Appendix 15. 85% Preliminary Detail Design Report

M Noted as generally complying at 15%. The following variances are explained in the 85% documents;- 1:2 batter slopes to minimise footprint - treatment of drainage channelsThe following variances require explanation;- 5.4 (f) geometric form of water treatment ponds

Water quality pond shape in most instances, is also driven by the requirement to reduce clearing. The most economical shape has been chosen in most instances. Ponds under elecricity easments were determined to be more appropriate with a geometric shape than an informal shape, given the linear nature of the clearing.

15 Compensatory Habitat - the Contractor must not make changes to the Project Works, the Temporary Works or the Landscaping Maintenance that increases the requirements for the provision of compensatory habitat required by condition 49.

N/A To be addressed in the Ecological Review C

Appendix 151 Urban Design - The Project Works must;

(i) be sensitive and responsive to the landform and character of the landscape context of the Project Works and the surrounding area;(ii) provide a visually attractive artefact in the landscape; and(iii) provide a road corridor that is well vegetated, with planting which matches the character of the local landscape and adjoining vegetation communities as closely as possible, and retains good views to the surrounding landscape.

Urban & Landscape Design Sub Plan (15%) & 85% Preliminary Detail Design Report

Y Design Report at 85% provides detailed methods for soil preparation and treatment to optimise hydromulching and revegetation success. LMP needs to be provided to check monitoring for achieving outcomes (i),(ii) & (iii)

The LMP is available for review with the 100% landscape package

C

2 Quality of the urban and landscape design - of the road and its elements must be consistent throughout the Project Works. It must also conform to the requirements for safety, cost effectiveness and sustainability as set down in section 1.4 of 'Beyond the Pavement - RTA Urban Design Policy Procedures and Design Principles - 2009'.

Urban & Landscape Design Sub Plan (15%)

Y Complied at 15%. Assessed against 'Beyond the Pavement - RTA Urban Design Policy, Procedures and Design Principles - 2009'

C

3 Urban and landscape designers - The Contractor must include qualified and experienced urban and landscape designers in the design team for the Project Works. The urban and landscape designers must:(i) be registered on RTA’s (Urban Design Services) Category U2 Register of Prequalified Contractors;(ii) be integrated into the design organisation and with all the various design disciplines;(iii) be involved in the ongoing development, detailing and finalisation of the urban and landscape design and all its elements;(iv) attend the Construction Site during the construction activities to monitor the implementation and effectiveness of the urban and landscape design; and(v) review and advise on all design issues and modifications affecting the urban and landscape design during the construction period, in consultation with RTA’s Representative.

Urban & Landscape Design Sub Plan (15%)

Y Complied at 15%. The designers HBO+EMPT are listed on the RTA’s Register of Prequalified Contractors under Category U2 (Urban Design Services)

C

4 Urban and landscape design - must be “best urban design practice”, as this requirement is detailed and required by relevant RTA Reference Documents, which promote simple, elegant, cost effective design solutions appropriate to road projects. They also promote durability, sustainability and safety as key characteristics of good design.

Urban & LandscapeDesign Sub Plan (15%)

Y Complied at 15% C

5 Character Zone requirements - The Contractor’s urban and landscape design must be consistent with and comply with the urban and landscape designs of the character zone requirements contained in sections 15.12 of this Appendix 15.

D.1 Landscape Planting & Seeding Plans & D.3 Landscape Character Zones

Y Complied at 15% C

6 Detailed urban and landscape design - must comply with:(i) road safety requirements;(ii) OH&S requirements for both construction and maintenance; and(iii) environmental requirements including in relation to flora and fauna, noise and water quality.

85% Preliminary Detail Design Report, Design Development 3.14 & Appendix A Cross sections

Y Complies C

7 Artwork - must not be included in the Contractor’s urban and landscape design. Urban & Landscape Design Sub Plan (15%)

Y Complied at 15% C

Page 27: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 257

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

8 Interpretive techniques – the Contractor must use as described in Section 15.10 of this Appendix 15. D.3 Dlandscape Character Zones

Y Complied at 15% C

15.2 Bridges

9 15.2.1 Requirements for Bridges, Overbridges and Underpasses(a) Bridges must present smooth, clean lines and have a minimum structural depth consistent with their spans and method of construction. The design of the bridges, including the parapets, must address the slenderness ratio of the structures. The bridges for the Project Works must be designed as a consistent family of bridges.

B. Bridges B.5 Bridge Elevations & Sections BR01 to BR25

Y Complied at 15% C

10 (b) Except for haunched or arched bridges, the depth of the bridge superstructure must be constant for all spans on a bridge. B.5 Bridge Elevations &

Sections

Y Complied at 15% C

11 (c) Noise barriers located on bridges must be transparent and shatter proof and be integrated with the design of the bridge as a whole. Transparent noise barriers must be provided with markings / symbols to reduce the instances of bird strikes.

85% Noise Walls Type 6 Sheets A,B,C

Y Noted as complying at 15% & requiring further review. Compliance verified at 85%

C

12 (d) Safety screens located on bridges must be integrated with the design of the bridge as a whole. Post spacing must be designed to have a pleasing and ordered visual relationship with other bridge details, including safety barrier posts, lighting columns and parapet joints.

B.3 and B5 Bridge Elevations and Sections

Y Complied at 15% C

13 (e) Signage must not be located on bridges or overbridges, except for bridge name plates, overpass bridge road names, clearance markers and navigation markers.

B Bridges Introduction & B.5 Bridge Elevation & Sections

Y Complied at 15% C

14 (f) Connections between road and bridge traffic barriers must be neat and simple. B.5 Bridge Elevation and Sections

Y Complied at 15% C

15 (g) Bridge parapets must:(i) be elegant, thin and smooth;(ii) extend parallel to the road surface for the full length of the bridge, with a generous overlap of the bridge abutments;(iii) have outside faces with smooth single plane surfaces, must not contain visible joints or kinks and must be slanted slightly outwards to catch the sunlight, such that the bottom of the parapet is furthest from the centreline of the bridge;(iv) have a top surface that angles towards the road to channel rainwater onto the bridge and minimise staining of the outside face of the parapet;(v) where the parapets are to be constructed using precast concrete units, have the adjoining parapet units installed plumb to ensure that all lines along the parapets are smooth, continuous and parallel to the road surface for the full length of the bridge;(vi) have a bottom surface which overhangs below the underside of the bridge deck slabs (including girder flanges) by a minimum of 50mm;(vii) be sculpted to be self-cleaning: and(viii) be integrated with traffic barriers.

15% Urban & Landscape Design Sub Plan Report, B. Bridges

Y Noted as generally complying at 15%. C

16 (h) Traffic barriers on bridges must consist of a metal two rail and post system mounted on top of a concrete parapet to maximise road user views to the landscape.

B.3 Safety Screens and B.5 Bridge Elevations & Sections

Y Complied at 15% C

17 (i) The bridge deck draining systems must be discreet and concealed from view.Drainage pipes, services and future provisions for services must not be visible except from directly underneath the bridges. The thickness of the bridge deck structure or parapets must not be increased above the minimum that is structurally required to accommodate drainage systems, services and provisions for services.

B.5 Bridge Elevations and Sections

Y Complied at 15% C

18 (j) Where spill through abutments are utilised, abutment treatments must extend 1m beyond the parapet line. Abutment treatments must extend into the horizontal portion of the abutments by 1.5m.

B.7.1 BR04, B.7.2 BR21, B.7.3 BR25

Y Noted as appearing to comply at 15%. C

Page 28: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )258

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

19 (k) Where retaining abutment structures are utilised, they must return back to the alignment to form buttresses. Retaining abutment structures must be finished in concrete panels and must be designed so that the horizontal joints are accentuated to provide strong horizontal banding and the vertical joints are minimised and less accentuated. Abutments must visually relate to other retaining structures.

B.5 Bridge Elevations and Sections

Y Complied at 15% C

20 (l) For bridges that span over the main carriageways of the Hunter Expressway, retaining abutment structures perpendicular to the centrelines of bridges must tilt outwards towards the base of the wall at an angle of no less than 5 degrees from the vertical. Walls parallel to the centrelines of bridges must be recessed a minimum of 500mm by cantilevering the parapet.

B.5.1 BR01 B.5.2 BR02 B.5.3 BR018 B.5.4 BR019 B.5.7 BR03 B.5.8 BR05 B.5.9 BR08 B.5.10 BR014 B.5.11 BR017 B.5.12 BR022 B.4 Abutments No relevant documents at 85%

N 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

C

21 (m) Abutment design must address and accommodate:(i) erosion and measures to reduce the potential for erosion;(ii) fauna corridor access requirements;(iii) fish friendly design requirements; and

B.4 and B.5 Bridge Elevations & Sections No relevant documents at 85%

N 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

The 100% landscape design includes scour protection details and Fauna corridor access requirements.

22 (iv) unless required to be retaining-type abutments, batter slopes and surfacing must be graded flatter than 2:1 to allow plant growth. Where it is not feasible to construct batter slopes flatter than 2:1, they must be finished in a hard surface. Abutment hard surfacing treatments must be designed to be aesthetically pleasing and to reinforce the aesthetics of the Project Works.

B.5 Bridge Elevations and Sections

Y Batters 2:1 or flatter are vegetated. Batters steeper than 1:2 are finished with Gabion Mattresses for scour protection.

C

23 Abutment hard surfacing areas must be edged to reduce future crumbling and to form a neat interface. Other than hard-surfaced abutments, embankments must be vegetated to reduce erosion. Where fauna access is not required under bridges, hard erosion resistant treatments must be applied to the areas which are shaded or are sheltered from rainfall.

B. Bridges and HEX-DW-SB-31-D202 to HEX-SB-

23-D402 inclusive No relevant documents at

85%

N 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

Noted. Only creeks and fauna underpasses have rock protection at 1:1.5. The adjacent earthwork is transitioned into the rock protection on all sides. Vegetative cover abuts this edge on all sides. Re hard erosion treatments for shaded areas under bridges; landscape is also required to cover 70% of the area below bridges which in some cases covers scour (hard surfacing)treatment

24 (n) Exposed shotcrete must not be used around the curtilage of the bridges, unless the location is not visible to road users or surrounding land users.

C4 Shotcrete Minimisation Strategy No relevant documents at 85%

N 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

See Urban Design Report

25 (o) Abutment walls must, wherever possible, utilise natural materials and /or colours which are representative of the structure’s natural setting.

B.4 Abutments Y Complies. Finish nominated is exposed course basalt aggregate with contrasting horizontal rib.

C

26 15.2.2 Bridges Over the Main CarriagewaysBridges must be simple and refined and as similar in appearance to each other as possible. As a minimum, the bridges must meet the following requirements:(a) In the transverse direction to the bridge centre lines, the bridge decks must extend beyond the limits of the substructures, including abutments, so as to avoid staining to the substructures and to produce shadow lines. The designs must incorporate drip lines to the soffits and flanges of the bridges to reduce staining.

B. Bridges and HEX-DW-SB-31-D202 to HEX-SB-23-D402 inclusive & 85% Preliminary Detail Design Report No relevant documents at 85%

N Noted as appearing to comply at 15% but not enough information to fully confirm. 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

See Urban Design Report

Page 29: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 259

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

27 (b) Where safety screens are required, they must extend the full length of the bridge from abutment to abutment with a generous tapered overlap of the abutment to match the extent of the bridge parapets. Bridge safety screens must be designed as a folding element when seen in section to visually articulate the screen and reinforce a horizontal character. The screens must be terminated by tapering ends towards the parapet and their fixing points must be in line with the double rail barrier to minimise visual clutter. Safety screens, including posts, must not obscure the outer faces of the parapets and must be integral with the shape and form of the parapets, including the traffic barrier railing system and any skirt systems to hide services or drainage pipes.

B. Bridges and HEX-DW-SB-31-D202 to HEX-SB-23-D402 inclusive

Y Complied at 15% C

28 (c) Bridges must be single-span with no intermediate piers between abutments. B.5 Bridge Elevations and Sections and HEX-DW-SB-31-D202 to HEX-SB-23-D402 inclusive

Y Complied at 15% C

29 (d) Bridges must be constructed using retaining wall-type abutments rather than spill through abutments. B.5 Bridge Elevations and Sections

Y Complied at 15% C

30 (e) Exposed aggregate finish must be applied to the abutment walls to assist in integrating the structure within its setting.

B.4 Abutments Y Complies C

31 (f) At interchanges where access ramps are to be provided to both carriageways, roads over the Main Carriageway must be configured as a roundabout, elliptical in plan with the long axis of the ellipse parallel to the centreline of the Local road passing over the Main Carriageway.

B.5.1, B.5.2 Y Complies C

32 (g) Structural methods which maximise shadowing of the superstructure, elegant thin leading edges and parapets, refined supporting structures and integrated open twin rail safety barriers and safety screens must be used to increase the apparent slenderness of the bridges.

B.5 Bridge Elevations and Sections No relevant documents at 85%

N Noted as appearing to comply at 15% but not enough information to fully confirm. 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

See Urban Design Report

33 (h) On bridges where the centreline of the superstructure is curved in either vertical or horizontal alignments, use only structural methods in which girders can be curved to the same radii as the superstructure above.

B.5 Bridge Elevations and Sections

N Noted as appearing to comply at 15% but not enough information to fully confirm. 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

See Urban Design Report

34 (i) Notwithstanding any specific girder construction type illustrated in the drawings referred to in this Section 15.21.2 and identified in Table 3 of this Appendix 15, on bridges where the centreline of the superstructure is straight, any structural method which complies with all the requirements of sections 15.2.1 and 15.2.2 may be used.

B.5 Bridge Elevations and Sections No relevant documents at 85%

N Noted as appearing to comply at 15% but not enough information to fully confirm. 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

See Urban Design Report

35 (j) Where bridge decks are inclined from the horizontal, retaining-type abutments must be constructed so that the ratio of abutment height to the vertical clearance between embankment hinge point and soffit on each carriageway is equal.

B.5 Bridge Elevations and Sections No relevant documents at 85%

M Noted as generally complying at 15%. 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

See Urban Design Report

36 (k) If retaining type abutments are not technically feasible at a particular location and a spill through abutment must be used, surfaces under the end spans of the bridges must be paved in a paving slab finish or stone beaching.

B.4 Abutments & B.5 Bridge Elevations and Sections B.7.1, B.7.2 & B.7.3

Y Complied at 15%. Spill through abutments are located on bridges BR04, BR21 & BR25. Gabion Baskets are used for scour protection.

C

37 (l) If it is technically not feasible to avoid piers, they must be of the column or wall type without headstocks which protrude in the bridge elevation. Bridge elements, including piers, headstocks, sill beams, abutments and leading edges, must be fully integrated.

B.5.2 to B.7.3 and HEX-DW-SB-31-D202 to HEX-SB-23-D402 inclusive No relevant documents at 85%

M Noted as appearing to comply at 15% but not enough information to fully confirm. 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

See Urban Design Report

38 (m) Planting must complement the bridge designs with the aim of enhancing the appearance of the bridge. 85% Preliminary Detail Design Report & Appendix A

Y Complies C

39 15.2.3 Bridges Over Creeks, Fauna Corridors and Underpasses(a) Abutments must be neatly designed so that they are easy to maintain and do not promote vagrancy or graffiti.

B.4 Abutments & 85% Preliminary Detail Design Report No relevant documents at 85%

N Noted as generally complying at 15%. 85% documents do not provide sufficient information to allow verification. Additional information needs to be provided in 100% documents

The 100% landscape design includes scour protection details and Fauna corridor access requirements.

40 (b) Gabion rock mattresses or rip-rap rock must be used for scour protection at bridge abutments to improve visual amenity.

B.5.3 Y Complied at 15% C

Page 30: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )260

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

41 15.3 Requirements for Earthworks, Landform and Slope StabilisationThe earthworks and stabilisation treatments must be integrated with the local landform and must, as a minimum, include the following features:(a) The vertical and horizontal alignment of the Works must be flowing and responsive to the landform and landscape. Independently grading the carriageways is an acceptable method to achieve this outcome.

85% Preliminary Detail Design Report & Appendix A Landscape Cross Sections

M 85% Design report explains slope angles of 1:2 adopted to minimise footprint but 1:2 slopes preclude integration into the adjoining landform. Carriageways have generally been independently graded.

Minimising footprint to reduce clearing of native vegetation has left little scope for transitioning batters into existing landform

42 (b) Exposed rock finish to cut batters is acceptable, provided that shotcrete does not comprise more that 10% of the surface area of the exposed batter. Exposed rock batters must be constructed as vertical as the material will allow. Where shotcrete coverage of any exposed batter exceeds 10%, the batter must be covered with concrete panels, or laid back sufficiently to allow it to be planted. Should areas of weak rock be experienced during construction, stone pitching using locally won rock should be used to infill the weakareas.

C4 Shotcrete Minimisation Strategy C.4.2.1 Stone Pitching & 85% Preliminary Detail Design Report

Y Complied at 15% C

43 (c) Where shotcrete is used and is visible from the road, or surrounding land, it must comply with the following requirements:(i) Shotcrete must not be used around the base of light columns or other roadside fittings or furniture;(ii) The extent of the shotcrete must be minimised;(iii) The edges of the shotcrete must be masked off to avoid overspray;(iv) The colour and texture of the shotcrete must match the colour and texture of the surrounding rock batter, where the batter is visible, or be finished with a wood float finish and be a dark recessive colour. A gun finish must not be used;(v) Areas of shotcrete along rock seams must be recessed to allow the exposed rock to visually dominate;(vi) Soil nails and rock bolts must be recessed and any supporting shotcrete must be finished with a wood float finish;(vii) Shotcrete must be screened by plantings where technically feasible;(viii) Shotcrete must not be visible from the areas on or around the abutments of bridges; and(ix) Shotcrete test panels must be provided in accordance with RTA QA Specification D&C R92 to demonstrate compliance of the shotcrete with the requirements of this Scope of Works and Technical Criteria.

C.4 Shotcrete Minimisation Strategy & 85% Preliminary Detail Design Report

Y There is no indication on 85% drawings that shotcrete is to be used. C

44 (d) The tops and bottoms of batters must be rounded and feathered into the adjacent landform. The ends of cuttings must be rounded off and feathered into the adjacent landform. If rounding off does not improve the response of the batter’s design to the surrounding landscape an alternative solution must be provided.

Landscape cross sections Drawings Hex-LS-20-D601 to Drawings Hex-LS-20-D607

Y Complies. Noted as a design principle at 15%. Noted and shown on cross sections at 85%

C

45 (e) The slopes of batter must vary in response to the existing landform. The slopes of batters must be flatter where the existing landform is shallowest and steeper where existing landform is deepest. The cross section profile, form and shape must be continuous and not variable along the full length of the cut batter faces, except where lay backs and curves are required by Appendix 11 of the Scope of Works and Technical Criteria.

85% Preliminary Detail Design Report & Appendix A

N Design Report at 85% explains 2:1 batters have been used to minimise the project footprint. Cross section profiles appear to be continuous

Minimising footprint to reduce clearing of native vegetation has left little scope for transitioning batters into existing landform

46 15.4 Requirements for Drainage(a) A system of water sensitive drainage devices must be used, where practical, to drain and cleanse runoff. Such devices must include swales, ponds, or basins to control the intensity of, and remove pollutants from, stormwater runoff from locations between where it leaves the pavement or bridge surfaces and where it discharges from the Project Works into the surrounding receiving environments.

85% Preliminary Detail Design Report & Appendix A: Drawing Hex-LS-20-D808 to Hex-LS-20-D810

Y Complies. Detail of typical basin and channel provided. C

47 (f) Landform for swales, water treatment ponds, detention basins and other permanent drainage elements must be informal and ‘natural’ in appearance and not be geometric and rectangular in shape. Planting and seeding must be used to help integrate drainage elements with the local landscape.

85% Preliminary Detail Design Report & Appendix A: Drawings Hex-LS-20-D001 - Hex-LS-20-D908

N Verified as non complying at 15% due to geometric forms of treatment ponds & basins. The forms are retained in the current design at 85% therefore do not meet requirements. Report needs to explain the reason for shapes not being natural and informal. Planting is used to integrate drainage elements with the landscape.

Water quality pond shape in most instances, is also driven by the requirement to reduce clearing. The most economical shape has been chosen in most instances. Ponds under elecricity easments (which do not have clearing limit requirements) were determined to be more appropriate with a geometric shape than an

Page 31: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 261

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

informal shape, given the linear nature of the clearing.

48 (g) Concrete or shotcrete must not be used in drainage channels that are visible to road users and residents where practical alternative means of scour protection are available. The use of natural materials as drainage channel stabilisation materials, including stone in wire mattresses, must be maximised in these situations.

85% Preliminary Detail Design Report 7.2 & Dwg Hex-LS-20-D804

N The extent of concrete channels is noted in the 85% information as an outstanding issue. Information available shows typical channel detail as jute mesh lined and hydromulched. Additional information needs to be provided in 100% documents to allow verification.

See Urban Design Report

49 (h) Where concrete or shotcrete channels are unavoidable and visible from the road or residences, the location and line of the channel must minimise visual impacts and planting must be designed to screen the channel. The lining material must be darkly coloured to achieve an unobtrusive consistent colour.

85% Preliminary Detail Design Report 7.2 & Dwg Hex-LS-20-D804

N The extent of concrete channels is noted in the 85% information as an outstanding issue. Information available shows typical channel detail as jute mesh lined and hydromulched. Additional information needs to be provided in 100% documents to allow verification.

The 100% design shows the extent of concrete, rock and vegetated channels.See Urban Design Report. Trials of colour to best minimise visual impact of channels have been trialled. See Urban Design Report

50 15.5.1 General The landscape and planting design must:(i) provide an attractive approach to and departure from the developed areas along the route;

85% Preliminary Detail Design Report & Appendix A: Drawings Hex-LS-20-D001 - Hex-LS-20-D908

Y Verified as generally complying at 15%. Landscape Planting Plans and Design Description at 85% define the interchanges, rest area and to a lesser extent intersections as locations for providing attractive and distinctive approaches to and departure from along the route.

C

(ii) must assist in wayfinding destinations along and near to the route; 85% Preliminary Detail Design Report Appendix A: Drawings Hex-LS-20-D001 - Hex-LS-20-D908

Y The landscape and planting design provides for wayfinding with more than 900 feature trees in unique plantings in key locations.

C

(iii) match to the existing spatial sequence of the landscape along the Project Works. Reinforce enclosure when passing through forest and woodland areas and provide long distance views for road users when such views are available;

85% Preliminary Detail Design Report , 3 Design Development

Y Complies C

(iv) fulfil any environmental, safety and functional requirements identified in the Environmental Documents; and

85% Preliminary Detail Design Report , 3 Design Development

Y 85% Design Report section 3.14 notes adherence to RTA Safety Guidelines & clearances

C

(v) mitigate the visual impact of fauna fencing and overhead power lines where required. Distinctive and locally characteristic semi-mature tree planting must be used to emphasise junctions to local towns and rest areas.

85% Preliminary Detail Design Report

Y Complies. Noise walls have replaced the requirement of fauna fencing in some areas and planting will screen between noise walls and barriers. Semi-mature feature planting will be used to emphasise junctions to local towns and rest areas.

C

51 (i) The plant species and mixes of the landscape design must respond to the landscape zones through which the Project Works pass.

85% Preliminary Detail Design Report Appendix A: Drawings Hex-LS-20-D001 - Hex-LS-20-D908

Y Noted as generally complying at 15%. More detailed layout provided at 85% verifies that the planting reflects the LCZ's derived from the Urban and Landscape Design Report by Kiah Infranet.

C

52 (j) New planting and seeding must be integrated with existing vegetation to reinforce local vegetation patterns and to maintain or enhance existing landscape character.

85% Preliminary Detail Design Report

Y Noted as generally complying at 15%. Only indigenous species found in the existing plant communities are used in the planting and seeding and more detailed layout and callout of species is provided at 85%

C

53 (k) Landscape treatments adjacent to and within half the average crown height of forested areas that are retained must be limited to revegetation by hydroseeding and hydromulching.

85% Preliminary Detail Design Report Appendix A: Drawings Hex-LS-20-D001 - Hex-LS-20-D908

Y Generally complies except in areas such as fauna underpasses, creeks & basins

C

54 (l) Embankment stabilisation revegetation must include plantings where adjacent to industrial land for selective screening and improved visual amenity.

Figures D1.1 to D1.66 Planting & Seedling Plans

Y Complied at 15% C

55 (m) The retention of existing vegetation (including root and above ground plant mass) must be maximised. 85% Preliminary Detail Design Report, 3 Design Development

Y Complies. Intent described in Design Report C

Page 32: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )262

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

56 n) Non-frangible planting and seeding must conform to clear zone requirements or be protected by a safety barrier with the required allowance for barrier deflection.

85% Preliminary Detail Design Report, 3 Design Development

M Noted as generally complying at 15%. Design Report describes intent of conforming to requirements. Required allowances need to be provided in 100% Documentation

The 100% design accomodates all clear zone requirements . See plan and details

57 (o) Safe sight distances and signage must not be obscured by planting and revegetation regrowth. 85% Design Report 7.1.8 Signage & Roadside Furniture & 3.14

M Principles noted as generally complying at 15%. Further review at 85% notes the following- trees will not to block visibility to signage- planting layout is in accordance with RTA Road Safety Guidelines including safe sight distances- layout has taken into account input from RTA's Asset Mgt TeamSightlines need to be provided.

The 100% design conforms with safe sight distances. Sightline X-refs have been incorporated into the design process

58 p) Setbacks must be provided for structures, roadside furniture and pathways to enable clear access for maintenance and visual inspections when the landscape matures.

RTA draft Specification D&C R179 3.4 Setting out & 85% Design Report 7.1.8 Signage & Roadside Furniture & 7.1.3 Pavements

N Noted as generally complying at 15%. Draft specification does not provide sufficient information. Information needs to be provided in 100% documents

The 100% design conforms with setbacks for maintenance and visual inspection

59 15.5.2 Seed Collection(a) The existing topsoil seed bank must be recovered and used for revegetation;

85% Preliminary Detail Design Report , 4 Landscape Rehabilitation areas

Y Complies. Design Report details procedures for stockpiling and direct returning landscape topsoil and bushland topsoil. Topsoil methodology documented in R44.

C

60 (b) Indigenous seed and other propagative material must be collected from the Site itself and/or from other remnant bushland within a 20-kilometre radius;

RTA draft Specification D&C R178

M Noted as generally complying at 15%. Draft specification does not provide sufficient information. Information needs to be provided in 100% documents including seed collection contract.

RTA have adopted a seed collection strategy for the entire Hunter Expressway which sets out collection criteria. Document prepared by Diversity seeds. Seeding schedules have been finalised in consultaion with the consultant

61 (c) A seed collection program must be prepared in consultation with a local ecologist to ensure there is a sufficient quantity of seeds of the right species available to complement commercially available seeds;

85% Preliminary Detail Design Report & draft Specification

M Noted as generally complying at 15%. Draft specification does not provide sufficient information. Information needs to be provided in 100% documents

RTA have adopted a seed collection strategy for the entire Hunter Expressway which sets out collection criteria. Document prepared by Diversity seeds. Seeding schedules have been finalised in consultaion with the consultant

(e) Seeds must be stored and treated in a manner so as to maximise germination rates. RTA draft Specification D&C R178 3.3 Preparation of Seed

M Noted as generally complying at 15%. Draft specification does not provide sufficient information. Information needs to be provided in 100% documents

See R176 included in the 100% package for this project

62 (d) Collection sites shall be identified through examination of aerial photographs and maps, local knowledge and verified by ground searches;

85% Preliminary Detail Design Report & draft specification

Y Complies. Intent noted in 85% Design Report. Relevant clause also needs to be provided in the specification

C

63 The following procedures shall be adopted for seed cleaning and storage:i) Separate seed from fruits (fleshy fruits or dry capsules, pods etc) and store in sealed, labelled containers;ii) Where there is evidence of insect attack. immerse seed in water for 12 hours, and then re-dry it;iii) Store seed at 5°C in a refrigerator and check for evidence of mould;iv) Do not expose seed to extremes of heat or cold or moisture; andv) Send seed of species that is unlikely to store well to a nursery for propagation within 3 months of collection.

85% Preliminary Detail Design Report & draft specification

N Noted as generally complying at 15%. Draft specification does not provide adequate information. 100% documents need to provide detailed information to allow verification

See R176 included in the 100% package for this project

64 15.5.3 Seeding –(a) Except where verges and medians are sealed, seeding must be used to revegetate non planted verges and medians of the Project Works, cuttings and other areas which are not easily accessible for planting operations and maintenance work. The seed mix must be an endemic/non-invasive grass and cover crop seed mix sown at a minimum rate of 8 kg/Ha.

85% Preliminary Detail Design Report Appendix A: Drawings Hex-LS-20-D001 - Hex-LS-20-D908

Y Complies. Endemic seed mixes are sown at 8 kg/Ha. Cover crop mixes are sown at 30 kg/Ha. Seeding is reliant on topsoil management documented in the report.

C

65 (b) The seed mix for verges must contain an appropriate ratio of ground covers, native grasses, shrubs and trees depending on the landscape context and adjacent levels, except for areas where open views must be retained when the mix must be grass and groundcover species only.

85% Preliminary Detail Design Report Appendix A: Drawings Hex-LS-20-D001 - Hex-LS-20-D908

N Seed mixes for verges contain appropriate ratio of ground covers, native grasses, & shrubs but do not include tree species. Design report needs to explain why tree planting , to be provided on verges, will be mass planted in tube stock. Additional information needs to be provided in 100% documents

In consultation with the RTA trees are only introduced via planting, in order to control safety and sight clearances, given the narrow footprint. Also considering the fringing tree canopy and the

Page 33: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 263

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

emphasis on direct return and topsoil management that

66 (c) All carriageway medians, except in retained forest areas must be seeded using an endemic/ non-invasive grass cover crop seed mix sown at a minimum rate of 8 kg/Ha. The seed mix must contain ground covers and shrubs in the proportions of 2:1 (ground covers/grasses: shrubs).

85% Preliminary Detail Design Report Appendix A: Drawings Hex-LS-20-D001 - Hex-LS-20-D908

M Design report explains that seeding has been increased in the median in the 85% design. However substantial areas are designed to be planted, a decision which needs to be confirmed in a statement by RTA. Where seeding is proposed, mix is to be sown at 8 kg/Ha in proportions of 2:1.

Appendix 15 also has a requirement for planting medians with 27,500 plant numbers

67 15.5.4 Planting(a) Planting must be used where tree, shrub and ground cover planting is required for early landscape and visual effect (particularly at intersections), for a neat attractive finish on opening (particularly in urban areas and at town approaches), for visual screening (for properties), and wildlife mitigation measures (where early impact is required).

85% Preliminary Detail Design Report Appendix A: HEX-LS-21-D101 to HEX-LS-21-D166

N Complies for early landscape & visual effect. Design report does not provide information of where planting is to provide visual screening for properties & wildlife mitigation measures. Additional information needs to be provided to allow verification

100% design shows planting at fauna underpasses and crossings, and creek crossings to assist fauna refuge. Planting for visual screening has been instigated following completion of community consultation and residents feedback

68 (b) The landscape and planting design must provide a strong emphasis on creating a well vegetated green corridor with distinctive junctions, interchanges and place markers.Where planting is used the planting mix must contain endemic species in tubestock, and larger tree stock for feature / marker planting, interchanges and the rest areas.

85% Preliminary Detail Design Report Appendix A: HEX-LS-21-D101 to HEX-LS-21-D166

M Noted as generally complying at 15% with reliance on hydro-mulching to revegetate 1:2 slopes and a large proportion of the median. Further topsoil measures to improve the results from hydromulching are detailed in the 85% information. 100% documents need to provide detailed contractual arrangements to ensure implementation and remediation if necessary.

Contractual arrangements detailed in the specificatins available with the 100% design

69 Additional plant numbers - Further to the plant numbers required in terms of section 15.6 of this Appendix 15, additional plant numbers, not less than shown in Table 1, must be provided by the Contractor:Table 1Location Plant NumbersMedians 27,500Noise walls 7,500Interchanges 10,000Fauna Underpasses 1,000Rest Area 1,000Marker planting for wayfinding 1,000Total 48,000

85% Preliminary Detail Design Report Appendix A: Drawings Hex-LS-20-D001 - Hex-LS-20-D908

M Plant numbers, as per Landscape Planting Schedule Sheet 1, exceed total plant quantity in Table 1. Location plant nos. are exceeded for Noise walls, Interchanges, Rest area & Culverts . Numbers for plants in Medians and Marker Planting for Wayfinding appear to be minimally less than quantities nominated in Table 1

There is more than double the required plant numbers. Location plant nos. vary due to the requirements of the final design. Eg; there is no location plant no. allowance for planting at bridge or creek crossing scour protection.

70 (c) Acacia spp must not be used in the planting mix. 85% Landscape Planting Schedules Sheets 1 to 8

Y Complies. Acacia spp. have only been used in Hydromulch Schedules. C

71 (d) Sedges must be used in the ground covers. 85% Landscape Planting Schedules Sheets 1 to 8

Y Complies. Sedges included in both Hydromulch & Planting Schedules. C

72 15.5.5 Landscaping Maintenance(a) A Landscaping Maintenance Plan (LMP), detailing all landscape maintenance actions for the Landscaping Maintenance, must be prepared as a part of the Design Documentation. The requirements identified in section 21.6 of Appendix 21 must be addressed in the LMP and implemented as a part of the Landscaping Maintenance.

85% Preliminary Detail Design Report, 6.7 Maintenance & Monitoring

Y Design Report describes the intent to prepare the LMP for detailing all landscape maintenance actions as part of the Detailed Design Documentation available with IFC documentation

The LMP is available for review with the 100% landscape package

C

73 (b) The landscaping must;(i) be cost effective;(ii) minimise ongoing maintenance requirements; and(iii) utilise native species, dense planting, bold simple planting designs and rapid planting establishment to assist in achieving the requirements of sub-sections 15.5.4(b)(i) and (ii).

85% Preliminary Detail Design Report 5.5 Top Soil Application

N 85% Design Report includes detail of topsoil treatments designed to improve the results of hydromulching. However draft LMP needs to be provided to allow verification. LMP needs to detail all maintenance and remediation actions required for vegetation establishment particularly on 1:2 slopes and along medians.

The LMP is available for review with the 100% landscape package

Page 34: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )264

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

74 15.6 Rehabilitation for Biodiversity Protection and Recovery Landscape Rehabilitation(a) Notwithstanding the requirements of DECCW Condition of Concurrence 15 and the Minister’s Condition of Approval 59, and 62 to 67, the Contractor must comply with the landscape rehabilitation requirements outlined in this Appendix 15 as a minimum. Implementation of these requirements shall b.e supported by the preparation of a Landscape Rehabilitation Plan in consultation with DECCW and generally consistent with the Hunter Expressway Brief for Landscape Rehabilitation.

85% Preliminary Detail Design Report, 4 Landscape Rehabilitation Areas & draft specification

N Landscape report and drawings address all the requirements for landscape rehabilitation required in App.15. However draft LRP needs to be provided to allow verification

LRP to be provided at Pre IFC. To be prepared by project environment officer in consultation with Landscape Architect

75 (b) The Landscape Rehabilitation Plan must be prepared by persons with demonstrable experience in the ecological rehabilitation of large and degraded landscapes and must include:(i) Employment of rehabilitation specialists including a Landscape Restoration Manager and a Soil Scientist. The Landscape Restoration Manager must have, as a minimum, the following qualifications and experience:A. have a minimum of ten years experience in bushland regeneration and restoration;B. completed training in bushland regeneration/horticultural studies to a minimum level of Certificate IV in Horticulture or equivalent; andC. be a member or eligible for professional membership into the Australia Association of Bush Regenerators (AABR).The Soil Scientist must be accredited under the Certified Professional Soil Scientist Scheme (CPSS) and/or be eligible for accreditation and membership of the Australian Society of Soil Science Incorporated.(ii) Identification of areas within the road corridor to be subject to landscape rehabilitation consistent with this Appendix.(iii) Desired landscape rehabilitation outcomes for each rehabilitation area consistent with the performance requirements outlined in this Appendix.(iv) Landscape rehabilitation techniques to be adopted for each rehabilitation area consistent with this Appendix.(v) Identification of propagation and nursery materials required to carry out landscape rehabilitation in accordance with this Appendix.(vi) Quality control procedures to ensure execution of works in accordance with the requirements of the Project Deed. This must include preparation and implementation of a stepwise inspection and test plan to confirm that the required rehabilitation standards outcomes have been achieved.(vii) Training of all construction personnel involved in clearing, stripping, stockpiling and topsoiling activities in relation to rehabilitation requirements. The training must describe clearing, topsoil stripping, stockpiling, and application techniques to be employed on the project.(viii) Maintenance requirements of each rehabilitation area until the completion of works under the Project Deed. Rehabilitation activities must be designed and implemented to minimise maintenance after the Date of Construction Completion.(ix) Monitoring of rehabilitation areas at 3-monthly intervals to measure performance against the performance requirements outlined in this Appendix and provide recommendations for improvement. Monitoring must extend for the duration of the landscaping maintenance period. Monitoring reports must be provided to the RTA.

No reference in 85% documents

N Information is not provided for requirements (ii) to (ix). Information should be provided in 100% documents including LRP & prepared with input from the Landscape Restoration Manager and Soil Scientist. Qualifications and experience requirements of both needs to be described in the Final Design Report. Draft LRP needs to be provided to allow verification

LRP to be provided at Pre IFC. To be prepared by project environment officer in consultation with Landscape Architect

Page 35: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 265

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

76 15.6.1 Landscape Rehabilitation Areas(a) The Contractor shall undertake landscape rehabilitation activities in accordance with this Appendix in the areas within the road corridor outlined in the Table 2. to be in accordance with this Appendix in the areas within the road corridor outlined in the TableChainage Description Dominant vegetationcommunities12900 - 20000 Chainage 12900 to waterway atChainage 20000Kurri Sand Swamp WoodlandLower Hunter Spotted GumIronbark Forest20700 - 26600 Waterway at Chainage 20700 to800m south of Allandaleinterchange Lower Hunter Spotted GumIronbark ForestHunter Lowland RedgumForest28250 - 35300 750m north of Allandaleinterchange to BranxtoninterchangeLower Hunter Spotted GumIronbark ForestHunter Lowland RedgumForest

(b) This does not preclude revegetation/landscaping works in other locations in accordance with other requirements of the Project Deed. (c) All areas described in the table above are hereafter referred to as Landscape Rehabilitation Areas.

85% Preliminary Detail Design Report, 5.3 Topsoil Management Plans Fig. 5.3 & Appendix A

Y Complies C

77 15.6.2 Performance Requirements for Landscape Rehabilitation AreasThe Contractor must undertake landscape rehabilitation activities so that Landscape Rehabilitation Areas contain vascular plant species consistent with the following:(a) Species representative of each of the structural strata (tree, shrub and herb layer), as listed within the tables in Annexure 15.1/A;

85% Preliminary Detail Design Report, Appendix A Planting Schedules HEX-LS-20-D901- HEX-LS-20-D908

M Species generally comply with species noted in tables in Annexure 15.1/A. More information is required in 100% documents on whether Landscape Rehabilitation areas are to to be hydromulched or massplanted as hydromulch schedules do not contain tree species and these therefore do not provide plant species representative of each of the structural strata . The report also explains that for some areas the preferred treatment may be managed by regeneration of the topsoil seedbank without planting, seeding or mulching

Landscape rehabilitation areas are showing all the signs of natural regeneration since access has been excluded. Tree seed is in hand and available for inclusion in hydromulch mixes in rehabilitation areas if required. However the preferred treatment is to manage any naturally regenerating areas as Bushland Regeneration Areas.

78 (b) All of the species identified with positive or unique fidelity, as listed within the tables in Annexure 15.1/A;

Y C

79 (c) At least 50% of the vascular plant species, as listed within the tables in Annexure 15.1A; with a community frequency of 25% or greater;

85% Preliminary Detail Design Report, Appendix A Planting Schedules HEX-LS-20-D901- HEX-LS-20-D908

Y Verified as generally complying at 15%. Further verified by intensive checking of Hydromulch Schedules at 85%.

C

80 (d) Sufficient cover of native herbs established at a density which is sufficient to ensure continuous plant coverage by completion of the landscaping maintenance period;

Landscape Design Planting Schedules HEXHEX-LS-20-D901- HEX-LS-20-D908

N 100% documents need to explain how it will be ensured that there will sufficient cover of native herbs for continuous plant coverage by completion of the landscaping maintenance period

See LMP for re-vegetation strategy

81 (e) Weed species comprise no greater than 5% of all plant species per restored area with exception of 15% in riparian vegetation communities; and

D.11.3.2.4 Weeding N Information is not adequate to allow verification and needs be provided in 100% documents including LMP & specification

Information can only be provided post construction following rehab

Page 36: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )266

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

82 (f) Weed cover is less than 5% per restored area. 85% Preliminary Detail Design Report, 5.4.4 Preparation for bushland topsoil application

N Information is not provided in 85% Design Report or draft spec. Relevant information needs to be provided in 100% documents including LMP & specification.

Information can only be provided post construction following rehab

83 15.6.3 Topsoil Management in Landscape Rehabilitation Areas(a) Within Landscape Rehabilitation Areas disturbed by construction activities and all other landscape areas on Site, the Contractor must implement the following standards and practices in carrying out works under the Project Deed.

84 Soil testing(b) The Contractor must undertake soil paedology survey and analysis within each soil landscape and vegetation community type. Each soil landscape and vegetation community type must be tested in three locations, each with three sampling depths of A1, A2 and B1 horizon. Soil testing must be undertaken by a National Association of Testing Authorities (NATA) registered laboratory and include pH, salinity, cation exchange capacity, plant available phosphorous, total organic matter, total nitrogen and carbon/nitrogen.(c) Soil testing and any recommendations to soil management recommendations must be made by an appropriately qualified soil scientist with expertise in revegetation.

85% Preliminary Detail Design Report, 5.4.1 Stripping & draft specification

M Design Report describes the intent however draft specification does not provide sufficient information. 100% documents need to provide detailed information to allow verification

Specifications provided with 100% design

85 Stripping of topsoil required for re-use in Landscape Rehabilitation Areas(d) Topsoil to be used for re-use in landscape rehabilitation areas is hereafter referred to as bushland topsoil.(e) The structure of much of the site topsoil is fragile, and needs to be handled with a carefully integrated clearing and stripping process.(f) The Contractor must strip at least 50,000m3 of A1 Horizon topsoil from Landscape Rehabilitation Areas, or sufficient topsoil to implement the landscape rehabilitation requirements, whichever is greater, in the manner outlined below. The quantities of topsoil from each vegetation community type stripped must be directly proportional to the areas of each vegetation community subject to landscape rehabilitation activities.(g) Stripping undertaken for the purpose of generating bushland topsoil must be undertaken by the following process:(i) Limit the use of heavy or tracked vehicles and equipment so as not to disturb the A1 horizon surface soil to the extent that it is contaminated with lower layers.(ii) Where tree density does not allow effective slashing or the stripping of topsoil as described below, remove trees and stumps in a manner that does not mix B Horizon soil with bushland topsoil. Acceptable methods include felling trees and grinding stumps.(iii) Slash the understorey to within 50mm of ground level, leaving the slashed trash insitu.(iv) Pause for a period of one (1) week prior to undertaking bushland topsoil stripping.(v) Strip A1 Horizon bushland topsoil to a depth of 100mm plus the slashed trash.(vi) Relocate bushland topsoil as either direct return or to stockpile.(vii) Strip remaining topsoil to extent required. Avoid mixing of B Horizon material.(viii) Clear any remaining trees (including stumps) and any other remaining vegetation.

85% Preliminary Detail Design Report, 5.4.1 Stripping

Y Complies C

86 Direct return of topsoilThe construction process must facilitate the immediate re-laying (hereafter referred to as direct return) of stripped topsoil in Landscape Rehabilitation Areas. Where it is not practical to direct return bushland topsoil to batters and embankments of the road formation due to earthworks programming, the Contractor is to direct return an amount of bushland topsoil to Landscape Rehabilitation Areas within the road corridor where bushland restoration is required.

85% Preliminary Detail Design Report, 5.4.2 Direct Return

Y Complies. C

Page 37: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 267

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

87 Stockpiling of bushland topsoil(h) Where it is not possible to undertake direct return of bushland topsoil, bushland topsoil must be stockpiled in areas separate from all other stockpiled material to minimise the potential for weed contamination. Topsoil handling and stockpile contamination are critical factors with regard to the success of the landscape rehabilitation process.

85% Preliminary Detail Design Report, 5.4.3 Stockpiling

Y Complies C

88 (i) Bushland topsoil must be stockpiled separately by vegetation community type. For each vegetation community type, topsoil is to be stockpiled as follows:(i) A1 Horizon in windrows up to one (1) metre high by a maximum of three (3) metres wide at the base; and(ii) A2 Horizon in windrows of any stable configuration, limiting their height to preferably 1-2 metres and not more than 3 metres. Construct with 1:4 outer batter slopes if possible;(iii) Leave the surface of the completed stockpiles in a rough condition to help promote water infiltration and minimise erosion; and(iv) Sow stockpiles with cover crop or legume species to minimise erosion and discourage weeds.

85% Preliminary Detail Design Report. 5.4.3 Stockpiling & 5.6 Cover Crop & Draft Specification

M (i) Complies (ii) Design Report does not indicate limitations for height and batter slopes of A2 horizon. Refer App 44. Information needs to be provided in 100%documents (iii) Complies (iv) Complies

This information is contained in Specifications provided with 100% design

89 (j) Bushland topsoil must not be stockpiled for periods greater than:(v) Bushland topsoil from Endangered Ecological Communities - 6 months;(vi) Bushland topsoil from the Greta to Branxton section - 12 months, with the exception of cut batters below the first bench and fill batters above the first bench; and(vii) All other bushland topsoil – 18 months.

85% Preliminary Detail Design Report. Figure 5.2 Bushland Topsoil Procedures & 5.4.3 Stockpiling

Y Complies C

90 1. (k) Topsoil stockpile areas must be managed continuously so that weed densities are no greater than 5% over the entire stockpile area. All weeds must be eradicated before setting seed.

85% Preliminary Detail Design Report, 5.4.3 Stockpiling

Y Complies C

91 (l) Large, clearly legible signs must be placed and maintained on each windrow, nominating vegetation community type, soil horizon, collection area (e.g. by chainage) and date of stockpiling.

85% Preliminary Detail Design Report. 5.4.3 Stockpiling

Y Complies C

92 Preparation for bushland topsoil application(m) All bushland topsoil re-used within landscape rehabilitation areas must be prepared in the following manner:(i) Soil testing must be carried out to finished sub-grades to address any severe soil deficiencies. Should the test results indicate that subsoils contain contaminants or have chemical properties likely to inhibit the success of the landscape restoration process, additives must be added during ripping, as required by the Soil Scientist;(ii) Prior to the placement of topsoil, continuously eradicate weeds to treatment and adjoining areas, until weed growth four (4) weeks after the last spray comprises less than 5% cover, and then eradicate remaining weeds; and(iii) Rip the subsoil to a depth ranging from 50-100mm using the tynes on a swivelling head excavator bucket, or by some other means to form a loosened or roughened surface suitable for the application of topsoil and/or seed. During ripping, mix in any materials required by the soil testing into the upper 100 mm layer to the rates specified within the soil testing recommendations. Rip parallel to the final contours where possible. Do not rip within the drip line of trees to be retained. Do not disturb services or tree roots, cultivating these areas by hand if necessary. Remove any weeds, rubbish or other deleterious material brought to the surface by the ripping process.(iv) The subsoil must be ripped to a depth greater than 100mm at locations of planting holes for Hiko tubes.

85% Preliminary Detail Design Report. 5.4.4 Preparation for bushland Topsoil Application

Y Complies. Design Report recommends ripping subsoil to 300mm depth C

93 Application of bushland topsoil(n) Application of bushland topsoil in Landscape Rehabilitation Areas must be applied in accordance withthe requirements of Specification RTA D&C R178 Vegetation and this Appendix 15.

85% Preliminary Detail Design Report. 5.4.3 Stockpiling

Y Complies C

Page 38: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )268

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

94 (o) Application of bushland topsoil in Landscape Restoration Areas with 3:1 slopes or less must be undertaken in the opposite order to stripping, as follows:(i) A2 Horizon to a depth of 200mm; and(ii) A1 Horizon to a depth of 100mm.

85% Preliminary Detail Design Report. 5.4.4 Preparation for bushland Topsoil Application

Y Complies for application of bushland topsoil in Landscape Restoration Areas with 3:1 slopes or less outside the formation. Depth varies for special situations and formations such as cut and fill batters.

C

95 (p) A1 and A2 Horizons must be supplemented by site mulch derived from a coarsely shredded vegetative material cleared during works. Mulch materials must not be mixed with topsoil prior to composting for the minimum period., A1 and A2 Horizons must be supplemented as follows: (i) 15% by volume where it is to be used for direct return; and(ii) 30% by volume for topsoil that is to be stockpiled.Prior to mixing topsoil with composted mulch at the soil stockpile, mix the top 300 millimetres of the stockpile material with the remainder of the stockpile to ensure that living organisms, propagules and viable seed are distributed throughout the topsoil profile at the time of final placement.Obtain advice from the project soil scientist to determine if topsoil requires:(i) further physical amelioration such as ripping or discing;(ii) chemical treatment such as fertiliser application or application of lime or gypsum;(iii) movement to another site for placement or mixing; and/or(iv) woodchip mulch to be added.

85% Preliminary Detail Design Report, 5.4.4 Preparation for Bushland Topsoil Application & Fig. 5.1 Landscape Topsoil Procedures

Y Complies C

96 (q) Site mulch must be composted for a minimum of 6 weeks with the following additions:(i) Urea 600g/cu,m;(ii) Sulphate of Iron 500g/cu.m; and(iii) Dolomite or Magrilime 500g/cu.m.(r) Sufficient water to dampen product.

85% Preliminary Detail Design Report 5.4.5 Application of Bushland Topsoil

Y Complies C

97 15.6.4 Augmentation of Landscape Rehabilitation AreasLandscape Rehabilitation Areas disturbed by construction activitiesLandscape Rehabilitation - Areas disturbed by construction activities must be subject to augmentation in accordance with specification RTA D&C R178 - Vegetation, specification RTA D&C R179 - Landscape Planting and this Appendix 15 to meet the landscape rehabilitation performance criteria including:(a) Provision of a sterile cover crop of sufficient density to assist with soil stabilisation while not significantly restricting native seed germination and establishment;(b) Seeding of select, locally sourced native species representative of adjacent remnant vegetation;(c) Provision of a limited palette and number of provenance landscape plantings to visually prominent parts of the works, to provide a quick landscape effect, and facilitate the reintroduction of specific desirable species.

85% Preliminary Detail Design Report, Dwg HEX-LS-20-D902 & specification RTA D&C R178 - Vegetation, specification RTA D&C R179 - Landscape Planting & draft specification

M Design Report describes the intent however draft specification does not provide sufficient information. 100% documents need to provide detailed information to allow verification

This information is contained in Specifications provided with 100% design

Page 39: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 269

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

98 Bushland regeneration(d) Landscape Rehabilitation Areas not disturbed by construction activities and where weed cover can be anticipated to be less than 15% of plant cover within 12 months of commencing the work must be subject to bushland regeneration to meet the landscape rehabilitation performance criteria.(e) The bush regeneration program must be approached using three (3) strategies, as follows:(i) Primary weeding, including techniques such as:A. selective spraying of weeds with herbicides;B. cutting/scraping and painting deep rooted woody weeds and climbers with hand tools, chainsaws and brush cutters and painting cut stumps with herbicide;C. target drilling and injecting certain large exotic trees such as African Olive, Willows, Large and Small-leaf Privet between December and April, whilst sap flow is at optimum levels for herbicide translocation, with herbicides such as Glyphosate and a garlon/diesel mix;D. selective hand removal of weeds, andE. burning areas dominated by naturalised grasses.(ii) Avoid disturbance to remnant native plants and to soil stored seed banks, which may contain dormant native plant propagules. All weeds are to be targeted during the primary weeding phase.(iii) Follow-up weeding must be undertaken in areas that have received a primary weeding treatment, including selective removal or treatment of weeds, whilst allowing regenerating or planted native plants to increase in size, abundance and percentage cover. All weeds are to be targeted during the follow up weeding phase. Follow-up bush regeneration work is to commence no longer than 3 months after the first exposure to primary

85% Preliminary Detail Design Report, 4.2 Bushland Regeneration Areas

M (i) Complies (ii) & (iii) Draft specification does not provide sufficient information. 100% documents need to provide detailed information to allow verification

This information is contained in Specifications provided with 100% design

99 Bushland reconstruction(g) Landscape Rehabilitation Areas not disturbed by construction activities or subject to bushland regeneration must be subject to bushland reconstruction to meet the landscape rehabilitation performance criteria. Bushland reconstruction must be undertaken as follows:(i) Soil preparation, including addition of ameliorants and cultivation as recommended within the soil testing results;(ii) Planting using either or a combination of the following alternatives:A. Mass Planting: Mulch to 100mm depth, followed by planting using Hiko or similar cell size at a density of 10 plants sq.m for full reconstruction, with the number of trees, shrubs and groundcovers broadly informed by the structure of the community being reconstructed, e.g. less trees and a greater shrub layer for a woodland community than for a forest community. A substantial ground layer, with a predominance of grasses, will be required for all communities to provide an initial, quick, self-regenerating, and dense weed suppressing ground layer. Planting must be consistent with section 15.5 of this Appendix; andB. Direct Seeding of Native Grasses: Direct seeding of a select suite of native grasses.(h) Bushland reconstruction must be undertaken by a Bushland Regenerator where a substantial relevant body of this work has been undertaken, or by a Landscape Contractor who is a member of the Landscape Contractors’ Association, and has a demonstrated strong record of experience in undertaking projects of this nature.

85% Preliminary Detail Design Report & Dwg HEX-LS-20-D902

M (g) i) Compliesii) 85% Design Report explains that follow up of previously identified areas for vegetation reconstruction have substantially regenerated therefore the report notes many areas nominated for Bushland Reconstruction may be best managed as bushland regen areas with no planting, seeding or mulching required. Where mass planting is to occur, a range of plant densities are nominated at less than 10 plants sq.m h) Design Report notes the requirements needed for the landscape specialist to carry out bushland reconstruction

Landscape rehabilitation areas are showing all the signs of natural regeneration since access has been excluded. Tree seed is in hand and available for inclusion in hydromulch mixes in rehabilitation areas if required. However the preferred treatment is to manage any naturally regenerating areas as Bushland Regeneration Areas. If additional rehab is required, it will beaccomplished by a combination of seeding and planting.

Page 40: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )270

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

100 15.7 Requirements for Road Furniture(a) Fauna fencing must be placed behind plantings to obscure it from the Main Carriageways and Local Road Works. Views of fencing on the skyline must be minimised. All fencing mesh must be dark coloured or black in appearance where it is visible from the Main Carriageways or Local Road Works.(i) Where not required for noise attenuation purposes, safety barrier types must be selected to minimise the obstruction of views. Wire rope systems must be used in preference to solid barrier types to provide good views. The upstands/posts of wire rope type barriers must be white.(ii) Signposting must be located to prevent the visual obstruction of good views of the landscape and views of signs against the skyline must be minimised.(iii) The design and placement of lighting must minimise visual intrusion and must include the use of slender, simple and refined lighting columns that eliminate unnecessary light spillage.

85% Preliminary Detail Design Report. 7.1.8 Signage and Roadside Furniture

N Landscape has been set back to meet requirements. Design report notes noise walls replace fauna fences where required but this cannot be verified without further information. Design Report does not include information on design and placement of lighting. Further information needs to be included in 100% Final Design Documentation

Lighting for landscape is only shown in the rest area report currently at Pre-IFC

101 15.8 Requirements for Road Structures Generally(a) Road structures, including culverts, underpasses and walls, must be unobtrusive. Visible road structures must be simple, refined and without any unnecessary embellishments.(b) The appearance of concrete retaining structures associated with:(i) bridges must have a strong horizontal emphasis; and(iv) retaining walls and noise walls must have a strong vertical emphasis.(c) The design of rock filled gabions visible from the road or surrounding properties must demonstrate consideration of the three-dimensional form of the batter face. The gabions must be constructed using techniques which control appearance of the visible faces, including the use of formwork and hand-packing individual stones. Structures must be neutral in colour and have non-reflective finishes.(d) Road structures must be designed and placed to minimise visual intrusion and be screened by existing or proposed vegetation to minimise their visibility to road users.(e) The design of retaining structures must be undertaken in consideration of all other elements such as bridges, noise walls and landscaping and provide a cohesive and unified design outcome(f) Gabions must be used as a retaining wall material for feature landscape treatments at the Branxton interchange and rest areas(g) Wall plan layouts must be simple and be straight or have large radius curved alignments sympathetic to the alignment and interfaces with adjoining infrastructure, including roads, pathways and bridges, and environmental features, including creeks and stands of trees. Kinks and bends must not be used in walls in either horizontal or vertical alignments.(h) Walls must be designed with cappings that neatly finish the wall with smooth flowing lines. Drainage must be diverted and aligned away from wall faces. Cappings, drainage channels, barriers, noise walls and headlight screens must be integrated.(i) Road structures must be provided with safe access for maintenance purposes.(j) Structures and joints must be designed and detailed to accommodate movement and settlement over time.(k) Fixings for retaining structures must preferably be concealed, or expressed as part of the structure’s design if concealment can not be achieved.(l) Except where specified elsewhere in this Appendix 15, retaining walls must generally be flush with parapet faces.(m) Structures must be designed to minimise graffiti. Whole-of-life costs must be considered in the design of structures and the design should minimise the need for ongoing repair works due to vandalism or graffiti.(n) Adjacent and remote landscaping and planting beds must be used to reduce the visual impact of structures.(o) Protection systems, fencing, safety barriers, noise barriers and headlight screens must be integrated with structures to reduce visual clutter. All joints must align to reinforce the vertical emphasis.

C. Earthworks, Landform & Slope stabilisation & 85% Preliminary Detail Design Report & draft specification

M Principles noted in 15% information. Design Report 85% does not include further relevant information on road structures. 100% documents need to provide information to allow verification

See urban design and rest area reports and drawings for the information required here

Page 41: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 271

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

102 15.8.1 Requirements for Noise Barriers(a) Selection of the type of noise barrier must be based on the following decreasing order of precedence, except where otherwise required by the Environmental Documents:(i) landscaped mound or ‘false’ cutting;(v) noise mound and wall combination; and(vi) noise walls.(b) Noise walls must respond appropriately to the context in which they are located. Noise walls must be easily maintainable, durable and aesthetically pleasing. Noise walls must enhance the Project Works and surrounding neighbourhood environment.All noise walls must be designed and detailed, including their texture, materials, finishes and colour, to be consistent, contextual and have interesting forms.(c) Noise walls must comply, as a minimum, with the following requirements:(i) the appearance of both sides of noise walls must be a vertical concrete panel Exposed ‘Z’ clips must not be used in the noise walls;(ii) timber, glass or other fragile or easily damaged materials must not be used for noise walls;(iii) fixing systems and footings must be concealed;(iv) a planted zone, with a minimum width of 2 metres, must be provided between noise walls and the road and between noise receptors and noise walls;(v) the tops of noise walls must not be stepped and must form a continuous flowing line;(vi) the horizontal alignment of the noise walls must be parallel to the outside edge of the carriageways and roads;(vii) where noise walls are constructed of lapped panels, the lapping must be in the direction of traffic on the immediately adjacent carriageway / lane. Noise wall support posts must not be visible from the adjacent travel lanes;(viii) noise walls must not start or terminate abruptly with vertical faces. Noise walls must ‘emerge’ from the ground with smooth flowing lines and must have a vertical emphasis;(ix) both sides of the noise walls must be equivalent in design quality;(x) noise walls must respond to the locality in which they are situated. Noise walls in feature areas must be sculptural, dynamic and interesting;(xi) noise walls must be integrated with other structures, including headlight screens, retaining walls, bridges and landscaping;(xii) noise walls on top of retaining walls must consolidate into one wall;(xiii) where noise walls are located close to property boundaries and near neighbourhoods, they must be recessive and simple; and(xiv) noise wall designs must address and accommodate drainage under the noise walls and include provisions to reduce noise penetration.(d) Noise wall location and heights and landscape screenings must address the visual impact and associated perception of truck exhaust stack noise and prevent truck exhaust stacks from being visible to adjacent residences.(e) Noise walls on bridges must be transparent and extend a minimum distance of 20m from the bridge abutments into the bridge approaches.(f) Noise walls which would block views to high quality scenery from the living areas of the residences must be avoided.(g) Transparent noise walls must be used for residences where views of high quality scenery would otherwise be blocked by opaque noise walls.(h) The design of the noise walls must include an anti-graffiti strategy, for both sides of the noise walls. Details of this anti-graffiti strategy, including maintenance and remedial measures, must be included in the Maintenance Plan to be submitted in terms of section 21.6 of Appendix 21 of the SWTC.

E. Noise Barriers NA Refer to separate verification of 85% noise walls C

103 15.9 Requirements for Footpaths, Shared Paths and Cycle Paths(a) Footpaths, shared paths and cycle paths must be constructed from a brushed finished concrete with an integral oxide pigmentation, grey in colour equal to Colour Concrete Systems “Onyx” to reduce glare.(b) Where paths are provided on overbridges, they must continue beyond the extent of any adjacent bridge barriers to permit pedestrians to access the road surface or adjacent paths without having to cross any area of turf, bare earth or planting.

No reference in 85% documents

N No reference in 85% documents in relation to treatment of footpaths, shared paths and cycle paths. Information needs to be provided in 100% documents.

See Urban Design Package

Page 42: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )272

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

104 15.10 Requirements for Interpretation of Cultural Heritage(a) The Contractor must develop techniques for interpretation of cultural heritage in consultation with the community to ensure the needs of the various community groups are incorporated.(b) Notwithstanding any urban and landscape design themes illustrated in section 15.12 of this Appendix 15, interpretive elements must not be constructed using location-specific materials or finishes.(c) Interpretation must be achieved through one or more of the following methods:(i) particular arrangement of both hard and soft materials used in the Works;(ii) selection and particular arrangement of plant species; and(iii) passive methods such as retaining a significant view.(d) Where the design for interpretation using one or more of the methods described in section 15.10 (c) is not possible, no interpretation in the design should be provided. Where design for interpretation is not possible the area must be designed to be consistent with the urban and landscape themes of the immediately adjacent areas.

85% Preliminary Detail Design Report, 3.1.1 Landscape Character Zones

Y Complies. Interpretive methods are described using methods as described in 15.10 (II) & (III)

C

105 15.11 Requirements for Rest Areas15.11.1 GeneralRest areas must be designed in accordance with Appendix 17 of the SWTC. The landscape design for the rest areas must provide scattered tree planting of Corymbia maculata, Eucalyptus crebra, Eucalyptus moluccana and native mown grasses to create a different landscaped character from Main Carriageways.

85% Preliminary Detail Design Report Appendix A: Drawings Hex-LS-23-D151 - Hex-LS-20-D152

Y The landscape design includes tree planting of Corymbia maculata, Eucalyptus crebra & Eucalyptus moluccana and a number of other tree species are also nominated. Native mown grass has been replaced with Sir Walter Buffalo Turf.

C

106 15.12.1 General(a) RTA has commissioned KIAH Infranet to prepare an urban and landscape design, which is documented in a report titled “Urban and Landscape Design Report – F3 to Branxton Link” (Report). The Report is Information Document ID275.(i) The Report identifies eleven character zones for the whole F3 to Branxton project. Character zones 5 to 11, which are shown in the drawings on pages 94 to 97 of the Report (“Character Zones”) apply to the Works under the Project Deed.

A.7.1.2 Character Precincts

107 15.12.2 Character Zone 5LandscapingThe Contractor must prepare the landscape design for Character Zone 5 consistent with the landscape themes detailed in the drawings ‘Landscape Plan Zone 5a’, ‘Landscape Plan Zone 5b’ and ‘Kurri Kurri Interchange’ on pages 148, 149 and 150 of the Report and the drawings’ associated legend on page 147 of the Report.Wire rope barriers must be used, as far as is compatible with the engineering design requirements, to minimise vegetation clearance and maximise the visual exposure of Kurri Sand Swamp Woodland to the Main Carriageways.The planting theme must reinforce the indigenous and endangered Kurri Sand Swamp Woodland species.The landscape design for the Kurri Kurri interchange must reinforce the indigenous character of Kurri Sand Swamp Woodland, using Eucalyptus parramattensis dominant vegetation with Hardenbergia violacea and Acacia understorey.A more formal treatment of regular tree spacing with Hardenbergia understorey to the top of the batters must be used to increase the legibility of the entrances to the townships of Kurri Kurri and Heddon Greta.The landscape design for the McLeod Road transverse bridge must reinforce the indigenous vegetation, to assist in visually ameliorating the proposed roadworks.

Landscape Planting Plans HEX-LS-22-D101 to HEX-LS-22-D106 & 3.1.1.1 LandscapeCharacter Zone 5

Y Noted as generally complying at 15%. The following is noted at 85% ; - Extent of both WRB and F barrier apparent - Theme of character of Kurri Sand Swamp Woodland is enforced through indienenous plant species- Understorey of Hardenbergia is indicated with shrub species of KSSW but not nominated for the top of batters. - Reason for not including Acacia spp. in understorey needs to be explained

C

Page 43: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 273

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

108 Structures(a) Kurri Kurri Interchange:The height of the structures at the Kurri Kurri interchange must be minimised to reduce the visual impacts of earthworks.Where noise walls are required, the noise walls must be designed as an integral part of the road components rather than natural barriers such as gabion baskets, rock walls or mounding.The urban design of the interchange must be consistent with the urban design themes detailed in the drawings ‘Kurri Kurri 3D animation, Birdview’, and ‘Kurri Kurri 3D study - screen detail’ on page 152 of the Report and the drawing ‘Artistic impression of the Kurri Kurri Interchange with the twin overpasses’ on page 153 of the Report, but excluding the artwork shown on these drawings.

B.5.1 BR01 Y Artistic impression shown in Figure B.5.1.3 appears to be consistent with pp. 152 & 153 of Kiah Infranet U & LD report.

C

109 (b) McLeod Road transverse bridgeThe McLeod Road transverse bridge must be designed to integrate with the surrounding landform and minimise potential batters. The bridge must be designed in sympathy with the suite of bridges for the Project Works.The urban design of the McLeod Road transverse bridge must be consistent with the urban design themes detailed in the drawings ‘McLeods Road Overpass’, ‘McLeods Road Cross Section’ and ‘McLeods Road Abutment’ on pages 155 to 157 inclusive of the Report

B.5.7 BR03 Y Complied at 15% . McLeod Road transverse bridge is in sympathy with the suite of bridges for the project and consistent with the urban design themes detailed in the U & LDR.

C

110 15.12.3 Character Zone 6LandscapingThe Contractor must prepare the landscape design for Character Zone 6 consistent with the landscape themes detailed in the drawings ‘Landscape Plan Zone 6a’, ‘Landscape Plan Zone 6b’, Landscape Plan Zone 6c’ and ‘Landscape Plan Zone 6d’ on pages 160 to 163 inclusive of the Report and the drawings’ associated legend on page 162 of the Report.Landscape revegetation must reflect the Kurri Sand Swamp Woodland associations in the areas to the east, to reinforce creek crossings and to ameliorate cuts and fills created by the proposed roadworks. Planting must be extended at the minor ridgeline to further accentuate the ridgeline and to mitigate visual impacts of the cutting.Wire rope barriers must be used, as far as is compatible with the engineering design requirements, to minimise vegetation clearance and maximise the visual presence/ exposure of the Kurri Sand Swamp Woodland.Landscape revegetation must reflect the Lower Hunter Spotted Gum-Ironbark Forest associations in the areas to the west, to reinforce creek crossings and to ameliorate cuts and fills created by the proposed roadworks. Open plantings of Eucalypts with native grass understorey must be provided to allow views through to pastoral lands.The planting areas in the median adjacent to the area of above ground power lines, lines must be provided in abstract geometric lines to reflect the influence of man in the landscape. A ‘rigid’ landscape planting scheme that compliments the stacks of the aluminium smelter plant and the power lines must provide a contrasting composition to the natural setting of the Kurri Sand Swamp Woodland along the route.Low landscape treatment, through native grassing to the lower sections of the bridge abutments must be provided at the Old Maitland Road Overpass, so as to create an open vista of the bridge structure.

Landscape Planting Plans HEX-LS-22-D107 to HEX-LS-22-D119 and Kiah Infranet Report pp. 160-163

Y Complies. Detail provided at 85% includes the following;- Consistantancy with Kiah Infranet L& UD Report.- extensive use of WRB - planting extended at the minor ridgeline - planting revegetation reflecting nominated existing plant associations- views to pastoral land maintained - median planting in rigid patterns to reflect influence of man and contrast with nature. .

C

Page 44: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )274

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

111 Structures(a) South Maitland Railway Bridge:The bridge structure and foundations of the South Maitland Railway Bridge will be constructed by others under a separate contract. The Contractor must construct the bridge abutments to meet the requirements of Appendix 18 of this Scope of Works and Technical Criteria.(b) Swamp Creek twin bridges:The Swamp Creek Twin Bridges must have clean and simple lines with spilled batters to minimise visual depth.(c) Loxford Interchange (Hart Road) transverse bridge:The Loxford Interchange (Hart Road) transverse bridge must be a portal type structure to express and reinforce its setting along a ridgeline and must maintain visual continuity with other structures on the Project.(d) Old Maitland Road transverse bridge:The Old Maitland Road transverse bridge must be designed in sympathy with the suite of bridges for the Project Works.

B.7.1 BR04, B.5.8 BR05, B.5.9 BR08 and HEX-DW-SB-31-D202 to HEX-SB-23-D402 inclusive

Y Complied at 15% C

112 15.12.4 Character Zone 7LandscapingThe Contractor must prepare the landscape design for Character Zone 7 consistent with the landscape themes detailed in the drawings ‘Landscape Plan Zone 7a’, ‘Landscape Plan Zone 7b’ and Landscape Plan Zone 7c’ on pages 167 to 169 inclusive of the Report and the drawings’ associated legend on page 168 of the Report.Revegetation in this character zone must reflect the existing dominant bushland setting by reinforcing the Central Hunter Riparian Forest along the Sawyer’s Gully area, and the Lower Hunter Spotted Gum Ironbark Forest on the higher areas of land. In the open pastoral areas around Sawyers Gully, a more open landscape character must be provided to complement the rural setting.Creek crossings must be reinforced with appropriate plantings in sympathy with the theme at creek crossings elsewhere on the Project Works. Plantings must be extended beyond large cuts and fills to assist in visual amelioration.

Landscape Planting Plans HEX-LS-22-D120 to HEX-LS-22-D127 and Kiah Infranet Report pp. 167-169

Y Complies. Revegetation reinforces the nominated plant community associations. Plantings generally extend beyond large cuts and fills to assist in visual amelioration except where bushland reconstruction areas occur

C

113 StructuresThe quarry access twin bridges (underpass) to maintain existing access within the quarry site must be designed in sympathy with the suite of bridges for the Project Works. However, walls must be vertical rather than sloped for simplicity of form.

B.6.7 BR13 & 85% Preliminary Detail Design Report

M Further information on urban design elements of the bridges needs to be provided in the 100%. documents to allow verification

See Urban Design Report. Bridges are as described.

C

Page 45: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 275

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

114 15.12.5 Character Zone 8LandscapingThe Contractor must prepare the landscape design for Character Zone 8 consistent with the landscape themes detailed in the drawings ‘Landscape Plan Zone 8a’ and ‘Landscape Plan Zone 8b’ on pages 172 and 173 of the Report and the drawings’ associated legend on page 171 of the Report.The planting design must reinforce the two main vegetation associations of Lower Hunter Spotted Gum Ironbark Woodland and the Hunter Lowlands Red gum Forest in the lower areas and drainage lines.The view potential to the south east and to the west of the Main Carriageway must be exploited by more open planting, so as to allow filtered views through tree trunks. Views to distant ranges, Barrington Tops, Kurri Kurri and Mount Sugarloaf must also be exploited by similar open planting.Existing timber rural fencing along the Main Carriageway must, as far as is practicable, be retained.At the Allendale Road Interchange a Red Gum upper canopy must be used along Allandale Road, to reinforce the existing character of mature vegetation. The visual screening at the interchange must minimise the visual impact of the Interchange to the surrounding landscape and integrate it with the landscape setting. Spotted Gums must be used as the accent tree canopy with the lower canopy utilising the existing species of Acacias, Dillwynias, Leucopogons and Danthonias as low accent shrubs and grasses around the interchange. Low native grasses must be planted on the lower slopes of the batters adjacent to the abutments to create open views to the abutments and bridge structure.Section treatments must be consistent with the landscape themes detailed in the drawings of the sections at Chainages 26500 and 27300 on page 174 of the Report. Batters must be densely planted with the indigenous species of the area to assist in visual amelioration of the road works. Trees must not be planted on the high areas of artificial fill so as to detrimentally affect the scale of the natural landscape.

Landscape Planting Plans HEX-LS-22-D128 to HEX-LS-22-D135 and Kiah Infranet Report pp. 171-174

M The following compliance for Character Zone 8 applies; - landscape design is consistent with themes detailed for zones 8a, 8b & associated legend - planting design reinforces nominated existing vegetation communities - nominated view potentials are retained with hydromulching mix of pasture grass -red gum is used along Allandale Road The following non compliance needs to be explained; - no reference to retention of existing timber rural fencing along the Main Carriageway - The following plant species are not called out 1. Spotted gums as accent trees. 2. Lower canopy utilising the existing species of Acacias, Dillwynias, Leucopogons and Danthonias as low accent shrubs and grasses around the interchange .

Existing timber rural fences are retained. These are shown on the Property Works and Fencing Drawings. The symbol has been added to the 100% landscape dreawings so the extent of retained timber rural fencing can be seen. Spotted Gums are used as the dominant tree species wherever mass tree planting occurs in this zone. Acacias are well represented in the seeding mixes for these communities. Danthonia (Austrodanthonia) is represented in HLRF seeding. Dillwynias are a much larger component of the KSSW community (80% in KSSW and only 20% in LHSIF). Instead we have Daviesia in the mix for LHSIF where it occurs at 80% frequency and better represents the community that is passed through in this zone. Leucopogons are difficult to collect and grow from seed and are thought to have complex dormancy mechanisms. Mycorrhizas possibly assist breakdown of woody seed coat and establishment of seedling. It is assumed that Leucopogon will be returned via direct return of topsoil and by correct topsoil management procedures given it is a coloniser of disturbed sites. Mycorrhizas possibly assist breakdown of woody seed coat and establishment of seedling.

115 StructuresAllandale Interchange (Lovedale Road) transverse bridge:The Allandale Interchange (Lovedale Road) transverse bridge must be designed in sympathy with the suite of bridges for the Project Works and must be treated as a portal structure to frame and reinforce the panoramic views on both sides of the interchange.The urban design of the Allandale Interchange (Lovedale Road) transverse bridge must be consistent with the urban design themes detailed in the drawing ‘Allandale Interchange Elevation’ on page 175 of the Report.

85% Drawings BRIDGE OVER HUNTER EXPRESSWAYINTERCHANGEAT ALLANDALE ROAD

Y Urban Design of Allandale Interchange (Lovedale Road) transverse bridge appears to comply

C

Page 46: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )276

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

116 15.12.6 Character Zone 9LandscapingThe Contractor must prepare the landscape design for Character Zone 9 consistent with the landscape themes detailed in the drawings ‘Landscape Plan Zone 9’ and ‘Camp Road Underpass’ on pages 181 and 182 respectively of the Report and the drawings’ associated legend on page 180 of the Report.Batters must, as far as is compatible with the engineering design requirements, be designed to reduce impact on the surrounding landscape and encourage plant revegetation.Earthworks in the vicinity of the Camp Road twin bridges and Sawyers Creek twin bridges must be designed to minimise impacts on the surrounding undulating landform. Section treatments must be consistent with the landscape themes detailed in the drawings of the section at Chainage 201000 on page 183 of the Report.The indigenous vegetation of Lower Hunter Spotted Gum Ironbark Forest must be reinforced through revegetation measures to cuts and fills. As far as is compatible with the engineering design requirements, type F barrier and wire rope barriers must be used at the interchange would allow closer tree planting to the road pavement, so as to reflect the ”woodland” character of the adjacent landscape.To the east of the Camp Road Underpass, the landscape character must be more open, with grass understorey, to maintain views to the foothills of Mount Molly Morgan and the valley to the north of the Main Carriageway.The landscape theme for the Camp Road Underpass must reinforce the Red Gum as the main tree canopy species, within the indigenous association of Hunter Lowlands Redgum Forest, with an understorey accent of Hardenbergias, Acacias, Dianellas and Dillwynnias.

Landscape Planting Plans HEX-LS-22-D136 to HEX-LS-22-D138 & 3.1.1.5 Landscape Character Zone 9

M Generally complies. Extensive use of WRB and extent of F Barrier at the interchange is apparent. Red Gum features with other Eucalyptus spp. for reinforcing the landscape theme for the Camp Road Underpass. Understorey accent of Hardenbergias is provided, however Design Report need to explain why there are no plantings of Acacias, Dianellas and Dillwynnias as required.

As above, Dillwynias are better representatives of KSSW. Acacias and Dianellas are well represented in the HLRF and LHSGIF seed mixes respectively.

117 Structures(a) Camp Road twin bridges:The Camp Road twin bridges must be designed in sympathy with the suite of bridges for the Project Works, and must utilise natural materials and dark colours to blend the structure with the enclosed landscape character at this location.

B.6.8 BR15 and HEX-DW-SB-31-D202 to HEX-SB-23-D402 inclusive

Y Verified as generally complying at 15% . C

118 15.12.7 Character Zone 10LandscapingThe Contractor must prepare the landscape design for Character Zone 10 consistent with the landscape themes detailed in the drawings ‘Landscape Plan Zone 10a’ and ‘Landscape Plan Zone 10b’ on pages 186 and 187 of the Report and the drawings’ associated legend on page 185 of the Report. The landscape design within this character zone must create a strong bushland character that reinforces the enclosed, high visual quality of the surrounding landscape.The landscape design must reinforce the existing indigenous associations of Lower Hunter Spotted Gum Woodland and, in the wetter drainage lines, creeks and low lying areas, Hunter Lowland Redgum Forest. The creek including Sawyers Creek and Anvil Creek must be revegetated with the Hunter Lowland Redgum Forest species to express the creek crossings.Wire rope barriers must be used, as far as is compatible with the engineering design requirements, to minimise vegetation clearance and environmental fragmentation.At the cutting at approximate chainage 32800, bushland revegetation on the batters must be densely planted to assist in visually ameliorating the works, as shown on the drawing of the typical section shown on page 188 of the Report.The landscape design at Tuckers Lane Overpass must assist in visually ameliorating the proposed bridge with the surrounding landscape. Dense screening must be provided to the south west of Tuckers Lane Overpass to provide a visual screen from the houses to the south to the Main Carriageway

Landscape Planting Plans HEX-LS-22-D139, HEX-LS-22-D140, HEX-LS-22-D141, HEX-LS-22-D142, HEX-LS-22-D143, HEX-LS-22-D144

Y Noted as generally complying at 15%. Further detail provided at 85% including -- extent of WRB -- species selection to reinforce LCZ's and existing plant community associations -- species nominated for dense screening from houses to Main Carriageway - shrub mix for hydromulching cutting at approximate chainage 32800

C

Page 47: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 277

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

119 Structures(a) Tuckers Lane transverse bridge:The Tuckers Lane transverse bridge must be designed in sympathy with the suite of bridges for the Project Works.The urban design of the Tuckers Lane transverse bridge must be consistent with the urban design themes detailed in the drawings ‘Tuckers Lane Bridge’ and ‘Tuckers Lane Bridge cross section’ on pages 189 and 190 of the Report.

BR.17 Tuckers Lane Bridge

M Noted as generally complying at 15%. Further relevant information on the urban design elements of the bridge are not provided in the 85% documents

See urban design report

120 15.12.8 Character Zone 11LandscapingThe Contractor must prepare the landscape design for Character Zone 11 consistent with the landscape themes detailed in the drawings ‘Landscape Plan Zone 11a’, Landscape Plan Zone 11b, Landscape Plan Zone 11c’ and ‘Branxton Interchange’ on pages 193 to 196 inclusive of the Report and the drawings’ associated legend on page 194 of the Report.. Planting themes must respond to the existing woodland forest to the south of Branxton, the open floodplain of the Black Creek, and create an effective gateway into Branxton.Landscape design must exploit the views to the north to distant ranges (Barrington Tops) and the open views across the floodplain.The landscape treatment at Branxton Interchange must be consistent with the landscape themes detailed in the drawing ‘Branxton Interchange’ on page 196 of the Report and drawing of the section ‘Chainage 35250’ on page 197 of the Report, and must reinforce the wine region theme by using abstract landscape plantings of linear shrubs to reflect the character of the vineyards in a grape vine pattern, together with a ground layer of coal mulch. Retaining walls must use local blue-grey stone as facing elements.Planting surrounding the Branxton Interchange must reinforce the association with the indigenous Lower Hunter Spotted Gum Ironbark.

Landscape Planting Plans HEX-LS-22-D139 to HEX-LS-22-D154 & 3.1.1.7 Landscape Character Zone 11

M Noted as generally complying at 15%. Additional information required in 100% documents for the setout of low linear shrubs in the centre of the interchange. The following changes from 15% noted and explained;- gateway to the Hunter vineyard pattern concept is represented by olive feature trees planted in 300mm deep furrows. The following changes from 15% noted and require explanation;- Local blue stone gabion walls have been removed- Feature planting change to spotted gum in the centre of the interchange . - Ground layer of coal mulch has not been included.

I consultation with RTA peer reviewers it was decided that a setout of linear tree plantings would be more enduring than shrubs. In order to represent the agricultural pattern these have been translated as rows of Olive trees. A non-fruiting variety has been selected. Coal Mulch has been removed due to danger of flammability and difficulty of maintaining in the long term. RTA requested that the Gabion wall with blue stone be removed as a cost saving measure and was low anyway so did not provide much visual impact as grasses would obscure much of it. Planting in the centre of the interchange has always been Spotted Gum, however has been changed to tubestock planting to offsett cost of 50 litre Olive trees

121 Structures(a) Branxton Interchange twin bridges:The Branxton Interchange twin bridges must be designed in sympathy with the suite of bridges for theProject Works.The urban design of the Branxton Interchange twin bridges must be consistent with the urban design themes detailed in the drawing ‘Artistic rendering of a view within the proposed Branxton Interchange’ on page 199 of the Report.(b) Branxton Interchange bridge over Main Northern Railway:The Branxton Interchange bridge over Main Northern Railway must be designed in sympathy with the suite of bridges for the Project Works, but in this instance, the abutment walls must be kept vertical for simplicity.(c) Branxton Interchange bridge over Anvil Creek:The Branxton Interchange bridge over Anvil Creek must be designed in sympathy with the suite of bridges for the Project Works, and the overall depth of the bridge must be kept to a minimum.(d) Wine Country Drive transverse bridge:The Wine Country Drive transverse bridge must be designed in sympathy with the suite of bridges for the Project Works.(e) Main Northern Railway twin bridges:The Main Northern Railway twin bridges must be designed in sympathy with the suite of bridges for the Project Works, with a walled abutment between the bridges to minimise the extent of the bridge spans.(f) Black Creek twin bridges:The Black Creek twin bridges must be designed in sympathy with the suite of bridges for the Project Works.

B.5.3 BR18, B.5.4 BR 19, B.5.12 BR22, B.7.2 BR21, B.5.5 BR23, B.5.6 BR24 and HEX-DW-SB-31-D202 to HEX-SB-23-D402 inclusive

Y Bridge structures (a),(b),(c),(d),(e) & (f) appear to generally comply.

Page 48: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )278

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Appendix C RESPONSES TO RTA COMMENTS

Not available at this time

Page 49: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 279

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Page 50: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )280

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Appendix D ENVIRONMENTAL COMPLIANCE REGISTER

Page 51: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 281

Appendix A

DESIGN LOT U6 DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Page 52: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )282

This page intentionally left blank

Page 53: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 283

Appendix B

HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON

DESIGN LOT U6

LANDSCAPE MAINTENANCE PLAN (100%)

INCORPORATING LANDSCAPE REHABILITATION PLAN

SYU-002251-DR-03

02 September 2011

APPENDIX B:

LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING THE LANDSCAPE REHABILITATION PLAN

Page 54: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )284

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |ii

TABLE OF CONTENTS1 BACKGROUND ............................................................................................................................................ 1

1.1 Project Background ........................................................................................................................ 1 1.2 Purpose of this Report ................................................................................................................... 1 1.3 Where this Plan Applies ................................................................................................................. 2 1.4 Landscape Maintenance Responsibility ......................................................................................... 2 1.5 Landscape Types to be Maintained ............................................................................................... 3

2 SUMMARY TABLE OF MAINTENANCE REQUIRED ...................................................................................... 6 3 MAINTENANCE ACTIONS ......................................................................................................................... 11

A. All Areas .................................................................................................................................... 11 A. Specific Landscape Types .................................................................................................... 15

Grassed (Mown) Areas ................................................................................................................ 15 Vegetation Areas (Hydromulch) ................................................................................................ 16 Planting Areas (Tubestock) ........................................................................................................ 18 Landscape Bed Plantings ........................................................................................................... 20

Areas of Special Consideration ...................................................................................................... 31

4 LANDSCAPE REHABILITATION PLAN ......................................................................................................... 36

4.1 Landscape Rehabilitation Areas Disturbed by Construction Activities ........................................ 36 4.2 Bushland Regeneration Areas ...................................................................................................... 37 4.3 Bushland Reconstruction Areas ................................................................................................... 38 4.4 Clearing Limits ............................................................................................................................. 39 4.5 Maintenance in Landscape Rehabilitation Areas ......................................................................... 39 4.6 Monitoring of Landscape Rehabilitation Works .......................................................................... 39

5 TOPSOIL MANAGEMENT .......................................................................................................................... 40

5.1 Landscape Topsoils ...................................................................................................................... 40 5.2 Bushland Topsoils ........................................................................................................................ 40 5.3 Topsoil Management Zones ......................................................................................................... 43 5.4 Topsoil Management in Landscape Rehabilitation Areas ............................................................ 43

5.4.1 Stripping .............................................................................................................................. 43 5.4.2 Direct Return ....................................................................................................................... 44 5.4.3 Stockpiling ........................................................................................................................... 44 5.4.4 Preparation for bushland topsoil application ..................................................................... 45 5.4.5 Application of bushland topsoil .......................................................................................... 45

5.5 Topsoil Application ....................................................................................................................... 47 5.6 Cover Crop ................................................................................................................................... 49

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |iii

LIST OF APPENDICESAppendix A LIST OF DRAWINGS Appendix B NOXIOUS WEED SPECIES: CESSNOCK, MAITLAND & PORT MACQUARIE Appendix C THREE MONTHLY MAINTENANCE AUDIT

LIST OF FIGURESFIGURE 4.1 EXTENT OF LANDSCAPE REHABILITATION AREAS ................................................................................ 36 FIGURE 5.1 LANDSCAPE TOPSOIL PROCEDURES ..................................................................................................... 41 FIGURE 5.2 BUSHLAND TOPSOIL PROCEDURES ...................................................................................................... 42 FIGURE 5.3 TOPSOIL EXTENTS................................................................................................................................. 43 FIGURE 5.4 SUGGESTIONS FOR WINDROWING TOPSOILS AND MULCH FOR LATER SPREADING ON BATTERS ..... 47

Page 55: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 285

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton Page |iv

DOCUMENT HISTORY AND STATUS

Revision Date Issued

Reviewed By

Approved By

Revision Type

01 26/05/2011 D.Mansfield J.Kemp 85% Submission

02 16/06/11 D.Mansfield J.Kemp 85% Submission

03 2/09/11 D.Mansfield J.Kemp 100% Submission

Revision Copy Number

Quantity Issued to

01 01 01 Brendon Johnson - Abigroup

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

1 B AC K G R OUND

1.1 P rojec t B ac kground

The Landscape Maintenance Plan (LMP) is designed to provide a methodology for both the short term landscape maintenance undertakings required of the contractor and the longer term maintenance scope of the authorities responsible for the maintenance following handover. It differs in content to the standard Landscape Maintenance Plan in that it contains additional information on the management and maintenance requirements for Landscape Rehabilitation Areas (LRP). Landscape Rehabilitation Plan A Landscape Rehabilitation Plan is incorporated into the LMP prepared by HBO+EMTB in consultation with the Project Landscape Restoration Manager and Soil Scientist and with input from the Office of Environment and Heritage. The Landscape Restoration Manager engaged by Abigroup will oversee and monitor both the landscape rehabilitation areas and also the general landscape works for a period of not less than three years. If the landscape restoration manager is also not suitably qualified as a landscape specialist for the general landscape works then such a person will be engaged. The LRP is generally consistent with the Hunter Expressway Brief for Landscape Rehabilitation and includes;

Identification of areas within the road corridor to be subject to landscape rehabilitation consistent with this Appendix. Desired landscape rehabilitation outcomes for each rehabilitation area consistent with the performance requirements outlined in Appendix 15 of the SWTC. Landscape rehabilitation techniques to be adopted for each rehabilitation area consistent with Appendix 15. Identification of propagation and nursery materials required to carry out landscape rehabilitation in accordance with this Appendix 15. Quality control procedures to ensure execution of works in accordance with the requirements of the Project Deed. This includes preparation and implementation of a stepwise inspection and test plan to confirm that the required rehabilitation standards outcomes have been achieved. Training of all construction personnel involved in clearing, stripping, stockpiling and topsoiling activities in relation to rehabilitation requirements. The training must describe clearing, topsoil stripping, stockpiling, and application techniques to be employed on the project. Maintenance requirements of each rehabilitation area until the completion of works under the Project Deed. Rehabilitation activities must be designed and implemented to avoid minimal maintenance at the completion of works under the Project Deed. Monitoring of rehabilitation areas at 3-monthly intervals to measure performance against the performance requirements outlined in Appendix 15 and provide recommendations for improvement. Monitoring must extend for the duration of the landscaping maintenance period. Monitoring reports must be provided to the RTA.

1.2 P urpos e of this R eport

This Landscape Maintenance Plan (LMP) has been requested by the RTA to promote the cost effective and consistent management of roadside landscape vegetation established for the Hunter Expressway F3 to Kurri Kurri. This LMP promotes a standard approach to the maintenance of landscape plantings, both in technique and frequency. To avoid duplication and to highlight the specific maintenance requirements of some landscape types, the LMP details the required maintenance actions into two categories:

1. All Areas Those maintenance actions that apply to every section of the landscape.

Page 56: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )286

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

2. Specific Landscape Types Those maintenance actions specific to the different landscape types present (This includes Landscape Rehabilitation Areas).

1.3 Where this P lan Applies

This LMP applies to Hunter Expressway Kurri Kurri to Branxton.

The scope of works and associated drawings are divided into three landscape management sections:

Eastern Section (Kurri Kurri to Old Maitland Road): Station 12900 to Station 21700

Middle Section, (Old Maitland Road to Camp Road Underpass) Station 21700 to Station 30100

Western Section, (Camp Road to Black Creek) Station 30100 to Station 39500

The approximate locations of these sections are illustrated Figure 1.

1.4 L ands c ape Maintenanc e R es pons ibility

Three agencies are responsible for the maintenance of roadside landscapes within this LMP:

Agency Extent of responsibility on Hunter Expressway Kurri Kurri to Branxton.

Council Local service roads, roundabouts and intersections and public areas immediately outside of

highway corridor

RTA Hunter Expressway corridor – for the lifetime of the expressway

Abigroup All- from the commencement of construction until the date of construction completion and

for 12 months post completion.

Abigroup -

Landscape

Rehabilitation

Areas

Bushland Restoration Areas. Abigroup have engaged a landscape restoration manager who

will carry out, monitor and maintain landscape rehabilitation areas for a period of 3 years

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Grass Areas (Mown)

Road edge mowing strips

Medians

Branxton Truck Rest Area

Fauna fence maintenance

Track and clear zones.

(Abigroup is required to mow grass during construction, establishment and maintenance period. Thereafter mowing is by others)

Landscape Planting Beds

Landscape planted beds. These vary in appearance from mass plantings of single species (eg. Lomandra sp; Dianella sp) to more complex beds containing advanced trees, low and tall shrubs and ground covers.

Planting size includes tubestock and 35 litre.

Vegetation (Hydromulch)

Shrubs and groundcovers are seeded using the hydromulching method. Species mix varies according to location and plant community.

The design intent is to allow an easy, quick and repeatable method of establishing vegetation cover with particular concern for soil stability. Where a vegetated area fails (ie; scouring, land slippage) the soil profile is reconstructed and re-hydromulched to re-establish vegetation cover.

At specific locations the hydromulch vegetation is over planted with tubestock tree species.

Hydromulch areas show the following variations, based on the plant species used in specific areas:

Pasture grasses (non-native species)

Native grasses

Groundcovers

Frangible shrubs

Mixes including all of the above

Planting (Tubestock)

Mass planting using tubestock of tree/tall shrub, frangible shrubs and groundcover species.

Planting of tubestock show the following variations, based on location, function and plant species used in individual areas:

Massed tubestock planted in hydromulched areas;

Massed tubestock in ponds, wetlands and creek corridors and fauna underpasses

Massed tubestock feature planting in roundabouts, medians, at bridges and sightline zones.

Page 57: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 287

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Grass Areas (Mown)

Road edge mowing strips

Medians

Branxton Truck Rest Area

Fauna fence maintenance

Track and clear zones.

(Abigroup is required to mow grass during construction, establishment and maintenance period. Thereafter mowing is by others)

Landscape Planting Beds

Landscape planted beds. These vary in appearance from mass plantings of single species (eg. Lomandra sp; Dianella sp) to more complex beds containing advanced trees, low and tall shrubs and ground covers.

Planting size includes tubestock and 35 litre.

Vegetation (Hydromulch)

Shrubs and groundcovers are seeded using the hydromulching method. Species mix varies according to location and plant community.

The design intent is to allow an easy, quick and repeatable method of establishing vegetation cover with particular concern for soil stability. Where a vegetated area fails (ie; scouring, land slippage) the soil profile is reconstructed and re-hydromulched to re-establish vegetation cover.

At specific locations the hydromulch vegetation is over planted with tubestock tree species.

Hydromulch areas show the following variations, based on the plant species used in specific areas:

Pasture grasses (non-native species)

Native grasses

Groundcovers

Frangible shrubs

Mixes including all of the above

Planting (Tubestock)

Mass planting using tubestock of tree/tall shrub, frangible shrubs and groundcover species.

Planting of tubestock show the following variations, based on location, function and plant species used in individual areas:

Massed tubestock planted in hydromulched areas;

Massed tubestock in ponds, wetlands and creek corridors and fauna underpasses

Massed tubestock feature planting in roundabouts, medians, at bridges and sightline zones.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Areas of Special Consideration

These areas may vary in appearance and function and have specific maintenance requirements in addition to other landscape types listed.

Batter Re-Vegetation Management Strategy

Fauna Underpasses

Fauna Fence

Buchanan Rest Area

Water Quality ponds

Riparian Zones

Bushland regeneration area (see LRP)

Bushland reconstruction area (see LRP)

Bushland rehabilitation Areas disturbed by construction activities (side tracks) (See LRP)

The exact extent of these landscape types is illustrated on the landscape planting and seeding plans.

Page 58: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )288

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

2 S UMMAR Y T AB L E OF MAINT E NANC E R E QUIR E D

Maintenance Actions Tasks Timeframes / Frequency

Weekly Monthly Seasonal As Required

As Specified Below

Su Au Wi Sp

All Areas (Summarised from Section3 of this LMP)

1. Pruning of Vegetation for Safety

Maintaining driver and pedestrian sightlines

Vegetation in intersection traffic islands

Pruning trees over carriageways, roads, paths and cycle ways.

2. Management of Non Frangible Vegetation

Remove woody “non-frangible” vegetation in setbacks

As Required

3. Noxious Weed Control

Treat noxious weeds according to control category

4. Rubbish Removal Remove all roadside litter and debris.

And prior to Mowing

5. Auditing and Reporting

Audit and report on maintenance and additional works

Every three months

Grassed Areas (Mown) Only

(Summarised from Section 3 of this LMP)

1. Mowing Mow grass to a minimum / maximum height of 5cm.

Every 6 weeks

Every 8 weeks

Every 12 weeks

Every 8 weeks

2. Replacement of Damaged Grass

Re-establish damaged turf.

4. Weed Control in Grass

Control weeds in turf areas using selective biodegradable herbicides.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Maintenance Actions Tasks Timeframes / Frequency

Weekly Monthly Seasonal As Required

As Specified Below

Su Au Wi Sp

Hydromulch areas (Summarised from Section3 of this LMP)

1. Weeding Weed garden beds (manual or biodegradable herbicide) before weed seed set.

Bi-monthly

Use biodegradable herbicide only

Replace landscape plants damaged or killed by herbicide.

Should this happen it suggests improper use. Review manufactures instructions and application method

2. Remove Dead/Dying Vegetation

Cut back and remove dead or dying planting material. Do not pull root out. Replace topsoil as required. Prepare topsoil by loosening surface. Ensure topsoil depth is even across affected area and has a smooth transition into the existing vegetation.

3. Replacement Hydromulch

Reapply hydromulch as per specification. Hydromulch seed mix as per vegetation plans and equal to what has been applied previously. Apply sufficient hydromulch to achieve consistent vegetation cover over affected area

When possible, apply hydromulch during optimum seasonal conditions

Tubestock areas (Summarised from Section3 of this LMP)

1. Weeding Weed planting area (manual or biodegradable herbicide) before plant flowers.

Bi-monthly

Use biodegradable herbicide only

Page 59: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 289

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Maintenance Actions Tasks Timeframes / Frequency

Weekly Monthly Seasonal As Required

As Specified Below

Su Au Wi Sp

Replace landscape plants damaged or killed by herbicide.

Should this happen it suggests improper use. Review manufactures instructions and application method

2. Mulching Reapply mulch to individual tubestock and maintain to a depth of 75 mm min

Do not apply mulch in areas within water zone ie ponds and creek lines

Every two years

3. Removal of Dead / Dying Plant Material

Remove dead or dying planting material and replace.

4. Replacement Plantings

Replace failed plantings with specified species and densities.

Water replacement plantings for 12 weeks.

5. Tree Guards and Stakes

Check and repair damaged tree guards and stakes during establishment.

Replace damaged tree guards and stakes during establishment.

Remove tree guards and stakes.

12 months after planting

6. Fertilising and Pruning

Fertilise all plantings at specified rates.

At time of planting

Prune all plantings in specified manner:

Refer All Areas, Point 1

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Maintenance Actions Tasks Timeframes / Frequency

Weekly Monthly Seasonal As Required

As Specified Below

Su Au Wi Sp

Landscape Bed Plantings Only

(Summarised from Section3 of this LMP)

1. Weeding Weed garden beds (manual or biodegradable herbicide) before plant flowers.

Use biodegradable herbicide only

Replace landscape plants damaged or killed by herbicide.

Should this happen it suggests improper use. Review manufactures instructions and application method

2. Mulching Reapply mulch to maintain a depth of 75 mm min.

Every two years

3. Removal of Dead / Dying Plant Material

Remove dead or dying planting material and replace.

4. Replacement Plantings

Replace failed plantings with specified species and densities.

Water replacement plantings for 12 weeks.

5. Tree Guards and Stakes

Replace damaged tree guards and stakes during establishment.

Remove tree guards and stakes.

12 months after planting

6. Fertilising and Pruning

Fertilise all plantings at specified rates.

Prune all plantings in specified manner:

• Trees refer All Areas Point 1

Page 60: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )290

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Maintenance Actions Tasks Timeframes / Frequency

Weekly Monthly Seasonal As Required

As Specified Below

Su Au Wi Sp

• Tall / Medium / Low Shrubs

After Flowering. Allow to grow to full potential

• Climbers Once per year. Allow to grow to full potential

• Groundcover / Tussocks

After Flowering. Allow to grow to full potential

Every 4 years

Areas of Special Consideration

(Summarised from Section3 of this LMP)

1. Refer Section 3

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

3 MAINT E NANC E AC T IONS

“The RTA Pesticide Use Notification Plan must be followed prior to herbicide application”

The Plan is available on the RTA Website at:

http://www.rta.nsw.gov.au/environment/downloads/rta_pesticide_plan_040107.pdf

Maintenance actions to be undertaken under this LMP are divided into two categories based on which landscape type is being maintained:

5. Actions for All Areas;Actions that apply to ALL landscape types / areas.

6. Specific Actions for Different Landscape Types.In addition to actions that apply to all landscape types / areas, these actions are applied to a specific landscape type.

A. All Areas

The following maintenance actions are to be implemented by all maintenance authorities (with reference to the Table of Responsibilities S1.3) across all areas of this LMP.

a) Pruning of Vegetation for Safety

Pruning to maintain driver sight lines; pruning to remove dead wood from over hanging paths, cycle-ways and roads.

Prune to an extent where this will not re-occur as a problem in the period to next routine maintenance without compromising overall form and growth potential of plant.

Actions Required Frequency

Maintaining driver sight lines

Within the sightline zone, prune all roadside vegetation, to a height of 300mm, when:

Vegetation obscures any part of horizontal railing of safety barriers, when viewed from approaching traffic within 300 m of all intersections and access roads. Any vegetation other than grasses and tussocks closer than 1.7m from the back of barrier

Monthly

Pruning trees over carriageways, roads, paths and cycle ways

Prune all roadside vegetation over carriageways, roads, paths and cycle ways when it is:

Carriageways / Roads: Lower than 5.5 m above carriageway;

Paths and Cycle ways: Lower than 3.3 m above path or cycleway

Page 61: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 291

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Actions Required Frequency

All areas: Overhanging dead / diseased/ badly damaged trees or limbs

b) Management of Non Frangible Vegetation

To ensure that non frangible vegetation is removed in dangerous areas in accordance with RTA safety standards.

Actions Required Frequency

Remove woody regeneration / woody weeds (ie. where trunk diameter exceeds 150 mm measured at 300 mm from the ground) in set backarea by manual removal if present in the following areas:

Annual

Set backs from edge of travel lane:

With safety rail present:

1.7m.

With no safety rail present, setback varies as follows:

<70 km/h speed zones: 5 m

70-90 km/h speed zones: 9 m

>90 km/h speed zones: 11 m

c) Noxious Weed Control

Noxious weeds continuously controlled as per legal requirements.

Actions Required Frequency

Continuously suppress and destroy, in accordance with their control category, the growth of all declared noxious weeds where present or where they establish.

Of particular concern are;

The areas planted with Pasture Grass. These areas must remain free of noxious weeds, in particular Giant Parramatta Grass;

All areas where site topsoil has been respread. Site topsoil has beennoted to contain Lantana seed.

Monthly

Declared noxious weed species within the area are listed in

Appendix 2 – Noxious Weed Species and Control Categories (pg. 26) of this LMP.

d) Rubbish Removal

Litter and roadside debris removal.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Actions Required Frequency

Remove all roadside litter and debris. Weekly and prior to mowing.

Page 62: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )292

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

e) Auditing and Reporting

Regular auditing and reporting on maintenance works undertaken and additional works required.

Actions Required Frequency

Inspection of entire site to report on LMP maintenance compliance, report and enact remedial works.

Every 3 months

An auditing and reporting form is provided in Appendix 3 – Three Monthly Maintenance Audit of this LMP.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

A. Specific Landscape Types

Grassed (Mown) Areas

The following maintenance actions are to be implemented by all maintenance authorities in grassed (mown) areas.

The extent of grassed (mown) areas are illustrated on the Landscape Plans (Appendix 1) pg. 23.

a) Mowing

Maintenance of grasses areas for neat appearance and to maintain groundcover.

Actions Required Frequency

Remove litter prior to mowing.

Mow grass at road side to a min height of 50 mm and max height of 150 mm.

Mow grass at rest area picnic and transpiration areas to a min height of 50 mm and max height of 100 mm.

Do not scalp grass.

Clippings to remain where they fall except that: road surfaces, drains, footpaths, picnic areas and cycle paths shall be swept or raked clear of clippings and these clippings shall be removed from site.

Spring – Every 8 weeks

Summer – Every 6 weeks

Autumn – Every 8 weeks

Winter – Every 12 weeks

b) Replacement of Damaged Grass

Replacement of grass damaged by vehicles or other disturbances.

Actions Required Frequency

Re-establish grass cover immediately after damage / death / removal. Use originally specified species.

As Required

c) Weed control in Grass

Ensure that grass remains weed free.

Actions Required Frequency

Control, through the use of selective herbicides, the establishment and growth of weed species in turf.

Herbicide use to be in accordance with regulation rates and manufacturers recommendations. Dye (colour: red) is to be added to herbicides to show extent of treated area.

Monthly

Page 63: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 293

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Vegetation Areas (Hydromulch)

The following maintenance issues and actions are to be implemented by all maintenance authorities in vegetation (hydromulch) areas.

The extent of vegetation (hydromulch) areas is illustrated on the Landscape Plans (Appendix 1) pg. 23.

a) Weeding

To ensure that environmental weeds do not reproduce within vegetation (hydromulch) areas and compete with vegetation.

Weeding and weed control is considered to be a critical maintenance action.

Actions Required Frequency

Prevent reproduction of weeds by destroying seedlings and established weeds before seed set or other propagules form. Weeds to not exceed 10% cover in any 50m2 area.

Monthly

Herbicide application must occur before weed seed set. Non-target species and areas must be reinstated if damaged by herbicide application.

Herbicide use to be in accordance with regulation rates and manufacturers recommendations.

Dye is to be added to herbicides to show extent of treated area.

Use of bio-degradable herbicide is encouraged

b) Mulching

Maintain an adequate level of mulch in planted beds where these are located within otherwise hydromulch areas, to maximise soil binding, water conservation and weed suppression.

Actions Required Frequency

Mulch is applied as part of the hydromulch application process. Maintain mulch in planted beds in otherwise hydromulched areas to a depth of minimum 75mm. through periodic applications

As required

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

c) Removal of Dead / Dying Plant Material

To remove dead or dying plant material from landscapes. This action may be required as plantings mature, after damage or adverse environmental conditions.

Actions Required Frequency

Remove dead or dying plant material only if contact between re-applied hydromulch and ground will not occur. Preference is to slash and leave existing dead or dying plant material to act as additional mulch material

As required.

Replacement of plantings in accordance with actions listed in 4. Replacement Plantings (below)

d) Replacement Plantings

To ensure that the density and species of established plant material is maintained.

Actions Required Frequency

Replace failed, senescent or damaged plantings. Densities and species used are to be in accordance with those specified in the original landscape plans.

Water replacement plantings for a minimum of 12 weeks after planting.

As Required

Weekly

The species density and species selections specified for each area of landscape covered by this LMP are provided in Appendix 1 – Landscape Plans (pg. 23)

Page 64: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )294

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Planting Areas (Tubestock)

The following maintenance issues and actions are to be implemented by all maintenance authorities in plantings (Tubestock).The extent of plantings (Tubestock) are illustrated on the Landscape Planting and Seeding Plans.

a) Weeding

To ensure that environmental weeds do not reproduce within planted beds and compete with plantings.

Weeding and weed control is considered to be a critical maintenance action.

Actions Required Frequency

Prevent reproduction of weeds by destroying seedlings and established weeds before seed set or other propagules form. Weeds to not exceed 10% cover in any 50m2 area.

Monthly

Herbicide application must occur before weed seed set. Non-target species and areas must be reinstated if damaged by herbicide application.

Herbicide use to be in accordance with regulation rates and manufacturers recommendations.

Dye is to be added to herbicides to show extent of treated area.

Use of bio-degradable herbicide is encouraged

b) Mulching

Maintain an adequate level of mulch in planted beds to maximise water conservation and weed suppression.

Actions Required Frequency

Maintain mulch depth to min 75 mm. though periodic applications.

Use same mulch as originally specified in each planting.

As required.

Mulch is to be applied to all existing and new planting (Tubestock).

Do not apply mulch to those areas of planting with the water line at creek lines, ponds and wetlands

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

c) Removal of Dead / Dying Plant Material

To remove dead or dying plant material from landscapes. This action may be required as plantings mature, after damage or adverse environmental conditions.

Actions Required Frequency

Remove dead or dying plant material. As required.

Replacement of plantings in accordance with actions listed in

4. Replacement Plantings (below)

d) Replacement Plantings

To ensure that the density and species of established plant material is maintained.

Actions Required Frequency

Replace failed, senescent or damaged plantings. Densities, sizes and species used are to be in accordance with those specified in the original landscape plans.

As Required

Water replacement plantings for a minimum of 12 weeks after planting. Weekly.

The species density and species selections specified for each area of landscape covered by this LMP will be provided in the Landscape Plans

e) Tree Guards and Stakes

To replace tree guards / stakes when damaged and to remove when no longer required.

Actions Required Frequency

Replace timber tree guards or stakes (for trees and shrubs) if damaged or removed prior to plant establishment. Replace with same or equivalent guard / stake.

As required.

Remove tree guards and stakes. 12 months after planting.

Page 65: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 295

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Landscape Bed Plantings

The following maintenance issues and actions are to be implemented by all maintenance authorities in landscape bed plantings.

The extent of landscape bed plantings are illustrated on the Landscape Planting and Seeding Plans.

a) Weeding

To ensure that environmental weeds do not reproduce within planted beds and compete with plantings.

Weeding and weed control is considered to be a critical maintenance action.

Actions Required Frequency

Prevent reproduction of weeds by destroying seedlings and established weeds before seed set or other propagules form. Weeds to not exceed 10% cover in any 50m2 area.

Monthly

Herbicide application must occur before weed seed set. Non-target species and areas must be reinstated if damaged by herbicide application.

Herbicide use to be in accordance with regulation rates and manufacturers recommendations.

Dye (colour: red) is to be added to herbicides to show extent of treated area.

b) Mulching

Maintain an adequate level of mulch in planted beds to maximise water conservation and weed suppression.

Actions Required Frequency

Maintain mulch depth to min 75 mm through periodic applications.

Use same mulch as originally specified in each planting.

As required.

Mulch is to be applied to beds at edges of roads, paths and verges.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

c) Removal of Dead / Dying Plant Material

To remove dead or dying plant material from landscapes. This action may be required as plantings mature, after damage or adverse environmental conditions.

Actions Required Frequency

Remove dead or dying plant material. As required.

Replacement of plantings in accordance with actions listed in

4. Replacement Plantings (below)

d) Replacement Plantings

To ensure that the density and species of established plant material is maintained.

Actions Required Frequency

Replace failed, senescent or damaged plantings. Densities, sizes and species used are to be in accordance with those specified in the original landscape plans.

As Required

Water replacement plantings for a minimum of 12 weeks after planting. Weekly.

The species density and species selections specified for each area of landscape covered by this LMP are provided in Appendix 1 – Landscape Plans

e) Tree Guards and Stakes

To replace tree guards / stakes when damaged, and to remove when no longer required.

Actions Required Frequency

Replace timber tree guards or stakes (for trees and shrubs) if damaged or removed prior to plant establishment. Replace with same or equivalentguard / stake.

As required.

Remove tree guards and stakes. 12 months after planting.

Page 66: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )296

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

f) Horticultural Maintenance of Plantings

Horticultural maintenance of advanced plantings to ensure the long life and maintenance of form.

The following tables outline the standards required for pruning and fertilising all Landscape Planter Bed or Feature Plantings.

Trees - Feature Planting

Botanic Name Common Name Pruning Type

Acmena smithii Lilly Pilly B

Allocasuarina littoralis Black She-Oak B

Allocasuarina torulosa Forest She-Oak B

Angophora bakeri Narrow-leaved Apple A

Angophora costata Sydney Red Gum B

Angophora floribunda Rough-barked Apple A

Callistemon salignus Willow Bottlebrush B

Casuarina glauca Swamp Oak B

Corymbia gummifera Red Bloodwood A

Corymbia maculata Spotted Gum A

Eucalyptus agglomerata Blue-leaved Stringybark A

Eucalyptus amplifolia Cabbage Gum A

Eucalyptus capitellata Brown Stringybark A

Eucalyptus crebra Narrow-leaved Ironbark A

Eucalyptus fibrosa Broad leaved Red Ironbark A

Eucalyptus grandis Flooded Gum A

Eucalyptus moluccana Grey Box A

Eucalyptus microcorys Tallowood A

Eucalyptus parramattensis subsp. Decandens

Parramatta Red Gum A

Eucalyptus pilularis Blackbutt A

Eucalyptus piperita Sydney Peppermint A

Eucalyptus punctata Grey Gum A

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Eucalyptus racemosa Narrow-leaved Scribbly Gum A

Eucalyptus robusta Swamp Mahogany A

Eucalyptus siderophloia Northern Grey Ironbark A

Eucalyptus signata Scribbly Gum A

Eucalyptus sparsifolia Narrow-leaved Ironbark A

Eucalyptus tereticornis Forest Red Gum A

Eucalyptus umbra Broad-leaved White Mahogany A

Ficus coronata Sandpaper Fig B

Glochidion ferdinandi Cheese Tree B

Syncarpia glomulifera Turpentine A

Melaleuca linariifolia Flax-leaved Paperbark B

Melaleuca styphelioides Prickly-leaved Paperbark B

Olea Europea “Swan Hill” European Olive (Non-fruiting variety)

B (prune lower limbs to 2m above ground)

Acmena smithii Allocasuarina littoralis Allocasuarina torulosa

Angophora bakeri Angophora costata Angophora floribunda

Page 67: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 297

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Callistemon salignus Casuarina glauca Corymbia gummifera

Corymbia maculata Eucalyptus amplifolia Eucalyptus crebra

Eucalyptus agglomerata Eucalyptus capitellata

Eucalyptus fibrosa Eucalyptus grandis Eucalyptus moluccana

Eucalyptus microcorys Eucalyptus parramattensis Eucalyptus pilularis

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

subsp. Decandens

Eucalyptus piperita Eucalyptus punctata Eucalyptus racemosa

Eucalyptus signata Eucalyptus robusta Eucalyptus siderophloia

Eucalyptus tereticornis Ficus coronata Glochidion ferdinandi

Syncarpia glomulifera Melaleuca linariifolia Melaleuca styphelioides

Olea Europea “Swan Hill”

Page 68: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )298

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

For all tree species, the following fertilising and pruning is required:

Apply the following fertiliser to all species:

Fertilising Frequency

10 grams slow release fertiliser per plant.

N:P:K ratio– 18:3:10

(The above fertiliser rates are in addition to those specified in the landscape details required at time of planting)

Annually.

Applied Late Spring.

Pruning Frequency

A Prune to remove split leaders, remove dead limbs, and remove heavily damaged limbs.

As maturity permits prune lower branches to collar to 5.5 m above ground level where these overhang carriageways and roads. In other areas, prune lower branches to 3.3m above ground level.

As required.

B Prune to remove split leaders, remove dead limbs, and remove heavily damaged limbs. As maturity permits prune lower branches to 1 m above ground level

As required.

C Prune to remove dead fronds. Remove fronds to base of crown of fronds; do not leave fronds hanging from trunk.

As required.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Feature Planting-Shrubs

Botanic Name Common Name Pruning Type

Max. Height.(m)

Banksia spinulosa Hair-pin Banksia B 2.5

Callistemon salignus Willow Bottlebrush B 2.5

Hakea dactyloides Broad-leaved Hakea B 2

Lambertia formosa Mountain Devil B 1.2

Leptospermum polygalifolium Lemon-scented Tea-tree B 2.5

Melaleuca decora White Feather Honeymyrtle B 3

Melaleuca linarifolia Flax-leafed Paperbark B 3

Melaleuca nodosa Ball Honeymyrtle B 2

For all shrub species, the following fertilising and pruning is required:

Apply the following fertiliser to all species: Prune species as per appropriate type:

Fertilising Frequency Pruning Frequency

10 grams slow release fertiliser per plant.

N:P:K ratio– 18:3:10

Annually.

Applied Late Spring.

B Prune evenly to promote compact shape (to specified max. height). Remove 200 to 300mm (depending on vigour of previous plant growth) length of branches all around the plant.

Annually.

Late Spring

C Tip prune to encourage density.

Annually after flowering.

Page 69: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 299

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Banksia spinulosa Callistemon salignus Hakea dactyloides

Lambertia formosa Leptospermum polygalifolium Melaleuca decora

Melaleuca linarifolia Melaleuca nodosa

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Feature Planting-Ground Covers / Low Tussocks

Botanic Name Common Name Pruning Type

Clematis aristata Old Man's Beard G

Dianella revoluta var. revoluta Spreading Flax Lily H

Hardenbergia violacea False Sarsaparilla G

Lepidosperma laterale Variable Sword Sedge H

Lomandra longifolia Spiny-headed Mat-Rush H

Lomandra multiflora subsp.multiflora Many flowered Mat Rush H

Oxylobium ellipticum Pea G

Phyllanthus hirtellus Thyme Spurge G

For all groundcover and low tussock species, the following fertilising and pruning is required:

Apply the following fertiliser to all species: Prune species as per appropriate type:

Fertilising Frequency Pruning Frequency

10 grams slow release fertiliser per plant.

N:P:K ratio– 18:3:10

Annually.

Applied Late Spring.

G Prune evenly to a height of 300mm above ground.

Every 2 years in April.

H Remove spent flower heads.

Annually.

Late Summer.

J Mowing Refer Grassed (Mown) Areas

Page 70: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )300

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Clematis aristata Dianella revoluta var. revoluta

Hardenbergia violacea

Lepidosperma laterale Lomandra longifolia Lomandra multiflora subsp.multiflora

Oxylobium ellipticum Phyllanthus hirtellus

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Areas of Special Consideration

The following maintenance issues and actions are to be implemented by all maintenance authorities in areas of special consideration.

The extent of special are illustrated generally on the LMP Landscape Plans

1. Batter Re-Vegetation Management Strategy

To ensure batter stability through the successful establishment of vegetation.

A batter management strategy is recommended as part of the long-term management of the road edge. The strategy will be audited and revised as experiences demands.

Activity Intervention Repair Standards

1. Topsoil and hydromulch Where areas larger than riling occur

After previous option fails

Reapply topsoil as specified in Landscape Plans and ensure an even finish and matches existing ground levels.

Vegetation is established and binds soil within first growing season.

2. Topsoil and hydroseed At areas where riling only occurs After initial growing season or next failure.

Vegetation is established and binds soil within first growing season, halting riling.

3. Engineered solutions may include anchor mat, or meshes

At slopes of 2:1 or steeper

After previous options fail

Apply topsoil type to ensure successful vegetation growth. Topsoil depth as per the anchor mat manufactures recommendations.

Vegetation is established and binds soil within first growing season.

4. One of the previous treatments plus Tubestock planting

After previous options fail and only in those areas where tree planting is permitted ie not interfering with sight-lines or within a setback zone

Vegetation is established and binds soil within first growing season.

5. Lastly shotcrete (although shotcrete is not preferred and would require urban design treatments to be visually acceptable

After previous options fail

Page 71: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 301

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

The cause of rilling should be identified and rectified before reapplication of topsoil etc.

All plant species, hydromulch and tubestock to be as per Landscape Planting and Seeding Plans

Geo-technical advice is recommended for each situation to identify potential variations in the physical properties of the underlying geology which may impact on the practicality of planting vegetation community type on a single cut batter. Final plant selection was varied to match the final exposed geological properties without variation to the design intent as best as possible.

Final plant selection for use at these locations should be as per the Landscape Planting and Seeding Plan to match those species in the existing adjacent vegetation community and that tolerate drier conditions due to potentially lower or non-existent water table.

2. Fauna Underpasses

To ensure that the integrity of the fauna underpasses is maintained.

Actions Required Frequency

Remove all plant growth from fence ie; vine growth As required

Remove all fallen branches and tree limbs that are leaning or resting on or against the fence or fauna crossing paths

As required

Maintain the grassed access path across the underpass to maintain height to 300mm max.

As required

Provide surveillance for evidence of predators such as foxes, cats and wild dogs and report to DEC if suspected.

monthly

Maintain fauna refuge poles and frog pipes in good condition and repair where necessary

As required

The species density and species selections specified for each area of landscape covered by this LMP will be provided in the Landscape Plans

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

3. Fauna Fence

To ensure that the integrity of the fauna fence is maintained.

Actions Required Frequency

Remove all plant growth from fence ie vine growth As required

Remove all fallen branches and tree limbs that are leaning or resting on or against the fence

As required

Maintain height of planting to maximum 300mm in height within 2 metres and remove all naturally occuring tree species within 3 metres of the non-road side of the fence.

As required

Maintain height of planting to maximum 300mm in height within 1m and remove all naturally occuring tree species within 2 metres on the road side of the fence except where shown on plan.

As required

The species density and species selections specified for each area of landscape covered by this LMP will be provided in the Landscape Plans

4. Water Quality Ponds and Detention Basins

To ensure that the integrity of the transpiration area is maintained.

Actions Required Frequency

Maintain grass species as per Grassed (Mown) Areas Refer Grassed (Mown) Areas

Weed macrophyte zones and embankments As required but only during dry periods when no water present

Macrophyte Zones should require no special attention except through periods of prolonged drought when local tree species may colonise the basins. These are to be removed.

As required

If spills occur or when silt build-up requires removal, macrophytes may require total replacement as per the landscape plans

As required

The species density and species selections specified for macrophyte (margin zone planting) zones covered by this LMP will be provided in the Landscape Plans

5. Threatened Species

Actions Required Frequency

Page 72: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )302

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Actions Required Frequency

Care is to be taken not to harm threatened flora within the road corridor. The location of all the threatened species is to be documented along with a monitoring report as per Appendix 14 of the SWTC to be issued for all individual threatened species covered in the EMP.

Annually

6. Site Works

There are a number of areas on the landscape plans that state “Extent of Works to be confirmed on site” This work is documented below.

Actions Required Frequency

1. Batch Plants

2. Compounds

3. Stockpiles

4. Other areas

Adjust extent of landscape works on site to suit. The yards will be in place during the maintenance period, after which the yard will be the subject of further landscape remediation as per Landscape Rehabilitation- Areäs Disturbed by Construction.

Completion of works

7. Buchanan Rest Areas – Northbound and Southbound

To ensure that the integrity and standard of the rest area is maintained for public amenity.

Actions Required Frequency

Remove all rubbish to prevent the blocking of permeable kerb. Remove rubbish from vegetated swales.

As required

Remove all fallen branches and tree limbs that are leaning or resting on or against water quality pond fences

As required

Maintain grassed areas as per “mowing” As per “mowing”

Maintain grassed septic absorption area as per mowing to maintain grass and removing

As per “mowing”clippings

Visually inspect amenities and alert RTA to any actions (such as vandalism or inoperable equipment) required outside the scope of the landscape maintenance

As required

The species density and species selections specified for each area of landscape covered by this LMP will be provided in the Landscape Plans

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

8. Riparian Zones

To ensure that the integrity of riparian zones is maintained for resilience to flooding.

Actions Required Frequency

Remove all rubbish and fallen branches to prevent the blocking of underbridges or culverts. Remove rubbish from vegetated zones.

As required

Inspection following abnormal rainfall events to assess any damage caused by increased flows. Take remedial action as for All Areas, replacement plantings and horticultural maintenance of plantings.

As required

Repair Jute Mesh where damage or lifting has occurred. As required

The species density and species selections specified for each area of landscape covered by this LMP will be provided in the Landscape Plans

9. Bushland Regeneration Area.

See Section 4. Landscape Rehabilitation Plan.

10. Bushland Reconstruction Area.

See Section 4. Landscape Rehabilitation Plan.

11. Bushland Rehabilitation Areas disturbed by construction activities (construction access tracks and other landscape types within bushland areas and used for construction purposes)

See Section 4. Landscape Rehabilitation Plan.

Page 73: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 303

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

4 L ANDS C AP E R E HAB IL IT AT ION P L AN

In addition to the above general aspects of the landscape, the landscape design also includes requirements as set out in Appendix 15 for Landscape Rehabilitation Areas. See Table 4.1 below for the extent of landscape rehabilitation areas. Landscape Rehabilitation Areas are designed to protect and improve the biodiversity of the dominant vegetation communities (especially those listed as EEC’s which include; Central Hunter Riparian Forest, Hunter Lowland Redgum Forest, Kurri Sand Swamp Woodland, Lower Hunter Spotted Gum-Ironbark Forest and post the original mapping now also includes Central Hunter Ironbark-Spotted Gum-Grey Box Forest) within the project area.

Chainage Description Dominant vegetation communities

12900 - 20000 Chainage 12900 to waterway at Chainage 20000

Kurri Sand Swamp Woodland Lower Hunter Spotted Gum Ironbark Forest

20700 - 26600 Waterway at Chainage 20700 to 800m south of Allandale interchange

Lower Hunter Spotted Gum Ironbark Forest Hunter Lowland Redgum Forest

28250 - 35300 750m north of Allandale interchange to Branxton interchange

Lower Hunter Spotted Gum Ironbark Forest Hunter Lowland Redgum Forest

Figure 4.1 Extent of Landscape Rehabilitation Areas

Landscape Rehabilitation Areas include the following sub types:

4.1 L ands c ape R ehabilitation Areas Dis turbed by C ons truc tion Ac tivities

These are areas which include de-commissioned side roads and tracks, batching plants, site offices and compounds, construction parking areas, and all other areas with slopes 3:1 or less which require rehabilitation following construction. These areas are indicated on the planting and seeding plans and topsoil plans and will be rehabilitated according to Appendix 15.6 and RTA Specification D & C R178 Vegetation which specify measures such as:

The method of stripping of A1 and A2 horizons topsoil for re-use in landscape rehabilitation areas;

Direct return of topsoil where practical;

Stockpiling of bushland topsoil in order to preserve the stored soil seedbank and soil micro-flora;

Preparation of receiving sites for bushland topsoil;

Composting and amelioration of components (site topsoil and woodchip) of bushland topsoil;

Application of bushland topsoil, and;

Application of the appropriate hydromulch seed mix and planting (according to character zone and vegetation community).

See section 5 for details of topsoil management and treatments for Landscape Rehabilitation Areas Disturbed by Construction Activities or HEX-LS-20-D003.

Within Landscape Rehabilitation Areas disturbed by construction activities, the Contractor must implement careful management of topsoil stripping, storage and return for the purpose of preserving the native species soil seedbank.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

In summary, the soil seedbank from nominated areas is to be salvaged during clearing operations, stored according to vegetation community type, and then spread on batters and road verges to revegetate the site as construction is progressively completed. In optimal circumstances, programming will facilitate the direct return of topsoil.

Apart from the obvious ecological benefits such as the return of the endemic species composition (the soil seedbank will be composed entirely of native seed in the areas proposed for this treatment), prevention of weeds and improved management of Endangered Ecological Communities (avoiding the introduction of non-local genetic material into EEC’s), the project cost savings could prove to be substantial by reducing the requirement for seed collection, hydromulching, and landscape planting.

Plant propagules other than seed can also be present in the salvaged soil. These can include the roots and tubers of herbaceous native irises, lilies and other plant types which can propogate from below ground plant parts. In the majority of native plant communities, species with soil-stored seed can comprise 20-50% of the total flora. Soil seedbanks are composed mainly of fast growing pioneer species, particularly ground layer species and shrubs. Many of these species are not reliably propagated from seed (eg; Persoonia spp.)

The extent of potential Landscape Rehabilitation Areas Disturbed by Construction are indicated on the Planting and Seeding Plans.

4.2 B us hland R egeneration Areas

These comprise well forested areas within the project boundary where within 12 months of commencement of the work they can be anticipated to have less than 15% weed cover. Regenerating the bushland within the project boundary will improve biodiversity and improve the expressway backdrop of native Australian landscape and pastoral views.

The Bush regeneration approach will utlilise 5 strategies in order to remove weeds:

1. Primary weeding, spraying weeds with herbicide - selective spraying of weeds with herbicides. do not spray where herbicide could fall into a watercourse or when wind conditions could cause drift outside the area to be treated or onto desirable plants. remove by hand any weeds which cannot be controlled by herbicide. carry out grass and weed removal and ensure that weeds do not flower to form seed heads;

2. Major weeding, woody weed control - cutting/scraping and painting deep rooted woody weeds such as lantana and climbers with hand tools, chainsaws and brush cutters and painting cut stumps with herbicide, and selective hand removal of weeds;

3. Targeted weeding - target drilling and injecting certain large exotic trees such as camphor laurel, large and small-leaf privet between december and april, whilst sap flow is at optimum levels for herbicide translocation, with herbicides such as glyphosate and a garlon/diesel mix;

4. Hand removal, and;

5. Burning areas dominated by naturalised grasses.

Avoid disturbance to remnant native plants and to soil stored seed banks, which may contain dormant native plant propagules. all weeds are to be targeted during the primary weeding phase

Follow-up weeding will be undertaken in areas that have received a primary weeding treatment, including selective removal or treatment of weeds, whilst allowing regenerating or planted native plants to increase in size, abundance and percentage cover. All weeds are to be targeted during the follow up weeding phase. Follow-up bush regeneration work is to commence no longer than 3 months after the first exposure to primary weeding, and continue to a point where native plants occur at 95% or higher cover levels

Maintenance weeding is to be undertaken in areas where native plant regeneration has significantly progressed to the stage where native plants occur at high percentage cover levels (95% or greater).

Bushland regeneration is to be undertaken by appropriately qualified bush regenerators. All bush regenerators will have attained or be in the process of completing the TAFE certificate ii course in natural area restoration, or an equivilant qualification which has strong practical application of the principles of natural regeneration.

Page 74: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )304

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

The D and C will make all efforts to exclude access to these areas other than the designated bush regenerators, to prevent disturbance and the introduction of weeds. Access should be strictly policed because the savings in later remedial action are likely to be significant.

This is particularly pertinent because since the LHCCREMS native vegetation mapping by Biosis Research in 2005 upon which the landscape rehabilitation areas and clearing limits are based, ground –truthing has shown that there has been significant increases in the regrowth vegetation cover of bushland.

The extent of potential bushland regeneration areas are indicated on the Planting and Seeding Plans.

4.3 B us hland R ec ons truc tion Areas

These are areas within the project boundary where existing bushland or bushland remnants surround or are in proximity to clearings, and where the new expressway would cause these areas to become “Island” clearings.

These areas will be subject to landscape rehabilitation through active revegetation (called “Bushland Reconstruction”) to “infill” the “gaps” in the existing bushland. This increases the area of each vegetation community, compensates for some of the loss due to clearing for the expressway and improves habitat connectivity for fauna. The majority of bushland reconstruction will be comprised of the five vegetation communities found to be occurring along the western section of the highway, four of which are listed as Endangered Ecological Communities.

It is anticipated that many of these areas will have topsoil horizons intact and will not require additional topsoil. In addition there are often remnant trees, shrubs or native grasses present which precludes extensive cultivation. Soil preparation will include the addition of ameliorants and cultivation as recommended by the project soil scientist. Direct seeding of natives with the appropriate hydromulch seed mix (according to character zone and vegetation community), and/or mass planting. Follow up weed control will contribute to a well vegetated corridor with improved biodiversity.

Where no remnant or regrowth bushland is found, Bushland Reconstruction Areas provide an ideal case for direct return of bushland topsoil. Prepare these area ahead of topsoil stripping of the alignment construction footprint by spraying with glyphosate at the recommended rate to remove pasture grasses and weeds, stripped A1 horizon topsoil can be placed directly over the area. This soil should contain sufficient seed for rapid germination. Ensure that the stripped soil originates from the adjacent vegetation communities. See Section 5.5 of this report for topsoil treatments for Bushland Reconstruction Areas or HEX-LS-20-D003.

in addition to direct return and in order to control erosion, hydromulch the entire area where shown on the landscape plans with the appropriate hydromulching mix. Note that Hydromulch mixes in the landscape schedules do not contain tree seed. Tree seed from the appropriate vegetation community can be added to the hydromulch mixes for Bushland Reconstruction Areas because all are beyond the required clearance distances.

Areas of bushland reconstruction were identified from aerial mapping. In the intervening period since mapping, ground –truthing has shown that bushland has increased in some areas through regrowth with the introduction of very few weeds. Therefore many of the areas indicated as bushland reconstruction may be best managed as bushland regeneration areas with no planting seeding or mulching required. Such areas will be identified on site by the Landscape Restoration Manager.

As for bushland regeneration areas, it is in the contractors interest to restrict access to these areas wherever possible in order to allow the natural regrowth to continue for the duration of the construction period.

The extent of potential bushland reconstruction areas are indicated on the Planting and Seeding Plans.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

4.4 C learing L imits

Beyond the clearing limits shown on the landscape plans are extensive Landscape Rehabilitation Areas. The single most important task of the Landscape Restoration Manager is to restrict access to these areas. Failure to do so will result in the degradation of intact or naturally regenerating vegetation communities which must be then rehabilItated at greater cost. Restricting access is also the single most effective method of preventing the introduction of weeds to these areas.

4.5 Maintenanc e in L ands c ape R ehabilitation Areas

Following establishment, the maintenance required for landscape rehabilitation areas follows that described for Landscape maintenance in other areas (see landscape maintenance plan). Those that can be described as bushland regeneration areas will utilize the weed removal strategies described in that approach.

Maintenance of Landscape rehabilitation areas will continue throughout the project works from the commencement of construction until the date of construction completion and for 12 months post completion.

4.6 Monitoring of L ands c ape R ehabilitation Works

Any augmentation of Landscape Rehabilitation Areas through weed control, planting, seeding or translocation of topsoil will be monitored. Monitoring will take place within each vegetation community and within each landscape rehabilitation type. Each location would be marked with a stake, which is used as the centre of a 20m radius sample plot. Data on a range of environmental and biological variables should be collected prior to the translocation, and photographs taken of the sites. Photographs should be taken from the same position during each monitoring session. Examples of variables that would be monitored include:

Habitat condition;

Floristics and structure;

The environmental parameters controlled, such as weeds, irrigation and grazing animals;

The intensity of management required;

Growth and survival of planted seeds;

The survival of the target species established; and,

Reproduction of translocated and self-recruited plants.

In addition, the presence of any threatened species identified within the Bushland Rehabilitation Areas should be

monitored and data collected as above.

Monitoring of rehabilitation works is to be performed at 3 monthly intervals throughout the contract period in order

to measure performance against the requirements of Appendix 15 and to provide recommendations for

improvement. Monitoring reports must be provided to the RTA representative. See Appendix C for 3-monthly

maintenance form

Page 75: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 305

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

5 T OP S OIL MANAG E ME NT

Topsoil management, as detailed in Appendix 15, Version 6.0, of the SWTC and topsoil drawings HEA-GEN-DRG-LA001-301 to 326, has been carefully considered in respect of opportunities for:

direct return of topsoil;

soil amendments;

the utilization of organic materials and other soil ameliorants as additives to improve soil quality, and;

the stockpiling of topsoil to preserve the soil seed bank and to ensure soils from plant communities remain intact and are returned to areas where those plant communities occur.

The application of these requirements for the Kurri Kurri tio Branxton section are described below.

Landscape Topsoil and Bushland Topsoil.

Two terms are used to describe the topsoils used for this project. Landscape Topsoils and Bushland Topsoils

5.1 L ands c ape T ops oils

All topsoils which are not required for landscape rehabilitation areas are hereafter referred to as “Landscape Topsoils”. Landscape topsoils are generally from areas of the alignment where existing (mainly exotic) pasture is the main vegetation cover but may also include patches of bushland or remnant trees. Generally there is no intact existing vegetation community present.

Unlike Bushland topsoils, there is no requirement to strip, store or apply landscape topsoils according to vegetation community. Therefore landscape topsoils are to be stripped and stored according to RTA specification R44.

The method for treating landscape topsoils is summarised in figure 5.1;

5.2 B us hland T ops oils

App. 15 of the SWTC uses the term “Bushland Topsoil” to describe topsoil to be stripped and re-used in the nominated Landscape Rehabilitation Areas. These are the topsoils where the native soil seedbank is to be preserved. Site visits by the project team have verified the notable absence of weeds in the nominated landscape rehabilitation areas.

The method for treating landscape topsoils is summarised in the figure5.2;

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Figure 5.1 Landscape Topsoil Procedures

LANDSCAPE TOPSOIL

STOCKPILE

SEED WITH COVERCROP TO 2.5m HIGH AND 2:1 BATTER

SLOPES. USE WITHIN 18 MONTHS

SOIL TESTING

PREPARE FOR APPLICATION (ADD COMPOSTED MULCH OR

AMENDMENTS AS PER SOIL SCIENTISTS

RECOMMENDATIONS)

TOPSOILING (TO PREPARED SUB BASE)

DIRECT RETURN

(UNDER SOME CIRCUMSTANCES AND WHERE PROGRAMMING

ALLOWS)

Page 76: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )306

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Figure 5.2 Bushland Topsoil Procedures

BUSHLANDTOPSOIL

SOIL TESTING PRIOR TO STRIPPING EACH VEG. COMM. TYPE IN THREE

LOCATIONS AT THREE DEPTHS

STRIPPING

A1 HORIZON WITH SLASHED TRASH TO A DEPTH OF 100MM. REMAINING TOPSOIL TO THE DEPTH REQUIRED.

STOCKPILE ACCORDING TO VEGETATION COMMUNITY AND

COVERCROP

(A1 TO 1m HIGH x 3m WIDE. A2 AS PER APP.44)

EEC

6 MONTHS

GRETA TO BRANXTON

12 MONTHS

SOIL TESTING

TEST FOR C/N RATIO. VERIFY EXISTING ORGANIC MATTER

CONTENT. ADD ADDITIONAL IF REQUIRED UP TO 30% FOR

STOCKPILES SOILSORGANIC MATTER)

PREPARE FOR APPLICATION

(MIX WITH AMENDMENTS AND COMPOSTED MULCH)

TOPSOILING

ALL OTHER AREAS

18 MONTHS

DIRECT RETURN.

MIX WITH 15% COMPOSTED MULCH

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

5.3 T ops oil Management Zones

The nominated chainages where each type occurs, and the vegetation communities that occur within them, are shown in Figure 5.3 below;

Figure 5.3 Topsoil Extents

5.4 T ops oil Management in L ands cape R ehabilitation Areas

The following extract from the SWTC Appendix 15 describes the requirements for stripping, storing and applying bushland topsoils. Any recommendations, proposed changes or comments are shown in red.

5.4.1 S tripping

The Contractor must undertake soil paedology survey and analysis within each soil landscape and vegetation community type. Each soil landscape and vegetation community type must be tested in three locations, each with three sampling depths of A1, A2 and B1 horizon. Soil testing must be undertaken by a National Association of Testing Authorities (NATA) registered laboratory and include pH, salinity, cation exchange capacity, plant available phosphorous, total organic matter, total nitrogen and carbon/nitrogen.

Soil testing and any recommendations must be made by an appropriately qualified soil scientist with expertise in revegetation.

The Contractor must strip at least 50,000m3 of A1 Horizon topsoil from Landscape Rehabilitation Areas, or sufficient topsoil to implement the landscape rehabilitation requirements, whichever is greater, in the manner outlined below. The quantities of topsoil from each vegetation community type stripped must be directly proportional to the areas of each vegetation community subject to landscape rehabilitation activities.

Stripping undertaken for the purpose of generating bushland topsoil must be undertaken by the following process:

Page 77: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 307

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

(i) Limit the use of heavy or tracked vehicles and equipment so as not to disturb the A1 horizon surface soil to the extent that it is contaminated with lower layers.

(ii) Where tree density does not allow effective slashing or the stripping of topsoil as described below, remove trees and stumps in a manner that does not mix B Horizon soil with bushland topsoil. Acceptable methods include felling trees and grinding stumps.

(iii) Slash the understorey to within 50mm of ground level, leaving the slashed trash insitu.

(iv) Pause for a period of one (1) week prior to undertaking bushland topsoil stripping.

(v) Strip A1 Horizon bushland topsoil to a depth of 100mm plus the slashed trash.

(vi) Relocate bushland topsoil as either direct return or to stockpile.

(vii) Strip remaining topsoil to extent required. Avoid mixing of B Horizon material.

(viii) Clear any remaining trees (including stumps) and any other remaining vegetation.

5.4.2 Direct R eturn

The construction process must facilitate the immediate re-laying (hereafter referred to as direct return) of stripped topsoil in Landscape Rehabilitation Areas. Where it is not practical to direct return bushland topsoil to batters and embankments of the road formation due to earthworks programming, the Contractor is to direct return an amount of bushland topsoil to Landscape Rehabilitation Areas within the road corridor where bushland restoration is required.

Where it is not possible to undertake direct return of bushland topsoil, bushland topsoil must be stockpiled in areas separate from all other stockpiled material to minimise the potential for weed contamination. Topsoil handling and stockpile contamination are critical factors with regard to the success of the landscape rehabilitation process.

In addition to direct return of topsoil, the direct return of mulches containing known seed bearing material, the salvage of tree trunks and large branches to provide coarse woody debris, and the salvage of cut branches and any other seed bearing plant material to spread at the receptor site as a brush matting, are all practical methods of returning seed to rehabilitation sites within the project works.

5.4.3 S tockpiling

Bushland topsoil must be stockpiled separately by vegetation community type. For each vegetation community type, topsoil is to be stockpiled as follows:

(i) A1 Horizon in windrows up to one (1) metre high by a maximum of three (3) metres wide at the base; and

(ii) A2 Horizon in windrows of any stable configuration. (According to R44)

(j) Bushland topsoil (A1 Horizon Only) must not be stockpiled for periods greater than:

(i) Bushland topsoil from Endangered Ecological Communities - 6 months;

(ii) Bushland topsoil from the Greta to Branxton section - 12 months, with the exception of cut batters below the first bench and fill batters above the first bench; and

(iii) All other bushland topsoil – 18 months.

(k) Topsoil stockpile areas must be managed continuously so that weed densities are no greater than 5% over the entire stockpile area. All weeds must be eradicated before setting seed.

(l) Large, clearly legible signs must be placed and maintained on each windrow,nominating vegetation community type, soil horizon, collection area (e.g. by chainage) and date of stockpiling.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

5.4.4 P reparation for bus hland tops oil applic ation

(m) All bushland topsoil re-used within landscape rehabilitation areas must be prepared in the following manner:

(i) Soil testing must be carried out to finished sub-grades to address any severe soil deficiencies. Should the test results indicate that subsoils contain contaminants or have chemical properties likely to inhibit the success of the landscape restoration process, additives must be added during ripping, as required by the Soil Scientist;

(ii) Prior to the placement of topsoil, continuously eradicate weeds to treatment and adjoining areas, until weed growth four (4) weeks after the last spray comprises less than 5% cover, and then eradicate remaining weeds, and;

(iii) Rip the subsoil to a depth ranging from 50-100mm using the tynes on a swivelling head excavator bucket, or by some other means to form a loosened or roughened surface suitable for the application of topsoil and/or seed. Since this procedure is for slopes of 3:1 or less, we recommend ripping to 300mm. During ripping, mix in any materials required by the soil testing into the upper 100 mm layer to the rates specified within the soil testing recommendations. Rip parallel to the final contours where possible. Do not rip within the drip line of trees to be retained. Do not disturb services or tree roots, cultivating these areas by hand if necessary. Remove any weeds, rubbish or other deleterious material brought to the surface by the ripping process.

5.4.5 Application of bus hland tops oil

(n) Application of bushland topsoil in Landscape Rehabilitation Areas must be applied in accordance with the requirements of Specification D&C R178 Vegetation and this Appendix 15.

(o) Application of bushland topsoil in Landscape Restoration Areas with 3:1 slopes or less must be undertaken in the opposite order to stripping, as follows:

(i) A2 Horizon to a depth of 200mm; and

(ii) A1 Horizon to a depth of 100mm. The soil depths noted here are fine for Landscape Rehabilitation Areas outside the formation. However on formations such as fill and cut batters, and in special situations such as at intersections, medians and adjacent to noise walls, this may be varied. Refer to the landscape plans. The general depth for roadworks batter slopes of 2:1 is 50-100mm, however in cases when composted mulch is added at the maximum quantities described here, it would have a greater ability to withstand slippage and erosive forces and could therefore be applied to a full 100mm

(p) A1 and A2 Horizons must be supplemented by site mulch (organic carbon content) derived from a coarsely shredded vegetative material cleared during works, A1 and A2 Horizons must be supplemented as follows:

(i) 15% by volume where it is to be used for direct return; and

30% by volume for topsoil that is to be stockpiled. (The ratio of Organic Carbon content in existing topsoils is likely to be 3-10%. Whilst the project should allow for 30% at this stage as there are likely to be other benefits that come from increased organic content which include wettability, increased porosity, increased resistance to slippage and erosive forces, the final ratio should be determined by the project soil scientist).

(q) Site mulch must be composted for a minimum of 6 weeks Site mulch should be composted until a NDI of 0.5% or less is achieved with a pH range of 6.5 to 8.5. Imported compost can also be utilised provided it achieves the above parameters and the soluble salt concentration is 5 dS/m or less and man made inert physical contaminants are less than 1% dry weight basis and meets the AS4454-2003 definition for a ‘process to further reduce pathogens’ (PFRP), with the following additions:

(i) Urea 600g/cu,m;

(ii) Sulphate of Iron 500g/cu.m; and

(iii) Dolomite or Magrilime 500g/cu.m.

(iv) Sufficient water to dampen product.

These additives may be best added in liquid form especially since they must be added early to assist the composting process and if windrowed in remote locations which make mechanical mixing and turning of dry ingredients impractical.

Page 78: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )308

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Given these parameters and also limited areas available for separate stockpiling and composting of mulches due to clearing limits required for Endangered Ecological Communities, one solution may be to stockpile in windrows at the bottom and/or tops of cut and fill batters as in figure 5.4 below to facilitate the composting process, mixing and spreading of bushland topsoils;

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Figure 5.4 Suggestions for Windrowing topsoils and mulch for later spreading on batters Final topsoil treatments will be made in consultation with the project soil scientist. The topsoil treatments may include amelioration with compost, lime, gypsum and fertilizer and other parameters as identified in R178.

5.5 T ops oil Applic ation

The following topsoil applications are required for the various landscape types encountered.

Topsoil Treatment 1: For Areas Flatter than 3H:1V (For planting, hydromulching, turfing and grass seeding all areas other than batters).

Rip the subsoil to a depth of 300mm (except within water quality basins and creek edges which should be ripped to 100mm only, and for medians which should be ripped to 200mm). Rip parallel to contours on slopes.

Do not smooth or compact the roughened subsoil surface prior to the application of topsoil.

Page 79: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 309

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Apply A1 horizon topsoil to a minimum depth of;

100mm generally;

100mm for medians;

150mm where feature trees, shrubs and mass plantings occur at intersections, and;

300mm depth between the noise wall and pavement.

Spread the topsoil but do not otherwise smooth or compact the surface. Trim the surface flush with adjacent surfaces.

Apply appropriate hydromulch seed mix or plant. Where pasture grass or native/pasture seeding is to be applied, level, trim and roll to lightly compact.

For tubestock: prepare 150x150x200mm deep hole.

For advanced tree: prepare 400x400x350mm deep hole.

Apply fertiliser at the recommended rates (refer to relevant version of modified specifications R178 and R179).

Install advanced trees/ tubestock and backfill with topsoil to finish flush with ground level.

Apply 75mm mulch to planted areas.

Topsoil Treatment 2: For Areas Steeper than 3H:1V (For hydromulching batters)

Prepare batter sub-base by ripping to a depth of 100mm using the tynes on a swivelling head excavator bucket, or by some other means to form a loosened or roughened surface suitable for the application of topsoil and/or seed. During ripping, mix in any materials required by the soil testing into the upper 100mm layer to the rates specified within the soil testing recommendations and/or as advised by the Project soil scientist or geotechnical advisor. This may include the mixing of gypsum or any other suitable agent to prevent erosion of subsoil, if dispersivity is identified as an issue for the materials on the cut batter faces to be vegetated.

Apply A1 horizon topsoil to a minimum depth of 50mm, but not more than 100mm.

Spread out the topsoil to an even surface but do not otherwise smooth or compact the surface. (topsoil should have been previously ameliorated and any additional materials required by soil testing mixed at the stockpile.)

Provide 'cleatmarks', 'dimples' or horizontal scores so the sub-base surface. This is best achieved by track rolling with an excavator or bulldozer.

Apply appropriate hydromulch seed mix.

For slopes steeper than 2H:1V and up to 1.5H:1V install Jute Mesh as per the specification over final topsoil preparation and prior to hydromulching.

Topsoil Treatment 3: (Bushland Reconstruction and Landscape Rehabilitation Areas Disturbed by Construction Activities)

Where existing topsoil is absent;

Rip the subsoil/subgrade to a depth of 300mm. Where existing road surface occurs, it is to be removed. Avoid ripping within the dripline of established trees. Where A2 horizon is absent, apply A2 Horizon to a depth of 200mm. Apply A1 horizon bushland topsoil to a depth of 100mm. Apply appropriate hydromulch seed mix or planting in accordance with the landscape plans.

Where existing topsoil is present;

Assess whether there may be seedling regeneration in the area. In such cases, the landscape restoration officer may take no immediate action. If no germination can be observed, Rip the topsoil to a depth of 300mm. Avoid ripping within the dripline of established trees. Apply composted site mulch to the amount as directed by the Alliance soil scientist to augment the organic matter of the site soil. Apply appropriate hydromulch seed mix or planting in accordance with the landscape plans. .

Where existing topsoil and grass or other vegetative cover is also present ;

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Bushland reconstruction in this situation will involve the planting of individual provenance trees mulched and staked to provide a quick landscape effect, and facilitate the reintroduction of specific desirable species.

75mm mulch is to be applied to all planted areas whether group planting or individual tree planting. Individually planted trees will receive 1mx1mx75mm of mulch per tree. Do not apply mulch to areas below water lines. All tubestock shrubs and trees are to be staked with a marker stake as per the planting schedules.

5.6 C over C rop

A cover crop of fast growing annual grasses is to be applied to all disturbed areas of the site. The purpose of the cover crop application is to stabilise the surface material, particularly batters, and to provide an effective barrier to erosion.

Depending upon programming and construction staging, the cover crop may be applied separately or in conjunction with the final native seed mix.

For pasture grass only mixes, the seed of couch and cover crop are best applied simultaneously.

Should the seeding fail at any time it can be reapplied until it establishes.

Cover crop seeding will also be used to minimise erosion and weed establishment on topsoil stockpiles.

The generally accepted rate used by the RTA for cover crops is 65kg/ha. However given the greater emphasis on stockpile procedures and the corresponding likelihood of soil-stored seed, we have reduced this rate to 30kg/ha in order to improve conditions for germination of soil stored seed and native seed applied with cover crop.

Page 80: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )310

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Appendix A LIST OF DRAWINGS

HEX-LS-20-D001 Cover Sheet HEX-LS-23-D145 Zone 3 - planting plan sheet 45

HEX-LS-20-D002 Sheet layout HEX-LS-23-D146 Zone 3 - planting plan sheet 46

HEX-LS-20-D003 Drawing Index & Notes HEX-LS-23-D147 Zone 3 - planting plan sheet 47

HEX-LS-21-D101 Zone 1 - planting plan sheet 1 HEX-LS-23-D148 Zone 3 - planting plan sheet 48

HEX-LS-21-D102 Zone 1 - planting plan sheet 2 HEX-LS-23-D149 Zone 3 - planting plan sheet 49

HEX-LS-21-D103 Zone 1 - planting plan sheet 3 HEX-LS-23-D150 Zone 3 - planting plan sheet 50

HEX-LS-21-D104 Zone 1 - planting plan sheet 4 HEX-LS-23-D151 Zone 3 - planting plan sheet 51

HEX-LS-21-D105 Zone 1 - planting plan sheet 5 HEX-LS-23-D152 Zone 3 - planting plan sheet 52

HEX-LS-21-D106 Zone 1 - planting plan sheet 6 HEX-LS-21-D156 Zone 1 - planting plan sheet 56

HEX-LS-21-D107 Zone 1 - planting plan sheet 7 HEX-LS-21-D157 Zone 1 - planting plan sheet 57

HEX-LS-21-D108 Zone 1 - planting plan sheet 8 HEX-LS-21-D158 Zone 1 - planting plan sheet 58

HEX-LS-21-D109 Zone 1 - planting plan sheet 9 HEX-LS-21-D159 Zone 1 - planting plan sheet 59

HEX-LS-21-D110 Zone 1 - planting plan sheet 10 HEX-LS-21-D160 Zone 1 - planting plan sheet 60

HEX-LS-21-D111 Zone 1 - planting plan sheet 11 HEX-LS-21-D161 Zone 1 - planting plan sheet 61

HEX-LS-21-D112 Zone 1 - planting plan sheet 12 HEX-LS-22-D162 Zone 2 - planting plan sheet 62

HEX-LS-21-D113 Zone 1 - planting plan sheet 13 HEX-LS-22-D163 Zone 2 - planting plan sheet 63

HEX-LS-21-D114 Zone 1 - planting plan sheet 14 HEX-LS-22-D164 Zone 2 - planting plan sheet 64

HEX-LS-21-D115 Zone 1 - planting plan sheet 15 HEX-LS-23-D165 Zone 3 - planting plan sheet 65

HEX-LS-21-D116 Zone 1 - planting plan sheet 16 HEX-LS-23-D166 Zone 3 - planting plan sheet 66

HEX-LS-21-D117 Zone 1 - planting plan sheet 17

HEX-LS-20-D801 Typical Sections - Landscape treatment for medians

HEX-LS-21-D118 Zone 1 - planting plan sheet 18

HEX-LS-20-D802 Typical Sections - Landscape treatment for verge

HEX-LS-21-D119 Zone 1 - planting plan sheet 19 HEX-LS-20-D803 Typical Landscape Details

HEX-LS-22-D120 Zone 1 - planting plan sheet 20 HEX-LS-20-D804 Typical Landscape Details

HEX-LS-22-D121 Zone 2 - planting plan sheet 21 HEX-LS-20-D805 Typical Fauna Underpass Detail

HEX-LS-22-D122 Zone 2 - planting plan sheet 22 HEX-LS-20-D806 Typical Furrow Detail

HEX-LS-22-D123 Zone 2 - planting plan sheet 23

HEX-LS-20-D807 Typical Landscape Treatment at Noise Wall

HEX-LS-22-D124 Zone 2 - planting plan sheet 24 HEX-LS-20-D808 Typical Basin - Sheet 1

HEX-LS-22-D125 Zone 2 - planting plan sheet 25 HEX-LS-20-D809 Typical Basin - Sheet 2

HEX-LS-22-D126 Zone 2 - planting plan sheet 26

HEX-LS-20-D810 Typical Landscape Detail - Creek Realignment

HEX-LS-22-D127 Zone 2 - planting plan sheet 27

HEX-LS-21-D811 Detail Planting Plan - Bridge Over Swamp Creek

HEX-LS-22-D128 Zone 2 - planting plan sheet 28

HEX-LS-21-D812 Detail Planting Plan - Bridge Over Anvil Creek

HEX-LS-22-D129 Zone 2 - planting plan sheet 29 HEX-LS-20-D901 Landscape Planting Schedule - Sheet 1

HEX-LS-22-D130 Zone 2 - planting plan sheet 30 HEX-LS-20-D902 Landscape Planting Schedule - Sheet 2

HEX-LS-22-D131 Zone 2 - planting plan sheet 31 HEX-LS-20-D903 Landscape Planting Schedule - Sheet 3

HEX-LS-22-D132 Zone 2 - planting plan sheet 32 HEX-LS-20-D904 Landscape Planting Schedule - Sheet 4

HEX-LS-22-D133 Zone 2 - planting plan sheet 33 HEX-LS-20-D905 Landscape Planting Schedule - Sheet 5

HEX-LS-22-D134 Zone 2 - planting plan sheet 34 HEX-LS-20-D906 Landscape Planting Schedule - Sheet 6

HEX-LS-22-D135 Zone 2 - planting plan sheet 35 HEX-LS-20-D907 Landscape Planting Schedule - Sheet 7

HEX-LS-22-D136 Zone 2 - planting plan sheet 36 HEX-LS-20-D908 Landscape Planting Schedule - Sheet 8

HEX-LS-22-D137 Zone 2 - planting plan sheet 37 HEX-LS-20-D909 Landscape Planting Schedule - Sheet 9

HEX-LS-22-D138 Zone 2 - planting plan sheet 38

HEX-LS-20-D910 Landscape Planting Schedule - Sheet 10

HEX-LS-22-D139 Zone 2 - planting plan sheet 39

HEX-LS-20-D911 Landscape Planting Schedule - Sheet 11

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

HEX-LS-22-D140 Zone 2 - planting plan sheet 40

HEX-LS-20-D912 Landscape Planting Schedule - Sheet 12

HEX-LS-22-D141 Zone 2 - planting plan sheet 41

HEX-LS-20-D913 Landscape Planting Schedule - Sheet 13

HEX-LS-23-D142 Zone 3 - planting plan sheet 42

HEX-LS-23-D143 Zone 3 - planting plan sheet 43

Page 81: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 311

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Appendix B NOXIOUS WEED SPECIES: CESSNOCK, MAITLAND & PORT MACQUARIE

The following table contains a list of the Noxious Weed species that have been declared for the land covered by this LMP which includes the Local Government Areas of Cessnock, Maitland and Lake Macquarie City Council.

Maintenance staff should be familiarised with the identification of these species as their control (in accordance with the control category) is a legal requirement under the NSW Noxious Weeds Act.

Control techniques for these species are to be consistent the standards / practices outlined in theNoxious and Environmental Weed Control Handbook 2004-2005. Copies of this handbook can be downloaded for free from:

http://www.dpi.nsw.gov.au/__data/assets/pdf_file/0017/123317/noxious-and-environmental-weed-control-handbook.pdf

Where control standards have not been clearly defined for a species, control is to utilise chemicals (where required) that are registered for use on the species or control techniques that minimise environmental impacts.

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Schedule of Noxious Weeds (cont.)

Page 82: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )312

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Schedule of Noxious Weeds (cont.)

Page 83: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % ) 313

Appendix B

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Schedule of Noxious Weeds (source: www.dpi.nsw.gov.au):

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Appendix C THREE MONTHLY MAINTENANCE AUDITThis form is to be completed by the landscape supervisor / landscape officer in each agency responsible for overseeing their section of the site.Two copies of this completed form are required. One is to be issued to maintenance staff for action. The second is to be maintained for records.

Date of Inspection: _______________________________________

Inspected by: ____________________________________________

Location Landscape Type / Area

Issue Remediation Works Required Date to be completed Defect? Variation?

Signed: _______________________________ Date: _________________________________

Page 84: HUNTER EXPRESSWAY – KURRI KURRI TO BRANXTON DESIGN … · DESIGN REPORT FOR LANDSCAPE FINAL DETAILED DESIGN (100%) REPORT Detailed Design for Hunter Expressway – Kurri Kurri to

H B O + E M T B S E P T E M B E R 2 0 1 1 S Y U - 0 0 2 2 5 1 H U N T E R E X P R E S S W A Y: K U R R I K U R R I T O B R A N X T O N - F I N A L U R B A N + L A N D S C A P E D E S I G N S U B P L A N R E P O R T ( 1 0 0 % )314

DESIGN LOT U6 LANDSCAPE MAINTENANCE PLAN (100%) INCORPORATING LANDSCAPE REHABILITATION PLAN

Detailed Design for Hunter Expressway – Kurri Kurri to Branxton

Issued to: ______________________________ Date: _____________________