Human Systems Division
Transcript of Human Systems Division
Human Systems Division6 November 19
Mr. Emilio VarcarcelSenior Materials LeaderAFLCMC/WNU, Human Systems Agile Combat SupportDSN: (937) [email protected]
AFLCMC… Providing the Warfighter’s Edge
AFLCMC… Providing the Warfighter’sEdge
Overview
• Agile Combat Support Directorate• Acquisition Priorities• Aircrew Flight Equipment• Combat Ready Airman• Female Fitment• Way Forward
47
AFLCMC… Providing the Warfighter’sEdge
Agile Combat Support (ACS)Directorate
48
SupportEquipment & VehiclesSimulatorsAFMETCALAutomatic Test
Systems
Agile Combat Support Directorate(WN) PEO/Director: Mr Paul Waugh, SES Deputy Director: Col Lea Kirkwood
Exec: Capt AmandaMcGowan 937-904-2271
Electronic Warfare& Avionics
Air Force Life Cycle Management Center (AFLCMC)
Air Force Materiel Command (AFMC)
ColorLegend
RobinsAFBWPAFB AberdeenMD
HeathOH
HumanSystems
Mr. EmilioVarcarcel 937-
938-3157Dep Lt Col ScottForeman
937-938-4320Egress &
Survival Lt Col PatrickGillette 937-938-4072
AircrewPerformanceMr. RichardRoell 937-938-4073
AeromedicalMr. Chris
McCammant 937-938-2737
Combat ReadyAirmanLt Col Joe
Nichols 937-938-2737
AF Chem-BioDefenseLt Col Paul
Hendrickson 867-3209
SustainmentBranchMs Mary
Kicklighter 478-222-7414
AFLCMC… Providing the Warfighter’sEdge
2019 Aircrew Flight Equipment Acquisition Priorities
49
AFLCMC… Providing the Warfighter’sEdge
2019 CBRN Priorities
50
AFLCMC… Providing the Warfighter’sEdge
2019 Air Force Uniform OfficePriorities
51
Requirements Documents Legend Development Money Legend Procurement Money Legend Sustainment LegendRqmts Doc (1067, CDD, etc.) Signed & Val’d Development (RDT&E) allocated Procurement Money Allocated Sustainment (TO’s, Money,etc.)
Rqmts Doc (1067, CDD, etc.) in Coordination Development (RDT&E) in coordination Procurement Money in Coordination Sustainment (TO’s, Money, etc) in Coord
Rqmts Doc (1067, CDD, etc.) Not Yet Drafted Development (RDT&E) not yet defined Procurement Money Not Yet Defined Sustainment Not Yet Defined
AFLCMC… Providing the Warfighter’sEdge
Integrated Aircrew Ensemble EjectionLauren Wargacki Acquisitions Priority #3
52
Program Description: Integrated flight ensemble consisting of multiple layers that work as a system to safely and effectively maximize aircrew performance
Requirement: Address operational needs such as increase mobility and reduce thermal burden
Major Customers:■ Ejection Seat Aircrew
ACQ Status■ ACAT: ACAT III
7 May19Oct 19Oct 19
Coming Into View (Next 30-60 Days): Coverall, CBRL, & COTS Undergarments Contract Mod Award Supply Request Package for DLA Resupply
Dec 19Dec 19
Next Major Milestone/Significant Event: Initial Operational Capability (IOC) Oct 20
ProjectionS O N D J F M A M J J A
Cost G G G G G G G G G G G G
Schedule G G G G G G G G G G G G
Performance G G G G G G G G G G G G
Logistics G G G G G G G G G G G G
Funding Y Y Y Y Y Y Y Y Y Y Y Y
Manpower G G G G G G G G G G G G
Status
Schedule of EventsRecent Highlights (Last 30 Days): IAE F-22 Production ContractAwarded First Production Lots passed DCMA inspection Successfully completed all site planning visits
Program Description
Status Updates
Funding – required for G-Suit engineering change effort.
AFLCMC… Providing the Warfighter’sEdge
Heated Flight Clothing1Lt Kenneth Bridges Acquisitions Priority #5
53
Program Description: Provide active heating garments for aircrew members operating in hyper cold environments
Requirement: AF Form 1067Major Customers:■ AFGSCContractor:■ Climb & Place/VOLT Smart YarnACQ Status■ Cost Est: $34.0 M (total)
Dates Sept-Oct 19
Oct 19
Coming Into View (Next 30-60 Days): AF contract SOW development Test plans and coordination User evaluation
Nov 19Nov 19Nov 19
Next Major Milestone/Significant Event: Preliminary Fielding Plan Release Fair Opportunity Pricing Request (FOPR)
Nov 19Nov 19
Top Issues/Risks:Schedule aggressive
ProjectionS O N D J F M A M J J A
Cost G G G G G G G G G G G G
Schedule G G G G G G G G G G G G
Performance Y Y G G G G G G G G G G
Logistics G G G G G G G G G G G G
Funding G G G G G G G G G G G G
Manpower G G G G G G G G G G G G
Status
Schedule of EventsRecent Highlights (Last 30 Days): Internal testing Assess heating system designs
Program Description
Status Updates
Performance – Problems with consistent heating throughout entire glove system (mitigated via further internal vendor testing)
Performance – Optimization of heat draw/battery life (mitigated via further internal vendor testing)
AFLCMC… Providing the Warfighter’sEdge
AF Ejection Survival Kits
54
Projection
Major Customers:■ACC
Contractor:■TBD (TDB vendors have been notified)
06 Aug1927 Aug1906 Sep 1911 Oct 19
Major Milestone/Significant Event:SAFE Industry Day held 15 Oct 19
Coming Into View (Next 30-60 Days): Rqmt1067 Part IV work 15 Nov 19
J A S O N D J F M A M J
Cost G G G G G G G G G G G G
Schedule G G G G G G G G G G G G
Performance G G G G G G G G G G G G
Logistics Y Y Y Y Y Y Y Y Y Y Y Y
Funding R R R R R R R R R R R R
Manpower Y Y Y Y Y Y R R R R R R
Status
Schedule of EventsRecent Highlights (Last 30 Days):Formed IPTTDB Kickoff briefRFI posted to FBO, sent to TDB vendorsReceive pre-industry day feedback
Program Description
Program Description: Increase functional capability of ACES II ejection seat survival kit through adding/replacing items to current kit configuration.Requirement: Capabilities Document: 1067, Approved for HSD resourcing Jul 19. Add existing capabilities to ACES II Kitconfiguration.
Status Updates
Logistics – fielding strategy/plan specifics still being worked
Funding – No FY20 funds identified. Section IV of 1067 requirement must be completed
DISTRIBUTION D: Distribution authorized to Department of Defense and U.S. DoD contractors only (critical technology) (26Sept2018). Other requests for this document shall be referred to AFRL/RH.
Survival Kit Development Process
ACC/A5RRequirement s documents
AFRL
• In house research• CRADAs with industry• Tech Sprints• Capstone Engineering
projects with Universities
AFLCMC/WIS (SOF/PR)AFLCMC/WNU (Survival & Egress)
Tech Pull
Industry
Working GroupsCWG SCWG IPWG
AFLCMC… Providing the Warfighter’sEdge
Next Gen Fixed Wing Helmet (NGFWH)2Lt Sam Gong
56
Status
Schedule of EventsProgram Description
Status Updates
Program Description: Obtain performance and sustainability upgrades to the flight helmet used by fixed wing aircrewRequirement: Three Key Performance Parameters (KPP’s), 52 total requirements
Major Customers: ACC
Contractors: GENTEX / Lift Aviation /ASU
ASU Lift Aviation GENTEX HGU-55/PRecent Highlights (Last 30 Days): RFPP Proposals Received Sep 19
Coming Into View (Next 30-60 Days): Agreement Negotiations Test Org Kick-Off Meeting
Dec 19Dec 19
Next Major Milestone/Significant Event: Contract Development OTA AgreementsAward
Dec-Jan 20Jan 20
Projection
S O N D J F M A M J J A
Cost G G G G G G G G G G G G
Schedule Y Y Y Y Y Y Y Y Y Y Y Y
Performance Y Y G G G G G G G G G G
Logistics G G G G G G G G G G G G
Funding G G G G Y Y Y Y Y Y Y Y
Manpower Y Y Y Y Y Y Y Y Y Y Y Y
Schedule – nor yet finalized
Funding – too soon to know finalcosts
Manpower – dedicated manpower to support program
POC: Lt Sam Gong, (937) 904-3878,[email protected]
AFLCMC… Providing the Warfighter’sEdge
Bladder Relief SystemLt Abraham Louisma Acquisitions Priority #4
57
Program Description: Procurement of male and female in-flight bladder relief system that is comfortable and safe-to-fly
Requirement: Allows for use while harnessed in aircraft seat and is configured to be worn with aircrew flight suits
Major Customers:■ DoD
Contractor:■ TBD
ACQ Status■ ACAT: N/A■ Funding (SBIR)
Dates28 Aug1910 Sep 1919 Sep 19
Coming Into View (Next 30-60 Days): Airworthiness determination for USAFA aircraftspecific 66p / Low profile testing results
31 Oct 1931 Oct 19
Next Major Milestone/Significant Event: AF SBIR funding - pending avail of funds 31 Oct 19
ProjectionS O N D J F M A M J J A
Cost G G G G G G G G G G G G
Schedule G G G G G G G G G G G G
Performance G G G G G G G G G G G G
Logistics G G G G G G G G G G G G
Funding G R R R R R R R R R R R
Manpower G G G G G G G G G G G G
Status
Schedule of EventsRecent Highlights (Last 30 Days): Rqmt received for bladder relief Configuration documentupdated StF approved for USAFA
Program Description
Status Updates
AF funding is not currently allocated. Actions Pending avail ofAF SBIR funds.
AFLCMC… Providing the Warfighter’sEdge
Combat Ready Airman Vision
58
Develop, acquire, field, and sustain affordable integrated state of the art equipment for all Airmen to maximize full-spectrum readiness enabling global Air Force dominance.
Currently no equipment standardization for the majority of ourAirmen
AFLCMC… Providing the Warfighter’sEdge
“To-be” FY24 Combat Ready Airman
59
Develop, acquire, field, and sustainstandardized, integrated, and stateof the art equipment for all Airman.How?
1. Centralize Requirements Management:• Ensures Standardized Ensembles &
Interoperability• Enables Product Support and Innovation
through Strategic Partnering• Enables Forward Planning
2. Centralize Funding & Acquisition:• Increases Purchasing Power• Reduces Waste
3. Centralize Asset Management:• Improves Asset Accountability&
Visibility• Enables Enterprise Resource Leveling
to Avoid “Haves and Have-nots”IOC FY22 FOCFY27
AFLCMC… Providing the Warfighter’sEdge
Recent Events:Female Fitment Major Milestones
60
AFLCMC… Providing the Warfighter’sEdge
Human Systems Division Way Ahead
61
FY17 FY18 FY24 FY25
AFE
Female FitmentCRA
FY19 FY20 FY21 FY22 FY23
AFLCMC… Providing the Warfighter’sEdge
AF Acronyms
62
FY24 FY25
AFECRA
AFLCMC… Providing the Warfighter’sEdge
AF Acronyms
63
FY24 FY25
AFECRA