![Page 1: Human Capital Availability Nick Greenfield. Goals and Methods To determine the human capital availability of coastal engineers in the US and worldwide.](https://reader035.fdocuments.us/reader035/viewer/2022081908/56649ea85503460f94bab887/html5/thumbnails/1.jpg)
Human Capital Availability
Nick Greenfield
![Page 2: Human Capital Availability Nick Greenfield. Goals and Methods To determine the human capital availability of coastal engineers in the US and worldwide.](https://reader035.fdocuments.us/reader035/viewer/2022081908/56649ea85503460f94bab887/html5/thumbnails/2.jpg)
Goals and Methods
• To determine the human capital availability of coastal engineers in the US and worldwide
• Phone Interviews, Coastal List, Firm Research, Organizational Research, Individual Emails.
• Sources: Higher Education, Accrediting Bodies, Engineering Firms, CORPS, Project Managers
![Page 3: Human Capital Availability Nick Greenfield. Goals and Methods To determine the human capital availability of coastal engineers in the US and worldwide.](https://reader035.fdocuments.us/reader035/viewer/2022081908/56649ea85503460f94bab887/html5/thumbnails/3.jpg)
Coastal Engineering: Higher Education
• Total number of programs in the United States undetermined: 8, 15, 30. LACKS DEFINITION
• Graduate programs for coastal engineering aren’t specifically for port/harbor engineering
• Dearth of trained engineers coming out of university, but MS/PhD level civil engineers can be trained
• Military provides qualified engineers
![Page 4: Human Capital Availability Nick Greenfield. Goals and Methods To determine the human capital availability of coastal engineers in the US and worldwide.](https://reader035.fdocuments.us/reader035/viewer/2022081908/56649ea85503460f94bab887/html5/thumbnails/4.jpg)
Certification + Accreditation
![Page 5: Human Capital Availability Nick Greenfield. Goals and Methods To determine the human capital availability of coastal engineers in the US and worldwide.](https://reader035.fdocuments.us/reader035/viewer/2022081908/56649ea85503460f94bab887/html5/thumbnails/5.jpg)
Typical Project Resource Demand: Durban, South Africa
Fortifying the south breakwater, building a new north breakwater, constructing 500m of revetment and seawall as well as dredging the channel to a depth of -18mCD from -12.5mCD in some places . A three-person dive team for each individual task.
![Page 6: Human Capital Availability Nick Greenfield. Goals and Methods To determine the human capital availability of coastal engineers in the US and worldwide.](https://reader035.fdocuments.us/reader035/viewer/2022081908/56649ea85503460f94bab887/html5/thumbnails/6.jpg)
US and World Estimates
• The Coastal List: 5000-6000 members• COPRI: 4000 members (US+INTL)• Johns Hopkins: 800 (US), 3000 (WORLD)• Infer: under 10,000 worldwide
# Currently QUALIFIED Engineers INSUFFICIENT.