HSU Trinity Annex Project - Facilities Management

102
HSU Trinity Annex Project Initial Study prepared by California State University, Humboldt 1 Harpst Street Arcata, California 95521 Contact: Michael Fisher, (707) 8263646 prepared with the assistance of Rincon Consultants, Inc. 4825 J Street, Suite 200 Sacramento, California 95819 June 2018

Transcript of HSU Trinity Annex Project - Facilities Management

Page 1: HSU Trinity Annex Project - Facilities Management

HSU Trinity Annex Project

Initial Study  

prepared by 

California State University, Humboldt 1 Harpst Street 

Arcata, California 95521 Contact: Michael Fisher, (707) 826‐3646 

 

prepared with the assistance of 

Rincon Consultants, Inc. 4825 J Street, Suite 200 

Sacramento, California 95819 

June 2018 

Page 2: HSU Trinity Annex Project - Facilities Management
Page 3: HSU Trinity Annex Project - Facilities Management

HSU Trinity Annex Project

Initial Study  

prepared by 

California State University, Humboldt 1 Harpst Street 

Arcata, California 95521 Contact: Michael Fisher, (707) 826‐3646 

prepared with the assistance of 

Rincon Consultants, Inc. 4825 J Street, Suite 200 

Sacramento, California 95819 

June 2018 

Page 4: HSU Trinity Annex Project - Facilities Management

 

This report prepared on 50% recycled paper with 50% post‐consumer content. 

Page 5: HSU Trinity Annex Project - Facilities Management

Table of Contents

Initial Study i

Table of Contents

Initial Study .............................................................................................................................................1 1.  Project Title .........................................................................................................................1 2.  Lead Agency Name and Address .........................................................................................1 3.  Contact Person and Phone Number ...................................................................................1 4.  Project Sponsor’s Name and Address .................................................................................1 5.  Project Location ..................................................................................................................1 6.  Existing Setting ....................................................................................................................4 7.  Surrounding Land Uses and Setting ....................................................................................4 8.  Project Description ..............................................................................................................8 9.  HSU 2004 Master Plan and EIR ........................................................................................ 10 10.  Other Public Agencies Whose Approval is Required ....................................................... 11 11.  Required Approvals .......................................................................................................... 11 

Environmental Factors Potentially Affected ........................................................................................ 13 

Determination ..................................................................................................................................... 13 

Environmental Checklist ...................................................................................................................... 15 1  Aesthetics ......................................................................................................................... 15 2  Agriculture and Forestry Resources ................................................................................. 19 3  Air Quality ........................................................................................................................ 21 4  Biological Resources ......................................................................................................... 29 5  Cultural Resources ........................................................................................................... 33 6  Geology and Soils ............................................................................................................. 37 7  Greenhouse Gas Emissions .............................................................................................. 41 8  Hazards and Hazardous Materials ................................................................................... 45 9  Hydrology and Water Quality .......................................................................................... 51 10  Land Use and Planning ..................................................................................................... 57 11  Mineral Resources ........................................................................................................... 61 12  Noise ................................................................................................................................ 63 13  Population and Housing ................................................................................................... 73 14  Public Services .................................................................................................................. 75 15  Recreation ........................................................................................................................ 77 16  Transportation/Traffic ..................................................................................................... 79 17  Tribal Cultural Resources ................................................................................................. 83 18  Utilities and Service Systems ........................................................................................... 85 19  Mandatory Findings of Significance ................................................................................. 89 

References ........................................................................................................................................... 93 Bibliography ................................................................................................................................. 93 List of Preparers ........................................................................................................................... 96 

Page 6: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

ii

Tables Table 1   Proposed Project Timeline ..................................................................................................8 

Table 2   Health Effects Associated with Criteria Pollutants .......................................................... 22 

Table 3   NCUAQMD Significance Thresholds for BACT Adoption .................................................. 23 

Table 4   Project Construction Emissions without Hauling to a Class I Landfill .............................. 25 

Table 5   Project Construction Emissions with Hauling to a Class I Landfill .................................... 25 

Table 6  Project Operational Emissions ......................................................................................... 26 

Table 7  Project Consistency with Applicable 2004 Master Plan Environmental Policies ............. 58 

Table 8  City of Arcata Maximum Allowable Noise Level by Receiving Land Use ......................... 65 

Table 9  Maximum Allowable Transportation Noise Exposure ..................................................... 66 

Table 10  Noise Monitoring Results ................................................................................................. 67 

Table 11  Vibration Levels for Construction Equipment .................................................................. 70 

Table 12  Construction Noise Levels by Phase ................................................................................ 71 

Table 13  Mitigated Construction Noise Levels at Nearest Sensitive Receptors ............................. 72 

Figures Figure 1  Regional Location ................................................................................................................2 

Figure 2  Project Location ..................................................................................................................3 

Figure 3  Existing Site Conditions‐ Aerial Photograph .......................................................................5 

Figure 4  Site Photographs .................................................................................................................6 

Figure 5  Photographs of Surrounding Area ......................................................................................7 

Figure 6  Site Concept Plan ................................................................................................................9 

Figure 7  Noise Measurement Locations ........................................................................................ 68 

Appendices Appendix A  Air Quality and Greenhouse Gas Emissions Modeling and Analysis 

Appendix B  Cultural Resources Technical Report 

Appendix C  Hazards Reports 

Appendix D  Noise and Vibration Analysis 

 

Page 7: HSU Trinity Annex Project - Facilities Management

Initial Study

Initial Study 1

Initial Study

1. Project Title HSU Trinity Annex Project 

2. Lead Agency Name and Address Trustees of the California State University 401 Golden Shore Long Beach, California 90802 

3. Contact Person and Phone Number Michael Fisher, Associate Director Planning, Design & Construction, Humboldt State University  [email protected] (707) 826‐3646 

4. Project Sponsor’s Name and Address Humboldt State University  1 Harpst Street Arcata, California 95521 

5. Project Location The project site is located on the southernmost portion of the Humboldt State University (HSU) campus and comprises a 1.44‐acre block located between B and C Streets and 13th and 14th Streets. The Assessor’s Parcel Number is 021‐061‐001 and the site address is 1350 C Street, Arcata, California 95521. Figure 1 shows the regional location of the project site and Figure 2 shows the project location in its campus context. 

Page 8: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

2

Figure 1 Regional Location

 

Page 9: HSU Trinity Annex Project - Facilities Management

Initial Study

Initial Study 3

Figure 2 Project Location

 

Page 10: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

4

6. Existing Setting The project site is located in the southernmost portion of the HSU campus and currently contains a complex of interconnected buildings known as the Trinity Annex, three surface parking areas with HSU permit parking, and associated landscaping. Figure 3 provides an aerial image of the project site and Figure 4 provides photographs of the project site and interior of the Trinity Annex.  

The Trinity Annex was originally constructed between 1944 and 1956 for use as a hospital and consists of a complex of interconnected buildings, all featuring similar architectural design and construction materials. Constructed in three phases between 1944 and 1956, the complex features a main building at the west side of the property, an 1948 addition extending east from the south wing of the main building, and a 1956 expansion of the south wing of the main building. The parking lots on the project site provide approximately 42 HSU permit parking spaces.  

The HSU Auxiliary purchased the site in 1969 and ownership of the site was transferred to HSU in April 2018. HSU has utilized the Trinity Annex for a variety of uses since 1969, including office, storage, and laboratory space. The Trinity Annex is no longer in active use as much of the complex is in poor condition with collapsing ceilings and deteriorating walls. Only the east wing is in use and serves as storage space. The Trinity Annex also contains asbestos in exposed insulation and lead paint on the complex exterior. Although the Trinity Annex is locked up and not available for public use, the safety hazards associated with the building pose a public risk, particularly to trespassers.  

According to the United States Geological Survey 7.5‐minute topographic map for the Arcata South Quadrangle (2015), the project site is situated at an elevation of about 80 to 90 feet above mean sea level. The topography of the site is generally flat. In general, the topography in the vicinity of the project site slopes gradually toward the west. Vegetation on the project site consists primarily of landscaped grass lawn and low shrubs. Several conifer trees are located adjacent to the main building of the Trinity Annex. These trees appear to have been originally planted as landscaping, and are partially shown on Photo 4 of Figure 4. 

7. Surrounding Land Uses and Setting The project site is located on the southernmost portion of the HSU campus directly adjacent to campus facilities and private residences. To the north, across 14th Street, is HSU’s Facilities Management building complex and to the northwest is HSU’s College Creek Field facility. To the west, south, and east are one to two‐story single‐family residences. A church is located on the corner of B Street and 13th Street. Figure 5 shows representative photos of the surrounding area. 

 

Page 11: HSU Trinity Annex Project - Facilities Management

Initial Study

Initial Study 5

Figure 3 Existing Site Conditions- Aerial Photograph

 

Page 12: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

6

Figure 4 Site Photographs

 Photograph 1. View of the southernmost portion of the site across 13th St, facing north  

 Photograph 2. View of the northern parking lot, facing west, illustrating the deteriorating condition of the building and flaking paint 

Photograph 3. A room in the main block of the Trinity Annex with collapsed ceilings 

Photograph 4. View of the front of the Trinity Annex along C Street, facing east 

Page 13: HSU Trinity Annex Project - Facilities Management

Initial Study

Initial Study 7

Figure 5 Photographs of Surrounding Area

 

Photograph 1. View north to the Facilities Management Building, across 14

th Street 

 

Photograph 2. Residences along C St. on the western side of the project site 

 

Photograph 3. View looking northeast to adjacent campus facilities at the intersection of 14

th and B St.  

 

Photograph 4. Church located at the intersection of 13th and B Streets, facing east 

Page 14: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

8

8. Project Description The project would involve the demolition of the existing Trinity Annex and conversion of the site into a surface parking lot with approximately 13,000 square feet of greenspace space located along the west and south sides of the parking lot. A bus shelter, benches, bicycle parking, and a bike repair station would also be constructed on the project site, along 14th Street. Figure 6 provides a schematic drawing of the project concept. The project would involve alteration of the public right‐of‐way to provide two bus berths along 14th Street, where a bus stop presently exists, two bus parking berths along B Street; and approximately 83 vehicle spaces for HSU permit parking. Vehicle access to the site would be provided via a driveway on 13th Street. Table 1 provides the anticipated timeline for project activities.  

Table 1 Proposed Project Timeline

Project Activity  Start Date  End Date  Duration 

Trinity Annex demolition  May 2019  July 2019  2 months 

Site preparation, grading, paving, and landscaping of site to construct parking lot, and pedestrian and transportation elements 

July 2019  October 2019  3 months 

Begin operational use of the site  November 2019  −  − 

The project would also include an amendment to the 2004 Master Plan to allow for the use of the project site as a parking lot. 

 

 

Page 15: HSU Trinity Annex Project - Facilities Management

Initial Study

Initial Study 9

Figure 6 Site Concept Plan

BUS SHELTER

BUS BERTHS (TYP.)

BIKE PARKING & REPAIR STATION

Page 16: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

10

9. HSU 2004 Master Plan and EIR The Humboldt State University 2004 Master Plan (2004 Master Plan) provides a blueprint for the growth and development of HSU’s physical campus (HSU 2004a). It summarizes existing conditions (as of 2004), identifies constraints, projects growth, and future needs, establishes planning principles for the development of the campus, and outlines specific projects and changes to the campus to accommodate projected enrollment and future needs in a manner consistent with the planning principles of the University. 

The 2004 Master Plan identifies the project site for acquisition and conversion into a playfield. Exhibit 2F of the 2004 Master Plan indicates that the building on the project site is planned for immediate termination; Exhibit 4C shows the land use designation of the site as “Sports/Recreation”; and Exhibit 4E labels the site as a “Playfield.” The project includes a minor amendment of the 2004 Master Plan to allow for the proposed use of the project site as a surface parking lot with landscaped passive recreation space, bike facilities, and a bus shelter. 

A programmatic Environmental Impact Report (EIR) was prepared to evaluate the environmental impacts of the development of the HSU campus as envisioned by the 2004 Master Plan (HSU 2004b). The EIR includes in its project scope the demolition of the Trinity Annex and conversion of the site into a playing field. Thus, much of the analysis included in the 2004 Master Plan EIR is relevant to the project and is incorporated by reference. 

The 2004 Master Plan EIR includes “mitigative elements,” which are standard practices that all projects encompassed in the EIR would implement. The proposed project would incorporate applicable mitigative elements, which are referenced as appropriate in each section and summarized below. The 2004 Master Plan EIR also provides mitigation measures to address identified environmental impacts resulting from implementation of the 2004 Master Plan. Applicable mitigation measures included in the 2004 Master Plan EIR are incorporated as mitigation measures in this Initial Study as appropriate, with revisions as needed. 

Applicable Mitigative Elements

Aesthetics

New sources of light will be designed to protect nighttime views, including the night sky. This design goal will be satisfied using a variety of means as applicable, including fixture types, cut off angles, shields, lamp arm extensions, and pole heights. Specific design preferences include not directing light upward or to other properties, avoiding brightly illuminated vertical [fixtures] where feasible, such as walls and lamp poles, and not directing indoor lighting toward skylights. The most Recommended Practices (RPs) of the Illuminating Engineering Society of North America (IES) should be used for lighting levels and quality of light 

Cultural Resources

During earthwork activities in the areas of development, construction personnel shall be notified of, and required to monitor for, signs of potential undiscovered paleontological, archaeological, ethnic, or religious resources.  

In the event undiscovered paleontological, archaeological, ethnic, or religious resources are encountered during construction, ground‐disturbing work will be halted in that area until a 

Page 17: HSU Trinity Annex Project - Facilities Management

Initial Study

Initial Study 11

qualified cultural resources specialist evaluates the situation and recommends an appropriate course of action. 

If human remains are discovered, the County Coroner must be contacted. 

Geology & Soils, Hydrology & Water Quality

Proper management of disturbed and exposed soils and implementation of effective BMPs for erosion and sedimentation control will be implemented to prevent significant erosion during rains. Erosion control requirements will be included in the construction plans and specifications. The construction contractor will be required to comply with these plans for protecting exposed soils from runoff‐producing rain and for the proper disposal of excess soils. For construction projects covering an acre or more, these types of controls will be addressed in a SWPPP required by the Regional Water Quality Control Board. Erosion control requirements will be specific to each project and location, ensuring adequate protection for Jolly Giant Creek and other drainages. 

Noise

Construction activities that generate intrusive sound offsite will be limited from 7 AM to 7 PM, Monday through Friday, and 9 AM to 7 PM on weekends. 

Construction equipment will be maintained in proper conditions to prevent excessive noise. 

Backup beepers will be used only when necessary and will be no louder than necessary. 

Traffic

The construction contractor will be required to submit a traffic control plan to the University for approval. The approved plan must require that the contractor follow appropriate traffic safety guidelines, such as the Caltrans "Manual of Traffic Safety Controls for Construction and Maintenance Work Zones," and that work be conducted such that: 

Effects on local circulation, parking, and hazards are minimized, 

Emergency vehicles can pass through the construction zone at all times, and 

Clearly marked and signed indicators of pedestrian, bicycle, and vehicle traffic areas to be closed or restricted during construction are provided and that affected traffic is directed to alternate routes where appropriate. 

10. Other Public Agencies Whose Approval is Required The Trustees of the California State University is the lead agency and has sole responsibility for approving the project.  

11. Required Approvals The following approvals are required for this project: 

California State University. Approval by the California State University is required for the proposed master plan revision and schematic design 

City of Arcata. Approval by the City may be required for improvements in the City right‐of‐way 

Other approvals, as necessary 

Page 18: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

12

This page intentionally left blank. 

 

Page 19: HSU Trinity Annex Project - Facilities Management

Environmental Factors Potentially Affected

Initial Study 13

Environmental Factors Potentially Affected This project would potentially affect the environmental factors checked below, involving at least one impact that is “Potentially Significant” or “Potentially Significant Unless Mitigation Incorporated” as indicated by the checklist on the following pages. 

■  Aesthetics  □  Agriculture and Forestry Resources 

■  Air Quality 

□  Biological Resources  ■  Cultural Resources  □  Geology and Soils 

□  Greenhouse Gas Emissions 

■  Hazards and Hazardous Materials 

□  Hydrology and Water Quality 

□  Land Use and Planning  □  Mineral Resources  ■  Noise 

□  Population and Housing  □  Public Services  □  Recreation 

□  Transportation/Traffic  ■  Tribal Cultural Resources 

□  Utilities and Service Systems 

■  Mandatory Findings  of Significance 

       

Determination Based on this initial evaluation: 

□  I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. 

□  I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions to the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. 

■  I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. 

□  I find that the proposed project MAY have a “potentially significant impact” or “potentially significant unless mitigated” impact on the environment, but at least one effect (1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and (2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. 

Page 20: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

14

□  I find that although the proposed project could have a significant effect on the environment, because all potential significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. 

Signature   Date 

    

Printed Name   Title 

Page 21: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Aesthetics

Initial Study 15

Environmental Checklist 1 Aesthetics

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Have a substantial adverse effect on a scenic vista?  □  □  □  ■ 

b. Substantially damage scenic resources, including but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?  □  □  □  ■ 

c. Substantially degrade the existing visual character or quality of the site and its surroundings?  ■  □  □  □ 

d. Create a new source of substantial light or glare that would adversely affect daytime or nighttime views in the area?  □  □  ■  □ 

a.  Would the project have a substantial adverse effect on a scenic vista? 

The project site is located on the southernmost portion of the HSU campus and is approximately 4.2 miles east of the ocean. The project site does not lie in the viewshed of a scenic vista as identified in the 2004 Master Plan or Arcata General Plan: 2020 (Arcata General Plan) and would not involve the construction of a structure that could obstruct a scenic vista (HSU 2004a, City of Arcata 2008). In fact, the project would result in a reduction in structural development compared to current conditions and may therefore allow for an increase in views available through the site. There would be no impact to scenic vistas, and further analysis in an EIR is not warranted. 

NO IMPACT 

b.  Would the project substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? 

The project site is located 0.1 mile from U.S. Highway (US) 101 and 0.5 mile north of State Route (SR) 255. These highways are not designated as state scenic highways in Humboldt County (California Department of Transportation [Caltrans] 2018). The stretch of US 101 extending from the southerly city boundary north to the Mad River crossing is locally designated as a coastal scenic highway in the Arcata General Plan (City of Arcata 2008); however, the project site is not visible from this portion of the highway due to intervening trees and buildings.  

Page 22: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

16

The project site is currently developed and contains the Trinity Annex, trees, shrubs, lawns, and parking areas. The trees on the project site are associated with landscaping along the western perimeter of the Trinity Annex, and not located within a corridor of a scenic highway. Additionally, the site does not contain rock outcroppings or other natural features that would be considered scenic resources. However, the project would involve demolition of the Trinity Annex, which was listed in the City of Arcata’s “Noteworthy Structures” list and was found eligible for listing as a historical resource in part for its architecture as a unique vernacular expression of the Colonial Revival style applied to a rural hospital in the Cultural Resources Technical Report prepared for the project (HSU 2018a). While the exterior of the building shows signs of deterioration, the Trinity Annex could still be considered a scenic resource. However, because the project site, including the Trinity Annex, is not within or visible from a state scenic highway, there would be no impact to scenic resources within a state scenic highway. Further analysis in an EIR is not warranted. 

NO IMPACT

c.  Would the project substantially degrade the existing visual character or quality of the site and its surroundings? 

The project site currently contains the Trinity Annex, three surface parking areas, and associated landscaping. The Trinity Annex is no longer in active use and much of the exterior shows signs of deterioration. The largest existing surface parking area on the site is located in the northern area of the project site, adjacent to 14th Street, as shown on Figure 3. The Trinity Annex blocks views of this parking area from 13th Street, and from B and C Streets south of 14th Street. Areas on the project site not developed with the Trinity Annex or surface parking area are generally landscaped with lawn, shrubs, and hedge rows. There are also several trees located adjacent to the exterior of the Trinity Annex, mostly along the side of the Trinity Annex facing C Street. The project site is surrounded by one and two‐story single‐family residences to the east, west, and south, and campus facility buildings and associated parking lots to the north and northeast (see Figure 5). 

Removal of the Trinity Annex and conversion of the site to a parking lot with landscaped passive recreation space, bike facilities, and a bus shelter would alter the existing character and quality of the site. As discussed above under threshold b, the Trinity Annex could be considered a scenic resource due to its historic architectural features. Therefore, the removal of the Trinity Annex could substantially degrade the visual quality of the site or surroundings. This impact would be potentially significant and will be evaluated further in an EIR.  

POTENTIALLY SIGNIFICANT IMPACT

d.  Would the project create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? 

The project site currently contains the Trinity Annex, three active parking areas, and landscaping. The site is also currently served by bus transit along 14th Street and B Street. Existing light and glare sources associated with the site include vehicle headlamps, reflective vehicle surfaces, and security lighting. The proposed parking lot would have similar light and glare sources, but would also include parking lot lights up to 30 feet above ground surface, which would increase the amount of light on site. Additionally, the number of on‐site parking spaces would be increased by approximately 42 spaces relative to existing conditions, which could increase the amount of vehicle glare during the day, and during the night, the amount of light from vehicle headlights entering and exiting the parking lot. The proposed design for the site (see Figure 6) includes a buffer area around the lot to the south and west that would reduce the amount of parking lot light, light from vehicle headlights, 

Page 23: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Aesthetics

Initial Study 17

and parked vehicle glare reaching nearby receptors. In addition, the project would incorporate mitigative elements prescribed in the 2004 Master Plan EIR to ensure that parking lot lights, or other security lighting installed on the site would not significantly impact nighttime views.  

As stated in the 2004 Master Plan EIR, “New sources of light will be designed to protect nighttime views, including the night sky. This design goal will be satisfied using a variety of means as applicable, including fixture types, cut off angles, shields, lamp arm extensions, and pole heights. Specific design preferences include not directing light upward or to other properties, avoiding brightly illuminated vertical [fixtures] where feasible, such as walls and lamp poles, and not directing indoor lighting toward skylights. The most Recommended Practices (RPs) of the Illuminating Engineering Society of North America (IES) should be used for lighting levels and quality of light.” According to the 2004 Master Plan EIR, no separate mitigation beyond this mitigative element was deemed necessary. 

During demolition, site preparation, grading, and paving activities the site would also experience light and glare associated with construction activities, such as construction equipment and truck headlamps. However, construction activities would be limited to daytime hours in accordance with mitigative elements included in the 2004 Master Plan EIR and HSU general construction practices, and would be temporary in nature. Therefore, with incorporation of mitigative elements, the project’s impact to day or nighttime views due to lighting and glare would be reduced to a less than significant level. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

 

Page 24: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

18

 

This page intentionally left blank. 

 

Page 25: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Agriculture and Forestry Resources

Initial Study 19

2 Agriculture and Forestry Resources

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Convert Prime Farmland, Unique Farmland, Farmland of Statewide Importance (Farmland), as shown on maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non‐agricultural use?  □  □  □  ■ 

b. Conflict with existing zoning for agricultural use or a Williamson Act contract?  □  □  □  ■ 

c. Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)); timberland (as defined by Public Resources Code Section 4526); or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))?  □  □  □  ■ 

d. Result in the loss of forest land or conversion of forest land to non‐forest use?  □  □  □  ■ 

e. Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland to non‐agricultural use or conversion of forest land to non‐forest use?  □  □  □  ■ 

a.  Would the project convert Prime Farmland, Unique Farmland, Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non‐agricultural use?  

b.  Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract?  

c.  Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))?  

d.  Would the project result in the loss of forest land or conversion of forest land to non‐forest use?  

Page 26: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

20

e.  Would the project involve other changes in the existing environment, which, due to their location or nature, could result in conversion of Farmland to non‐agricultural use? 

The project site is not located on or adjacent to designated farmland, agricultural zones or forest lands (California Department of Conservation [DOC] 2018). Additionally, no agricultural or forest land resources are present on the project site, as it is part of a fully developed university campus. The project would have no impact upon agricultural or forest resources. Further analysis in an EIR is not warranted. 

NO IMPACT

Page 27: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Air Quality

Initial Study 21

3 Air Quality

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Conflict with or obstruct implementation of the applicable air quality plan?  □ □ □ ■

b. Violate any air quality standard or contribute substantially to an existing or projected air quality violation?  □ ■ □ □

c. Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non‐attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)?  □ ■ □ □

d. Expose sensitive receptors to substantial pollutant concentrations?  □ □ ■ □

e. Create objectionable odors affecting a substantial number of people?  □ □ ■ □

The project site is located within the North Coast Air Basin (the Basin) under the jurisdiction of the North Coast Unified Air Quality Management District (NCUAQMD). As the local air quality management agency, the NCUAQMD is required to monitor air pollutant levels to ensure that state and federal air quality standards are met and, if they are not met, to develop strategies to meet the standards. Depending on whether or not the standards are met or exceeded, the Basin is classified as being in “attainment” or “nonattainment.” The health effects associated with criteria pollutants for which attainment of state and federal air quality standards is evaluated are described in Table 2. 

The Basin is designated as non‐attainment for the state 24‐hour PM10 standard (NCUAQMD 2016a). Humboldt County's climate, pollution‐trapping mountains and valleys, and growing population all contribute to the non‐attainment status for PM10 (HCAOG 2014). The primary sources of particulate matter are exhaust and dust generated from on‐road and off‐road vehicles, open burning of vegetation, residential wood stoves, and stationary industrial sources (NCUAQMD 2016a). The NCUAQMD prepared an Attainment Plan in 1995 to assess the sources of air pollution, determine reduction targets, and identify control strategies to achieve attainment with state standards. Control strategies identified by the study include transportation control measures (public transit, ridesharing, vehicle buy‐back program, traffic flow improvements, bicycle incentives, etc.), land use measures to reduce reliance on automobiles, and open burning measures (NCUAQMD 1995). This 

Page 28: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

22

document was not a required component of District attainment efforts and was prepared solely to inform NCUAQMD. 

Table 2 Health Effects Associated with Criteria Pollutants Pollutant  Adverse Effects 

Ozone  (1) Short‐term exposures: pulmonary function decrements and localized lung edema in humans and animals, risk to public health implied by alterations in pulmonary morphology and host defense in animals; (2) long‐term exposures: risk to public health implied by altered connective tissue metabolism and altered pulmonary morphology in animals after long‐term exposures and pulmonary function decrements in chronically exposed humans; (3) vegetation damage; and (4) property damage. 

Carbon monoxide (CO)  Reduces oxygen delivery leading to: (1) Aggravation of chest pain (angina pectoris) and other aspects of coronary heart disease; (2) decreased exercise tolerance in persons with peripheral vascular disease and lung disease; (3) impairment of central nervous system functions; and (4) possible increased risk to fetuses. 

Nitrogen dioxide (NO2)   (1) Potential to aggravate chronic respiratory disease and respiratory symptoms in sensitive groups; (2) risk to public health implied by pulmonary and extra‐pulmonary biochemical and cellular changes and pulmonary structural changes; and (3) contribution to atmospheric discoloration. 

Sulfur dioxide (SO2)  (1) Bronchoconstriction accompanied by symptoms that may include wheezing, shortness of breath, and chest tightness during exercise or physical activity in persons with asthma. 

Suspended particulate matter (PM10) 

(1) Excess deaths from short‐term and long‐term exposures; (2) excess seasonal declines in pulmonary function, especially in children; (3) asthma exacerbation and possibly induction; (4) adverse birth outcomes including low birth weight; (5) increased infant mortality; (6) increased respiratory symptoms in children such as cough and bronchitis; and (7) increased hospitalization for both cardiovascular and respiratory disease (including asthma).

Suspended particulate matter (PM2.5) 

(1) Excess deaths from short‐ and long‐term exposures; (2) excess seasonal declines in pulmonary function, especially in children; (3) asthma exacerbation and possibly induction; (4) adverse birth outcomes, including low birth weight; (5) increased infant mortality; (6) increased respiratory symptoms in children, such as cough and bronchitis; and (7) increased hospitalization for both cardiovascular and respiratory disease, including asthma.1 

1 More detailed discussions on the health effects associated with exposure to suspended particulate matter can be found in the following documents: Office of Environmental Health Hazard Assessment, Particulate Matter Health Effects and Standard Recommendations, www.oehha.ca.gov/air/toxic_contaminants/PM10notice.html#may, May 9, 2002; and EPA, Air Quality Criteria for Particulate Matter, October 2004. 

Source: U.S. EPA 2016a 

The NCUAQMD has not formally adopted significance thresholds to guide CEQA significance determinations for land development projects (NCUAQMD 2016b). Instead, the District uses the Best Available Control Technology (BACT) emission rates for stationary sources as defined in the NCUAQMD Rule 110 and listed in Table 3 as significance thresholds. For the purpose of this analysis, air quality emissions are considered to have a significant individual and cumulative impact if they exceed the District’s significance thresholds for BACT adoption.  

Page 29: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Air Quality

Initial Study 23

Table 3 NCUAQMD Significance Thresholds for BACT Adoption

Pollutant 

Mass Daily Thresholds 

Daily (pounds/day)  Annual (tons/year) 

CO  500  100 

Fluorides  15  2 

Hydrogen sulfide (H2S)  50  10 

Lead  3.2  0.6 

Nitrogen Oxides (NOx)  50  40 

PM10  80  15 

PM2.5  50  10 

Reactive Organic Compounds (ROC)1  50  40 

Reduced Sulfur Compounds  50  10 

Sulfur Oxides  80  40 

Sulfuric Acid Mist  35  7 

Total Reduced Sulfur Compounds  50  10 

1 Reactive Organic Compounds (ROC) are formed during combustion and evaporation of organic solvents. ROCs are also referred to as Reactive Organic Gases (ROG) and Volatile Organic Compounds (VOC). 

Source: NCUAQMD Rule 110 

a.  Would the project conflict with or obstruct implementation of the applicable air quality plan? 

A project may be inconsistent with an applicable air quality plan if it would generate population, housing, or employment growth exceeding the forecasts used in the development of the plan. The proposed project would not increase the population because it does not include residential uses, nor would it generate employment growth as it would not increase enrollment capacity or add academic or office space to the campus. Therefore, no impact would occur.  

NO IMPACT

b.  Would the project violate any air quality standard or contribute substantially to an existing or projected air quality violation? 

c.  Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non‐attainment under an applicable federal or state ambient air quality standard (including releasing emissions that exceed quantitative thresholds for ozone precursors)?  

Construction Emissions The project would involve the demolition of an existing building complex and construction of a parking lot with greenspace and transportation elements that would serve existing development. Demolition and construction activities would temporarily generate air pollutants from operation of 

Page 30: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

24

diesel‐powered equipment, employee vehicle trips, truck haul trips, and earthwork, which would generate fugitive dust (i.e., PM10) emissions.  

Project construction emissions were modeled using the California Emissions Estimator Model (CalEEMod) version 2016.3.2. CalEEMod was run assuming demolition of a 23,544‐square foot building and construction of a parking lot with 83 spaces on a 1.44‐acre lot. Based on the anticipated schedule for the project, demolition was modeled to occur over two months, beginning on May 1, 2019 and ending at the end of June 2019. Site preparation, grading, paving, and architectural coating were modeled to occur over three months, beginning on July 1, 2019 and ending at the end of September 2019. The number of days allotted to each phase was weighted based on CalEEMod defaults, with the exception of the architectural coating phase, which was assumed to overlap with paving and occur over a period of ten days as application of coatings would be minimal and involve only parking lot striping.  

As discussed in greater detail in Section 8, Hazards and Hazardous Materials, lead is present in the paint on the interiors and exteriors of the Trinity Annex. Because the exterior paint is peeling, soils on site are likely contaminated with lead as well. Mitigation Measures HAZ‐1 and HAZ‐2 indicate that contaminated soils may need to be removed and would be required to be disposed of at an appropriate hazardous waste landfill. Consequently, it was conservatively assumed that the top two feet of the project site soils would need to be removed and replaced, resulting in export and import of approximately 4,646 cubic yards of soil. Depending on the concentration of lead in the soils and building, it is possible that construction debris and contaminated soils would need to be hauled to a Class I landfill. Thus, the project’s pollutant emissions were modeled for both scenarios. The “no hauling” scenario assumes that demolition debris and contaminated soils would not need to be deposited in a Class I landfill; debris and soils would still be hauled, but the CalEEMod default of 20 miles was used for the hauling trip length. The “hauling” scenario assumes demolition debris and contaminated soils would be hauled to a Class I facility; a truck haul trip length of 225 miles was used, which is the approximate distance from the project site to the boundary of the NCAB, en route to the Kettleman Hills Waste Facility1. CalEEMod outputs and assumptions for each scenario are provided in Appendix A. 

Table 4 shows the estimated construction emissions generated by the project under the no hauling scenario along with NCUAQMD significance thresholds for applicable criteria pollutants. Emissions of fluorides, air‐borne lead, and sulfuric acid mist are associated with industrial sources, while hydrogen sulfide emissions are associated with sewage and manure; air‐borne lead emissions are also associated with aviation fuel. As the proposed project would not be a source of these air pollutants, they were not considered in the construction emissions analysis (U.S. EPA 2014). As shown in Table 4, construction emissions for the project would be within NCUAQMD recommended daily significance thresholds for all criteria pollutants under the no haul scenario.  

Table 5 shows the estimated construction emissions generated by the project under the hauling scenario along with NCUAQMD significance thresholds. Construction emissions for the project with hauling to a Class I landfill would exceed the NCUAQMD daily significance threshold for NOX. Therefore, if the concentrations of lead or solvents in project construction debris and/or site soils necessitate disposal of materials in a Class I landfill, mitigation is required to reduce this impact to a less than significant level.  

1 Impacts for both hauling scenarios would be the same for all issue areas discussed in this Initial Study except for air quality and greenhouse gas emissions.  

Page 31: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Air Quality

Initial Study 25

Table 4 Project Construction Emissions without Hauling to a Class I Landfill

Pollutant 

Maximum Daily Emissions (lbs/day) 

Daily Significance Threshold (lbs/day) 

Maximum Annual Emissions 

(tons/year) 

Annual Significance Threshold (tons/year) 

Significant Impact? 

ROCs  4.7  50  0.1  40  No 

NOx  45.9  50  1.1  40  No 

CO  16.0  500  0.7  100  No 

SOX1  0.1  80  <0.1  40  No 

PM10  8.2  80  0.1  15  No 

PM2.5  4.3  50  0.1  10  No 

1. CalEEMod provides estimated emissions for SO2, which is the predominant form of SOx emitted. Emission values are taken from the season with the highest value.  

Sources: Appendix A (CalEEMod outputs); NCUAQMD Rule 110 (significance thresholds) 

Table 5 Project Construction Emissions with Hauling to a Class I Landfill

Pollutant 

Maximum Daily Emissions (lbs/day) 

Daily Significance Threshold (lbs/day) 

Maximum Annual Emissions 

(tons/year) 

Annual Significance Threshold (tons/year) 

Significant Impact? 

ROCs  8.9  50  0.1  40  No 

NOx  241.6  50  2.0  40  Yes 

CO  44.9  500  0.8  100  No 

SOx  0.6  80  <0.1  40  No 

PM10  22.8  80  0.2  15  No 

PM2.5  9.4  50  0.1  10  No 

Notes: CalEEMod provides estimated emissions for SO2, which is the predominant form of SOx emitted. Emission values are taken from 

the season with the highest value.  

Sources: Appendix A (CalEEMod outputs); NCUAQMD Rule 110 (significance thresholds) 

The project would also be required to comply with applicable NCUAQMD rules and regulations, including requirements to prevent fugitive dust emissions as stated in Section D of Rule 104, Prohibitions. In accordance with Rule 104, the construction contractor for the project would be required to take reasonable precautions to prevent particulate matter from becoming airborne, including, but not limited to, the following applicable provisions: 

Covering open bodied trucks when used for transporting materials likely to give rise to airborne dust. 

The use of water or chemicals for control of dust in the demolition of existing buildings or structures, construction operations, the grading of roads or the clearing of land.  

Page 32: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

26

The application of asphalt, oil, water or suitable chemicals on dirt roads, materials stockpiles, and other surfaces which can give rise to airborne dusts.  

The paving of roadways and their maintenance in a clean condition.  

The prompt removal of earth or other track out material from paved streets onto which earth or other material has been transported by trucking or earth moving equipment, erosion by water, or other means. 

Operational Emissions The project would not involve the construction of a building that would generate criteria pollutant emissions from natural gas usage or the development of a land use that would generate new vehicle trips. The parking lot would serve existing HSU students, employees, and visitors, and would not increase HSU’s enrollment capacity. The proposed parking lot would accommodate approximately 42 more vehicles than are currently able to park at the project site. This could result in a small increase in vehicle trips to and from the project site. However, a substantial increase in vehicle trips on roadways adjacent to the project site would not be expected because the site is located along one of the main entrances to the HSU campus and vehicles currently travel past the site toward other parking areas on campus. Therefore, as summarized in Table 6 the project would have minimal operational emissions, which would be emitted by area sources associated primarily with site maintenance, such as emissions associated with operation of diesel‐powered landscaping equipment and VOC emissions from occasional re‐striping of the parking lot and area. Operational emissions would not contribute substantially to an air quality violation or result in a cumulatively net increase in PM10.  

Table 6 Project Operational Emissions

Pollutant 

Maximum Daily Emissions (lbs/day) 

Daily Significance Threshold (lbs/day) 

Maximum Annual Emissions 

(tons/year) 

Annual Significance Threshold (tons/year) 

Significant Impact? 

ROCs  <0.1  50  <0.1  40  No 

NOx  <0.1  50  <0.1  40  No 

CO  <0.1  500  <0.1  100  No 

SOx  0.0  80  0.0  40  No 

PM10  <0.1  80  0.0  15  No 

PM2.5  <0.1  50  0.0  10  No 

Notes: CalEEMod provides estimated emissions for SO2, which is the predominant form of SOx emitted. Emission values are taken from 

the season with the highest value.  

Sources: Appendix A (CalEEMod outputs); NCUAQMD Rule 110 (significance thresholds).  

Mitigation Measure If the project would require hauling to a designated hazardous waste landfill, incorporation of the following mitigation measure is required to reduce NOX emissions to a less than significant level.  

Page 33: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Air Quality

Initial Study 27

AQ-1 Hauling Trip Daily Mileage Cap

If construction debris and contaminated soils would be hauled to a Class I landfill, HSU shall require that the total daily hauling trip mileage be limited to 1,900 miles per day during demolition activities and 2,150 miles per day during all other construction activities.  

Implementation of Mitigation Measure AQ‐1 would ensure that project NOX emissions not exceed the NCUAQMD threshold of 50 lbs/day. Refer to Appendix A for calculations of the maximum allowable hauling mileage and an explanation of methodology. With incorporation of Mitigation Measure AQ‐1 in the event that construction debris and contaminated soils would need to be hauled to a Class I landfill, project construction and operational emissions would not violate or contribute to a violation of air quality standards or result in a cumulatively considerable increase in PM10. This impact would be less than significant with mitigation, and further analysis in an EIR is not warranted. This mitigation measure will be included in the Executive Summary of the EIR and in the project’s Mitigation Monitoring and Reporting Program. 

LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED

d.  Would the project expose sensitive receptors to substantial pollutant concentrations? 

Certain population groups, such as children, the elderly, and people with health problems, are particularly sensitive to air pollution. Sensitive receptors are defined as land uses that are more likely to be used by these population groups and include health care facilities, retirement homes, school and playground facilities, and residential areas. The project site is adjacent to a residential neighborhood, where it is possible that children, the elderly, and/or people with health problems reside. Therefore, the adjacent residences are considered to be sensitive receptors. However, as described above under Threshold c, with mitigation, construction emissions from the proposed project would not exceed NCUAQMD significance thresholds and operation emissions would be equivalent to, or below, existing conditions.  

The NCUAQMD recommends the use of the latest version of the California Air Pollution Control Officers Association (CAPCOA) “Health Risk Assessments for Proposed Land Use Projects” to assess impacts from toxic air contaminants. Because the proposed project is neither a source of toxic air contaminants, as defined in CAPCOA’s guidance document, nor located in the vicinity of a source of toxic air contaminants, a health risk assessment is not required.  

As discussed in greater detail in Section 8, Hazards and Hazardous Materials, the Trinity Annex contains asbestos and lead‐based paint and on‐site soils may also be contaminated with lead. There is the potential for asbestos and lead to be emitted into the air during demolition. Lead‐based materials and asbestos exposure are regulated by the California Occupational Safety and Health Administration (Cal OSHA). The California Code of Regulations (CCR), §1532.1, requires testing, monitoring, containment, and disposal of lead‐based materials such that exposure levels do not exceed Cal OSHA standards. Under this rule, construction workers may not be exposed to lead at concentrations greater than fifty micrograms per cubic meter of air averaged over an eight‐hour period and exposure must be reduced to lower concentrations if the work day exceeds eight hours. Similarly, CCR §1529 sets requirements for asbestos exposure assessments and monitoring, methods of complying with exposure requirements, safety wear, communication of hazards, and medical examination of workers. The NCUAQMD also enforces Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP), which regulates the control of asbestos during the renovation and demolition of buildings under the Clean Air Act (CAA) (NCUAQMD 2016c). The CAA requires a thorough inspection for asbestos where demolition will occur and specifies work 

Page 34: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

28

practices to control emissions, such as removing all asbestos‐containing materials, adequately wetting all regulated asbestos‐containing materials, sealing the material in leak tight containers and disposing of the asbestos‐containing waste material as expediently as practicable (U.S. EPA 2016b).  

As the proposed project would not result in emissions exceeding significance thresholds or be a source of toxic air contaminants; would comply with regulations limiting lead and asbestos emissions and exposure; and would incorporate mitigation to prevent dust‐borne lead emissions, the project would not expose sensitive receptors to substantial pollutant concentrations and impacts would be less than significant. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT

e.  Would the project create objectionable odors affecting a substantial number of people? 

Major odor sources typically include industrial facilities, landfills, and agricultural operations. Parking lots are not considered a major odor source. Potential sources of odors during project operation would be vehicle exhaust from older vehicles. Objectionable odors may be generated by the operation of diesel equipment during the construction phases of the proposed project, which would emit diesel exhaust fumes. Some of these odors may reach sensitive receptors adjacent to the project site, but impacts would be temporary in nature. The odors would be limited to the time that construction equipment is operating and all off‐road diesel construction equipment is required to limit engine idling to five minutes under the California Air Resources Board’s anti‐idling rule (CARB 2008). As odors from construction would be temporary and limited by CARB regulations, no significant impact would occur, and further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT

 

Page 35: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Biological Resources

Initial Study 29

4 Biological Resources

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?  □ ■ □ □

b. Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?  □ □ □ ■

c. Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?  □ □ □ ■

d. Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?  □ □ □ ■

e. Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?  □ □ □ ■

f. Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?  □ □ □ ■

Page 36: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

30

a.  Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as candidate, sensitive, or special status in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or the U.S. Fish and Wildlife Service?  

The project site is currently developed, lies in an urban context, and is covered in large part by impervious surface and structures. Vegetation on the site consists of maintained ornamental landscaping, including grasses, shrubs, and trees. The maintained landscaping on‐site is not suitable habitat for special status plant species. The project would have no impact on special status plants. 

The developed conditions and maintained landscaping on‐site are also not suitable habitat for the majority of special status wildlife known to occur in the area of the HSU campus, such as southern torrent salamander and osprey (HSU 2004b). However, migratory nesting birds, which are protected under the Migratory Bird Treaty Act, may utilize on‐site landscaping trees and shrubs for nesting. The proposed demolition of the Trinity Annex, including associated landscaping, may occur within the nesting bird season. Therefore, proposed demolition activities could impact nesting migratory bird species, which would be a potentially significant impact and mitigation is required. 

Mitigation Measures

BIO-1 Nesting Birds

To avoid disturbance of nesting migratory bird species and their nests, which are protected by the Migratory Bird Treaty Act and California Fish and Game Code, demolition activities related to the project, including, but not limited to vegetation removal and ground disturbance, shall occur outside of the bird breeding season (February 1st through August 30th). If demolition must begin during the breeding season, then a pre‐construction nesting bird survey shall be conducted no more than three days prior to initiation of ground disturbance and vegetation removal activities. The nesting bird pre‐construction survey shall be conducted on foot inside the project boundary, focusing on the on‐site vegetation and landscaping, particularly trees and shrubs. As public roads surround the project site, and private residences are located to the east, south, and west, surveys of areas outside of the project site shall not be required. The survey shall be conducted by a biologist familiar with the identification of avian species known to occur in Northern California communities. If nests are found, an avoidance buffer (dependent upon the species, the proposed work activity, and existing disturbances associated with land uses outside of the site) shall be determined and demarcated by the biologist with bright orange construction fencing, flagging, construction lathe, or other means to mark the boundary. All construction personnel shall be notified as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No ground disturbing activities shall occur within this buffer until the avian biologist has confirmed that breeding/ nesting is completed and the young have fledged the nest. Encroachment into the buffer shall occur only at the discretion of the qualified biologist. 

Implementation of Mitigation Measure BIO‐1 would reduce the impacts associated with disturbance or disruption of nesting migratory bird species. With implementation of this mitigation measure, impacts would be reduced to a less than significant level. Further evaluation of this issue in an EIR is not warranted. However, this mitigation measure will be included in the Executive Summary of the EIR and in the project’s Mitigation Monitoring and Reporting Program. 

LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED 

Page 37: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Biological Resources

Initial Study 31

b.  Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? 

c.  Would the project have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? 

d.  Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? 

f.  Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? 

The project site does not contain riparian habitat or wetlands, and lies in an urban setting where it would not interfere with wildlife movement or impede the use of native wildlife nursery sites. The project site is not within the area of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan (CDFW 2017, USFWS 2018). There would be no impact. Further analysis in an EIR is not warranted. 

NO IMPACT 

e.  Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? 

On‐site vegetation, including trees, would be removed during the demolition of the Trinity Annex. However, there are no applicable local policies or ordinances for the HSU campus protecting biological resources, including a tree preservation policy or ordinance. Therefore, the project would not conflict with an applicable local policy or ordinance protecting biological resources. Additionally, the proposed project includes landscaping the project site with maintained lawns and trees, similar to existing conditions. There would be no impact. Further analysis in an EIR is not warranted. 

NO IMPACT 

Page 38: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

32

 

This page intentionally left blank. 

Page 39: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Cultural Resources

Initial Study 33

5 Cultural Resources

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Cause a substantial adverse change in the significance of a historical resource as defined in §15064.5?  ■ □ □ □

b. Cause a substantial adverse change in the significance of an archaeological resource as defined in §15064.5?  □ □ ■ □

c. Directly or indirectly destroy a unique paleontological resource or site or unique geological feature?  □ □ ■ □

d. Disturb any human remains, including those interred outside of formal cemeteries?  □ □ ■ □

The California Environmental Quality Act (CEQA) requires that a lead agency determine whether a project may have a significant effect on historical resources (Public Resources Code [PRC], Section 21084.1) and tribal cultural resources (PRC Section 21074 [a][1][A]‐[B]). A historical resource is a resource listed in, or determined to be eligible for listing, in the California Register of Historical Resources (CRHR), a resource included in a local register of historical resources, or any object, building, structure, site, area, place, record, or manuscript that a lead agency determines to be historically significant (State CEQA Guidelines, Section 15064.5[a][1‐3]). 

A resource is considered historically significant if it:  

1. Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage; 

2. Is associated with the lives of persons important in our past; 

3. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or 

4. Has yielded, or may be likely to yield, information important in prehistory or history.  

In addition, if it can be demonstrated that a project would cause damage to a unique archaeological resource, the lead agency may require reasonable efforts be made to permit any or all of these resources to be preserved in place or left in an undisturbed state. To the extent that resources cannot be left undisturbed, mitigation measures are required (PRC, Section 21083.2[a], [b]).  

PRC, Section 21083.2(g) defines a unique archaeological resource as an archaeological artifact, object, or site about which it can be clearly demonstrated that, without merely adding to the current body of knowledge, there is a high probability that it: 

Page 40: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

34

1. Contains information needed to answer important scientific research questions and that there is a demonstrable public interest in that information; 

2. Has a special and particular quality such as being the oldest of its type or the best available example of its type; or 

3. Is directly associated with a scientifically recognized important prehistoric or historic event or person. 

a.  Would the project cause a substantial adverse change in the significance of a historical resource as defined in §15064.5? 

A cultural resources technical report was prepared in June 2018 to evaluate the project’s impacts to cultural resources; it is included as Appendix B of this document (HSU 2018a). The report found the Trinity Annex eligible for individual listing in the National Register of Historic Places (NRHP) and the California Register of Historical Resources (CRHR) at the local level of significance under Criterion A/1 for its association with the broad pattern of events in local history as the first hospital constructed in Arcata to serve that purpose; Criterion B/2, as the oldest remaining property that retains integrity associated with the Sisters of St. Joseph of Orange in Humboldt County; and Criterion C/3, as a vernacular expression of the Colonial Revival style of architecture designed for a rural hospital. As such, the property is considered a historical resource under CEQA. The project would involve demolition of the Trinity Annex. Therefore, this impact would be potentially significant and will be evaluated further in an EIR. 

POTENTIALLY SIGNIFICANT IMPACT 

b.  Would the project cause a substantial adverse change in the significance of an archaeological resource as defined in §15064.5?  

c.  Would the project directly or indirectly destroy a unique paleontological resource or site or unique geological feature? 

d.  Would the project disturb any human remains, including those interred outside of formal cemeteries? 

The project site is located in a previously developed area of the HSU campus. As discussed in the Cultural Resources Technical Report prepared for the project, no archaeological resources have been identified on the site, although two archaeological sites have been identified within 0.3 mile of the site (HSU 2018a). The project would involve minor excavation associated with site preparation and grading of the site for construction of a parking lot, greenspace, and pedestrian and transportation amenities. In addition, as discussed in Section 8, Hazards and Hazardous Materials, surface soils may need to be removed and replaced due to potential lead contamination. However, excavation would be limited in depth to surficial soils, and soils on the site have been previously disturbed for construction of the Trinity Annex, which has a basement level. In the unlikely event that human remains or archaeological resources are unearthed during soil disturbance associated with the project, applicable regulatory requirements pertaining to the handling and treatment of such resources would be followed as described in section 15067.5(e) and 15064.5(f) of the State CEQA Guidelines and Section 7050.5 of the Health and Safety Code. In addition, the project would incorporate the following mitigative elements provided in the 2004 Master Plan EIR to prevent impacts to unanticipated cultural resources, including paleontological resources: 

Page 41: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Cultural Resources

Initial Study 35

During earthwork activities in the areas of development, construction personnel shall be notified of, and required to monitor for, signs of potential undiscovered paleontological, archaeological, ethnic, or religious resources.  

In the event undiscovered paleontological, archaeological, ethnic, or religious resources are encountered during construction, ground‐disturbing work will be halted in that area until a qualified cultural resources specialist evaluates the situation and recommends an appropriate course of action. 

If human remains are discovered, the County Coroner must be contacted 

Compliance with regulatory requirements and mitigative elements incorporated into the project would reduce impacts to archaeological and paleontological resources and human remains to a less than significant level. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

 

Page 42: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

36

 

This page intentionally left blank. 

Page 43: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Geology and Soils

Initial Study 37

6 Geology and Soils

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Expose people or structures to potentially substantial adverse effects, including the risk of loss, injury, or death involving: 

1.  Rupture of a known earthquake fault, as delineated on the most recent Alquist‐Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault?  □ □ ■ □

2.  Strong seismic ground shaking?  □ □ ■ □

3.  Seismic‐related ground failure, including liquefaction?  □ □ ■ □

4.  Landslides?  □ □ □ ■

b. Result in substantial soil erosion or the loss of topsoil?  □ □ ■ □

c. Be located on a geologic unit or soil that is made unstable as a result of the project, and potentially result in on or offsite landslide, lateral spreading, subsidence, liquefaction, or collapse?  □ □ □ ■

d. Be located on expansive soil, as defined in Table 1‐B of the Uniform Building Code (1994), creating substantial risks to life or property?  □ □ ■ □

e. Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?  □ □ □ ■

Page 44: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

38

a.1.  Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist‐Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? 

Humboldt County lies in an area of high seismic risk (Humboldt County 2002). Three crustal plates—the Pacific Plate, Gorda Plate, and North American Plate—intersect offshore to form the Mendocino Triple Junction. Consequently, the area is seismically active and offshore of Cape Mendocino has the highest concentration of earthquake events in the continental United States. The project site does not lie in a fault rupture zone, as delineated by the Alquist‐Priolo Earthquake Fault Zoning Map (DOC 2016). There are several known active faults in the vicinity of the HSU campus. The closest is the Fickle Hill Fault, which is located one block to the southwest of the project site (City of Arcata 2008). However, the project would not involve the construction of a structure or development of a land use where people would spend a substantial amount of time, such as a residence, office, or classroom. Therefore, the project would not expose people to substantial adverse effects involving surface rupture of a fault and this impact would be less than significant. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

a.2.  Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving strong seismic ground shaking? 

Humboldt County contains four major fault zones: San Andreas Fault, Falor‐Korbel (Mad River) Fault, Trinidad and Big Lagoon Faults, and Cascadia Subduction Zone (Humboldt County 2002). Activity along any of these fault systems could result in strong ground shaking. As stated in the 2004 Master Plan EIR, the campus lies in an area prone to potentially prolonged and strong seismic groundshaking (HSU 2004b). However, the project would not involve the construction of a new building or development of a land use where people would reside, work, or otherwise spend long periods of time. Therefore, it would not expose people or structures to significant adverse effects involving strong seismic ground shaking. This impact would be less than significant. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

a.3.  Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving seismic‐related ground failure, including liquefaction? 

Liquefaction is a process whereby soil is temporarily transformed to fluid form during intense and prolonged ground shaking or because of a sudden shock or strain. Liquefaction typically occurs in areas where the groundwater is less than 30 feet from the surface and where the soils are composed of poorly consolidated fine to medium sand. As indicated in Figure PS‐a (Hazards Map) of the Arcata General Plan, the project site is not located within an area subject to seismic‐related ground failure or liquefaction (City of Arcata 2008). This impact would be less than significant. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

Page 45: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Geology and Soils

Initial Study 39

a.4.  Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving landslides? 

The project site is located in a flat, developed area without adjacent slopes and has not been mapped as an area at risk for seismically induced landslides (DOC 1984). As there is no risk of landslides on the site, no impact would occur. Further analysis in an EIR is not warranted. 

NO IMPACT 

b.  Would the project result in substantial soil erosion or the loss of topsoil? 

The project site is located in a relatively flat, urbanized area not subject to erosion, and is currently developed with a building, parking lots, and some landscaping. The project involves demolition of the existing building and construction of a parking lot area with landscape and pedestrian and transportation amenities. During operation, most of the site would be paved, with some greenspace, and minimal erosion or loss of topsoil would occur. 

Project construction would involve ground disturbance. However, construction activities would be subject to the National Pollution Discharge Elimination System (NPDES) Construction General Permit, most recently adopted by the California State Water Board on September 2, 2009. This permit became effective on July 1, 2010 and applies to construction sites one acre or larger in size. All developments for which the Construction General Permit applies are required to prepare and implement a storm water pollution prevention plan (SWPPP). SWPPPs specify best management practices (BMP) to be implemented by the contractor during construction to minimize soil erosion, stormwater runoff, and downstream impacts to water quality. With adherence to the BMPs required by a SWPPP, erosion impacts would be less than significant.  

In addition, the 2004 HSU Master Plan EIR includes the following mitigative element that would be incorporated by the project (HSU 2004b): 

Proper management of disturbed and exposed soils and implementation of effective BMPs for erosion and sedimentation control will be implemented to prevent significant erosion during rains. Erosion control requirements will be included in the construction plans and specifications. The construction contractor will be required to comply with these plans for protecting exposed soils from runoff‐producing rain and for the proper disposal of excess soils. For construction projects covering an acre or more, these types of controls will be addressed in a SWPPP required by the Regional Water Quality Control Board. Erosion control requirements will be specific to each project and location, ensuring adequate protection for Jolly Giant Creek and other drainages. 

Compliance with NPDES requirements and incorporation of the above mitigative element would reduce the potential for substantial soil erosion or the loss of topsoil to a less than significant level. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT

c.  Would the project be located on a geologic unit or soil that is made unstable as a result of the project, and potentially result in on or offsite landslide, lateral spreading, subsidence, liquefaction, or collapse? 

The project site is not located in an area vulnerable to liquefaction, collapse, landsliding, lateral spreading, lurch cracking, or fault rupture nor located in an area of land subsidence (DOC 1984, USGS 2016). The project site is currently developed with a building and there is no record of damage 

Page 46: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

40

from unstable geologic conditions. The project would not result in on or offsite impacts related to geological instability, and there would be no impact. Further analysis in an EIR is not warranted. 

NO IMPACT 

d.  Would the project be located on expansive soil, as defined in Table 1‐B of the Uniform Building Code (1994), creating substantial risks to life or property? 

This property has previously been developed and utilized for campus activities. Expansive soils are not known to be present. This impact would be less than significant. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

e.  Would the project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? 

HSU is served by an existing sewer system. The project area and the area adjacent to the project is operated and maintained by the City of Arcata. The project would not involve the use of septic tanks or any other alternative waste water disposal systems. No impact would occur. Further analysis in an EIR is not warranted. 

NO IMPACT

Page 47: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Greenhouse Gas Emissions

Initial Study 41

7 Greenhouse Gas Emissions

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?  □ □ ■ □

b. Conflict with any applicable plan, policy, or regulation adopted for the purposes of reducing the emissions of greenhouse gases?  □ □ ■ □

Climate change is the observed increase in the average temperature of the earth’s atmosphere and oceans along with other substantial changes in climate (such as wind patterns, precipitation, and storms) over an extended period. Climate change is the result of numerous, cumulative sources of greenhouse gases (GHG), which contribute to the “greenhouse effect,” a natural occurrence that helps regulate the temperature of the planet. The majority of radiation from the sun hits the earth’s surface and warms it. The surface in turn radiates heat, known as infrared radiation, back toward the atmosphere. Gases and clouds in the atmosphere trap and prevent some of this heat from escaping into space and re‐radiate it in all directions. This process is essential to support life on Earth because it warms the planet by approximately 60° Fahrenheit. Emissions from human activities since the beginning of the industrial revolution (approximately 250 years ago) are adding to the natural greenhouse effect by increasing the gases in the atmosphere that trap heat and contribute to an average increase in Earth’s temperature. 

GHGs occur naturally and from human activities. Human activities that produce GHGs include fossil fuel burning (coal, oil, and natural gas for heating and electricity, gasoline and diesel for transportation); methane generated by landfill wastes and raising livestock; deforestation activities; and some agricultural practices. GHGs produced by human activities include carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), hydrofluorocarbons (HFC), perfluorocarbons (PFC), and sulfur hexafluoride (SF6). Since 1750, estimated concentrations of CO2, CH4, and N2O in the atmosphere have increased over by 36 percent, 148 percent, and 18 percent respectively, primarily due to human activity. Emissions of GHGs affect the atmosphere directly by changing its chemical composition. Changes to the land surface indirectly affect the atmosphere by changing the way in the Earth absorbs gases from the atmosphere. Potential impacts in California of global warming may include loss of snow pack, sea level rise, more extreme heat days per year, more high ozone days, more large forest fires, and more drought years (California Energy Commission [CEC] 2009). 

California’s major initiative for reducing GHG emissions is outlined in Assembly Bill 32 (AB 32), the “California Global Warming Solutions Act of 2006,” signed into law in 2006. AB 32 codifies the statewide goal of reducing GHG emissions to 1990 levels by 2020 (essentially a 15% reduction below 2005 emission levels; the same requirement as under S‐3‐05), and requires ARB to prepare a Scoping Plan that outlines the main State strategies for reducing GHGs to meet the 2020 deadline. 

Page 48: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

42

In addition, AB 32 requires ARB to adopt regulations to require reporting and verification of statewide GHG emissions. 

Senate Bill (SB) 97, signed in August 2007, acknowledges that climate change is an environmental issue that requires analysis in California Environmental Quality Act (CEQA) documents. In March 2010, the California Resources Agency (Resources Agency) adopted amendments to the State CEQA Guidelines for the feasible mitigation of GHG emissions or the effects of GHG emissions. The adopted guidelines give lead agencies the discretion to set quantitative or qualitative thresholds for the assessment and mitigation of GHGs and climate change impacts. 

Senate Bill (SB) 375, signed in August 2008, enhances the state’s ability to reach AB 32 goals by directing ARB to develop regional GHG emission reduction targets to be achieved from vehicles for 2020 and 2035. In addition, SB 375 directs each of the state’s 18 major Metropolitan Planning Organizations (MPO) to prepare a “sustainable communities strategy” (SCS) that contains a growth strategy to meet these emission targets for inclusion in the Regional Transportation Plan (RTP). On September 23, 2010, ARB adopted final regional targets for reducing GHG emissions from 2005 levels by 2020 and 2035.  

In September 2016, Governor Brown signed SB 32, which requires California to reduce GHG emissions by 40 percent below 1990 levels by the year 2030 (Office of Governor 2016). On December 14, 2017, the ARB adopted the 2017 Scoping Plan that provides California’s roadmap for achieving the SB 32 target. 

The adopted CEQA Guidelines provide regulatory guidance on the analysis and mitigation of GHG emissions in CEQA documents, while giving lead agencies the discretion to set quantitative or qualitative thresholds for the assessment and mitigation of GHGs and climate change impacts. The NCUAQMD has not set any thresholds with which to assess the significance of GHG emissions under CEQA (NCUAQMD 2016b).  

The California State University (CSU) system has committed to reducing system‐wide CO2 emissions by 15 percent to reach 1990 levels by 2020, and 80 percent below 1990 levels by 2040 (CSU 2014). Efforts to achieve this goal are primarily organized at the campus level. HSU has been recognized by the Association for the Advancement of Sustainability in Higher Education (AASHE) in the 2017 Sustainable Campus Index for their exemplary performance and innovative programs in a number of sustainability impact areas assessed through the Sustainability Tracking, Assessment and Rating System (STARS) (CSU 2017). As part of their sustainability efforts, HSU has committed to achieving carbon neutrality by 2050 (CSU 2017). 

In the absence of specific NCUAQMD or CSU thresholds, the significance of the project’s GHG emissions is assessed in comparison to thresholds adopted by other air quality management districts. The other air quality management districts used for this comparison include the Bay Area AQMD (BAAQMD), San Luis Obispo County Air Pollution Control District (SLOAPCD), and the Sacramento Metropolitan AQMD (SMAQMD). The BAAQMD’s established project‐level threshold is 1,100 metric tons of carbon dioxide equivalent (MT CO2e) (BAAQMD 2015). The SLOAPCD’s established bright‐line threshold is 1,150 MT CO2e per year, and the SMAQMD’s is 1,100 MT CO2e per year (SLOAPCD 2012; SMAQMD 2015). 

a.  Would the project generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment? 

b.  Would the project conflict with any applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse gases? 

Page 49: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Greenhouse Gas Emissions

Initial Study 43

The main sources of GHG emissions resulting from land use projects are mobile sources (i.e., new vehicle trips resulting from the project) and building energy consumption. The project would not involve the development of a land use that would generate new vehicle trips to and from the project site and would not involve construction of a building. Parking lots attract vehicle trips but do not generate additional vehicle trips beyond those already generated by existing land uses in the vicinity. 

Project GHG emissions were quantified using CalEEMod as described in Section 3, Air Quality; see Appendix A for modeling assumptions and outputs. The project is estimated to generate MT CO2e per year during operation from on‐site energy use (e.g., parking lot lighting), irrigation, waste disposal, and area sources, such as from paint used to re‐stripe the parking lot. Project construction and demolition activities would also generate GHG emissions associated with employee trips, truck hauling trips, and operation of diesel‐powered construction equipment. With hauling of demolition debris and contaminated soils to a Class I landfill, the project is estimated to generate 378 MT CO2e in 2019 due to construction and demolition activities. Without hauling to a Class I landfill, the project is estimated to generate 143 MT CO2e in 2019 due to construction and demolition activities.  

Typically, construction emissions are amortized over the lifespan of a project to determine total (operational + construction) GHG emissions. Assuming a 30‐year lifespan, total project annual emissions would be approximately 17 MT CO2e under the hauling scenario (4 MT CO2e + [378 MT CO2e /30 years]) and 9 MT CO2e (4 MT CO2e + [143 MT CO2e /30 years]) under the no hauling scenario; see Section 2, Air Quality, for an explanation of the two scenarios analyzed here. Significance thresholds that have been adopted by other AQMD’s are much higher than the project’s estimated emissions. For example, the BAAQMD has established a project‐level threshold of 1,100 MT CO2e, the SLOAPCD has established a bright‐line threshold of 1,150 MT CO2e per year, and the SMAQMD has established a threshold of 1,100 MT CO2e per year (BAAQMD, SLOAPCD 2012, SMAQMD 2015).  

The project’s total GHG emissions would be nominal and would not impede attainment of statewide reduction goals encoded in AB 32 or SB 32, CSU reduction targets, or HSU’s carbon neutrality goal for 2050. Impacts from GHG emissions would be less than significant and further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

Page 50: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

44

 

This page intentionally left blank. 

Page 51: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Hazards and Hazardous Materials

Initial Study 45

8 Hazards and Hazardous Materials

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?  □ □ ■ □

b. Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?  □ ■ □ □

c. Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within 0.25 mile of an existing or proposed school?  □ ■ □ □

d. Be located on a site that is included on a list of hazardous material sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?  □ □ □ ■

e. For a project located in an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area?  □ □ □ ■

f. For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area?  □ □ □ ■

Page 52: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

46

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

g. Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?  □ □ ■ □

h. Expose people or structures to a significant risk of loss, injury, or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands?  □ □ □ ■

a.  Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? 

Operational use of the project site as a parking lot would not require the routine transport, use, or disposal of hazardous materials. Project demolition and construction activities would potentially involve the use, transport, and disposal of hazardous materials, such as vehicle fuels. However, construction contractors would be required to comply with all local, state and federal regulations regarding the handling of hazardous materials and construction activities would be temporary. Therefore, the proposed project would have a less than significant impact related to the routine transport, use, or disposal of hazardous materials.  

LESS THAN SIGNIFICANT IMPACT

b.  Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? 

c.  Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within 0.25 mile of an existing or proposed school? 

As discussed above, operation of the project site as a parking lot with greenspace and transportation amenities would not involve the transport, use, or disposal of hazardous materials. Demolition of the Trinity Annex structure and project construction would require the use of heavy machinery and construction equipment, such as dozers, backhoes, and front‐end loaders. The operation of this equipment and machinery could result in a spill or accidental release of hazardous materials used for equipment, including fuel, engine oil, engine coolant, and lubricants. As described in Section 9, Hydrology and Water Quality, construction of the proposed project would require coverage under the Construction General Permit. Compliance with these requirements would include preparation of a construction SWPPP, which would specify BMPs to quickly contain and clean up any accidental spills or leaks. Mandatory implementation a construction SWPPP and associated BMPs would prevent an accidental release of hazardous materials associated with construction equipment. Additionally, the use of potentially hazardous materials utilized during 

Page 53: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Hazards and Hazardous Materials

Initial Study 47

construction of the proposed project would comply with all local, state, and federal regulations regarding the handling of potentially hazardous materials.  

The Trinity Annex was surveyed in 2016 for the presence of asbestos and lead‐based materials that identified hazardous levels of lead and asbestos in the building. A report was prepared by Masek Consulting Services that summarizes the findings of the survey and provides recommendations for implementation of federal and state requirements to safeguard against lead and asbestos exposure. (HSU 2016); a copy of the report is provided in Appendix C. Lead exposure is regulated at the state level under CCR §1532.1 by Cal OSHA, and asbestos exposure is regulated at the federal, state, and local level under CFR Title 40, Part 61, Subpart M, CCR §1529, and NCUAQMD Rule 401, respectively. The project would be required to comply with all applicable regulations, which reduce potential hazards from the accidental release of lead and asbestos during demolition activities to a less than significant level.  

A Phase I Environmental Site Assessment (ESA) of the project site was conducted by Rincon Consultants in February 2018 and is provided in Appendix C. The Phase I ESA identified the potential for elevated concentrations of lead in site soils due to peeling lead‐based paint, as well as the presence of solvents and hydrocarbons in the soils and groundwater due to historic on‐site laundry operations. Depth to groundwater in the area was recorded at approximately 2.5 to 3.2 feet below ground surface (Appendix C). Project construction activities that disturb the soils on‐site would potentially result in the release of hazardous materials into the environment, and solvents, if present on‐site, may contribute to groundwater contamination and emission of hazardous soil vapors. The project site is located approximately 1,200 feet (0.2 mile) southeast of the Arcata Christian School. Thus, soil disturbance associated with project activities and existing groundwater contamination, if present, would have the potential to release hazardous materials within 0.25 mile of a school. Impacts related to the accidental release of hazardous materials and emission of hazardous materials in proximity to a school would be potentially significant and mitigation is required. 

Mitigation Measures

HAZ-1 Phase II Environmental Site Assessment

A Phase II ESA, conforming to the recommended guidelines established by the American Society for Testing and Materials in Standard E1903‐11, shall be conducted prior to the start of project demolition and construction activities. The Phase II ESA shall include the collection of soil samples from areas of exposed soil along the perimeter of the Trinity Annex and analysis of samples for total lead levels. The Phase II shall also include a subsurface investigation within or in the proximity of the northeast wing of the Trinity Annex to evaluate the potential for soil and groundwater contamination associated with the on‐site laundry facilities. Given the reported shallow depth of groundwater at the site, in‐situ groundwater samples shall be collected concurrently with subsurface soil sampling. The Phase II ESA shall provide recommendations to address any identified hazards and indicate when to apply those recommended actions in relation to proposed project activities (i.e., Trinity Annex demolition and project construction). Example recommendations that could be provided in the Phase II ESA include developing a Remedial Action Agreement that would potentially involve: 

soil vapor and/or indoor air survey 

additional delineation of impacts 

remediation of impacted groundwater and/or soil 

Page 54: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

48

removal and disposal of contaminated soils 

mitigate potential for contaminant exposure and leave‐in‐place 

engagement with regulatory agencies 

The applicant shall implement remedial actions as identified in the Phase II ESA. 

HAZ-2 Disposal of Hazardous Waste

Waste considered hazardous shall be disposed of at an appropriate hazardous waste landfill and shall be hauled under a proper manifest by a licensed hazardous waste transporter in accordance with all applicable local, state, and federal regulations. 

Implementation of Mitigation Measure HAZ‐1 would reduce the impacts associated with potentially hazardous soils on the project site to a less than significant level. Implementation of mitigation measure HAZ‐2 would reduce the potential hazards associated with release of hazardous materials off‐site by ensuring that they are properly transported and disposed. With implementation of both of these mitigation measures, impacts would be reduced to a less than significant level. Further evaluation of this issue in an EIR is not warranted. However, this mitigation measure will be included in the Executive Summary of the EIR and in the project’s Mitigation Monitoring and Reporting Program. 

LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED

d.  Would the project be located on a site included on a list of hazardous material sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? 

A database search of known hazardous materials sites compiled pursuant to Government Code Section 65962.5 was completed as part of the Phase I ESA for the project site (Appendix C). The site was not listed on any of the databases; however, the Phase I ESA identified two listed sites nearby.  

HSU Plant Operations, adjacent to the northern boundary of the project site, is the site of a leaking underground storage tank case involving a release of gasoline and fuel oxygenates. The case was listed as open for site assessment in 2015. A request for closure report has been submitted, and based on the result of recent groundwater monitoring and the recorded groundwater westerly flow direction, this listed site is not expected to have impacted the project site. 

Located approximately 550 feet northeast of the project site, HSU is listed for a 2012 release of approximately 50 gallons of raw sewage to a storm drain, a 2012 release of 0.5 gallons of paint to a storm drain, and a 2008 release of mineral spirits to a storm drain (Appendix C). Because of the minimal quantity of substances released during these events, distance from the project site, and because the substances entered storm drains and discharged away from the area, this listed site is not expected to have impacted the project site. The university is also listed for having an NPDES permit and as an emitter of GHGs; no violations are associated with these listings. 

As the project site itself is not included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and neither of the listed sites located in the vicinity of the project site have affected the project site, the proposed project would have no impact. Further analysis in an EIR is not warranted. 

NO IMPACT

Page 55: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Hazards and Hazardous Materials

Initial Study 49

e.  For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? 

f.  For a project near a private airstrip, would it result in a safety hazard for people residing or working in the project area? 

The project site is located approximately five miles northwest of Murray Field Airport, approximately seven miles southeast of the California Redwood Coast‐Humboldt County Airport, and approximately nine miles northwest of the Samoa Field Airport. No other airports or private air strips are located in the project vicinity. The proposed project would not be located within the airspace of a Military Training Route or Military Operating Area (Humboldt County 2014) or an Airport Land Use Compatibility Zone (Humboldt County 2007) and would not conflict with adopted or planned airport land use plans. Consequently, it would not result in a safety hazard associated with airports or airstrips. Therefore, no impact would occur, and further analysis in an EIR is not warranted. 

NO IMPACT

g.  Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? 

The proposed project would not directly impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan, or involve the development of structures or changes in roadway configurations or accessibility that could potentially impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation. The proposed parking lot would not alter procedures or communications to be utilized or implemented during an emergency, or generate additional population or traffic that could slow emergency response. The bus pull‐in area would not impede access to the site and may result in improved access for emergency vehicles. Therefore, impacts would be less than significant, and further analysis of this issue in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT

h.  Would the project expose people or structures to a significant risk of loss, injury, or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? 

The project is located in an urbanized area in Arcata, surrounded primarily by paved surfaces and structures. The project site is not intermixed with or adjacent to wildlands. Additionally, the project site is not located in a Fire Hazard Severity Zone (CAL Fire 2007), indicating that the area is at low risk from fire. 

The city of Arcata is a Local Responsibility Area (CAL FIRE 2007) with fire protection services provided by the Arcata Volunteer Fire Department (HSU 2002). The closest fire station is the Arcata Station, located at 631 9th Street, approximately 0.3 mile southeast of the project site. As the project site lies in an area at low risk for fire and in proximity to local fire protection resources, and as no habitable structures are proposed, there would be no impact. Further analysis of this issue in an EIR is not warranted. 

NO IMPACT

Page 56: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

50

 

This page intentionally left blank. 

Page 57: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Hydrology and Water Quality

Initial Study 51

9 Hydrology and Water Quality

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Violate any water quality standards or waste discharge requirements?  □ □ ■ □

b. Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering or the local groundwater table level (e.g., the production rate of pre‐existing nearby wells would drop to a level that would not support existing land uses or planned uses for which permits have been granted)?  □ □ ■ □

c. Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner that would result in substantial erosion or siltation on‐ or off‐site?  □ □ ■ □

d. Substantially alter the existing drainage pattern of the site or area, including the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner that would result in flooding on‐ or off‐site?  □ □ ■ □

e. Create or contribute runoff water that would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff?  □ □ ■ □

f. Otherwise substantially degrade water quality?  □ □ ■ □

Page 58: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

52

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

g. Place housing in a 100‐year flood hazard area as mapped on a federal Flood Hazard Boundary, Flood Insurance Rate Map, or other flood hazard delineation map?  □ □ □ ■

h. Place structures in a 100‐year flood hazard area that would impede or redirect flood flows?  □ □ □ ■

i. Expose people or structures to a significant risk of loss, injury, or death involving flooding, including that occurring as a result of the failure of a levee or dam?  □ □ □ ■

j. Result in inundation by seiche, tsunami, or mudflow?  □ □ □ ■

a.  Would the project violate any water quality standards or waste discharge requirements? 

e.  Would the project create or contribute runoff water that would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? 

f.  Would the project otherwise substantially degrade water quality? 

The project site is generally flat and located in an urban, developed environment served by a municipal storm sewer system. Municipal storm sewer systems consist of roads with drainage systems, catch basins, curbs, gutter, ditches, and man‐made channels that convey stormwater to surface water bodies. The project would potentially generate pollutants during operation and construction activities that could be washed by stormwater into the municipal storm sewer system and consequently lead to water quality impacts.  

As discussed in Section 8, Hazards and Hazardous Materials, on‐site laundry operations associated with prior use of the site as a hospital may have released solvents into the soil and groundwater, which could contribute to degradation water quality. Mitigation Measure HAZ‐1 would require that groundwater contamination be remediated prior to the start of project construction and demolition activities.  

Operation of construction equipment and other construction activities could generate silt, debris, chemicals, paints, and other solvents with the potential to adversely affect water quality, or release debris, particulate, and petroleum hydrocarbons as a result of improper storage of construction materials and spilled petroleum products. As discussed in Section 6, Geology and Soils, the project would be required to incorporate BMPs for erosion and sedimentation control in accordance with the 2004 Master Plan EIR during construction activities, and would comply with NPDES General 

Page 59: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Hydrology and Water Quality

Initial Study 53

Construction Permit requirements, which include the preparation of a SWPPP. SWPPPs may include the following BMPs to reduce construction impacts on water quality: 

Schedule excavation and grading work for dry weather 

Avoid excavation and grading activities during wet weather 

Avoid runoff while applying water for dust control 

Avoid hosing‐down dirty pavement or impermeable surfaces where fluids have spilled 

Construct diversion dikes to channel runoff around the site, and line channels with grass or roughened pavement to reduce velocity of runoff 

Cover stockpiles and excavated soil with tarps or plastic sheeting 

Utilize re‐vegetation for erosion control after clearing, grading, or excavating, where practicable 

Remove existing vegetation and only when absolutely necessary 

Consider planting temporary vegetation for erosion control on slopes or where construction is not immediately planned 

Plant permanent vegetation as soon as possible 

Operational use of the site as a parking lot could also generate pollutants, such as leaked fluids from vehicles that would enter surface water bodies via stormwater. Stormwater pollution is regulated under the NPDES Municipal Storm Water Permitting Program; HSU has been issued a Phase II Small MS4 General Permit (Order NO. 2013‐0001‐DWQ). HSU’s MS4 permit requires the University to implement Low‐Impact Development (LID) features for projects that create or replace greater than or equal to 2,500 square feet of impervious surface (Sustainability Tracking, Assessment & Rating System [STARS] 2017). The final project design would be required to capture and treat runoff in compliance with MS4 permit requirements. This is typically accomplished with low impact development techniques, such as pervious pavers, and bioretention systems, such as bioswales and raingardens. Therefore, project operation would not create or contribute runoff that would exceed the capacity of existing stormwater drainage systems, result in a violation of water quality standards, or otherwise degrade water quality. Compliance with NPDES permit requirements would reduce project construction and operation impacts to a less than significant level. Further analysis in an EIR is not warranted.  

LESS THAN SIGNIFICANT IMPACT

b.  Would the project substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering or the local groundwater table level (e.g., the production rate of pre‐existing nearby wells would drop to a level that would not support existing land uses or planned uses for which permits have been granted)? 

The potential concerns with respect to groundwater are: (1) creating or increasing overdraft due to groundwater consumption; (2) reduction of groundwater recharge due to increased impervious surfaces; and (3) direct intrusion into the groundwater table for projects requiring major excavation.  

Domestic water would be provided to the project site by the City of Arcata. The majority of the City’s water supply is purchased from the Humboldt Bay Municipal Water District (HBMWD) with a secondary source from the City‐owned Heindon Well. The City of Arcata has an Urban Water Management Plan (as required by the California Water Code) that defines the current and future capacity of the system. The City currently has 1.37 billion gallons of water available annually, while 

Page 60: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

54

the City projects that water use will increase to 880 million gallons per year by 2040 (City of Arcata 2015). As such, the City of Arcata, with its present mix of water sources, possesses a significant surplus of capacity.  

The project would not substantially alter existing hydrological conditions on the project site. The project site is currently mostly covered in impervious surface and would continue to be mostly covered in impervious surfaces under project conditions. In addition, the project would include landscaping and provide low impact development and stormwater management systems that encourage on‐site retention and infiltration of precipitation and runoff. Therefore, groundwater recharge would not be significantly affected. In addition, the project site would not involve the construction of new dwelling units or employment space that would generate demand for groundwater resources, and project construction would only require minor excavation as no structures or below‐grade space would be constructed. Impacts to groundwater resources would be less than significant and further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT

c.  Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner that would result in substantial erosion or siltation on‐ or off‐site? 

d.  Would the project substantially alter the existing drainage pattern of the site or area, including the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner that would result in flooding on‐ or off‐site? 

The project site is relatively flat, located in a largely paved, urban environment, and is drained primarily via a municipal storm drain system. The project would not substantially alter the existing drainage pattern of the site as the project site is currently mostly paved or covered by buildings, with some landscaping, and would remain in a similar condition after construction of the proposed parking lot with greenspace. Construction activities would temporarily result in greater exposure of on‐site soils, but, as discussed above under thresholds a, e, and f, the project would be required to comply with NPDES permit requirements during construction activities that would minimize erosion and runoff. In addition, the project would be required to comply with MS4 permit requirements during operation that would minimize runoff. Therefore, the project would not substantially alter the existing drainage pattern of the site or area and impacts related to on‐ or off‐site erosion, siltation, or flooding due to runoff would be less than significant. Further analysis in an EIR is not warranted.  

LESS THAN SIGNIFICANT IMPACT

g.  Would the project place housing in a 100‐year flood hazard area as mapped on a federal Flood Hazard Boundary, Flood Insurance Rate Map, or other flood hazard delineation map? 

h.  Would the project place structures in a 100‐year flood hazard area that would impede or redirect flood flows? 

i.  Would the project expose people or structures to a significant risk of loss, injury, or death involving flooding, including that occurring as a result of the failure of a levee or dam? 

j.  Would the project result in inundation by seiche, tsunami, or mudflow? 

According to the Federal Emergency Management Agency (FEMA), the project site is located outside of the 1 percent and 0.2 percent annual chance flood hazard zone (FEMA 2017). In addition, no 

Page 61: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Hydrology and Water Quality

Initial Study 55

housing or habitable structures are proposed. Therefore, the project would not place housing or other structures in a flood hazard area or impede or redirect flood flows. In addition, the project site lies outside of Arcata’s tsunami inundation zone, as depicted in the Arcata South Quadrangle of the “Tsunami Inundation Map for Emergency Planning” and would not be vulnerable to seiches, which cause vertical movement of waves, as opposed to horizontal movement and thus impact near shore areas (FEMA 2009). Due to the relatively flat topography of the project site and its immediate surroundings, the project would not cause mudflows to occur.  

There is no documented risk of flooding at the project site due to levee or dam failure. The worst‐case flood of the Mad River would occur if there was a catastrophic failure of the Matthews Dam. Studies of how the resulting flood wave would travel down the river and onto the coastal flood plain in Arcata indicate that this event would result in temporary inundation of the Arcata Bottom and several neighborhoods on the west side of the City. The project site is mapped well outside of the Humboldt Bay Municipal Water District’s (HBMWD) Emergency Action Plan for R.W. Mathews Dam, which shows anticipated maximum reach of floodwaters resulting from catastrophic failure of the dam, in conjunction with winter floods the size of those occurring in 1964 (HBMWD 1999). There would be no impact related to flooding or inundation. Further analysis in an EIR is not warranted. 

NO IMPACT

 

Page 62: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

56

 

This page intentionally left blank. 

Page 63: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Land Use and Planning

Initial Study 57

10 Land Use and Planning

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Physically divide an established community?  □ □ □ ■

b. Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect?  □ □ □ ■

c. Conflict with an applicable habitat conservation plan or natural community conservation plan?  □ □ □ ■

a.  Would the project physically divide an established community? 

The project site is located within one city block on the HSU campus and involves demolition of an existing building and construction of a parking lot area with landscaping. The project would not involve the construction of major infrastructure that could divide the surrounding residential community, such as a new roadway or barrier, or alter the use of the site in a manner that would divide the surrounding community. There would be no impact and this issue does not warrant further evaluation in an EIR. 

NO IMPACT

b.  Would the project conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? 

The project site is located on the HSU campus. The CSU has land use jurisdiction over campus development and thus HSU is not regulated by the City’s General Plan, zoning ordinance, or other land use controls. The 2004 Master Plan guides the development of the HSU campus and includes planning principles adopted for the purpose of avoiding or mitigating environmental effects. Table 7 evaluates the project’s consistency with applicable policies included in the 2004 Master Plan. 

Page 64: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

58

Table 7 Project Consistency with Applicable 2004 Master Plan Environmental Policies

Policies  Consistency Evaluation 

Planning Objectives for Landscape Elements 

Landscaping shall be used to soften the public edges of the campus through the preservation, where possible, of mature trees and the use of appropriate plantings to support both screening and view 

Consistent 

The project would include greenspace with trees along the southern and western boundaries of the site, which face adjacent residences. 

Planning Objectives for Integrating Campus and Community 

Landscaping will be used at campus edges to create screening and modulate scale 

Consistent  

The project would include greenspace with trees along the southern and western boundaries of the site, which face adjacent residences. 

The impact of campus vehicle traffic on surrounding streets shall be mitigated to the extent possible with efficient campus parking and vehicular circulation systems 

Consistent  

The project would provide an additional surface lot where campus users can park and reduce demand on surrounding street parking. 

Planning Objectives for the Design of Parking Facilities and Vehicle Circulation Systems 

Routine vehicle traffic shall be kept out of the campus core, to minimize pedestrian and vehicle conflicts 

Consistent  

The project would provide additional parking at the main southern gateway to campus, reducing the number of vehicles that need to enter the campus core in search of parking. 

Service/emergency access shall be maintained throughout the campus; care shall be taken when these routes must coexist with pedestrian paths 

Consistent 

As discussed in Section 16, Transportation/Traffic, the project would incorporate a mitigative element requiring the construction contractor to submit a traffic control plan that would ensure emergency vehicles can pass through the construction zone at all times. Operational use of the site as a parking lot would not interfere with emergency access as it would not block roadways or further contribute to congestion. 

Parking capacity shall expand in proportion to campus population growth and this increased capacity shall be accommodated in parking structures 

Consistent 

The project would provide additional parking spaces in a concentrated area. 

To moderate the expansion of parking demand, programs to encourage the campus community to use public transportation rather than personal vehicles shall be maintained and expanded 

Consistent 

The project would involve the construction of transportation amenities, including benches, bicycle parking, a bike repair station, and bus loading berths that would support the use of non‐vehicle transportation modes. 

Bicycle storage facilities shall be improved  Consistent 

The project would include construction of new bicycle parking. 

Source: HSU 2004a 

Page 65: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Land Use and Planning

Initial Study 59

The 2004 Master Plan designates the Trinity Annex site (referred to as University Annex in the 2004 Master Plan) for acquisition, demolition, and development as a playing field to address a shortage of outdoor field space for Physical Education classes, recreation and club activities, and community open space. The proposed project would include an amendment of the 2004 Master Plan to alter the proposed designation of the project site for consistency with the proposed use. With approval of the amendment, the project would be consistent with plans and policies adopted for the purpose of avoiding or mitigating an environmental effect. There would be no impact and further analysis in an EIR is not warranted. 

NO IMPACT

c.  Would the project conflict with an applicable habitat conservation plan or natural community conservation plan? 

As discussed under Section 4, Biological Resources, there are no habitat conservation plans or natural community conservation plans that apply to the project site. There would be no impact and further analysis in an EIR is not warranted. 

NO IMPACT

 

Page 66: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

60

 

This page intentionally left blank. 

Page 67: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Mineral Resources

Initial Study 61

11 Mineral Resources

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?  □ □ □ ■

b. Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan?  □ □ □ ■

a.  Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? 

b.  Would the project result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? 

The project site is already developed and is located on a university campus without identified mineral resources or mineral resource extraction activities and that is not planned for mineral extraction activities (California Geological Survey [CGS] 2018). Thus, the project would not result in the loss of availability of a known mineral resource or a locally important mineral resource recovery site. There would be no impact. Further analysis in an EIR is not warranted. 

NO IMPACT 

Page 68: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

62

 

This page intentionally left blank. 

Page 69: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Noise

Initial Study 63

12 Noise

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project result in: 

a. Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?  □ □ ■ □

b. Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels?  □ □ ■ □

c. A substantial permanent increase in ambient noise levels above those existing prior to implementation of the project?  □ □ ■ □

d. A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project?  □ ■ □ □

e. For a project located in an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?  □ □ □ ■

f. For a project near a private airstrip, would it expose people residing or working in the project area to excessive noise?  □ □ □ ■

Noise Overview Noise is defined as unwanted sound for the purpose of this analysis. Noise level measurements include intensity, frequency, and duration, as well as time of occurrence. Noise level (or volume) is generally measured in decibels (dB) using the A‐weighted sound pressure level (dBA). The A‐weighting scale is an adjustment to the actual sound pressure levels to be consistent with that of human hearing response, which is most sensitive to frequencies around 4,000 Hertz (about the highest note on a piano) and less sensitive to low frequencies (below 100 Hertz). 

Page 70: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

64

Sound pressure level is measured on a logarithmic scale with the 0 dBA level based on the lowest detectable sound pressure level that people can perceive (an audible sound that is not zero sound pressure level). Based on the logarithmic scale, a doubling of sound energy is equivalent to an increase of 3 dBA, and a sound that is 10 dBA less than the ambient sound level has no effect on ambient noise. Because of the nature of the human ear, a sound must be about 10 dBA greater than the ambient noise level to be judged as twice as loud. In general, a 3 dBA change in the ambient noise level is noticeable, while 1‐2 dBA changes generally are not perceived. Quiet suburban areas typically have noise levels in the range of 40‐50 dBA, while areas adjacent to arterial streets are typically in the 50‐60+ dBA range. Normal conversational levels are usually in the 60‐65 dBA range and ambient noise levels greater than 65 dBA can interrupt conversations. 

Noise levels from point sources, such as those from individual pieces of machinery, typically attenuate (or drop off) at a rate of 6 dBA per doubling of distance from the noise source. Noise levels from lightly traveled roads typically attenuate at a rate of about 4.5 dBA per doubling of distance. Noise levels from heavily traveled roads typically attenuate at about 3 dBA per doubling of distance. Noise levels may also be reduced by intervening structures; generally, a single row of buildings between the receptor and the noise source can reduces noise levels by about 5 dBA, while a solid wall or berm can reduce noise levels by 5 to 10 dBA (Federal Transit Administration [FTA] 2006). The manner in which homes in California are constructed generally provides a reduction of exterior‐to‐interior noise levels of approximately 20 to 25 dBA with closed windows (FTA 2006). 

The duration of noise is important because sounds that occur over a long period of time are more likely to be an annoyance or cause direct physical damage or environmental stress. One of the most frequently used noise metrics that considers both duration and sound power level is the equivalent noise level (Leq). The Leq is defined as the single steady A‐weighted level that is equivalent to the same amount of energy as that contained in the actual fluctuating levels over a period of time (essentially, the average noise level). Typically, Leq is summed over a one‐hour period. Lmax is the highest RMS (root mean squared) sound pressure level within the measurement period, and Lmin is the lowest RMS sound pressure level within the measurement period. 

The time period in which noise occurs is also important since nighttime noise tends to disturb people more than daytime noise. Community noise is usually measured using the Day‐Night Average Level (Ldn), which is the 24‐hour average noise level with a 10‐dBA penalty for noise occurring during nighttime (10 PM to 7 AM) hours, or Community Noise Equivalent Level (CNEL), which is the 24‐hour average noise level with a 5 dBA penalty for noise occurring from 7 PM to 10 PM and a 10 dBA penalty for noise occurring from 10 PM to 7 AM. The Ldn and CNEL typically do not differ by more than 1 dBA. In practice, CNEL and Ldn are often used interchangeably. 

Sensitive Receptors Some land uses are more sensitive to ambient noise levels than other uses due to the amount of noise exposure and the types of activities involved. For example, residences, motels, hotels, schools, libraries, churches, nursing homes, auditoriums, museums, cultural facilities, parks, and outdoor recreation areas are more sensitive to noise than commercial and industrial land uses. The nearest sensitive receptors to the project site are residences located across the street. The distance from the project site boundary to the property line of the nearest adjacent residences is approximately 50 feet. In addition, there is a Church of Jesus Christ of Latter Day Saints located across from the project site on the northeast corner of 13th and B Streets. 

Page 71: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Noise

Initial Study 65

Noise Regulatory Framework The roadways surrounding the project site fall under the jurisdiction of the City of Arcata, as do the residences to the east, west, and south of the project site. Consequently, for the purpose of this analysis, the City of Arcata’s quantitative noise standards are taken into consideration in considering noise impacts to surrounding uses. HSU has not established quantitative noise standards for the campus and campus projects. The City’s noise standards are outlined in the Noise Element of the Arcata General Plan: 2020 and codified in Section 9.30.050 of the Arcata Municipal Code (AMC).  

City of Arcata Noise Standards

The City of Arcata has established exterior and interior noise standards for new projects, exterior and interior noise standards for receiving land uses, and exterior and interior noise standards for transportation noise exposure for sensitive uses. The first set of standards (i.e., standards for new projects) does not apply to the proposed project as it would not involve construction of a sensitive receptor and the project is under the jurisdiction of HSU.  

Table 8 summarizes the City’s standards for allowable noise levels by receiving land uses. These standards apply to stationary and transportation noise sources as measured at the property line of a noise sensitive land use. However, in cases where existing ambient noise levels exceed standard noise levels, the ambient noise level replaces the standard noise level (AMC Section 9.30.050.D.1a). 

Table 8 City of Arcata Maximum Allowable Noise Level by Receiving Land Use

Noise Level Descriptor 

Maximum Exterior Noise Level  Maximum Interior Noise Level 

7 AM ‐ 7 PM  7 PM ‐ 10 PM  10 PM ‐ 7 AM  7 AM ‐ 7 PM  7 PM ‐ 10 PM  10 PM ‐ 7 AM 

Dwellings, Transient Lodging, Hospitals, Extended Care, and Similar Uses 

Hourly Leq (dB)  55  50  45  45  40  35 

Maximum (dB)  75  75  70  65  65  60 

Meeting Facilities, Auditoriums, Theaters, Libraries, Schools, and Similar Uses 

Hourly Leq (dB)  55  55  n/a  40  40  n/a 

Maximum (dB)  75  75  n/a  60  60  n/a 

Source: AMC Section 9.30.050.D, Table 3‐2 

Table 9 summarizes the City’s standards for allowable transportation noise exposure by receiving land uses.  

Page 72: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

66

Table 9 Maximum Allowable Transportation Noise Exposure

Noise Sensitive Land Use 

Outdoor Activity Areas  Interior Spaces 

dBA Ldn  dBA Ldn dBA Leq  

(worst‐case hour) 

Residential  60  45  N/A 

Transient lodging  60  45  N/A 

Hospitals, extended care  60  45  N/A 

Theater, auditorium  N/A  N/A  35 

Meeting facility, public or private  60  N/A  40 

Offices  N/A  N/A  45 

School, library, museum  N/A  N/A  45 

Playground, park  70  N/A  N/A 

Source: AMC Section 9.30.050.D, Table 3‐3 

HSU Noise Policies

The 2004 Master Plan does not include specific policies related to noise. However, the 2004 Master Plan EIR includes the following mitigative elements, which would be incorporated into this project: 

1. Construction activities that generate intrusive sound offsite will be limited from 7 AM to 7 PM, Monday through Friday, and 9 AM to 7 PM on weekends. 

2. Construction equipment will be maintained in proper conditions to prevent excessive noise. 

3. Backup beepers will be used only when necessary and will be no louder than necessary. 

In addition, as a standard general condition for all construction activities, HSU requires that construction contractor work hours be limited from 7:30 AM to 5:00 PM and not exceed eight hours per day. Thus, in practice, construction activities would be restricted to 7:30 AM to 5:00 PM on weekdays and 9:00 AM to 5:00 PM on weekends. 

Vibration

Vibration is a unique form of noise because its energy is carried through buildings, structures, and the ground, whereas sound is simply carried through the air. Thus, vibration is generally felt rather than heard. Some vibration effects can be caused by noise (e.g., the rattling of windows from passing trucks). This phenomenon is caused by the coupling of the acoustic energy at frequencies that are close to the resonant frequency of the material being vibrated. Typically, ground‐borne vibration generated by manmade activities attenuates rapidly as distance from the source of the vibration increases. The ground motion caused by vibration is measured as particle velocity in inches per second and is measured in vibration decibels (VdB). 

The vibration velocity level threshold of perception for humans is approximately 65 VdB. A vibration velocity of 75 VdB is the approximate dividing line between barely perceptible and distinctly perceptible levels for many people. Most perceptible indoor vibration is caused by sources inside buildings such as the operation of mechanical equipment, movement of people, or the slamming of 

Page 73: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Noise

Initial Study 67

doors. Typical outdoor sources of perceptible ground‐borne vibration are construction equipment, steel‐wheeled trains, and traffic on rough roads.  

Neither HSU nor the City of Arcata has established standards for evaluating vibration impacts to existing uses. For the purpose of this analysis, vibration impacts would be significant if they exceed the following Federal Railroad Administration (FRA) recommended thresholds:  

65 VdB where low ambient vibration is essential for interior operations, such as hospitals and recording studios 

72 VdB for residences and buildings where people normally sleep, including hotels 

75 VdB for institutional land uses with primary daytime use, such as churches and schools 

95 VdB for physical damage to extremely fragile historic buildings 

100 VdB for physical damage to buildings 

Impact Analysis

a.  Would the project result in exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? 

c.  Would the project result in a substantial permanent increase in ambient noise levels above levels existing without the project? 

The project site is surrounded by residences to the east, west, and south, and to campus buildings and associated parking lots to the north and northeast. Ambient noise on the site consists primarily of traffic noise from local roadways, although freeway traffic from US 101 can also be heard in the background. Two noise measurements were taken on May 3, 2018 during peak hour traffic to characterize ambient noise levels on the project site. Figure 7 provides a map of the noise measurement locations. Table 10 provides a summary of the noise measurement results. Based on these results, current ambient noise levels at residences in the project vicinity exceed the City’s standard of 55 dBA between 7 AM and 7 PM presented in Table 8 above. Therefore, in accordance with Section 9.30.050.D.1(a), the measured ambient noise level is considered the applicable standard for the project. 

Table 10 Noise Monitoring Results

Measurement Number 

Measurement Location  Primary Noise Source  Sample Time 

Leq (dBA) 

Maximum Leq (dBA) 

1  SW corner of C and 14th Streets 

Local traffic, including several construction trucks 

7:35 AM – 7:50 AM  58.3  72.7 

2  NE corner of B and 13th Streets 

Local traffic, including two southbound buses 

7:55 AM – 8:10 AM  57.4  75.4 

Source: Noise measurements conducted by SHN on May 3, 2018 using a Soft dB Piccolo Integrating Sound Meter and Data Logger, Model SLM‐P3, meeting the requirements of the IEC 651/804 Type 2 and ANSI S1.4 Type 2. 

The project would not involve the construction of new land uses that would generate new trips or expand campus enrollment capacity. Therefore, its operation would not increase traffic and associated roadway noise, which is the predominant source of ambient noise at the project site and  

Page 74: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

68

Figure 7 Noise Measurement Locations

 

Page 75: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Noise

Initial Study 69

surrounding area. The proposed parking lot would accommodate approximately 42 more vehicles than are currently able to park at the project site, which could result in a small shift of vehicle trips onto the project site. However, a substantial increase in vehicle trips on roadways adjacent to the project site would not be expected because the site would provide HSU permit parking and, thus, would exclusively serve vehicles traveling to or within campus, and the site is located along one of the main entrances to the HSU campus, where vehicles accessing parking areas on campus already travel. The additional parking capacity would increase parking lot noises on the site, such as slamming car doors and engine start‐ups. However, these noises are infrequent, short in duration, and would be below existing maximum noise levels, as shown in Table 10. For example, slamming doors and engine start‐up generate a maximum sound level of approximately 60 to 70 dB at 50 feet and car pass‐bys in parking lots generate a maximum sound level of approximately 55 to 70 dB at 50 feet (Monterey County 2004).  

The project site is currently along the route of two bus lines and there is a stop on the corner of 14th on the northeast corner of the project site, as well as a stop across the street along B Street. These stops are serviced by Redwood Transit System and Arcata & Mad River Transit System bus routes, which run along B Street and 14th Street. Noises associated with bus stops include engine idling, occasional honking or beeping, conversation, and vehicle noise. As with parking lot noises, these noises are typically infrequent, short in duration, and not loud enough to substantially contribute to ambient noise levels.  

The project would involve construction of bus loading/parking berths along 14th Street. Because they would serve existing bus traffic, these features would not increase bus‐related noises relative to existing conditions. The project would also involve construction of parking/loading berths along B Street that would provide parking for visiting buses, such as visiting high schools, which currently park elsewhere on campus. Thus, the project would not increase overall bus traffic on area roadways, but could potentially increase localized bus‐related noises by rerouting visiting buses to the project site. However, the parking berths along B Street are expected to experience a low amount of usage – approximately one visit a week. In addition, visiting buses would primarily arrive and depart from the site during regular business hours and would not interfere with noise‐sensitive activities at residences, such as sleeping. Parking berths may be used outside of business hours by sports teams or major performers, but this would occur infrequently, as sports team charter buses typically park at the team’s hotel, and major performances are not a regular occurrence on campus. Due to the minimal expected usage of these parking berths, long‐term impacts to local noise levels are expected to be nominal and would not perceptibly alter ambient noise levels. 

As described above, although parking capacity on‐site would increase, a substantial increase in vehicle trips on roadways adjacent to the project site would not be expected because the site is located along one of the main entrances to the HSU campus and vehicles currently travel past the site toward other parking areas on campus. The project would not increase roadway noise, which is the predominant source of ambient noise, and would imperceptibly increase ambient noise on the project site and vicinity associated with parking lot uses and bus parking/loading. Therefore, the project would not result in generation or exposure of persons to noise levels in excess of standards or result in a substantial permanent increase in ambient noise levels above levels existing without the project. These impacts would be less than significant. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

Page 76: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

70

b.  Would the project result in exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels? 

Project construction and demolition activities would involve operation of construction equipment that could generate perceptible levels of groundborne vibration at nearby sensitive receptors. Table 11 lists construction equipment and their standard vibration levels at 25 feet and 50 feet, which is the approximate distance from the project boundary to the nearest residences. The table includes only equipment that generate a high level of groundborne vibration and would be used during project construction and demolition activities. The project’s equipment list was generated using CalEEMod based on project details, as described in Section 3, Air Quality.  

As indicated in Table 11, vibration levels would reach as high as 85 VdB at nearby residences. This would fall below the threshold level of physical damage to buildings (100 VdB), but would be above the recommended threshold for residences and other buildings where people sleep (72 VdB). However, operation of construction equipment would be limited to daytime hours in accordance with mitigative elements in the 2004 HSU Master Plan EIR and in keeping with HSU standard conditions for construction contractors. Therefore, vibration from operation of construction equipment on the project site would not interfere with sleep and this impact would be less than significant. Further analysis in an EIR is not warranted. 

Table 11 Vibration Levels for Construction Equipment

  Approximate VdB 

Equipment  25 feet  50 feet 

Vibratory Roller  94  85 

Large Bulldozer  87  78 

Loaded trucks  86  77 

Source: Caltrans 2013 

LESS THAN SIGNIFICANT IMPACT

d.  Would the project result in a substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? 

Project construction and demolition activities would involve operation of construction equipment that could generate substantial temporary or periodic increases in ambient noise levels in the project vicinity. To determine noise impacts during project construction and demolition activities noise levels were modeled for each phase of construction using the Federal Highway Administration’s (FHWA) Roadway Construction Noise Model (RCNM) (FHWA 2008). Noise levels were modeled using the distance from the project site to nearby receptors (50 feet from property line to property line) and a construction equipment list generated for the project in CalEEMod based on project details, as described in Section 3, Air Quality. Table 12 summarizes the construction noise modeling results. Appendix D provides the RCNM outputs. 

Page 77: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Noise

Initial Study 71

Table 12 Construction Noise Levels by Phase

Construction Phase  Equipment Estimated Noise Level at 50 feet (dBA Leq) 

Demolition   Concrete/industrial saw, bulldozer, tractor, loader, backhoe 

86 

Site Preparation  Grader, bulldozer, tractor  85 

Grading  Grader, bulldozer, tractor  85 

Paving  Paver, pavement scarifier, roller, tractor  85 

Architectural Coating  Air Compressor  74 

Source: See Appendix D for RCNM outputs.  

As indicated in Table 12, project demolition and construction activities would generate noise levels as high as 86 dBA Leq at nearby residences. In accordance with HSU standard practices and mitigative elements in the 2004 Master Plan EIR, construction activities would be limited to 7:30 AM to 5:00 PM on weekdays and 9:00 AM to 5:00 PM on weekends, construction equipment would be maintained in proper conditions, and backup beepers would be used only when necessary and would be no louder than necessary. In addition, project construction and demolition activities would be temporary, occurring over a period of approximately five months from the start of May 2019 through the start of October 2019. Nevertheless, construction activities would generate a substantial temporary increase in ambient noise levels and further mitigation is required to reduce this impact to a less than significant level.  

Mitigation Measures The following mitigation measures are required to reduce construction noise impacts to a less than significant level. 

N-1 Construction Noise Control Measures

To reduce daytime noise impacts due to construction, HSU shall require construction contractors to implement the following measures during project construction and demolition activities:  

Equipment and trucks used for project construction shall use the best available noise control 1.techniques (e.g., improved mufflers, equipment redesign, use of intake silencers, ducts, engine enclosures, and acoustically‐attenuating shields or shrouds), wherever feasible.  

Impact tools (e.g., jack hammers, pavement breakers, and rock drills) shall be hydraulically or 2.electrically powered rather than pneumatically powered wherever possible. Where use of pneumatic tools is unavoidable, an exhaust muffler shall be applied to the pneumatic tool; this muffler can lower noise levels from exhaust by up to about 10 dBA. External jackets on the tools shall be used where feasible; this could achieve a reduction of 5 dBA. Quieter tools and procedures shall be used whenever feasible. 

During project construction and demolition activities stationary noise sources shall be located as 3.far from adjacent receptors as possible, and they shall be muffled and enclosed within temporary sheds, insulation barriers, or other noise control structures to the extent feasible. 

Page 78: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

72

Use of manufacturer‐certified mufflers associated with construction equipment would reduce noise levels generally by 5 dBA, but has the potential to reduce noise levels by up to 8 dBA (West Hollywood 2014). Table 13 shows the mitigated construction noise levels by construction phase at the nearest sensitive receptors. With mitigation, construction noise levels at sensitive receptors would be reduced to sound levels of 81 dBA Leq or lower. As discussed above, construction noise impacts would be temporary and occur during daytime hours when residents are awake. Therefore, with mitigation incorporated project construction would not result in a substantial temporary increase in noise levels, and impacts would be less than significant. Further analysis in an EIR is not warranted. However, this mitigation measure will be included in the Executive Summary of the EIR and in the project’s Mitigation Monitoring and Reporting Program. 

Table 13 Mitigated Construction Noise Levels at Nearest Sensitive Receptors

Phase  Mitigated Noise Level at 50 feet (dBA Leq) 

Demolition   78‐81 

Site Preparation  77‐80 

Grading  77‐80 

Paving  77‐80 

Architectural Coating  66‐69 

LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED  

e.  For a project located in an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? 

f.  For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise? 

The project site lies approximately five miles from the nearest airport, the Humboldt County Murray Field Airport, and seven miles from the California Redwood Coast – Humboldt County Airport, and there is no private air strip in the project vicinity. In addition, the project would not develop residences or land uses providing employment. There would be no impact related to exposure of residents or workers to aircraft noise. Further analysis in an EIR is not warranted. 

NO IMPACT

Page 79: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Population and Housing

Initial Study 73

13 Population and Housing

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Induce substantial population growth in an area, either directly (e.g., by proposing new homes and businesses) or indirectly (e.g., through extension of roads or other infrastructure)?  □ □ □ ■

b. Displace substantial amounts of existing housing, necessitating the construction of replacement housing elsewhere?  □ □ □ ■

c. Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere?  □ □ □ ■

a.  Would the project induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? 

The project would involve the demolition of the Trinity Annex, and development of the site as a parking lot with landscaping and transportation and pedestrian elements. The project does not include the construction of new housing or employment space. The project site lies in a developed, urban setting and does not involve extending roads or any other infrastructure to an undeveloped area such that expanded growth and development would occur. Therefore, the project would not induce substantial population growth. There would be no impact. Further analysis in an EIR is not warranted. 

NO IMPACT

b.  Would the project displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? 

c.  Would the project displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? 

The project would involve demolition of the Trinity Annex. Except for the east wing of the building, which is used for storage, the building is not in active use. No residential dwelling units or residents would be displaced by its demolition. There would be no impact. Further analysis in an EIR is not warranted. 

NO IMPACT 

Page 80: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

74

 

This page intentionally left blank. 

Page 81: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Public Services

Initial Study 75

14 Public Services

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

a. Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, or the need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: 

1  Fire protection?  □ □ □ ■

2  Police protection?  □ □ ■ □

3  Schools?  □ □ □ ■

4  Parks?  □ □ □ ■

5  Other public facilities?  □ □ □ ■

a.1.  Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered fire protection facilities, or the need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives? 

The project would involve the demolition of the Trinity Annex and redevelopment of the project site as a parking lot with greenspace and pedestrian and transportation amenities. Because the existing structure would be demolished and replaced with parking infrastructure, there would be no increase in the number of structures on campus requiring fire protection services or fire suppression. The parking lot and pedestrian and transportation amenities would service the existing HSU campus population and would not increase HSU’s capacity or enrollment. Therefore, the project would not affect the demand for fire protection services or fire service ratios, response times, or other performance objectives for fire protection facilities. There would be no impact and further analysis in an EIR is not warranted. 

NO IMPACT

Page 82: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

76

a.2.  Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered police protection facilities, or the need for new or physically altered police protection facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives? 

As described above, the project would service the existing HSU campus population and would not increase HSU’s capacity or enrollment. Because the project would not increase enrollment or campus population, there would be no impact on police service ratios. Furthermore, there would be no impact on police response time because the project would occur on campus, within the current jurisdiction and service area of the HSU Police Department. The project would increase the number of vehicle parking spaces provided at the site. This could require more routine police monitoring and patrol for enforcement of HSU parking regulations. However, the incremental increase in parking spaces at the site would have a negligible increase on the demand for police patrols and the project would also remove an unsafe building that poses a public safety risk as it is known to attract trespassers. Therefore, impacts would be less than significant and further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT

a.3.  Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered schools, or the need for new or physically altered schools, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives? 

a.4.  Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered parks, or the need for new or physically altered parks, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios or other performance objectives? 

a.5.  Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, or the need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for other public facilities? 

The project would not increase HSU’s capacity or induce population growth, but would instead provide parking for the existing campus population. Because the project would not increase campus population or enrollment, it would not increase the demand for schools, recreation facilities, or other public and government facilities. There would be no impact and further analysis in an EIR is not warranted. 

NO IMPACT

Page 83: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Recreation

Initial Study 77

15 Recreation

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

a. Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?  □ □ □ ■

b. Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment?  □ □ ■ □

a.  Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? 

The project would involve demolition of the Trinity Annex and construction of a parking lot with greenspace and pedestrian and transportation amenities. It would not increase HSU’s capacity or induce population growth. Therefore, it would not increase the use of existing recreational facilities such that physical deterioration of existing facilities would be accelerated. There would be no impact. Further analysis in an EIR is not warranted. 

NO IMPACT 

b.  Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? 

The project would involve the construction of a new parking lot with landscaping and some pedestrian and transportation amenities (e.g., benches, bike station, bike parking) that could be used for recreational purposes. However, the primary use of the site would be as a parking lot. The project would not increase HSU’s capacity or induce population growth and would not necessitate the construction of new facilities or expansion of existing recreational facilities. Therefore, the project would not involve a recreational facility (such as a park, gymnasium, or community center) or necessitate the construction or expansion of recreational facilities that may have an adverse physical effect on the environment. This impact would be less than significant. Further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

Page 84: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

78

 

This page intentionally left blank. 

Page 85: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Transportation/Traffic

Initial Study 79

16 Transportation/Traffic

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation, including mass transit and non‐motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways, and freeways, pedestrian and bicycle paths, and mass transit?  □ □ ■ □

b. Conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways?  □ □ ■ □

c. Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks?  □ □ □ ■

d. Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible use (e.g., farm equipment)?  □ □ ■ □

e. Result in inadequate emergency access?  □ □ ■ □

f. Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise substantially decrease the performance or safety of such facilities?  □ □ □ ■

Page 86: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

80

a.  Would the project conflict with an applicable plan, ordinance or policy establishing a measure of effectiveness for the performance of the circulation system, taking into account all modes of transportation, including mass transit and non‐motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways, and freeways, pedestrian and bicycle paths, and mass transit?  

b.  Would the project conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways? 

Project construction would temporarily generate trips to the site from construction employee trips, truck haul trips, and movement of construction equipment. As identified in the 2004 Master Plan EIR, this short‐term impact could adversely affect the circulation system in the immediate site vicinity, but adverse effects would be reduced to a less than significant level with incorporation of the following mitigative element (HSU 2004b):  

The construction contractor will be required to submit a traffic control plan to the University for approval. The approved plan must require that the contractor follow appropriate traffic safety guidelines, such as the Caltrans "Manual of Traffic Safety Controls for Construction and Maintenance Work Zones," and that work be conducted such that: 

Effects on local circulation, parking, and hazards are minimized, 

Emergency vehicles can pass through the construction zone at all times, and 

Clearly marked and signed indicators of pedestrian, bicycle, and vehicle traffic areas to be closed or restricted during construction are provided and that affected traffic is directed to alternate routes where appropriate. 

The project would implement this mitigative element. Thus, short‐term construction vehicle trips would have a less than significant impact on the performance of the transportation circulation system. 

Operation of the project site as a parking lot with greenspace and pedestrian and transportation amenities would not increase HSU enrollment capacity. Thus, the proposed parking lot would not result in an increase in the number of daily vehicle trips to and from the HSU campus, relative to current conditions. The proposed parking lot would accommodate approximately 42 more vehicles than are currently able to park at the project site. This could result in a small shift of vehicle trips onto the project site. However, a substantial increase in vehicle trips on roadways adjacent to the project site would not be expected because the site is located along one of the main entrances to the HSU campus and vehicles currently travel past the site toward other parking areas on campus, and the parking lot would be reserved for HSU permit parking. 

The project would provide bus loading berths along 14th Street for existing transit that would allow buses to move out of traffic during loading. This would have a beneficial impact on congestion and roadway safety as 14th Street has only one lane and there is insufficient space for vehicles to safely go around stopped buses. In addition, the project would provide loading berths along B Street for visiting buses. Although this would redirect buses to the project site, only one additional bus trip to and from the site per week is anticipated, which would have an insubstantial impact to roadways adjacent to the project site. 

Considering the incremental increase in parking spaces on the project site, and that the vehicles that could be parked on‐site already travel on the surrounding roads to other campus parking areas, 

Page 87: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Transportation/Traffic

Initial Study 81

conflicts with level of service standards and other circulation system performance measures would be minimal. Additionally, the project includes pedestrian, bicycle, and public transit amenities that support the use travel modes other than a personal vehicle and the provision of bus loading berths for existing transit that would improve congestion and safety along 14th Street. Impacts would be less than significant, and further evaluation of this issue in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT

c.  Would the project result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? 

The project involves the demolition of the existing Trinity Annex and redevelopment of the project site with a parking lot with greenspace and pedestrian and transit amenities. The tallest structure(s) on the project site would be parking lot lights. The lights would be less tall than the existing Trinity Annex structure, and generally consistent with the height of typical street lights. Therefore, the project would not create height obstructions or hazards that require a change in the location of air traffic patterns. As described in Section 1, Aesthetics, mitigative elements prescribed in the 2004 Master Plan EIR to ensure that parking lot lights, or other security lighting installed on the site would not impact nighttime views would be implemented for the proposed project. These measures would also ensure that parking lot lights would not interfere with air traffic patterns. Therefore, the proposed project would have no impact, and further evaluation of this issue in an EIR is not warranted. 

NO IMPACT

d.  Would the project substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible use (e.g., farm equipment)? 

e.  Would the project result in inadequate emergency access? 

Project construction would temporarily generate truck haul trips and the movement of large construction equipment on nearby roads. These truck trips would involve larger and slower‐moving vehicles that could be incompatible with traditional passenger vehicles, which are the predominant type of vehicle in the area. These large vehicles could also impede the passage of emergency access. However, as described above, implementation of the 2004 Master Plan EIR mitigative elements would be required to minimize adverse impacts of construction‐related equipment, including safety hazard and emergency access impacts. Therefore, short‐term construction vehicle trips would have a less than significant impact related to increased transportation hazards. 

The site is currently used for parking and includes driveway entrances from 13th Street, 14th Street, and B Street. Additionally, several pull‐in parking spaces at the southern end of the site currently require ingress and egress directly from 13th Street. The proposed project would redirect vehicles to a single driveway entrance along B Street, as shown on Figure 6. This would eliminate existing hazards associated with the pull‐in parking on 13th Street that require maneuvering in reverse within the travel lanes of the street. It would also reduce potential hazards associated with multiple driveways from various directions and streets to the site. These impacts would be potentially beneficial, and would not substantially increase hazards or result in inadequate emergency response. 

The proposed driveway entrance and bus parking berths would encroach on City of Arcata streets. Any proposed on‐street improvements would require an encroachment permit from the City of Arcata and would be reviewed by and constructed to the standards of the City of Arcata Engineering 

Page 88: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

82

Department to ensure that no hazardous design features will be developed as part of the project. Therefore, the proposed project would have less than significant impacts, and further evaluation of this issue in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT

f.  Would the project conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise substantially decrease the performance or safety of such facilities? 

As one of the main entrance points to Humboldt State University, the project site is located in an area that has ample bicycle and pedestrian traffic, and is also served by public transit. Both Class II and Class III bicycle lanes exist adjacent to the project site and the project site is surrounded by sidewalks. The proposed project includes pedestrian walkway/gathering areas along the northern portion of the site, bicycle parking, reconfiguration of the bus pull‐in parking/ covered bus stop, and provision of bus loading berths that would. These street frontage improvements will be required to be accessible pursuant to the American with Disabilities Act. As such, the proposed project would improve pedestrian, bicycle, and transit facilities on campus. The project would have no impact with regards to conflicts with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the safety of these facilities. Further analysis of this issue in an EIR is not warranted. 

NO IMPACT

Page 89: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Tribal Cultural Resources

Initial Study 83

17 Tribal Cultural Resources

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in a Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is: 

a. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or  □ ■ □ □

b. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Cod Section 2024.1. In applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency shall consider the significant of the resource to a California Native American tribe.  □ ■ □ □

As of July 1, 2015, California Assembly Bill 52 of 2014 (AB 52) was enacted and expands CEQA by defining a new resource category, “tribal cultural resources.” AB 52 establishes that “A project with an effect that may cause a substantial adverse change in the significance of a tribal cultural resource is a project that may have a significant effect on the environment” (Public Resources Code [PRC] Section 21084.2). It further states that the lead agency shall establish measures to avoid impacts that would alter the significant characteristics of a tribal cultural resource, when feasible (PRC Section 21084.3).  

PRC Section 21074 (a)(1)(A) and (B) defines tribal cultural resources as “sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe” and is: 

1. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or 

2. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying these criteria, the lead agency shall consider the significance of the resource to a California Native American tribe. 

Page 90: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

84

AB 52 also establishes a formal consultation process for California tribes regarding those resources. The consultation process must be completed before a CEQA document can be certified. Under AB 52, lead agencies are required to “begin consultation with a California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed project.” Native American tribes to be included in the process are those that have requested notice of projects proposed within the jurisdiction of the lead agency.  

a.  Would the project cause a substantial adverse change in the significance of a tribal cultural resource as defined in Public Resources Code 21074 that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)? 

b.  Would the project cause a substantial adverse change in the significance of a tribal cultural resource as defined in Public Resources Code 21074 that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 2024.1? 

In accordance with AB 52, project notification letters were sent to the Wiyot tribe on April 19, 2018. No request for tribal consultation regarding the project has been received from the Wiyot tribe.  

As discussed in Section 5, Cultural Resources, the project site lies in proximity to two identified archaeological sites, but has been previously developed. The project would involve minimal disturbance of surface soils associated with site preparation, potential removal of contaminated soils, and grading activities for the construction of a parking lot with greenspace and pedestrian and transportation amenities. While no tribal resources have been identified on the site, and soil disturbance due to the project would be minimal, it is possible that unanticipated tribal resources would be uncovered during earth moving activities. The project would be required to mitigate the unanticipated discovery of cultural resources and human remains, including tribal resources and human remains, as outlined in the 2004 Master Plan EIR and restated in Section 5, Cultural Resources. In addition, incorporation of Mitigation Measure TCR‐1 would reduce potential impacts to unanticipated tribal cultural resources found on the project site to a less than significant level. Further analysis in an EIR is not warranted. This mitigation measure will also be included in the Executive Summary of the EIR and in the project’s Mitigation Monitoring and Reporting Program. 

Mitigation Measure

TCR-1 Unanticipated Discovery of Tribal Cultural Resources

In the event that a previously unidentified cultural resource is identified during ground disturbing activities and is determined to be of Native American origin, the Cultural Resources principal investigator will consult with HSU to begin Native American consultation procedures. If, in consultation with HSU, a discovery is determined to be a tribal cultural resource and thus significant under CEQA, a mitigation plan shall be prepared and implemented in accordance with state guidelines and in consultation with Native American groups. If the resource cannot be avoided, a mitigation plan shall be developed to address tribal concerns.  

LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED 

Page 91: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Utilities and Service Systems

Initial Study 85

18 Utilities and Service Systems

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Would the project: 

a. Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board?  □ □ □ ■

b. Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects?  □ □ □ ■

c. Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects?  □ □ ■ □

d. Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed?  □ □ ■ □

e. Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?  □ □ □ ■

f. Be served by a landfill with sufficient permitted capacity to accommodate the project’s solid waste disposal needs?  □ □ ■ □

g. Comply with federal, state, and local statutes and regulations related to solid waste?  □ □ ■ □

a.  Would the project exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? 

b.  Would the project require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? 

Page 92: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

86

e.  Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments? 

The North Coast Regional Water Quality Control Board (RWQCB) regulates wastewater treatment for the City of Arcata, including HSU. The project would involve the demolition of the Trinity Annex and subsequent development of the project site with a parking lot with greenspace and pedestrian and transportation amenities. Thus, the project would demolish existing sources of wastewater associated with the Trinity Annex building, such as restrooms. The proposed parking lots and pedestrian and transportation amenities would not generate wastewater. Therefore, the project would not exceed wastewater treatment requirements of the North Coast RWQCB, require the construction of new wastewater treatment facilities, or require the expansion of existing wastewater treatment facilities. The project would have no impact and further analysis in an EIR is not warranted. 

NO IMPACT 

c.  Would the project require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? 

As described in Section 9, Hydrology and Water Quality, the project would not substantially alter existing hydrological conditions on the project site. The project site is mostly covered in impervious surfaces under existing conditions and would continue to be mostly covered in impervious surfaces under project conditions. Therefore, resultant stormwater runoff volumes would not substantially change as a result of the project.  

Additionally, HSU’s MS4 permit requires that runoff from parking lots and other impervious surfaces be collected and treated onsite, to the extent feasible. The proposed greenspace component of the project would provide for some natural filtration and stormwater treatment onsite. Because the amount of impervious surface and associated stormwater runoff would not substantially change from existing conditions, the project would not generate the need for new stormwater drainage facilities or the expansion of existing stormwater drainage facilities. Impacts would be less than significant and further evaluation in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT

d.  Would the project have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? 

The project would demolish the Trinity Annex and convert the project site to a parking lot with greenspace and pedestrian and transportation amenities. Operation of the site as a parking lot with greenspace would generate minimal demand for water for irrigation purposes, but this would be comparable to existing demands as HSU has continued to maintain landscaping on the project site. During project construction, temporary application of water would be required as means of controlling fugitive dust emissions. However, the water required for dust suppression would be minimal, and demand would be short term. New or expanded water supply entitlements would not be required for short‐term dust suppression water uses. The project would less than significant impacts, and further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

Page 93: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Utilities and Service Systems

Initial Study 87

f.  Would the project be served by a landfill with sufficient permitted capacity to accommodate the project’s solid waste disposal needs? 

g.  Would the project comply with federal, state, and local statutes and regulations related to solid waste? 

Solid waste in the City of Arcata, including HSU, is transported to the Humboldt Waste Management Authority (HWMA) Solid Waste Transfer Station in Eureka. Large recyclable materials, such as scrap metal, wood, and concrete, and hazardous materials, such as washers, dryers, and tires are pulled from the waste stream at the Eureka facility. The remaining solid waste is shipped to the Dry Creek Landfill, in Medford, Oregon, and the Anderson Landfill, in Anderson, California. The Dry Creek Landfill has a total capacity of 35,700,000 cubic yards and is projected to close in 2074 (Rogue Disposal & Recycling 2016). The Anderson Landfill is currently permitted to receive 1,850 tons per day and has a maximum permitted capacity of 16,840,000 cubic yards. As of 2008, the remaining capacity at the Anderson Landfill was approximately 11,914,025 cubic yards (CalRecycle 2018a). The Anderson Landfill accepts friable asbestos materials. However, Class I‐designated contaminated soils would need to be shipped to a Class I facility, such as Kettleman Hills, which had a remaining capacity of six million cubic yards as of October 2000, with a total capacity of 10.7 million cubic yards and a maximum daily throughput of 8,000 tons per day (CalRecycle 2018b).  

As described above, the project would involve demolition of the Trinity Annex and redevelopment of the project site with a parking lot with greenspace and pedestrian and transportation amenities. Operation of the project site as a parking lot with pedestrian and transportation amenities would not generate new or additional sources of solid waste. Minor litter around the project site would be managed with other University cleanup activities, consistent with current conditions.  

The project would also involve demolition and construction activities, which would be a temporary source of solid waste. The aforementioned waste management facilities serving Arcata would have ample capacity for one‐time demolition and construction waste. Additionally, consistent with applicable state regulations, including requirements in the 2016 California Building Code, at least 65 percent of non‐hazardous construction and demolition waste would be diverted from landfills. 

Therefore, the proposed project would be served by a landfill with sufficient capacity to accommodate its solid waste needs and would comply with applicable regulations. Impacts would be less than significant, and further analysis of this issue in an EIR is not warranted. 

LESS THAN SIGNIFICANT IMPACT 

Page 94: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

88

 

This page intentionally left blank. 

Page 95: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Mandatory Findings of Significance

Initial Study 89

19 Mandatory Findings of Significance

 

Potentially Significant Impact 

Less than Significant 

with Mitigation 

Incorporated 

Less than Significant Impact  No Impact 

Does the project: 

a. Have the potential to substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self‐sustaining levels, eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory?  ■ □ □ □

b. Have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)?  ■ □ □ □

c. Have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?  □ ■ □ □

a.  Does the project have the potential to substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self‐sustaining levels, eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? 

As noted in Section 4, Biological Resources, the project site is on a fully developed site in an urban setting that does not support habitat for special status plants or natural plant communities. Habitat for special status wildlife is also generally not present on the project site, with the exception of potential migratory bird nesting habitat in landscaping trees and shrubs. Mitigation Measure BIO‐1 would require pre‐disturbance surveys to identify and avoid active nesting sites, as applicable. Implementation of this mitigation measure in combination with the lack of suitable habitat onsite would prevent the potential for substantial reduction of fish or wildlife species or population, or plant or animal community.  

Page 96: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

90

The project would involve demolition of the Trinity Annex, which has been identified as a historical resource eligible for listing in the NRHP and CRHR at the local level of significance for its association with important events in local history and historic figures, as well as its vernacular expression of the Colonial Revival style of architecture for a rural hospital. This impact would be potentially significant and will be analyzed further in an EIR. 

POTENTIALLY SIGNIFICANT IMPACT

b.  Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? 

The 2004 Master Plan EIR evaluates environmental impacts resulting from development of the HSU campus as envisioned in the HSU 2004 Master Plan. The EIR considers both project‐specific impacts as well as cumulative impacts of implementing the 2004 Master Plan. The Master Plan identifies impacts to biological resources, air quality, and water bodies to be potentially significant cumulative impacts, but indicates that impacts to biological resources and air quality would be mitigated to a less than significant level with mitigation. As discussed in Section 9, Hydrology and Water Quality, this project would have a less than significant impact to water quality and thus would not substantially contribute to cumulative impacts to water quality. In addition, the project would have a less than significant impact to air quality and biological resources and would not contribute to cumulative impacts to those resources.  

The 2004 Master Plan EIR envisioned use of the project site as a playfield, as opposed to a parking lot. However, as the proposed use would not increase HSU enrollment, otherwise induce growth, or involve an operational use that would increase long‐term demand for utilities or public services relative to existing conditions, the project would not contribute to cumulative impacts to land use and planning, population and housing, public services, recreation, operational traffic, or utilities and service systems. 

On‐campus construction activities related to seismic retrofits of the Theatre Arts Building and Library would potentially occur at the same time as project construction and demolition activities. However, the project site is located approximately 0.3 mile from these buildings, so localized noise, air quality (e.g. exposure to diesel particulate matter from diesel‐powered construction equipment), and hazard impacts (e.g., exposure to lead and asbestos) would not be cumulatively significant. 

The project would have localized, project‐specific impacts not considered under the scope of the 2004 Master Plan EIR, such as impacts to aesthetics, air quality, cultural resources, tribal cultural resources, hazards, noise, and traffic. Site‐specific impacts on traffic would be less than significant. With incorporation of mitigation measures provided in Section 2, Air Quality, Section 4, Biological Resources, Section 8, Hazards and Hazardous Materials, Section 12, Noise, and Section 17, Tribal Cultural Resources, cumulative impacts on air quality, biological resources, hazards, and noise would be reduced to a less than significant level. Site‐specific impacts to historical resources and the visual quality of the project site would be potentially significant. These impacts, including cumulative impacts will be evaluated in the project EIR. 

POTENTIALLY SIGNIFICANT IMPACT

Page 97: HSU Trinity Annex Project - Facilities Management

Environmental Checklist Mandatory Findings of Significance

Initial Study 91

c.  Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?  

In general, impacts to human beings are associated with air quality, hazards and hazardous materials, geology, water quality, and noise impacts. As detailed in the preceding responses, the proposed project would not result, either directly or indirectly, in substantial adverse hazards related to air quality, hazardous materials, geology, water quality, or noise with mitigation incorporated. This impact would be less than significant with mitigation incorporated, and further analysis in an EIR is not warranted. 

LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED

 

Page 98: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

92

 

This page intentionally left blank. 

Page 99: HSU Trinity Annex Project - Facilities Management

References

Initial Study 93

References

Bibliography Arcata, City of. 2008a. General Plan: 2020. Amended October 2008. 

_____. 2008b. Arcata General Plan:2020.Public Safety Element, Figure PS‐a, Arcata General Plan 2020 Hazards Map. https://www.cityofarcata.org/DocumentCenter/View/706/Hazards‐Map‐PDF. (accessed May 2018) 

_____. 2015. Urban Water Management Plan. Completed May 2016. https://www.cityofarcata.org/DocumentCenter/View/4148/2015‐Urban‐Water‐Management‐Plan‐PDF. (accessed May 2018) 

California Air Resources Board (CARB). 2008. New Idling Limits for Owners, Operators, Renters or Lessees of in‐use Off‐Road Diesel Vehicles. No. 377. June 2008. Last revised April 2016. https://www.arb.ca.gov/enf/advs/advs377.pdf. (accessed May 2018). 

California Department of Conservation (DOC). 1983. Special Studies Zones Map, Arcata South Quadrangle, 7.5 Minute Series. http://gmw.conservation.ca.gov/SHP/EZRIM/Maps/ARCATA_S.PDF. (accessed May 2018). 

_____. 1984. Geology for Planning, Arcata South 7 ½’ Quadrangle. ftp://ftp.consrv.ca.gov/pub/dmg/pubs/ofr/OFR_84‐39/OFR_84‐39.pdf (accessed May 2018). 

California Department of Fish and Wildlife (CDFW). 2017. California Regional Conservation Plans Map. https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=68626&inline. (accessed May 2018). 

California Department of Forestry and Fire Protection (CAL FIRE). 2007. Fire Hazard Severity Zones in Local Responsibility Areas [map]. 1:150,000. Fire and Resource Assessment Program. Sacramento, CA. http://frap.fire.ca.gov/webdata/maps/humboldt/fhszl06_1_map.12.pdf. (accessed May 2018). 

California Department of Resources Recycling and Recovery (CalRecycle). 2018a. Facility/Site Summary Details: Anderson Landfill, Inc. (45‐AA‐0020). http://www.calrecycle.ca.gov/SWFacilities/Directory/45‐AA‐0020/Detail/. (accessed May 2018). 

_____. 2018b. Facility/Site Summary Details: Kettleman Hills – B18 Nonhaz Codisposal (16‐AA‐0023). http://www.calrecycle.ca.gov/SWFacilities/Directory/16‐AA‐0023/Detail/. (accessed May 2018). 

California Department of Transportation (Caltrans). 2018. List of Eligible and Officially Designated State Scenic Highways. http://www.dot.ca.gov/hq/LandArch/16_livability/scenic_highways/scenic_hwy.htm. (accessed May 2018).  

_____. 2013. Transportation and Construction Vibration Guidance Manual. September 2013. http://www.dot.ca.gov/hq/env/noise/pub/TCVGM_Sep13_FINAL.pdf. (accessed May 2018). 

Page 100: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

94

California Energy Commission (CEC). 2009. Environmental Health and Equity Impacts from Climate Change and Mitigation Policies in California: A Review of the Literature.  

California Geological Survey (CGS). 2018. Index of Mineral Land Classification/SMARA Maps and Reports. http://maps.conservation.ca.gov/cgs/informationwarehouse/mlc/. (accessed May 2018). 

California State University (CSU). 2014. Sustainability Report 2014. https://www.calstate.edu/cpdc/ sustainability/policies‐ reports/documents/CSUSustainabilityReport2014.pdf. (accessed May 2018). 

_____. 2017. Sustainability in the California State University: The First Assessment of the 2014 Sustainability Policy, 2014‐2017. https://www2.calstate.edu/impact‐of‐the‐csu/sustainability/Documents/2014‐17‐Sustainability.pdf. (accessed May 2018). 

California Department of Conservation (DOC). 2018. California Important Farmland Finder. https://maps.conservation.ca.gov/DLRP/CIFF/. (accessed May 2018). 

Federal Emergency Management Agency (FEMA). 2009. Tsunami Inundation Map for Emergency Planning. http://www.conservation.ca.gov/cgs/geologic_hazards/Tsunami/Inundation_Maps/humboldt/Documents/Tsunami_Inundation_ArcataSouth_Quad_Humboldt.pdf. (accessed May 2018). 

_____. 2017. National Flood Hazard Layer: FIRM panel 06023C0852G. (accessed May 2018). 

Federal Highway Administration (FHWA). 2008. Roadway Construction Noise Model (RCNM) Software Version 1.1. December 2008. 

Humboldt Bay Municipal Water District (HBMWD). 1999. Emergency Action Plan for R.W. Matthews Dam – Inundation Maps (Sheet 12 of 13). 

Humboldt County. 2002. Natural Resources & Hazards Background Report: 10. Geologic, Seismic, and Soil Hazards. http://humboldtgov.org/DocumentCenter/Home/View/1375. (accessed May 2018). 

_____. 2007. Airport Land Use Compatibility Zones. Humboldt County Planning and Building Department. https://purl.stanford.edu/bm978dp1411. (accessed May 2018).  

_____. 2014. Safety Element Humboldt County General Plan. Eureka, CA. October 23, 2017. https://humboldtgov.org/DocumentCenter/View/61990/Chapter‐14‐Safety‐Element‐PDF (accessed May 2018). 

Humboldt State University (HSU). 2002. Chapter 25 Hazard Analysis and Planned Responses Emergency Management Plan. Arcata, CA. November 11, 2002. http://risksafety.humboldt.edu/sites/default/files/risksafety/sec_17b.pdf (accessed May 2018). 

_____. 2004a. Humboldt State University 2004 Master Plan. Prepared by AC Martin Partners, Inc. September 2004. 

_____. 2004b. Final Environmental Impact Report, 2004 Master Plan Revision for Humboldt State University. Prepared by Winzler & Kelly Consulting Engineers. October 2004. 

Page 101: HSU Trinity Annex Project - Facilities Management

References

Initial Study 95

_____. 2016. Asbestos and Lead‐Based Paint and Lead‐Glazed Ceramic Tile Survey Report. Trinity Annex at Humboldt State University in Arcata, CA. Prepared by Masek Consulting Services. April 26, 2016. 

_____. 2018a. HSU Trinity Annex Project, Cultural Resources Technical Report. Prepared by Rincon Consultants, Inc. May 2018. 

Monterey, County of. 2004. East Garrison Specific Plan Draft EIR, Noise. http://www.co.monterey.ca.us/planning/docs/eirs/eastgarrison/21370006_Sec04‐06_Noise.pdf. (accessed May 2018). 

North Coast Unified Air Quality Management District (NCUAQMD). 1995. North Coast Unified Air Quality Management District Particulate Matter (PM10) Attainment Plan. May 11, 1995. http://www.ncuaqmd.org/files/NCUAQMD%20Attainment%20Plan%205‐95.pdf 

_____. 2016a. The North Coast Air Basin. http://www.ncuaqmd.org/index.php?page=northcoast.airbasin. (accessed May 2018). 

_____. 2016b. Air Quality Planning & CEQA. http://www.ncuaqmd.org/index.php?page=aqplanning.ceqa#T1. (accessed May 2018). 

_____. 2016c. Asbestos Regulations. http://www.ncuaqmd.org/index.php?page=asbestos. (accessed December 2016). 

Rogue Disposal & Recycling, Inc. 2016. Dry Creek Landfill – About the Landfill. https://roguedisposal.com/about‐the‐landfill/. (accessed May 2018). 

Sacramento Metropolitan Air Quality Management District (SMAQMD). 2015. SMAQMD Thresholds of Significance Table. http://www.airquality.org/LandUseTransportation/Documents/CH2ThresholdsTable5‐2015.pdf. (accessed May 2018). 

San Luis Obispo County Air Pollution Control District (SLOAPCD). 2012. Greenhouse Gas Thresholds and Supporting Evidence. http://www.slocleanair.org/images/cms/upload/files/GHG_Thresholds_and_Supporting_Evidence_3‐28‐12.pdf. (accessed May 2018).  

Sustainability Tracking, Assessment & Rating System (STARS). 2017. Humboldt State University OP‐23: Rainwater Management. https://stars.aashe.org/institutions/humboldt‐state‐university‐ca/report/2017‐04‐21/OP/water/OP‐23/. (accessed May 2018). 

United States Environmental Protection Agency (U.S. EPA). 2014. Report on the Environment. 

_____ . 2016a. Criteria Air Pollutants. https://www.epa.gov/criteria‐air‐pollutants. (accessed May 2018). 

_____. 2016b. Asbestos National Emissions Standard for Hazardous Air Pollutants. https://www.epa.gov/asbestos/asbestos‐national‐emissions‐standard‐hazardous‐air‐pollutants‐neshap. (accessed January 2017). 

United States Fish and Wildlife Service (USFWS). 2018. Environmental Conservation Online System. http://ecos.fws.gov/ecp0/conservationPlan/region/summary?region=8&type=HCP. (accessed May 2018). 

Page 102: HSU Trinity Annex Project - Facilities Management

California State University, Humboldt HSU Trinity Annex Project

96

United States Geological Survey (USGS). 2015. Arcata South Quadrangle, California‐Humboldt Co., 7.5‐Minute Series [map]. Scale: 1:24,000. United States Department of the Interior, United States Geological Survey. 

_____. 2016. Areas of Land Subsidence in California, Map. http://ca.water.usgs.gov/land_subsidence/california‐subsidence‐areas.html. (accessed May 2018). 

West Hollywood, City of. 2014. Recirculated Draft Environmental Impact Report for the Melrose Triangle Project, City of West Hollywood. 

List of Preparers Rincon Consultants, Inc. prepared this IS‐MND under contract to HSU. Persons involved in data gathering analysis, project management, and quality control are listed below. 

RINCON CONSULTANTS, INC. Stephen Svete, AICP, LEED AP ND Abe Leider, AICP CEP Smadar Levy, MESM, Associate Planner George Dix, Senior Environmental Planner Katherine Green, Associate Planner Beth Wilson, Associate Planner Debra Jane Seltzer, Production Specialist Jon Montgomery, GIS Specialist 

SHN Bob Brown, AICP