Hsse and Pipe Check List

download Hsse and Pipe Check List

of 6

Transcript of Hsse and Pipe Check List

  • 8/6/2019 Hsse and Pipe Check List

    1/6

    Preventive Maintenance Schedule

    8 ZIL pipeline

    Month:

    S. No. Job Description Schedule Observation / Action

    Date: Date: Date: Date:

    01 Visual inspection on the

    way of the pipeline tocheck for any structures

    coming on its way

    Weekly

    02 Visual inspection on theway of the pipeline to

    check for any excavation

    or digging on its way

    Weekly

    03 Check all indicationmarkers of the line are in

    place and having proper

    display

    Weekly

    04 Check the ROW ismaintained free of over

    growth and

    encroachment

    Weekly

    05 Check the valves on thepipeline are protected

    from unauthorized

    operation and vandalism

    Weekly

    06 Check all CP test stationsare properly maintained

    all along the line

    Monthly

    07 Check CP readings withinlimits

    Bi-

    monthly

    08 Check for pressuretesting of the pipeline

    Yearly

    Preventive Maintenance Schedule

    Portable water overhead tank

    S. No. Job Description Schedule Observation / Action

    June-11 July-11 Aug-11 Sept-11

    01 Check the condition of

    water in the tank

    Monthly

    02 Clean the tank frominside by cleaning the

    walls of the tank

    Monthly

    03 Check for any algaeformation and suspended

    solids, clean the same

    Monthly

    04 Check for any leaks in thetank, rectify if any

    Monthly

    05 Check the valves andassociated pipes of the

    tank

    Monthly

    06 Check the manholes ofthe tank are properly

    closed

    Monthly

  • 8/6/2019 Hsse and Pipe Check List

    2/6

    Checked by/Reviewed by

    Any major observations/ actions

    Preventive Maintenance Schedule

    OWS TPI TANK

    S. No. Job Description Schedule Observation / Action

    01 Check the condition ofTPI plate pack

    Monthly

    02 Clean and flush the TPIplates with clean water

    Monthly

    03 Check for any algaeformation and suspended

    solids, clean the same

    Monthly

    04 Clean the tank secondarychambers internally with

    clean water

    Monthly

    05 Check the valves andassociated pipes of the

    tank

    Monthly

    06 Check for any leaks fromthe tank

    Monthly

    07 Check the condition ofskimmed oil collection

    tank, empty if full

    Monthly

    Checked by/Reviewed by

    Any major observations/ actions

  • 8/6/2019 Hsse and Pipe Check List

    3/6

  • 8/6/2019 Hsse and Pipe Check List

    4/6

    Zuari Indian Oiltanking Limited

  • 8/6/2019 Hsse and Pipe Check List

    5/6

    Contractor HSSERequirements

    1. Company Registration: The Contractor shall have valid registrationsunder the statutory requirements for carrying out the job mentioned inthe work order and other enclosures.

    2. Regular employees: All the employees of the contractor shall beregular employees on his rolls.

    3. Insurance: The contractor shall insure all his employees who will beworking in ZIOL premises.

    4. Education & Training: All the employees of the contractor shall meetthe minimum education criteria pertaining to the job and must be trainedfor carrying out the job. They should have also undergone training forcarrying out the job efficiently and safely.

    5. Safety Induction Training: The Contractor shall ensure that all hisemployees undergo safety induction training conducted by the ZIOL HSSEDept prior to the start of the job.

    6. Personal Protective Equipment (PPEs): The Contractor shall providehis employees with the required PPEs for carrying out the job. It is theduty of the Contractor to ensure that the PPEs are in good condition. All

    damaged PPEs should be immediately replaced.

    7. Water/ Food/Accommodation /Transport: The contractor will beresponsible for providing his employees with Water, Food

    Accommodation, Tea, Coffee, & Transport to the site at his cost.

    8. Safety of ZIOL equipment: The contractor shall ensure, that hisemployees while employed in the premises of ZIOL do not tamper withequipment of ZIOL.

    9. Terminal Safety Rules: At all given time the contractor must ensurethat he and his employees follow the Terminal Safety Rules very strictly.In case of any doubts the contractor shall contact the Terminal HSSEcoordinator.

    10.Reporting of Incidents: The contractor shall ensure that all the minor/major incidents /accidents/ near misses are reported to the HSSE dept orto the control room of ZIOL.

    11.Permit to work: The Contractor shall adopt the ZIOL permit to workSystem.The permit to work is required in all ZIOL restricted andunrestricted area. ZIOL has got different work permits like. Hot Work permit

    Cold Work permit Confined Space permit Vehicle permit

    12.Contractor Vehicles: The contractor can use only diesel vehicles fittedwith Spark Arrestor in the licensed area of the terminal after receivingnecessary permits from the control Room. The vehicle will be allowed inthe licensed area only to supply material etc. No vehicle should beoverloaded, the vehicle should be driven by the driver holding valid

    license issued by the transport department. The driving speed inside theterminal should not exceed 15 KMPH. The Height of the vehicle or goods

  • 8/6/2019 Hsse and Pipe Check List

    6/6

    stacked on it shall not exceed 4.5 mts inside the terminal. The driver shallwear Safety Belt at all given time when driving inside the ter minal.

    13.Inspection of Equipments and Tools: It will be the responsibility ofthe contractor to provide his employees with proper tools and tackles.

    The contractor shall periodically check the equipment and if founddefective shall replace the same so as to eliminate the risk of dangers.

    The HSSE dept of ZIOL shall have the right to reject all the equipment orsome part of it, which he finds may jeopardize the safety

    14.Safe Handling of Tools: The contractor shall ensure that all the safetydevices of the equipment to be used are in place and are not bypassed,e.g. guard of the hand grinding machine should be in place, flash backarrestor should be provided for gas welding machine etc.

    15.Supervisor: The contractor shall provide a trained supervisor at all time.No work will be allowed inside the ZIOL premises in the absence of thesupervisor.

    16.Security: The contractor shall ensure that the names of his employeesare entered at the security gate register at the time of entry everyday.The contractor shall also make all his employees available for frisking at

    the time of entry and exit from the terminal.

    17.House Keeping: The contractor shall ensure that the site of work is keptfree of surplus waste and shall maintain a clean and tidy site through out

    the duration of work.

    18.Lifting Equipments:All the lifting equipments of the contractor likecranes, Chain pulley block, slings etc should be regularly tested andcertified by a competent person. The copy of the certificate should be

    made available to the ZIOL HSSE dept.

    19.Scaffoldings: All scaffolds and staging shall comply with recognizedstandards. Prior to using any scaffolding, it shall be approved by ZIOLL. A

    SCAF-TAG indicating ZIOL acceptance will be attached to thescaffolding, the scaffolding is not to be used until the approval is given.