HS2: a 10-year pipeline of opportunity€¦ · Terrassement •Eiffage Genie ...

12
HS2: a 10-year pipeline of opportunity Robin Lapish Supply Chain Manager, HS2 Ltd Infrarail Knowledge Hub, hosted by RIA 2 May 2018

Transcript of HS2: a 10-year pipeline of opportunity€¦ · Terrassement •Eiffage Genie ...

HS2: a 10-year pipeline of opportunity

Robin Lapish

Supply Chain Manager, HS2 Ltd

Infrarail Knowledge Hub, hosted by RIA

2 May 2018

HS2: the new backbone of Britain’s rail network

Destinations served by HS2

HS2 line (Phase One – Completed 2026)

HS2 line (Phase 2a – Completed 2027)

HS2 services on existing network

HS2 line (Phase 2b – Completed 2033)

Project timeline

2033

Full Y-

shaped

network

operational

2019

Royal Assent

for Phase 2a

expected

2022

Royal Assent

for Phase 2b

expected

2026

Phase One

opens

2027

Phase 2a

opens to

Crewe

2017

Phase 2a Bill

deposited

with

parliament

2009

HS2 Ltd

set up

2012

HS2 strategy

confirmed by

government

2016

Full HS2

route

confirmed

2017

Royal Assent

for Phase

One

London

Manchester ManchesterBirmingham

London Leeds

HS2 vision: To be a catalyst for growth across Britain

HS2’s strategic goals and benefits

Catalyst

for growth

Value for

money

Sustainable and a

good neighbour

Skills and

employment

Customer

experience

World class

standardsCapacity and

connectivity

Tier 1

ITT issue

Tier 1

awardSupply chain

opportunities

Enabling works Complete Complete Ongoing

Main works civils Complete Complete Ongoing

Stations

Design Complete Complete 2018+

ConstructionNorth Q1 2019 Q2 2020 2020+

South Complete Q3 2018 2018+

Railway systems Q4 2018 Q4 2019 2019+

Rolling stock Q2 2018 Q4 2019 2019+

When we are buying

Enabling works contracts

NORTH

SOUTH

CENTRAL

LM JV

CS JV

Fusion JV

• Costain Group Plc

• Skanska Construction UK Ltd

• Laing O’Rourke

Construction Ltd

• J. Murphy & Sons Ltd

• Morgan Sindall Construction

& Infrastructure Ltd

• BAM Nuttall Ltd

• Ferrovial Agroman (UK) Ltd

BBV JV

CSC JV

EK JV

• Costain Group Plc

• Skanska Construction UK Ltd

• STRABAG AG

• Balfour Beatty Group Ltd

• VINCI Construction Grands

Projets

• VINCI Construction UK Ltd

• VINCI Construction

Terrassement

• Eiffage Genie Civil SA

• Kier Infrastructure & Overseas

Ltd

BBV JV

EK JV

Align JV

CSC JV

• Bouygues Travaux Publics

• VolkerFitzpatrick

• Sir Robert McAlpine

Main works civil contracts

NORTH

SOUTH

CENTRAL

• Network Integrated

Control Centre (NICC)

• Washwood Heath

depot (incl.

infrastructure)

• Tunnels M & E

• Openroute M & E

• HV distribution

• Traction power

• Feeder stations

HEAVY RAIL SYSTEMS

SOFT SYSTEMS BUILDINGS & DEPOTS

• Track (installation)

• Overhead catenary

system

• Radio/Telecoms

• Data transmission

network

• Engineering monitoring

& control

• Command control

signalling

• Traffic management

Railway Systems

Why our values matter

Safety Respect Leadership Integrity

The National College for High Speed Rail will attract new talent and train the existing workforce, producing over 1,000 graduates a year

How to engage with HS2

Register QuestionsResources

gov.uk/contracts-finder

competefor.com/hs2

Supplier Guide

Supply Chain FAQs

Contract Opportunities Table

bimupskilling.com

gov.uk/hs2 [email protected] [email protected]