How to start primavera p6

5
[email protected] ‐1 How to Start Primavera P6 If you do not find any P6 shortcut on your desktop, you can follow this step. Type “P6” or primavera on taskbar or select it from start menu. Right click and select open file location Right click “P6 Professional R16.2 (x64)” file and select “send to” and click “Desktop (create shortcut)” Shortcut of Primavera P6 is now visible on the desktop, then double click it Type your login name and password which was made in the previous tutorial.

Transcript of How to start primavera p6

Page 1: How to start primavera p6

[email protected] ‐ 1  

How to Start Primavera P6 

 

If you do not find any P6 shortcut on your desktop, you can follow this step. 

 Type “P6” or primavera on taskbar or select it from start menu. Right click and select open file location 

Right click “P6 Professional R16.2 (x64)” file and select “send to” and click “Desktop (create shortcut)” 

 

Shortcut of Primavera P6 is now visible on the desktop, then double click it 

Type your login name and password which was made in the previous tutorial.  

 

 

Page 2: How to start primavera p6

[email protected] ‐ 2  

 

 Click “Create new..”  Click “Next”, EPS will be discussed in the further chapter. 

Type “Project ID” and “Project Name” as you need for your practice 

Select you project duration. In this tutorial, I’m planning to construct RC building for 3 months. 

Click “Next”, Responsible Manager will be discussed in the further chapter. 

Select “Next”, Standard rate will be discussed in the further chapter. 

Page 3: How to start primavera p6

[email protected] ‐ 3  

 

Click “Finish” to open new project as displayed in the picture below. 

 

Now we can see general layout of Primavera P6 in standalone version. We are going to start making project schedule of 

RC Building as picture in the red box. Construction stage of this building has been made in the address below: 

https://www.linkedin.com/pulse/construction‐stage‐rc‐building‐firdaus‐muhammad‐adnan 

 

 

 

 

Page 4: How to start primavera p6

[email protected] ‐ 4  

According to tutorial explained in the link above, there are 6 steps of constructions to be developed in project 

management (Primavera P6). 

1. Pre‐construction work 

2. Foundation 

3. Ground beam and slab 

4. RC (Reinforced Concrete) and Steel column 

5. Masonry / Concrete block 

6. Roof frame and sheet 

7. Finishes (Architectural and MEP Work) 

These 6 steps above represent Work Breakdown Structure (WBS) in Primavera P6. 

 

Click blue box, WBS icon  Klick “+” icon to add WBS  Double click WBS Code field to edit code name 

 

Page 5: How to start primavera p6

[email protected] ‐ 5  

One by one we click “+” icon and type work title as per WBS list above. Some arrow inside red box above represent navigation of WBS item to arrange it as we need either it is put as main WBS or sub WBS 

In “Activities” tab, it can be seen that all WBS names are written as header of activity 

 

Next step is to add some activities in each WBS as picture below. 

 

Select any WBS name you want to start, click icon “+” and you can add new activity, for instance “Area Cleaning” with 

duration 5 days. 

 

Next tutorial will be discussing more detail about activity each WBS according to construction stage.