How to Key in Act Data
description
Transcript of How to Key in Act Data
HOW TO UPDATE ACT DATA DAILY Daily Key In ACT Guideline
1. Open Excel program-open file
i. Computer/Deepwater/Gumusut-Kakap/HSSE/ACT FPS/2014
2. Click “April 2014” tab at below
3. Key in ACT as below:
a. Running Number Continue ACT running number from previous day
b. Date
Key in date data in format either
23-04-14 or
23/04/14 or
23-Apr-2014 or
23-Apr-14
Do not key in date data using dot (23.04.2014 or 23.04.14) as Excel program will recognise it as number not a date format!
c. Findings
d. A/C/GA
Please pick from droplist
A-Unsafe Act
C-Unsafe Condition
GA-Good Action/Observation
e. Discussion &
Agreed Action
f. Follow Up/ Remarks
Any follow up or remarks
g. What (Code) Key in number from 1-57
h. Why (Code) Key in alphabet from A-W
i. Action Party Name and respective department (CSU,ORA,Petra,etc)
j. Date Rectified
k. Status Key in only ‘Closed’ or ‘Pending’. For Pending please add ‘1’ in additional column and highlight with different colour. *For GA(Good Action)please choose ‘Closed’
l. Reported by Reporter’s name
m. Dept. Department’s Reporter –
ORA
CSU(including Halliburton, GE, etc)
Petra
Completion
HSE
n. Category Please pick from droplist
PPE
Tools/Equipment
Material Handling
Position/Reaction of People
Housekeeping
Environment
Permit/Procedure
Process Safety For GA(Good Action) leave this column blank
o. Potential
Severity Please pick from droplist
Low
Medium
High For GA(Good Action) leave this column blank
4. For pending ACT copy data from Running Number to Dept and paste it at ‘Pending ACT for
April 2014’ at below section.
a. Copy pending
b. Paste pending item at below section ‘Pending ACT for April 2014’
5. Open April 2014 GRAPH tab and update as below instruction
1. Change to current date.
It will automatically
update all data in this
graph.
2. Number Cumulative
Submission and total
must be equal.
If not equal then some
Status data (Closed or
Pending) is missing.
3. Good ACT + Total UAUC Category
= Cumulative Submission
If not tally then either Category
(PPE, Tools/ Equipment, etc) or
Potential Severity (Low, Medium or
High) data is missing.
Click to April 2014 GRAPH
6. For daily ACT summary we need to send email soft copy file to respective party (HSE
Manager & Lead, OPM, OIM, CSU Manager,etc) which you can find it in previous email in
Outlook.
a. This ACT Daily Summary file is located at
i. Computer/Deepwater/Gumusut-Kakap/HSSE/ACT FPS/2014/April Daily ACT
b. Open previous day file and rename it according to current date.
c. Change date and copy current ACT data
d. Print this page in 3 copy and posted it at 3 different location
i. PLQ L2 – near to noticeboard in front of Conference Room.
ii. PLQ L1- near door entrance and stairway
iii. PLQ L1- Inside massroom/galley near to telephone.
e. Click to pending Tab and paste any pending item.
Change to current date
Delete and paste with current Daily
ACT Summary
Copy and paste pending item here
For Weekly ACT Summary Update
7. Weekly ACT Summary Analysis is start form Saturday and end Friday. In this tutorial Saturday
is on 5th April 2014 and Friday is 11th April.
8. Now click Weekly APRIL 2014 Graph tab in ACT Database file.
9. Change date by double click on text.
10. After date has been updated, print this page in 3 copy and posted it together with Daily ACT
Summary at 3 different location.
11. Print/save this page in PDF and attached together with Daily email. (Every Saturday
morning).
Change date
Change Start Date only and all data
will be update automatically
Click Weekly APRIL 2014 GRAPH tab