How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate...

14
Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email :-[email protected] www.balajihydromet.com How to Install the Automatic Weather Station [Modest Series] Installation of Mounting Stand Installation of Mounting Stand: Open the legs of tripod stand & setup as shown below Using nails can be fixed into the ground as shown below

Transcript of How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate...

Page 1: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

How to Install the Automatic Weather Station

[Modest Series]

Installation of Mounting Stand

Installation of Mounting Stand: Open the legs of tripod stand & setup as shown below

Using nails can be fixed into the ground as shown below

Page 2: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Solar Panel Setup

Take our solar panel & fix the solar panel clamp as shown below

Setup of Enclosure Turn back the enclosure unscrew the screws used for fixing SS Strips to enclosure & toggle the Position of SS-Strip as shown below

Page 3: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Fixing U-Clamps Now take U-clamp & insert them to SS-Strips & Solar Panel Clamp as shown below

Page 4: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Fixing of Enclosure & Solar Panel to Tripod Stand

Now fix the enclosure to tripod tower by inserting it to the centre pipe of the Tripod stand as shown

Below:

Tighten the nuts of the clamp using Keys keeping enclosure face towards North Direction. Now

insert the solar panel in the same way & tighten the nuts of the clamp using Keys keeping solar panel

face towards South Direction as shown below

Page 5: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Tighten the nuts using Keys keeping enclosure face towards North Direction & solar panel face

towards South Direction as shown below

Page 6: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Installation of Sensors:

First fix Wind speed & Wind Direction sensor with Z-clamp provided as shown below:

Now Fix this Z-clamp with L-Clamp onto Tripod Stand as shown below:

Page 7: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Now Fix Temperature humidity Sensor below & Rainfall Sensor above L-clamp as shown below

Page 8: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Wind Direction Sensor ARM should be NORTH facing

Using cable ties clamp wires with stand as shown above

Now Take Solar Radiation Sensor & Install at the centre pipe of Tripod Stand as shown below

Page 9: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Now open the front panel of Logger

Page 10: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Wiring Connections:

Open the panel of the logger by pressing the lock button Solar Charging

PCB

Data Logger Motherboard

Spare Fuse

Insert the solar panel cable & Sensor Cables from the cable gland provided at the bottom of the Enclosure as shown above

Connect the connector at the charging PCB (SOLAR is marked on PCB)

Page 11: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Now Connect the Sensor Cables at the connector provided on Mother –Board as shown below

Wiring of Batteries

Page 12: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Connect the red wire to Positive Terminal (Red) & black wire to Negative Terminal (black) of the Battery & place them inside enclosure as shown above.

How to install SIM in Logger End Modem: Open the Antenna-end side panel of Modem.

Take out the Modem PCB

Page 13: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Take out completely

Turn around the PCB

There is a slot for SIM, insert the SIM carefully & assemble the unit as it was opened.

Wiring Connections of Modem.

Now connect the modem cable & antenna cable as shown below.

Page 14: How to Install the Automatic Weather Station …Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469 Email

Address: - 1027 Salempur Rajputan Industrial Estate Roorkee -247667 Uttarakhand (INDIA). Mobile No. +91-7500041199/9412999469

Email :[email protected] www.balajihydromet.com

Connect other end of modem cable to motherboard as shown below

All the connections are done. Now close the panel& press & hold for 3Sec the ON button to switch

on the instrument.To switch OFF the instrument Press & Hold

Blinging of Power LED & display text will confirm that system has been installed successfully