How to Build

20
How to Build ~ The EDCO Model ~ Rob Fuller Beyster Institute E E FFECTIVE FFECTIVE D D EMOCRATIC EMOCRATIC C C HANGE-MINDED HANGE-MINDED O O RGANIZATIONS RGANIZATIONS

description

E FFECTIVE D EMOCRATIC C HANGE-MINDED O RGANIZATIONS. How to Build. ~ The EDCO Model ~ Rob Fuller Beyster Institute. Four Cornerstones. Reality People Resources Vision All successful EDCOs are built on a foundation with the same four cornerstones. What makes EDCOs Grow & Succeed?. - PowerPoint PPT Presentation

Transcript of How to Build

Page 1: How to Build

How to Build

~ The EDCO Model ~

Rob FullerBeyster Institute

EEFFECTIVEFFECTIVEDDEMOCRATICEMOCRATICCCHANGE-MINDEDHANGE-MINDEDOORGANIZATIONSRGANIZATIONS

Page 2: How to Build

MEET U.S.

Four Cornerstones

• Reality• People• Resources• Vision

All successful EDCOs are built on a foundation with the same four cornerstones

Page 3: How to Build

MEET U.S.

What makes EDCOs Grow & Succeed?

1. Leadership & Commitment2. Shared Vision & Strategy3. Inclusive Organizational Decision-

Making4. Effective Outreach5. Products/Services that are Valued6. Skill in Managing Change

Page 4: How to Build

MEET U.S.

“Change is indubitable, whereas progress is a matter of controversy.” Bertrand Russell

British author, mathematician, & philosopher (1872 - 1970)

Page 5: How to Build

MEET U.S.

People and Resources are what you need …

To change today’s vision into

tomorrow’s reality

But you must have the VISION first

Page 6: How to Build

MEET U.S.

What’s in a Vision?

• Get out of the Box and Think!– No Obstacles– No Resource Limitations

• Construct the Ideal Pathway– What will you do?– Who will do it?– How long will it take?– How much will it cost?– Who will benefit from it?

Page 7: How to Build

MEET U.S.

Making a Vision a Strategy• Start with the ideal and

introduce your Constraints, one-by-one.

• Assess the impact of each Constraint. Is it– A deal breaker?– A time eater?– Workable?– What is the tipping point?

Page 8: How to Build

MEET U.S.

Translate Vision Into Reality(Strategic Thinking)

• Identify your starting point and goal

• Recognize your resource & organizational needs to reach the goal

• Analyze and describe:– People assets – current &

potential– Obstacles (people and

institutions)– Critical path to the goal

Page 9: How to Build

MEET U.S.

Understanding Change

• Change is inevitable given enough time• Change is seldom simple; often complex• Change may depend on a sequence of events: the

right order matters• Change must be anchored in behavior if it is to last.

Page 10: How to Build

MEET U.S.

Building a Change Model

• What was the situation BEFORE the change?

• Who defined the desired change?• How was the change supported?• Who were the key people? Who brought

them together?• Who prepared the Action Plan?• Was change achieved? Did it last?

Page 11: How to Build

MEET U.S.

Generating Change

• Be sure the change is on your critical path• Make the change visible to the

organization• Make the change attainable• Engage EVERYONE in achieving the

change – not just the leadership• Measure and consolidate change as it

occursSMALL SUCCESSES MATTER!

Page 12: How to Build

MEET U.S.

Consolidating Change

• Make it visible to ALL stakeholders

• Celebrate successes (even small ones)

• Link it to similar changes, whether or not your organization is responsible

• Give it a CHAMPION– Leader– Expert

Page 13: How to Build

MEET U.S.

When can we claim Success?

• Success is more than completed project activities

• Success motivates support for your vision

• Success consolidates smaller changes into a framework, a structure, a larger picture

Page 14: How to Build

MEET U.S.

Useful Tools for EDCO Success

• Inventory of Assets, Obstacles, Needs, Capabilities

• Timelines• Organizational

Assessment• Networks & Experts• Strategic Plan

Page 15: How to Build

MEET U.S.

Useful Tools for EDCO Success

• Inventory of Assets, Obstacles, Needs, Capabilities – SWOT Analysis

• Timelines• Organizational Assessment• Networks & Experts• Strategic Plan

Page 16: How to Build

MEET U.S.

Useful Tools for EDCO Success

• Inventory of Assets, Obstacles, Needs, Capabilities

• Timelines – Action Plans• Organizational Assessment• Networks & Experts• Strategic Plan

Page 17: How to Build

MEET U.S.

Useful Tools for EDCO Success

• Inventory of Assets, Obstacles, Needs, Capabilities

• Timelines• Organizational Assessment – A Fresh

Look• Networks & Experts• Strategic Plan

Page 18: How to Build

MEET U.S.

Useful Tools for EDCO Success

• Inventory of Assets, Obstacles, Needs, Capabilities

• Timelines• Organizational Assessment• Networks & Experts – This program• Strategic Plan

Page 19: How to Build

MEET U.S.

Useful Tools for EDCO Success

• Inventory of Assets, Obstacles, Needs, Capabilities

• Timelines• Organizational Assessment• Networks & Experts• Strategic Plan – A Proven Model

Page 20: How to Build

MEET U.S.

Your Successful EDCO

• Build a shared vision• Incorporate open decision-making and

participative management• Communications strategies that reinforce

democratic practices, processes and values

• Set and meet high standards• Build champions and leaders• Delegate responsibility, ensure

accountability