Parking management company superb way to attract more customers without huge investments
How to attract Wind-Investments in Emerging Markets – a project developers point of view
-
Upload
sarah-cooper -
Category
Documents
-
view
38 -
download
0
description
Transcript of How to attract Wind-Investments in Emerging Markets – a project developers point of view
![Page 1: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/1.jpg)
1
How to attract Wind-Investments in Emerging Markets – a project developers point of view
Christian Friebe, Dr Paschen v. Flotow,
Sustainable Business Institute (SBI), Germany
EWEA Annual ConferenceSession “World Wide Wind”
March 2011
![Page 2: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/2.jpg)
2
Wind Energy Potential
![Page 3: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/3.jpg)
3
Influencing factors for policy makers in emerging countries regarding energy infrastructure
Rising energy demandRising energy demand
Energy SecurityEnergy Security
Price volatilityPrice volatility
Power mix based on fossil fuels
Power mix based on fossil fuels
Energy subsidiesEnergy subsidies
External costsExternal costs
(Inter-)National Climate Change Mitigation Measures
(Inter-)National Climate Change Mitigation Measures
Depending on the evaluation of these factors there is an opportunity for wind power.
Depending on the evaluation of these factors there is an opportunity for wind power.
![Page 4: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/4.jpg)
4
What is the right policy mix for wind energy in emerging countries?
Which support mechanism?Which support mechanism?
What is the role of the public sector?What is the role of the public sector?
Are there other important factors?Are there other important factors?
How to share risk and profit?How to share risk and profit?
Understanding the rationale of an investor helps to design more effective policies.
Understanding the rationale of an investor helps to design more effective policies.
How to minimize the costs for electricity?How to minimize the costs for electricity?
What is the role of the private sector?What is the role of the private sector?
![Page 5: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/5.jpg)
5
Qualitative: 11 Interviews (May und June 2010)Qualitative: 11 Interviews (May und June 2010)
Qualitative: one day workshop with 14 experts (November 2010)
Qualitative: one day workshop with 14 experts (November 2010)
SBI Wind Investment Study - evaluation of the preferences of the private sector
Quantitative: Survey, 41 responses by project developers (July und August 2010)
Quantitative: Survey, 41 responses by project developers (July und August 2010)
Some involved companies and organizations are:
![Page 6: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/6.jpg)
6
Key messages 1: Support mechanism
Feed-in-Tariff is the most attractive support mechanism
International Tender: Discontinuous market development Transparency?
Quota-System: High risks lead to high financing costs
![Page 7: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/7.jpg)
7
Key messages 2: Non-financial aspects
Very attractive for project developers:Legal securityTransparency Low risk of unforeseen changesKnown duration of the approval process
“one-stop-shop” – don’t do it! Lack of Transparency Additional administrative barrier
Local content requirements: Challenging for investors (even with bonus!)
![Page 8: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/8.jpg)
8
Key messages 3: Grid access and power dispatch
A guaranteed grid access and power dispatch is an attractive framework condition.
??
No guarantee for grid access and power dispatch is very challenging for an investor.
![Page 9: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/9.jpg)
9
Key messages 4: How and where to start?
A continuous approach is best for all stakeholders.
Framework conditions that are either extremely attractive or not attractive for investors.
![Page 10: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/10.jpg)
10
How to further use the results?
The study is not a blueprint for the „perfect“ support mechanism.The study is not a blueprint for the „perfect“ support mechanism.
Policy makers can increase the attractiveness of their country at little cost: Transparency, duration of the approval process, no unforeseen policy changes
Policy makers can increase the attractiveness of their country at little cost: Transparency, duration of the approval process, no unforeseen policy changes
Support for international climate change initiatives Global FIT and others
Support for international climate change initiatives Global FIT and others
Further studies on a country level lead to more specific recommendations.Further studies on a country level lead to more specific recommendations.
![Page 11: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/11.jpg)
11
Thank you for your attention
www.cfi21.org
![Page 12: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/12.jpg)
12
Backup
![Page 13: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/13.jpg)
13
CFI - Climate Change, Financial Markets and Innovation
Project partners:
Sustainable Business Institute (SBI)
Climate Change Finance Forum
Financed by the German Ministry of Research and Education (BMBF)
Increase the application of clean tech innovations
Venture Capital for clean technologies Financing of infrastructure through Public Private Partnerships Financing of selected technologies
![Page 14: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/14.jpg)
14
The impact of risk on the total power generation costs
Costs for “green” electricity
Costs for the technologyRisk and return perception
of the investor
Framework conditions
by policy makers
Jager, D. & Rathmann, M. (2008): "Policy instrument design to reduce financing costs in renewable energy technology projects". Paris. IEA, OECD.
![Page 15: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/15.jpg)
15
Sample of the survey
Participants of the study
The participants had up to 28 years of professional experience
Responsibility of the participants Headquarter of the companies
Companies where the participants work
75% of the companies had a high strategic focus on small emerging countries
![Page 16: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/16.jpg)
16
The respondents have a broad professional experience in different emerging markets
![Page 17: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/17.jpg)
17
One example from the survey
![Page 18: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/18.jpg)
18
Application of a new method in the field of investment preferences : Maximum-Difference-Scaling
1. Identify the 20 most important aspects when facing an investment decision in an emerging country
2. Identify experienced project developers (158 Persons, 25% return rate) 3. Each person answers 12 questions4. Statistical Analysis: Hierachical Bayes estimation & rescaling of the results
![Page 19: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/19.jpg)
19
Findings: Overview
![Page 20: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/20.jpg)
20
Support mechanism
![Page 21: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/21.jpg)
21
Financial aspects
![Page 22: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/22.jpg)
22
Non financial aspects
![Page 23: How to attract Wind-Investments in Emerging Markets – a project developers point of view](https://reader036.fdocuments.us/reader036/viewer/2022081516/568135c5550346895d9d25bd/html5/thumbnails/23.jpg)
23
Grid access and power dispatch