PDCA & TQM DOSTI!! The basic need of TQM is
continuous improvement. In this competition world if you
are not in the race you will loss. For this continuous
improvement purpose PCDA cycle acts as a best tool, so as to achieve Quality
Also called as deming cycle
PDCA TQM
PROCESS TO OBTAIN TQM BY PDCA
Select the project in which TQM to be achieved Grasp the present status Analyze the cause Determine the corrective action Implement corrective action Check the effects in terms of quality Take appropriate action Conclude and future plans to obtain TQM
Select the project in which TQM TO BE IMPLEMENTED
-Project background and reasons for selection-Set a target-Prepare a schedule of activities
Grasp the Current status Analyze the cause and Determine the Corrective
Action-Prepare cause and effect diagram-Prepare a hypothesis and verify most likely
causes-Document the corrective action
• Implement the corrective actionPrepare instructions and flow charts for complicated proceduresAdequate training must be providedFollow the plan exactlyRecord any division from plan and
collect the data on results
• Check the Effect of corrective action– Compare over all results– Analyse failure to achieve results– Results achieved
• Check appropriate action– Documentation, standardisation and control– Training– Decide on future plans– The well known seven quality control tools may be
used in this process
CONCLUSION• PDCA is a powerful tool to
obtain TOTAL QUALITY MANAGEMENT in any sector not only in construction sector.
• But it should be followed and implemented perfectly to see its fruits!!