Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule...

22
Houston Airport Marriott July 2013

Transcript of Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule...

Page 1: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Houston Airport Marriott

July 2013

Page 2: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Introduction to Host

• S&P 500 and Fortune 500 company

• Largest lodging REIT, $18 billion total market value

• Portfolio of irreplaceable assets in premier markets:

– Consolidated Portfolio + Joint Ventures: 145 hotels

4 hotels in Houston – Houston Airport Marriott, JW Houston Galleria, Houston Marriott Texas Medical Center and The St. Regis Houston

11 airport hotels

• Hotels managed by best operators under strongest brand names

2

Page 3: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Host Credentials

• Manage over $500 million annual capital investment plan (over $3.1 billion since 2007)

• Technical specialists in design, architecture, engineering, procurement, project management, estimating and sustainability

• Strategic relationships + scale ensure favorable pricing and quality workmanship from vendors, suppliers, consultants and contractors

3

Page 4: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Lobby / Great Room Elements

• State-of-the-art, high-energy lobby to elevate the customer experience

• 3-meal-a-day dining / lobby bar concept

• Expansive lobby seating area

• New guest reception experience

• Relocate and upgrade fitness facility

4

Page 5: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Conceptual Lobby Layout

5

BEFORE

Page 6: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Conceptual Lobby Layout

6

BAR

PANTRY

BUFFET BAR LOUNGE

RESTAURANT

DINING

SERV.

LOBBY LOUNGE

ADDITIONAL

SEATING

ADDITIONAL

SEATING REGISTRATION AFTER

Page 7: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Reception Desk

7

Page 8: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Lobby Lounge - Feature Wall

8

Page 9: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Bar Concept

9

Page 10: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Design Inspiration

10

Page 11: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Restaurant Concept

11

Page 12: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Feature Wall

12

Page 13: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Public Area & Grand Stair Concept

13

Page 14: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Tram Level Concept

14

Existing Tram Level

Tram Level Design Concept

Page 15: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Guestroom

15

Before: Existing typical king guestroom

After: Typical king guestroom (Chicago Marriott O’Hare)

Page 16: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Comparable Renovations

16

Chicago Marriott O’Hare Lobby / Great Room

Page 17: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Recent Renovations

17

Chicago Marriott Suites O’Hare

Page 18: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Recent Renovations

18

Washington Dulles Airport Marriott

Great Room

Page 19: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Business Terms

• 40-year lease

• $40.5 million capital investment

– $6.0 million within first year – $34.5 million within 42 months

• Rent = 10% of gross revenue

– Minimum annual rent is $1,560,000

• No additional hotels in the terminal complex within 10 years from the effective date

19

Page 20: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Community Impact

• 175-200 jobs created during renovation

– Industry day – MWBE construction goal (and ACDBE concession goal)

• LEED concepts and comprehensive sustainability program

– Recycling construction and packaging waste – Installation of energy and water saving devices – Use of recycled products

• Donate beds, furniture and other materials to local

charities

20

Page 21: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby

Renovation Plan

21

• Anticipated Construction Schedule

Building Exterior / Grounds 3Q 2014

Building Systems 3Q 2014

Rooms 4Q 2014

Lobby / Great Room 1Q 2015

Elevators and Escalators 1Q 2015

Ballrooms and Meeting Rooms 2Q 2016

Page 22: Houston Airport Marriott · 7/30/2013  · Renovation Plan 21 •Anticipated Construction Schedule Building Exterior / Grounds 3Q 2014 Building Systems 3Q 2014 Rooms 4Q 2014 Lobby