House1 for Construction2

download House1 for Construction2

of 1

Transcript of House1 for Construction2

  • 7/25/2019 House1 for Construction2

    1/1

    maids rm.

    existing house

    t&b service area

    car port

    7100

    e Ad c b

    5

    1

    2

    3

    4

    1'

    10000

    1400 37002400

    5000

    2500

    2540

    2500

    2900

    2500

    11000

    3660

    4800

    WM

    e Ad c b

    5

    1

    2

    3

    4

    1'

    10000

    existing house

    balcony

    walk-incloset

    4800

    4200

    5200

    2000

    11000

    4800

    75002500

    50mmx 75mmC-PURLINSSPACED@ 500mm.o.c

    existing house

    balcony

    walk-incloset

    e Ad c b

    5

    1

    2

    3

    4

    1'

    10000

    75002500

    5200

    4200

    4800

    4800

    2000

    11000

    50mmx 75mmC-PURLINSSPACED@ 500mm.o.c

    e Ad c b

    5

    1

    2

    3

    4

    1'

    10000

    existing house

    4800

    4200

    5200

    2000

    11000

    4800

    75002500

    50mmx 75mmC-PURLINSSPACED@ 500mm.o.c

    existing house

    7100

    e Ad c b

    5

    1

    2

    3

    4

    1'

    10000

    1400 37002400

    5000

    2500

    2540

    2500

    2900

    2500

    11000

    3660

    4800

    2250 2250 925 3975

    900

    900

    1800

    800

    400 1

    50

    950

    LOWERROOFAPEX

    2NDFLR.FINISH CLNGLINE

    2NDFLR.FINISH FLOORLINE

    GFFINISH FLOORLINE

    NGL

    HIGHEST ROOFAPEX

    existing house8000

    530

    1670

    2800

    2800

    200

    LOW

    2NDFLR.FIN

    2NDFLR.FINIS

    GFFINI

    HIGHE

    8000

    530

    1670

    2800

    2800

    FIREWALL

    200

    existing house

    LOWERROO

    2NDFLR.FINISH CL

    2NDFLR.FINISH FLO

    GFFINISH FLO

    HIGHEST ROO

    FIREWALL

    8000

    530

    1670

    2800

    2800

    200

    existing house

    e d

    LOWERROOFAPEX

    2NDFLR.FINISH CLNGLINE

    2NDFLR.FINISH FLOORLINE

    GFFINISH FLOORLINE

    NGL

    HIGHEST ROOFAPEX

    8000

    530

    1670

    2800

    2800

    200

    800800

    1600

    DESIGNATION

    DESCRIPTION

    QUANTITY

    MASTERS BEDROOM

    SLIDING/ DOUBLE SWING DOOR

    1

    d-1 D-2

    T&B

    SLIDING MIRROR DOOR

    1

    700

    2100

    1250

    800

    600

    DESIGNATION

    DESCRIPTION

    QUANTITY

    MASTERS W-I-C, MAIDS BEDRM

    SLIDING/ DOUBLE SWING DOOR

    2

    W-1 W-2

    SERVICE AREA & MAIDS RM

    SLIDING WINDOW

    3

    D-3

    MAIDS ROOM

    SOLID SLIDING WOOD

    1

    700

    2 1 0 0

    900

    1200

    900

    DOORS

    WINDOWS1GROUND FLOOR PLAN

    2SECOND FLOOR PLAN

    3ROOF PLAN

    4GF REFLECTED CLNG PLAN

    52F REFLECTED CLNG PLAN

    6FRONT ELEVation

    7right-side ELEVation

    7rear ELEVation

    9right-side ELEVation

    7SCHEDULE OF DOORS AND WINDOWS

    LOCATION:

    DESIGNEDBY:

    CADDBY:

    DATE:

    PROJECT TITLE/LOCATION OWNER SHEET CONTENT

    A.

    B.

    C.

    D.

    E.

    F.

    DRAWING STATUS:

    1

    2

    3

    REVISIONS DATE: DRAWING NU

    ZA.NARANJO

    ZA.NARANJO

    ADDRESS:

    PRCNO:

    TIN NO: FOR PERMIT

    PRC NO: PTR NO:

    TIN NO:

    32339

    VALIDUNTIL:06-19-2017

    438-173-134

    PTR NO:

    DATEISSUED:

    ARCHITECT

    AR. ZHARDEI ALYSON V. NARANJO

    4770452

    LOCATION:

    1-21-2015

    MAKATI CITY

    VALIDUNTIL: DATEISSUED:

    LOCATION:BLK 12 LOT36 BELLEFORTESTATES MOLINO, BACOOR 4 CITY 2NDFLR. TATLONG HARI BLDG., LASPINASCITY

    PROPOSED HOUSE EXTENSION VRB TRAVEL TOURS &

    TRANSPORT CORP

    FLOOR PLANS

    ELEVATIONS

    DOORSANDWINDOWSSCHEDULE

    -

    -

    -

    -

    -

    -

    A