Hoch ber dem Rheintal liegt das dreige-
schossige Einfamilienhaus eingebettet in
den Hang des Berges Hochwang. Der Ar-
chitekt entwarf innerhalb der engen Gren-
zen des Bebauungsplanes von Bearth und
Deplazes einen Kubus, der mit einer virtuo-
sen Raumfolge aufwartet vom Wohnraum
mit grandiosem Ausblick auf Chur und die
Berge bis hinunter zur grozgigen Wohn-
kche, an die der Garten anschliet.
Dabei verwendet er nur wenige, fast rohbelassene Materialien wie unbehandelten
Beton und massives Nussbaum- oder Lr-
chenholz.
Die eigentliche Besonderheit dieses Wohn-
hauses liegt allerdings in seiner monoli-
Wohnhaus in Chur
House in Chur
Architekt und Tragwerksplaner:
Patrick Gartmann, Chur
SectionsFloor plans
scale 1:400
1 Courtyard
2 Entrance3 Living room
SchnitteGrundrisseMastab 1:400
1 Hof
2 Eingang3 Wohnzimmer
4 Schlafzimmer 5 Bad 6 Arbeitszimmer 7 Einliegerwohnung 8 Wohnkche
9 Technik10 Terrasse
4 Bedroom 5 Bathroom 6 Study 7 Apartment 8 Dining/kitchen
9 Services10 Terrace
thischen Bauweise. Hier wird plastische Ar-
chitektur nicht durch komplizierte mehrscha-
lige Konstruktionen erreicht, sondern nur
durch ein einziges Material: Beton. Je nach
statischen Anforderungen und notwendigen
Dmmwerten sind die Wnde und Decken
entweder in Normal- oder in Konstruktions-
dmmbeton ausgefhrt, wobei die Strke
der Auenbauteile zwischen 45 und 65 cm
variiert. So konnte allerdings auf Dampf-
sperren, Dmmschichten, Innen- und Au-enputz, selbst auf Blechverwahrungen
und Kies verzichtet werden.
Den neuartigen Dmmbeton entwickelte der
Architekt in Zusammenarbeit mit zwei Fir-
men. Dabei wird der Zuschlag Kies durch
Blhton ersetzt und Sand durch Blhglas.
Die Blhglaskgelchen sind, ebenso wie
Blhton, wrmedmmend und leicht. Zudem
sorgt ihre Kugelform fr gute Flieeigen-
schaften und soll unerwnschte chemische
Reaktionen im Beton verhindern, die zu
Abplatzungen und Rostbildung fhren. Le-
diglich eine kunststoffvergtete Zement-
schlmme, dauerelastisch und UV-bestn-
dig, schtzt die Betonoberflche im Bereich
des Dachs und der Fensterbnke vor ein-dringender Feuchtigkeit. Der vergleichs-
weise hohe Preis fr den Spezialbeton wird
durch eine vereinfachte Planung, wenige
am Bau Beteiligte und eine krzere Bauzeit
kompensiert.
aa
bb
Fotos:Thomas Dix/Architekturphoto
32 2006 1/2
-
7/25/2019 House in Chur
2/4
Site planscale 1:1500
LageplanMastab 1:1500
tricate multiple layering, but through the use of
a single, solid material concrete. Depending
on structural requirements or required insula-
tion values, the walls are made of either ordi-
nary concrete or insulation-grade structural
concrete. The outer walls are 45 cm thick
(U-value: approx. 0.58 W/m2K) and the roof
slab 6065 cm (U-value: approx. 0.4 W/m2K).
As a result no further layers were necessary
no insulation, no plaster, no render, not even
any metal flashing or gravel on the roof.The insulating concrete from which the house
was built was developed by the architect him-
self, in co-operation with two manufacturing
firms. In this new product, gravel was replaced
by expanded clay and sand by expanded
glass. Like the expanded clay, the expanded
glass pellets are insulating and lightweight.
Their shape promotes good flowability and is
necessary for controlling undesirable reactions
between the glass and the cement in the con-
crete that could lead to spalling and rust-for-
mation. No surface treatment was applied to
the concrete, except for on the roof, where a
UV-resistant, permanently elastic coat of plas-
tic-modified cement slurry was applied to pre-
vent moisture penetration. Although this spe-cial concrete cost about twice as much as
conventional concrete, savings were made in
terms of fewer trades on site, a shorter build
time and because the outer skin is only a sin-
gle-layer construction, not double.
High above the upper Rhine valley, on the
slopes of Hochwang mountain, is this three-
storey detached house. Situated within an
area subject to a rigorous development plan
by Bearth and Deplazes, this cuboid volume
unfolds inside in a virtuoso sequence of spac-
es from the living room at the top with a pic-
ture-book view of Chur and the mountains be-
yond to the large kitchen/dining room on the
ground floor, which has direct access to the
garden. Only a few materials were used in itsconstruction, most of them left untreated, for
example exposed concrete and solid walnut
and larchwood. The special feature of this
house, however, is its monolithic construction.
Its sculpted outer form is produced not by in-
2006 1/2 Dokumentation 33
-
7/25/2019 House in Chur
3/4
1
4
1 5
7
83
10
9
6
11
c c
10
5
2
Schnitte Mastab 1:20 1 Abdichtung Zweikomponenten-Feinspachtel
2 Dmmbeton 600 650 mm im Geflle 3 Dmmbeton 450 mm 4 Festverglasung ESG 12 + SZR 10 + Float 8 mm 5 Fubodenaufbau 2. OG: Stahlbeton 300 mm, mit Weizement und hellen
Zuschlagstoffen, Oberflche geschliffen, Fubodenheizung einbetoniert 6 Fenster in Holzrahmen 7 Entwsserungsrohr Edelstahl 20 mm 8 Fubodenaufbau 1. OG: Holzdiele Lrche 30/180 mm Lattung 50 mm auf Vlies Stahlbeton 220 mm 9 Fubodenaufbau EG:
Holzdiele Lrche 30/180 mm Lattung 50 mm auf Vlies Stahlbeton 200 mm Wrmedmmung Polystyrol 100 mm10 Glasschiebetr in Holzrahmen11 Heizungs- und Medienkanal
34 Wohnhaus in Chur 2006 1/2
-
7/25/2019 House in Chur
4/4
3 10
cc
Sections scale 1:20 1 sealant, 2-component fine
stopper
2 600650 mm insulating concreteto falls 3 450 mm insulating concrete 4 fixed glazing: 12 mm toughened
glass + 10 mm cavity + 8 mmfloat glass
5 floor construction second floor: 300 mm reinforced concrete
slab with white cement andpale-coloured aggregates,surface-sanded, underfloorheating concreted in
6 timber casement window 7 drainpipe 20 mm stainless steel 8 floor construction first floor: 30 180 mm larch boarding
50 mm battens on mat220 mm reinforced concrete
9 floor construction ground floor:
30 180 mm larch boarding50 mm battens on mat
200 mm reinforced concrete100 mm polystyrene thermal
insulation10 glass sliding door in timber frame11 heating and services conduit
2006 1/2 Dokumentation 35