House for architects and artists / AFGH
1
House for architects and artists / AFGH Architects: AFGH / Andreas Fuhrimann – Gabrielle Hachler ( Switzerland ) Clients: Andreas Fuhrimann, Gabrielle Hächler, Pipilotti Rist, Balz Roth Consutants: Reto Bonomo, Rüdin- gen ( Ing, ) , SJB.Kemptner.Fitze AG, Herisau ( H olzbauing. ) , Bau- physik Meier AG, Dällikon Project year: 2002-2003 Construction year: 2003-2004 Area: 1035 sqm Budget: $2,2M CHF ( USD$1,7M ) Common place and unrefined ma- terials such as concrete, timber, wood and galvanized steel were chosen, which animated each other when com- bined. Steps of 3d modeling Step 1 Step 2 Step 7 Step 8 Step 4 Step 5 Step 6 Step 3
-
Upload
vilma-gokaj -
Category
Documents
-
view
220 -
download
3
description
Poster of the 3D Modeling Project, House for architects and artists / AFGH
Transcript of House for architects and artists / AFGH
House for architects and artists / AFGH
Architects: AFGH / Andreas Fuhrimann – Gabrielle
Hachler ( Switzerland )
Clients: Andreas Fuhrimann, Gabrielle Hächler, Pipilotti Rist, Balz
Roth
Consutants: Reto Bonomo, Rüdin-
gen ( Ing, ) , SJB.Kemptner.Fitze
AG, Herisau ( H olzbauing. ) , Bau-
physik Meier AG, Dällikon
Project year: 2002-2003
Construction year: 2003-2004
Area: 1035 sqm
Budget: $2,2M CHF ( USD$1,7M )
Common place and unrefined ma-
terials such as concrete, timber, wood
and galvanized steel were chosen,
which animated each other when com-