HOT Lanes on I-77Widen I-77 Goes To Raleigh
Apr 3, 2013
![Page 2: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/2.jpg)
What is a HOT lane?
Vehicles w/three or more occupants use lane for free
All others pay toll electronically “Congestion pricing” Designed, built, operated, financed
for profit by a private company (P3) 50 year contract Trucks prohibited
![Page 3: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/3.jpg)
The Problem
Congestedstretch of four lane road from exit 23 to
exit 36
![Page 4: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/4.jpg)
A GP Lane Estimate
Source: “I-77 HOT Discussion with Cornelius Town Board”, email from Bill Coxe to Andrew Grant, Oct. 10, 2012
A ballpark cost for two GP lanes from exit 23 to exit 36:
$80- $130M
![Page 5: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/5.jpg)
The Current HOT Lane Proposal
Source: “I-77 HOT Lanes Project Overview NCSITE Lunch N’ Learn”, August 21, 2012; “I-77 Widening Update”, MUMPO (Bill Coxe), Sept 19, 2012; “Billions invested in Roads”, Charlotte Observer, Jan 14, 2013
27.5 Miles of HOT Lanes
Cost: $550 Million
![Page 6: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/6.jpg)
GP vs HOT
HOTGP
27.5 Miles
$550M
13 Miles
$80- 130M (est)
![Page 7: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/7.jpg)
Why the difference?
Source: RFP
Majority of travel time
savings
Majority of Cost
![Page 8: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/8.jpg)
HOT Lanes and Congestion
HOT lanes rely on congestion
“Congestion Pricing” means more congestion = more toll revenue
![Page 9: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/9.jpg)
HOT Lane Revenues
Source: “Managed Lanes: More than a Revenue Tool”, Parsons Brinkerhoff, 2013
![Page 10: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/10.jpg)
Some other factoids
Automated Vehicle Occupancy Verification…
…doesn’t exist
MAP 21 Legislation… Grants categorical exclusion to every capacity
addition within the existing ROW…
Puts GP lanes on same legal footing as toll lanes
![Page 11: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/11.jpg)
Toll Lanes on I-77:
1. Cost much more than GP lanes
2. Ensure congestion instead of relieving it
3. Limits our ability to make future I-77
improvements
4. Locks us into an agreement with a private
company for 50 years
5. Will negatively impact our economy
![Page 12: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/12.jpg)
So what did Raleigh have to say about all
this?
![Page 13: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/13.jpg)
Speaker Thom Tillis on Tolling I-77
"I think the takeaway is that… the choice is (a high-occupancy toll lane) project ... or no improvements to I-77 for 15 or 20 years."
Source: “Tillis: Toll Lanes or Wait 20 Years for I-77 Widening”, LKN Citizen, March 27, 2013
![Page 14: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/14.jpg)
What else are y’all worried
about?We’re going to have to look at alternative revenue sources…
We can’t actually discredit the effort to use toll roads by going out and starting to backtoll existing roads.
Speaker Thom Tillis on Tolling I-95
… because if it happens to I-95…
We’re not going to toll I-95.
…why wouldn’t it work for 77?
…sales taxes subject to a vote of the people……We understand how this affects your industry…
…Retail industry, everybody else…
…We’ve got to do it in a smart, responsible way.
![Page 15: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/15.jpg)
If tolls won’t work on I-95, why will they
work on I-77?
![Page 16: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/16.jpg)
According to Speaker Tillis…
Fiscal Realities State doesn’t have the money Fuel tax receipts are declining
Political Realities Federal Local State
![Page 17: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/17.jpg)
The State Has No Money
![Page 18: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/18.jpg)
NC’s First Toll Road…
In twenty years the TriEx is projected to carry half the traffic I-77 does today.
Source: Toll Road News, Dec 29, 2012
![Page 19: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/19.jpg)
Gas Tax Receipts
![Page 20: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/20.jpg)
Cost Breakdown I-77 Toll Lanes -$M
Source: “Billions invested in Roads”, Charlotte Observer, Jan 14, 2013
$170
$380
Public
Private
![Page 21: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/21.jpg)
Toll Lanes vs GP Lanes
So there is enough public money. But can we use it for GP lanes?
GP lanes:$80- $130M
$170
$380
$170M
Public Funds:
![Page 22: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/22.jpg)
According to Speaker Tillis…
Fiscal Realities State doesn’t have the money Fuel tax receipts are declining
Political Realities Federal Local State
![Page 23: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/23.jpg)
HOT Lane Funding- Federal
Source: NCDOT
State FederalState Mobility 28CMAQ 1 12NHPP 13 117
Total 42 128
Source ($M)
What do the Feds Say?
![Page 24: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/24.jpg)
From the NCDOT
Q: “Does Federal funding (NHPP) receive a higher priority due to HOT lanes?”
A: ”We are going to get the same amount… from the feds funding regardless of what projects we build. The feds play no part in the selection process for projects that use NHPP funding.”
Source: NCDOTSo the Feds are a non-issue…
![Page 25: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/25.jpg)
According to Speaker Tillis…
Fiscal Realities State doesn’t have the money Fuel tax receipts are declining
Political Realities Federal Local State
![Page 26: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/26.jpg)
The Buck Stops Where?
Davidson Mayor John Woods: “We are
under the direction of the state. The town of Davidson doesn't manage I-77, nor does the City of Charlotte, Mecklenburg County or Iredell County.”
-Huntersville Herald, Jan 31, 2013
Speaker Thom Tillis: The state doesn't decide where to spend money in the regions. Rather those decisions rest in the hands of (MUMPO).
-Lake Norman Citizen, Mar 27, 2013
![Page 27: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/27.jpg)
MUMPO Priority #93
Source: 2035 LRTP
![Page 28: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/28.jpg)
Speaker Tillis on MUMPO
“Unless the local entity prioritizing roads changes that (prioritization), the only way you could potentially move up is to move other things down.“- Mar 27, 2013 (emphasis added)
Well Guess What…
![Page 29: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/29.jpg)
MUMPO Criteria Are A’ Changin’!
Source: Potential LRTP Roadway Project Priortization Process, RS&H, Feb 2, 2013
2/3 of possible points
1/3 of possible points
![Page 30: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/30.jpg)
MUMPO Tier 1
Highly Negative Highly Positive
Impact on I-77 GP Lanes Priority
Source: Potential LRTP Roadway Project Priortization Process, RS&H, Feb 2, 2013; MUMPO LRTP Roadway Ranking Methodology, approved 11/14/07
Tier 1 Criteria Old NewReduces Congestion 9% 33%Safety 9% 20%Accesses Employment Centers 9% 13%
Score Weighting
![Page 31: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/31.jpg)
MUMPO Tier 2
Highly Negative Highly Positive
Impact on I-77 GP Lanes Priority
Tier 2 Criteria Old NewProvides Benefits > Project Costs 9% 17%System Connectivity 0% 5%Supports Local Land Use 9% 3%Impacts on Natural Environment 14% 3%Supports Low Income/Minority Communities9% 3%Historic Resource 0% 3%Accesses Transit 9% 0%Center City 9% 0%Impacts Air Quality 9% 0%Intermodal Connectivity 9% 0%
Score Weighting
Source: Ibid.
I-77 General Purpose Lanes Poised to Be Much Higher Priority
![Page 32: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/32.jpg)
A Question
IF… …the 50 year P3 contract is supposed to
be signed by Dec 2013 BUT… …the new MUMPO ranking won’t be
completed until May 2014, THEN…
Shouldn’t we wait four months for the new MUMPO rankings before signing a 50 year contract?
Toll Lanes WILL be an Election Issue in November…
![Page 33: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/33.jpg)
According to Speaker Tillis…
Fiscal Realities State doesn’t have the money Fuel tax receipts are declining
Political Realities Federal Local State
![Page 34: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/34.jpg)
NCDOT on Toll Lanes
“My perspective on why express (toll) lanes should be how we add future capacity to all our interstates is founded on… the reality of declining revenue….”
-James Trogdon, COO NCDOT (emphasis added)
![Page 35: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/35.jpg)
Mobility Fund Criteria Weighting
Mobility Cost-Benefit measured by the estimated travel time
savings the project will provide divided by the cost to the Mobility Fund.
Multimodal/Intermodal measured by whether the project
provides an improvement to more than one mode of transportation
80%
20%
Weighting
HOT Lanes are worth an extra
The State of North Carolina WANTS to Build Toll Lanes
Source: Connect NCDOT
![Page 36: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/36.jpg)
Mobility Funding
Source: “Mobility Fund Project Scoring,” NCDOT, 2012
![Page 37: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/37.jpg)
Speaker Tillis on Tolls
"That option (to use mobility fund transfer money on I-77) is not on the table," Tillis said.
"If Wilmington, for example, says, 'We are ready for a managed lane project, let's take the mobility fund money and transfer it for that use if (the Lake Norman area) isn't ready to do that," the money will go there.
![Page 38: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/38.jpg)
Where’s Wilmington?
![Page 39: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/39.jpg)
State Priority- As Is
What if MUMPO Supported GP Lanes?Source: Prioritization Scores for Roads, NCDOT
Quantitative TotalScore Division MPO/RPO MULTI Score
1 Independence Blvd
U-2509Hayden Way to Krefeld Dr. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
39.44 100 100 11 80.44
2 Independence Blvd
U-2509Krefeld Dr to Village Lake Dr. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
35.84 100 100 11 76.84
3 Independence Blvd
U-2509NC 51 to Hayden Way. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
35.34 100 100 11 76.34
4 I-77 I-4750A
SR 5544 (West Catawba Avenue) to I-40. Widen and Reconstruct Roadway. Section A: SR 5544 (West Catawba Ave) to US 21 in Iredell County).
41.14 100 52 8 74.34
5 Independence Blvd
U-2509Village Lake Dr to Conference Dr. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
33.18 100 100 11 74.18
6 Independence Blvd
U-2509I-485 to NC 51. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
40.75 100 0 11 71.75
7 I-77 I-3311B5th Street in Charlotte to SR 5544 (West Catawba Avenue). Additional Lanes. Section B: I-485 to SR 5544 (West Catawba Avenue)
51.64 100 0 0 71.64
8 I-26 I-4700BNC 280 to I-40 at Asheville. Add Additional Lanes. Section B: NC 146 (Long Shoals Road) to I-40.
39.47 100 100 0 69.47
9 US401 U-5302 Short term improvement. Superstreet. 47.05 85 50 0 69.05
10 NC024Construct at four-lane freeway with a two-lane service road. Service Road will have sidewalks and paved shoulders.
25.41 100 100 13 68.41
PoliticalPriority
![Page 40: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/40.jpg)
State Priority w/MUMPO Priority
With Local Support, I77 Moves to the Top of the List…
Quantitative TotalScore Division MPO/RPO MULTI Score
1 I-77 I-3311B5th Street in Charlotte to SR 5544 (West Catawba Avenue). Additional Lanes. Section B: I-485 to SR 5544 (West Catawba Avenue)
51.64 100 100 0 81.64
2 Independence Blvd
U-2509Hayden Way to Krefeld Dr. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
39.44 100 100 11 80.44
3 I-77 I-4750A
SR 5544 (West Catawba Avenue) to I-40. Widen and Reconstruct Roadway. Section A: SR 5544 (West Catawba Ave) to US 21 in Iredell County).
41.14 100 100 8 79.14
4 Independence Blvd
U-2509Krefeld Dr to Village Lake Dr. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
35.84 100 100 11 76.84
5 Independence Blvd
U-2509NC 51 to Hayden Way. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
35.34 100 100 11 76.34
6 Independence Blvd
U-2509Village Lake Dr to Conference Dr. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
33.18 100 100 11 74.18
7 Independence Blvd
U-2509I-485 to NC 51. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
40.75 100 0 11 71.75
8 I-26 I-4700BNC 280 to I-40 at Asheville. Add Additional Lanes. Section B: NC 146 (Long Shoals Road) to I-40.
39.47 100 100 0 69.47
9 US401 U-5302 Short term improvement. Superstreet. 47.05 85 50 0 69.05
10 NC024Construct at four-lane freeway with a two-lane service road. Service Road will have sidewalks and paved shoulders.
25.41 100 100 13 68.41
PoliticalPriority
![Page 41: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/41.jpg)
State Priority Based on Merit
Competing on Merit, There’s a Clear Winner…
Quantitative TotalScore Division MPO/RPO MULTI Score
1 I-77 I-3311B5th Street in Charlotte to SR 5544 (West Catawba Avenue). Additional Lanes. Section B: I-485 to SR 5544 (West Catawba Avenue)
51.64 100 100 0 81.64
2 I-77 I-4750A
SR 5544 (West Catawba Avenue) to I-40. Widen and Reconstruct Roadway. Section A: SR 5544 (West Catawba Ave) to US 21 in Iredell County).
41.14 100 100 0 71.14
3 I-26 I-4700BNC 280 to I-40 at Asheville. Add Additional Lanes. Section B: NC 146 (Long Shoals Road) to I-40.
39.47 100 100 0 69.47
4 Independence Blvd
U-2509Hayden Way to Krefeld Dr. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
39.44 100 100 0 69.44
5 US401 U-5302 Short term improvement. Superstreet. 47.05 85 50 0 69.05
6 Independence Blvd
U-2509Krefeld Dr to Village Lake Dr. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
35.84 100 100 0 65.84
7 Independence Blvd
U-2509NC 51 to Hayden Way. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
35.34 100 100 0 65.34
8 Independence Blvd
U-2509Village Lake Dr to Conference Dr. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
33.18 100 100 0 63.18
9 Independence Blvd
U-2509I-485 to NC 51. Upgrade corridor to provide additional capacity and safety. Feasibility Study underway.
40.75 100 0 0 60.75
10 NC024Construct at four-lane freeway with a two-lane service road. Service Road will have sidewalks and paved shoulders.
25.41 100 100 0 55.41
PoliticalPriority
![Page 42: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/42.jpg)
Speaker Tillis on Tolls
Toll lanes or no lanes for 20 years
No Mobility Funds
No Support from MPO
![Page 43: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/43.jpg)
I-77 Is Just the Beginning
ESTIMATED CAPITAL COST
ESTIMATED REVENUE
ESTIMATED O & M COST
ESTIMATED REVENUE
ESTIMATED O & M COST
I-85 NORTH 30$550,000,000 TO $1,200,000,000
$1,000,000 TO $4,000,000
$13,000,000 $3,000,000 TO $17,000,000
$21,000,000 ?
I-77 NORTH 21$250,000,000 TO
$500,000,000$5,000,000 TO $25,000,000
$9,000,000 $10,000,000 TO
$60,000,000$15,000,000 PRIVATE
US-74 EAST 12$225,000,000 TO
$700,000,000$2,000,000 TO $11,000,000
$6,000,000 $6,000,000 TO $20,000,000
$8,000,000 ?
I-85 SOUTH 28$750,000,000 TO $1,700,000,000
$6,000,000 TO $27,000,000
$12,000,000 $20,000,000 TO
$95,000,000$20,000,000 ?
NC-16 NORTH 10$175,000,000 TO
$200,000,000$1,000,000 $4,000,000
$1,000,000 TO $3,000,000
$6,000,000 ?
I-77 SOUTH 12$500,000,000 TO
$800,000,000$1,000,000 TO
$5,000,000$5,000,000
$3,000,000 TO $23,000,000
$9,000,000 ?
I-485 SOUTH 15$400,000,000 TO
$700,000,000$2,000,000 TO $14,000,000
$6,000,000 $3,000,000 TO $15,000,000
$13,000,000 ?
I-485 WEST 10$225,000,000 TO
$375,000,000NA $4,000,000
$1,000,000 TO $2,000,000
$9,000,000 ?
I-485 NORTHEAST 6$175,000,000 TO
$300,000,000NA $2,000,000 $1,000,000 $5,000,000 ?
YEAR 2013 YEAR 2030CORRIDOR LENGTH (MILES)
CHARLOTTE AREA
PUBLIC / PRIVATE
Source: Charlotte Region Fast Lanes Study, Presentation to NCTA, Mar 3, 2011
![Page 44: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/44.jpg)
NCDOT Sources of Funding
![Page 45: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/45.jpg)
Toll Roads are a Poor Way to Pay for Construction
Operating Costs & Profit Pennies on the dollar goes toward
construction Only those willing/able to pay extra
will have access to good infrastructure and yet…
…NCDOT is looking at $40B+ in toll revenues from 2020- 2040
Source: NCDOT 2040 Plan
![Page 46: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/46.jpg)
Summarizing
All the necessary elements are coming together to build GP lanes… Funding ($170M) Local priority (MUMPO) Enabling environmental legislation (MAP
21)
…except the State of North Carolina wants to build toll roads
So why does Thom Tillis want to build toll lanes?
![Page 47: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/47.jpg)
What Can I Do?
Call/email Thom Tillis: [email protected]
Follow us wideni77.org and FB Sign the petition Take a petition Vote!
![Page 48: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/48.jpg)
Appendix
![Page 49: HOT Lanes on I-77 Widen I-77 Goes To Raleigh Apr 3, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022062804/56649efe5503460f94c12df9/html5/thumbnails/49.jpg)
AccessPoint
(1 req’d)
AccessPoint
(1 req’d)
Westmoreland & Hambright Bridges (to be replaced)
Access Points