Hostile and Pre-Operational Surveillance Mike Moll Protective Security Advisor, DHS.

21
Hostile and Pre-Operational Surveillance Mike Moll Protective Security Advisor, DHS

Transcript of Hostile and Pre-Operational Surveillance Mike Moll Protective Security Advisor, DHS.

Hostile and Pre-Operational Surveillance

Mike Moll Protective Security Advisor, DHS

Do Terrorist Cells exist in the U.S.?

--Yes?

--No??

Maybe??

Real World Examples--Middle-Eastern individual asking “suspicious questions” at a large

chemical facility

--White Male and Female engage in Suspicious Surveillance photography/videotaping of large chemical facility

--Two middle-eastern males taking pictures at a school bus garage

--Three middle-eastern males walk into a hospital in Michigan and ask, “Where are the children kept?” and “Where are the Muslims?”

--Three middle-eastern males driving up to a nuclear plant at a high rate of speed, doing a “Chinese Fire-Drill”, yelling “Allah Akbar” and leaving at a high rate of speed….

How do you mitigate Terrorism?--Can you???

--Yes

--Financially

--Understand CIKR Vulnerability

--Raise the vigilance level of the American Public

--Teach timely and accurate reporting

--Focus on training at the pre-primary levels and continue on through to the High School years

Enhanced Critical Infrastructure Protection (ECIP) Facility Dashboard

November 2009

Infrastructure Survey Tool (IST)Development Began in June 2008

Pilot (Summer 2008) Version 1 (Fall 2008) Version 2 (Summer 2009)

Web-based Tool Collects Data Streamlines data collection Oracle back end database Supports analysis and Dashboard

Major Principles Simply a survey of existing protective

measures in place at the facility Gathers data at the weakest point for

any particular protective measure (e.g., the shortest part of the fence or the one gate with the single lock)

6

Resulting Protective Measures Index (PMI) is calculated using the relative importance assigned to each protective

measure attribute by a team of subject matter experts

Protective Measures Index (PMI) - Review

Based on Six “Level 1 Components” 1. Physical Security

2. Security Management

3. Security Force

4. Information Sharing

5. Protective Measures Assessment

6. Dependencies

Each of these components is based on “Level 2 Components”

Level 2 Components are, in turn, based on the most detailed asset characteristics, which are “Level 3 Components” for the facility (at the weakest point)

7

8

IST Level 1 and Level 2 Components

Fences Gates Closed circuit television (CCTV) Intrusion detection systems (IDS) Parking Access control Security lighting Vehicle access control Building envelope

For Example, There Are 9 Physical Security Level 2 Components:

9

Level 3 Components Affect Vulnerability (Fences Example)

Fence Protective Measures Index = f (fraction enclosed, type, height, base anchored, other fence characteristics)

FPMI = f (z1, z2, ..., zn) = bi * zi

n

Σi = 1

FPMI is a protective measures index of fence security going from 0 (less secure) to 100 (more secure), the zi represent specific levels of achievement for the

factors that increase fence security (e.g., height, type, characteristics), and the b i are scaling constants (weights) that specify the relative importance of the factors.

(Note: the equation may take on a different form)

10

Additional information can be found at Constructing Vulnerability and Protective Measures Indices for the Enhanced Critical Infrastructure Protection Program by R.E.

Fisher, W.A. Buehring, et al., October 1, 2009.

7-foot aluminum chain-link fence

Anchored base

Outriggers, 45 degree

Barbed wire

Clear zone, free of objects

Fence Protective Measures Index = 60

Fences PMI Example

Wood fence 6-foot height

Partial clear zone

Fence Protective Measures Index = 13

11

Comparing Facility and Subsector

Facility PMI

12

Subsector Maximum

Subsector Average

Subsector Minimum

Overall Facility PMI

Dashboard – Overall Tab

“Overall” tab shows the overall facility PMI and the PMIs for each major component (Level 1) of the facility PMI (blue bar) and the low, average, and high PMI for the subsector (dots). Touch on the bar or dots to see the exact PMI figures.

13

Dashboard – Component Screens

Level 2

Components

Level 3

Data

Level 3

Component PMI

• Overall PMI Bar

•Level 1 PMI Bar

•Level 2 PMI Dial

Tabs – Level 1

14

Dashboard Interpretation The Dashboard is a way to display facility-specific information

obtained through the ECIP Shows the PMI calculations for each component of the IST

PMI has a constructive sense in that it increases (gets better) as protective measures are added

The Dashboard shows the difference between the individual facility’s specific PMI and the average PMI for other like facilities (usually the critical infrastructure subsector)

The product should not give the impression that the subsector average PMIs are indicative of desired or adequate performance

15

Dashboard Interpretation (cont’d)The Dashboard draws attention to components that are well below or

well above the subsector average and may deserve additional study.

There may be very good reasons why a facility has a component PMI that is below subsector average.

Example: An urban facility where parking is allowed on the street would result in a low standoff number; no additional facility action may be possible

May just note the vulnerability and consider other protective measures enhancements (e.g., additional CCTV along the facility street-side to identify suspicious vehicles)

Each facility is different and will mitigate vulnerabilities and implement protective measures based on an individualized assessment of risks taking into consideration threat, assets to be protected, and facility characteristics.

16

Dashboard is a Tool

The Dashboard is simply a tool, and the PMI is simply a reflection of existing protective measures at the facility, not a definitive determination of facility vulnerability.

DHS is not advocating that any particular protective measures be installed/utilized at a facility based solely on the relative impact to the facility’s PMI reflected in the scenario element of the Dashboard.

It is recognized that not all protective measures are appropriate at every facility. Therefore, simply raising the PMI for a section in the Dashboard is not necessarily directly correlated to a reduction in vulnerability for a particular facility unless it is an appropriate measure that is properly integrated with the facility’s current security posture and effectively implemented.

17

How Do You Receive an IST?--Based on CIKR Thresholds

--Contact Me to Arrange

--Takes at least 4 to 6 hours

--Need Security Director, IT, Facilities at a minimum

--Facility owner/operator will get a look prior to submission

--All information is protected from FOIA/Sunshine, etc…

QUESTIONS?

Mike MollProtective Security Advisor

616-454-5243 Work616-283-8772 Cell

[email protected]