Host key: 232337 · PDP annual customer meeting Thursday, May 31, 2018 From: Law, Diane (CONTR) To:...
Transcript of Host key: 232337 · PDP annual customer meeting Thursday, May 31, 2018 From: Law, Diane (CONTR) To:...
-
Hello,
WAPA DOE1 invites you to join this WebEx meeting.
PDP annual customer meetingThursday, May 31, 2018
From: Law, Diane (CONTR)To: Gonzalez, XavierSubject: FW: [EXTERNAL] WebEx meeting invitation: PDP annual customer meetingDate: Thursday, May 3, 2018 6:55:49 AMAttachments: WebEx_Meeting.ics
webex instructions.docx
Hi Diane,
Please see the attachment for claiming the host role. This will allow you to take the host roleafter you have joined as a participant and remove the need to contact WITCC to have the hostrole passed on to you. If you have any questions or concerns, please feel free to reach out tous. Have a great day.
Host key: 232337
Thanks,Monica Hobson | Call CenterVision Technologies Contractor to Western Area Power Administration | Headquarters(O) [email protected]
Diane M. Law | Administrative Support/Team LeadMIRACORP on contract toWestern Area Power Administration | Desert Southwest Region(O) 602.605.2664| (F) 602.605.2410Join us on Twitter
From: WAPA DOE1 [mailto:[email protected]] Sent: Thursday, May 3, 2018 6:29 AMTo: Law, Diane (CONTR) Subject: [EXTERNAL] WebEx meeting invitation: PDP annual customer meeting
USE SAME WEBEX INFO FOR PDP AOP CUSTOMER MEETING (10am PDT) & BCP MASTER SCHEDULE CUSTOMER MEETING (11:30am PDT)
mailto:[email protected]:[email protected]:[email protected]://twitter.com/WesternAreaPowrBEGIN:VCALENDARPRODID:-//Microsoft Corporation//Outlook 10.0 MIMEDIR//ENVERSION:2.0METHOD:REQUESTBEGIN:VTIMEZONETZID:Mountain TimeBEGIN:STANDARDDTSTART:20160401T000000TZOFFSETFROM:-0700TZOFFSETTO:-0700TZNAME:Standard TimeEND:STANDARDEND:VTIMEZONEBEGIN:VEVENTATTENDEE;CN="";ROLE=REQ-PARTICIPANT;RSVP=TRUE:MAILTO:[email protected];CN="WAPA DOE1":MAILTO:[email protected];TZID="Mountain Time":20180531T090000DTEND;TZID="Mountain Time":20180531T130000LOCATION:https://doe.webex.com/doeTRANSP:OPAQUESEQUENCE:1525354111UID:c1b91535-9ca0-4daa-9ce2-8b74c221666cDTSTAMP:20180531T160000ZDESCRIPTION:\n\n\n\nJOIN WEBEX MEETING\nhttps://doe.webex.com/doe/j.php?MTID=mcb62593f8416db2f7bd72af18e3c4eed\nMeeting number (access code): 900 493 479\nMeeting password: dnTfUurp\n\n\n\nJOIN BY PHONE\n+1-415-527-5035 US Toll\n\n\n\nCan't join the meeting?\nhttps://help.webex.com/docs/DOC-5412\n\n\nIMPORTANT NOTICE: Please note that this WebEx service allows audio and other information sent during the session to be recorded, which may be discoverable in a legal matter. By joining this session, you automatically consent to such recordings. If you do not consent to being recorded, discuss your concerns with the host or do not join the session.\nX-ALT-DESC;FMTTYPE=text/html:
Join WebEx meetingMeeting number (access code): 900 493 479Meeting password:dnTfUurp
Join by phone
+1-415-527-5035 US Toll
Can't join the meeting?
IMPORTANT NOTICE: Please note that this WebEx service allows audio and other information sent during the session to be recorded, which may be discoverable in a legal matter. By joining this session, you automatically consent to such recordings. If you do not consent to being recorded, discuss your concerns with the host or do not join the session.SUMMARY:PDP annual customer meetingPRIORITY:5CLASS:PUBLICBEGIN:VALARMTRIGGER:-PT15MACTION:DISPLAYDESCRIPTION:ReminderEND:VALARMEND:VEVENTEND:VCALENDARHow to claim host rights using host key number
(No call to WITCC required)
1) When it’s time to join your WebEx, join as a participant.
2) Once you have joined the meeting, you will receive the pop up “Host Not in Meeting”. Click “OK”.
3) Go to Participant menu and select Reclaim Host Role – enter the six digit host key (This code will be provided to the meeting organizer by WITCC). You will now be the host and presenter
4) To eliminate the beeping when people enter and exit the WebEx, click on Entry and Exit Tone so a checkmark is not displayed. (optional)
2
xgonzalezHighlight
-
9:00 am | Mountain Standard Time (Arizona, GMT-07:00) | 4 hrsMeeting number (access code): 900 493 479Meeting password: dnTfUurp
Add to Calendar When it's time, join the meeting.
Join by phone+1-415-527-5035 US Toll Can't join the meeting?
IMPORTANT NOTICE: Please note that this WebEx service allows audio and other informationsent during the session to be recorded, which may be discoverable in a legal matter. By joiningthis session, you automatically consent to such recordings. If you do not consent to beingrecorded, discuss your concerns with the host or do not join the session.
https://doe.webex.com/doe/j.php?MTID=m9a310c930da0da66b6d48009cef9f075https://doe.webex.com/doe/j.php?MTID=mc04e9e2928bc75020460a4583f7bc2dfhttps://help.webex.com/docs/DOC-5412
-
Subject, Office or event
ANNUAL MASTER SCHEDULE PRESENTATIONBoulder Canyon Project
BCP Final Master Schedule Presentation
May 31, 2018
-
Subject, Office or event
Agenda
Boulder Canyon Project Annual Master Schedule Presentation 5/31/18
2
• Introduction• What is the BCP Master Schedule?• History of the BCP Master Schedule• DSW Federal Project Integration• The Hoover Portal
-
Subject, Office or event 3Boulder Canyon Project Annual Master Schedule Presentation 5/31/18
What is the BCP Master Schedule?• Required by Section 6.10 of BCP Electric Service Contracts
• The BCP Master Schedule is simply a 16-month planning tool
• It provides a 16-month forecast of:• Hoover unit outages• Availability of Hoover energy• Maximum generating capacity
• Three periods covered:• Draft 1: Mar 1 – Sep 30 (current FY)
Oct 1 – Jun 30 (next FY)• Draft 2: May 1 – Sep 30 (current FY)
Oct 1 – Aug 31 (next FY)• Final: Jun 1 - Sep 30 (current FY)
Oct 1 – Sep 30 (next FY)
-
Subject, Office or event 4Boulder Canyon Project Annual Master Schedule Presentation 5/31/18
History of the BCP Master SchedulePrior to March 1, 2013, WAPA mailed out a hardbound copy of the Final master schedule. 1st & 2nd drafts were emailed.
-
Subject, Office or event 5Boulder Canyon Project Annual Master Schedule Presentation 5/31/18
History of the BCP Master Schedule• For FY 2013 – FY 2017, all master schedules were
emailed• Contained same content as the hardbound master
schedules with updated data• FY 2018 (Post-2017) master schedule went from 74
pages to 135 pages. 15 contractors to 46 contractors.
• Hoover Portal not ready for FY 2018 master schedules, therefore PDFs were provided for download
• Hoover Portal operational for FY 2019 master schedules. Master schedule now 50 pages.
"X:\Resource\Resource Integration Exchange\FY 2018\BCP\FINAL Master Schedule FY2018\PDFs\FINAL HOOVER MASTER SCHEDULE FY18.pdf"
-
Subject, Office or event 6Boulder Canyon Project Annual Master Schedule Presentation 5/31/18
DSW Federal Project Integration Guidelines
• Current Integrated Operations• BCP• PDP• WALC
• DSW will Integrate the above projects to optimize resources and efficiently manage obligations
• DSW will compile two deviation accounts to track individual project resources and obligations
• BCP/PDP• PDP/WALC
-
Subject, Office or event 7Boulder Canyon Project Annual Master Schedule Presentation 5/31/18
DSW Federal Project Integration Plan• BCP/PDP
• Opportunities for PDP to provide energy to BCP will be identified and a forecast total for the year will be compiled (PDP Energy Banked into BCP)
• PDP Energy Banked into BCP will be returned to PDP in the months where PDP resources are less then PDP obligations
• PDP/WALC• Buy or sale decisions will be made based on combined PDP(including BCP Banking) & WALC resource and obligation position
• Allocation of energy purchase costs and sales revenue will be based on which side was resource long or short
• Allocation of reserve costs will based on needs and requirements of each side
-
Subject, Office or event 8Boulder Canyon Project Annual Master Schedule Presentation 5/31/18
The Hoover Portal
https://portal.wapa.gov/wapa-web-portal/login
• Request for Hoover Portal Login
• Name, email, phone #, company• If not employee of company, letter of
authorization
• Hoover Portal Website
-
Subject, Office or event 9Boulder Canyon Project Annual Master Schedule Presentation 5/31/18
The DSW Websitehttps://www.wapa.gov/regions/DSW/PowerMarketing/Pages/power-marketing.aspx
The official BCP Master Schedules will be stored in their entirety and available for download at the DSW Website.
-
Subject, Office or event 10Boulder Canyon Project Annual Master Schedule Presentation 5/31/18
The BCP Master Schedule
Questions??
-
Subject, Office or event
Contact Information
Xavier Gonzalez – (602) 605–2678
John Paulsen – (602) 605-2557
Email: [email protected]
11
Website: https://www.wapa.gov/regions/DSW/PowerMarketing/Pages/power-marketing.aspx
Parker‐Davis Project Annual Operating Plan Presentation 5/31/18