HOSPITAL PENAWAR
DEVELOPMENT AND IMPROVEMENT
2011
![Page 2: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/2.jpg)
IVF-Development & Improvement
PROGRESS
PROJECT DATELINE STATUS
Gas connection to machine--- Nasir
4 NOV WAITING FOR GAS SUPPLIER
Anaest Machine---Ahmad
19 NOV Brochure & quotation acquired
![Page 3: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/3.jpg)
IVF- Development & Improvement
ACTIVITIES
PROJECT DATELINE STATUS
IVF TALK OCT 29NOV 2NOV 9
DONE –23 attended2ND BATCH3rd BATCH (namelist with Diana)
FREE AD-FACEBOOK
OCT 28 DONE
LPPKN VISIT(by NOV 9)
Draft letter---NOV 2Call to make appt ---NOV 2
DONE by Bella (see email)
GP VISIT OCT 28---GP @ PG & Masai areaNOV 1---GP @ PG & Masai areaNOV 4---GP @ Tmn U & Skudai areaNOV 15---GP @Kota Tinggi areaNOV 17--GP @ Johor Jaya & Permas areaNOV 23---GP @ JB area
DONERescheduled
![Page 4: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/4.jpg)
IVF-Development & Improvement
PROJECT DATELINE STATUS
DIGITAL MARKETING BY EMAIL(by NOV 10)
Get data frm kpp & MedilinkNOV 1
Draft email NOV 2
DONE-- Data acquired
PUBLIC BOOTH TESCO SERI ALAMNOV 12
BULK MAILING– NGO(by NOV 16)
Draft letter &IVF leaflet job order NOV 11
DIGITAL MARKETING BY TELEMARKETING (FOLLOW-UP)(by NOV 25)
Get data frm deptNOV 14Data tracking NOV 18
![Page 5: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/5.jpg)
GP VISIT
• 28 OCT 2011• AIR BIRU PASIR GUDANGPOLIKLINIK PENAWAR---DR SHUKORPOLIKLINIK SEJAHTERA---DR
ZURAIDAHPOLIKLINIK ROZIKIN---DR ZAIDAH
(locum)
![Page 6: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/6.jpg)
FREE AD ---FACEBOOK
![Page 7: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/7.jpg)
OCT 2011
IMAGING DEVELOPMENT
![Page 8: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/8.jpg)
NEW GENERAL X-RAY• SITE PROGRESS
COMPLETED• # BARIUM PLASTERING • # LEAD GLASS FRAME • # WALL AND FLOOR TILE AT CONTROL
AREA• # LEAD DOOR
![Page 9: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/9.jpg)
NEW GENERAL X-RAY
LEAD DOOR &BARIUM PLASTER LEAD GLASS FRAME
![Page 10: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/10.jpg)
NEW GENERAL X-RAY
WALL & FLOOR TILE@ CONTROL PANEL
FLOOR TRUNKING
![Page 11: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/11.jpg)
NEW GENERAL X-RAY • IN PROGRESS
• # FLOOR TRUNKING• # TOILET DOOR• # ELECTRICAL JOB• # CEILING
![Page 12: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/12.jpg)
NEW GENERAL X-RAY• CONCEPT
# LAMINATE CEILING
# FLOORING – VINYL
# WALL – FANCY PAINTING
COMPLETION DATE : 15 NOV 2011
![Page 13: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/13.jpg)
NEW GENERAL X-RAY
• LICENSE
STATUS : LULUS BERSYARAT
# 25/10/11 KKM submission
1. APC Dr Nachiappan
2. APC Dr Zukri as Penyelia
3. Floor plan PP Masai as a new place for Old X-Ray
4. Dr Marlina time table
![Page 14: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/14.jpg)
BIOMED PROGRESS DEVELOPMENT
NOVEMBER 2011
HOSPITAL PENAWAR
![Page 15: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/15.jpg)
NEW ENT
![Page 16: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/16.jpg)
CONFIRM TO BUY
• LIGHT SOURCE› U9112 GL 350-5A PRICE RMB 4296› 2 LAMP XENON & HALOGEN
INCASE BREAKDOWN WE CAN SELECT 2ND LAMP
› ILLUMINATION >2000000LX• CAMERA SYSTEM
› U9226 F-168D PRICE RMB 17491› SCANNING STANDARD 600 LINES› CAMERA HEAD 1.3” SONY WATERPROOF› OUTPUT : BNC, Y, C, RGB, DVI, USB
![Page 17: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/17.jpg)
SUPPLIER
• CONTACT NAME– Colin Zhuang
• ADDRESS– Shanghai Medical Instrument
Impt.&Expt.Co.,LTD Tel: +86-021-65951875 Fax: +86-021-65951876 Mobile:86-13816132537 Email:[email protected],[email protected] Website:www.smicc.com
![Page 18: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/18.jpg)
ACTIVITY PROGRESS• PROFORMA INVOICE NEEDED
– 31/10/2011– USD 6575.00
• PURCHASE ORDER – DONE 1/11/2011
• TT PROGRESS– PASS OVER TO ERIN– 1/11/2011
• TARGET TT COMPLETE– 21 NOVEMBER 2011 ( WAITING EN AZIZAN )
![Page 19: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/19.jpg)
CCTV DEVELOPMENT
![Page 20: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/20.jpg)
CCTV DEVELOPMENT
• Purchase of material:
Avtech Dome Camera (RM95.00 x 10 unit) = RM950.00
CCTV cable (2 box)+ Cable Power (2 box) = RM390.00
BNC Connector & other equipment = RM226.50
H/disk 500gb+Connecter DC 30pcs = RM345.00
DVR = RM0.00
Monitor + Bracket = RM405.00
Power DB 5AMP (3 unit) = RM540.00
TOTAL = RM2,856.50
APPROVED BUDGET = RM3,100.00
![Page 21: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/21.jpg)
MATERIAL PURCHASED
![Page 22: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/22.jpg)
MATERIAL PURCHASED
![Page 23: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/23.jpg)
SCHEDULE PROGRESS
Work done 24-30 Oct 31-6 Nov 7-13 Nov-Planning Done- Drilling In progress Done- Cable installation: *Lift A *Lift B
Not started yet In progressIn progress
-Camera installation: *Lift A *Lift B
**
- Camera replacement (2 unit) *
- System test *
![Page 24: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/24.jpg)
Drilling
LIFT A
![Page 25: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/25.jpg)
Drilling
LIFT B
![Page 26: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/26.jpg)
PARADE IMPROVEMENT
![Page 27: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/27.jpg)
CURRENT LOCATION
![Page 28: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/28.jpg)
NEW LOCATION
![Page 29: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/29.jpg)
THIS WEEK TARGET
• Start on 4 November 2011:- P.A. system ready to use.- new location (Directors’ parking lot)- parade commander on stage- record by CCTV – David to change CCTV view
- QC will in-charge for the parade until further notice
• Content:- Pemeriksaan perbarisan (attendance/uniform)- Takhlim- Current issues
![Page 30: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/30.jpg)
HP NOVEMBER 2011DEVELOPMENT &
IMPROVEMENTLADY O&G
2nd ENT CLINIC1 November 2011
Gee / CS Team
![Page 31: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/31.jpg)
LADY O&G# Target October ~ 150 outpatient / 30 inpatient
# Achievement for October
1.Dr.Norlela ~ 25 outpatient / 1 inpatient
2.Dr.Geetha ~ 10 outpatient / 0 inpatient
# Failure to achieve target:
3.Attendance & commitment lady O&G doctor.
4.Night clinic & Sunday clinic by resident doctor ( Dr.Suhaimi ) close.
![Page 32: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/32.jpg)
LADY O&GDr.Norlela
4 Oct 9 o/p
6 Oct 5 o/p
11 Oct 9 o/p ~ 1 i/p
13 Oct 2 o/p
18 Oct On leave
20 Oct On leave
25 Oct – 30 Nov On leave
![Page 33: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/33.jpg)
LADY O&GDr.Geetha
1 Oct 1 o/p
2 Oct 0 o/p
8 Oct On leave
9 Oct On leave
15 Oct 2 o/p
16 Oct 3 o/p
22 Oct Emergency leave
23 Oct Emergency leave
29 Oct 4 o/p
30 Oct ( Dr. Han Sok Kit ) 0 o/p
![Page 34: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/34.jpg)
LADY O&G# Target November ~ 150 outpatient / 30
inpatient
# Target performance measures:
1. Full commitment from lady O&G
~ Night clinic open 6-10pm @ by Dr.Geetha
~ Sat/Sun clinic open 9-1pm @ by Dr.Geetha
2. Replacement lady doctor if Dr.Geetha emergency leave;
@ Dr.Han Sok Kit (010-7171151) or MO under Dr.Geetha
![Page 35: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/35.jpg)
LADY O&G
3 . Activities by CS DepartmentProject Dateline Status
1. Banner installation 1 Nov Done
2. Roster by Medical Unit 31 Oct Done
3. Digital Marketing by SMS 4 Nov - sorting data from Kpp- HP data - done
4. Digital Telemarketing “Delivery” 11 Nov - sorting data from Kpp- HP data - done
5. Website Update “ Delivery Package & Lady O&G”
2 Nov - Draft done
6. Visit GP Clinic 1 Nov 8 Nov 15 Nov17 Nov23 Nov
- PG & Masai area- Taman U & Skudai area- Kota Tinggi area- Johor Jaya & Permas area- JB area
![Page 36: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/36.jpg)
LADY O&G • Comparison Total Patient O&G
Month 2011
Dr.Suhaimi
Dr.Norlela Dr.Geetha Total
July 493 493
August 382 8 23 413
September
387 24 31 442
October 456 26 10 492
![Page 37: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/37.jpg)
LADY O&G – Colposcopy (3 Oct 2011)
![Page 38: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/38.jpg)
LADY O&G - clinic
![Page 39: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/39.jpg)
LADY O&G - ultrasound
![Page 40: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/40.jpg)
2nd ENT CLINIC • Waiting for new light source & camera set
@ incharge by Ahmad
~ 31 October 2011 @ no progress
![Page 41: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/41.jpg)
2nd ENT CLINIC (3 Oct 2011)
![Page 42: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/42.jpg)
2nd ENT CLINIC – work station (3 Oct)
![Page 43: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/43.jpg)
DIALYSIS : KKM LICENSE SUBMISSION
![Page 44: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/44.jpg)
• Try to contact and visit Dialysis Center to find out SRN with Dialysis Certificate.
• Progress:- Already approach SRN Rohana (ex- staff
HP) but she demand for salary up to RM3K.
- Interviewed SRN done on 15th October 2011with Matron Marziah.
- Candidate experience at Kulai Rotary Dialysis Centre – 6 month
STAFFING
![Page 45: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/45.jpg)
NO DIALYSIS CENTRE VISITING/ CALL
STAFFING REMARK
1 BP RENAL CARE (RENGIT) SDN BHD
Visit 3 SRN, 2 AIDE 1 – Post Basic Renal-For licensing
2 Johor Quarries Association Dialysis,Johor Jaya
Visit 8 SRN 2 – post Basic Renal – 1 for licensing
3 Prima Dialysis Centre, Masai
Visit 4 SRN- 1in charge for license
1 – Post Basic Renal – 1 for licensing
4 Nefro Utama Sdn Bhd,Bandar Baru Uda
Call 10 SRN 2 – Post Basic renal – 1 for licensing
5 Pusat rawatan dialisis yayasan pembangunan keluarga,permas jaya
Call 10 SRN 4 AIDE 3 – post Basic renal - 1 license,2 (bond)
PROGRESS
![Page 46: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/46.jpg)
NO DIALYSIS CENTER VISIT/CALL STAFFING REMARKS
6 JB- Lions Medical Charity, Taman Sri tebrau
Call 5 SRN , 2 Aide
1 – SRN Post Basic
7 JJ Lion Dialysis centre,Taman Johor Jaya
Call 3 SRN, 1 Aide
No Post Basic
![Page 47: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/47.jpg)
• Requirement from NKF• Fees
RM 4,500.00•
DurationPeriod of training is 6 months
•Entry RequirementsMust be a registered staff nurse/medical assistant, preferably with 6 months working experience in a haemodialysis unit
• Must have full secondment and a form of endorsement from their relevant authority
• Hepatitis Status – must be negative
* Intake on January and August every year
PROGRESS
![Page 48: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/48.jpg)
• MOH Requirement• Fees
RM 3,500.00
• DurationPeriod of training is 6 months
• Entry RequirementsMust be a registered staff nurse/medical assistant, preferably with 6 months working experience in a haemodialysis unit
• Hepatitis Status – must be negative
• Closing date for course intake January’12 - September
• * Intake on January and July every year
![Page 49: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/49.jpg)
NEUROSURGERY
![Page 50: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/50.jpg)
PROGRESS• Letter to Director of Hospital Sultanah
Aminah ready and prepared by Pn Hjh Norizan.
• Will send the letter to Director on Thursday 01st November 2011
![Page 51: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/51.jpg)
PROGRESS• Letter already send and pass it to Ms
Hafilna PA, of Director, Hospital Sultanah Aminah by Tuesday -01st November 2011.
• Will follow up with her to get approval for attachment.
![Page 52: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/52.jpg)
MAINTENANCE RESOLVE 90%
SEPTEMBER
![Page 53: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/53.jpg)
Reference from M.O.D September report• Sekeliling bangunan• No. Report date Report Status• 1 16/9/2011 Air sinki café berlimpah ok
• 2 16/9/2011 Sampah banyak di kaki lima The Shoppe
• 3 16/9/2011 Mentol lampu pintu masuk hadapan tiada ok
• 4 16/9/2011 Lampu taman depan The Shoppe terbakar
• 5 16/9/2011 Lampu taman main entrance tak hidup ok
• 6 16/9/2011 Sebahagian Galery terlindung dengan bahan projek ok
• 7 20/9/2011 5 bulb lampu tiang terbakar ok
• 8 20/9/2011 A&E bulb terbakar ok
• 9 20/9/2011 Bumbung laluan kaki dari kafe tanggal ok
• 10 21/9/2011 Puntung rokok bertaburan dari The Shoppe ke A&E
![Page 54: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/54.jpg)
• 11 21/9/2011 Longkang tepi Genset kotor
• 12 21/9/2011 Puntung rokok di gazebo bertaburan
• 13 21/9/2011 Tandas A ground floor kotor
• 14 22/9/2011 Habuk di perabot dan bingkai tingkap
• 15 22/9/2011 Aircond not function well in ground floor ok
• 16 24/9/2011 Barang-barang Hari Raya Open House belum dikemaskan.
• 17 26/9/2011 Kucing berkeliaran di kafe
• 18 26/9/2011 Hos getah tidak digulung kemas di kaki lima
• 19 27/9/2011 Lampu depan Imaging department rosak ok
• 20 28/9.2011 Lampu di kafe tak berfungsi ok
![Page 55: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/55.jpg)
Reference from M.O.D report september
• Ground floor • 21 16/9/2011 Penutup pam tandas A tiada in progres • 22 16/9/2011 Lift B - lantai kotor • 23 22/9/2011 Habuk di kebanyakan tempat • 24 24/9/2011 Lampu A&E tak hidup ok
• 1st floor • 25 20/9/2011 Candle light di tangga Classic Clinic not fctn ok • 26 20/9/2011 Women & Child toilet - pipe leaking ok • 27 20/9/2011 Downlite Women & Child - not function
ok • 28 20/9/2011 Candle light at Women & Child not function ok • 29 20/9/2011 Frame spotlite - not function ok • 30 22/9/2011 habuk di kebanyakan tempat
![Page 56: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/56.jpg)
Reference from M.O.D report september• 2nd Floor • 31 16/9/2011 Toilet transit ward - besi atas pada pintu • 32 17/9/2011 Tandas transit ward 2 banyak sampah • 33 17/9/2011 Room 205 close due to leaking ok • 34 20/9/2011 Wallpaper tanggal in progres • 35 20/9/2011 Access door to wards 2 broken ok • 36 22/9/2011 Pantry messy because do not have rack for
plate ok • 37 23/9/2011 Banyak tandas kotor kerana tiada
Housekeeping • 38 23/9/2011 Perabot di transit ward 2 terkopak kulit
• 3rd Floor • 39 16/9/2011 Room 306 - tv plug tiada, no bed tiada,, bau cat
ok • 40 17/9/2011 Room 311 - siling bocor, paip tak ketat ok • 41 18/9/2011 Aircond at ward 3 counter not function ok • 42 23/9/2011 Bed di ward 305 tidak memuaskan
![Page 57: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/57.jpg)
Project - New x-ray
Pintu telah dipasang
Pemasangan siling
Kerja – kerja pengorekan lantai untuk elektrikal
Layout pemasangan elektrikal
![Page 58: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/58.jpg)
New transit ward
Pemasangan vinyl selesai
Aircond dalam progress
Compressor aircond telah dipasang
![Page 59: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/59.jpg)
HEALTH & PHYSICAL ASSESMENT
![Page 60: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/60.jpg)
• BY AGE- < 40 years
* Female -38 person
* Male – 11 person
> 40 years
* Female – 10 person
* Male – 5 person
CRITERIA
![Page 61: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/61.jpg)
• Year of service
- Propose staff more than 5 years of service
![Page 62: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/62.jpg)
• MALE- LAB TEST – Full Blood Count, Renal Test,
Liver Test, Lipid Profile And UFEME- Fasting Blood Sugar test (Diabetic)- Cancer Marker – Prostate (PSA)- Ecg Test - Stress Test- Physical Fitness
• * For staff more than 3 years of service ONLY
PROPOSAL STAFF 40 YEARS AND ABOVE
![Page 63: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/63.jpg)
• Female- LAB TEST – Full Blood Count, Renal Test, Liver Test,
Lipid Profile And UFEME- Fasting Blood Sugar test (Diabetic)- Cancer Marker – Ovary (CA-125)- Pap Smear- Ecg Test - Stress Test- Mammogram- Physical Fitness
• * For staff more than 3 years of service ONLY
![Page 64: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/64.jpg)
• MALE- LAB TEST – HB1C and UFEME- Stress Test- Physical Fitness
PROPOSAL STAFF < 40 YEARS
![Page 65: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/65.jpg)
• Female- LAB TEST –HB1C and UFEME- Pap Smear- Physical Fitness
![Page 66: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/66.jpg)
FITNESS TEST
1. FLEXIBILITY.
2. MUSCULAR ENDURANCE.
3. AEROBIC ENDURANCE.
![Page 67: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/67.jpg)
FLEXIBILTY TEST.(SIT AND REACH)
• 1. SIMPLE 3 TIMES TEST TO DO.• 2. GET AVERAGE SCORE.• 3. TO MEASURE CORE MUSCLE
FLEXIBILTY.
![Page 68: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/68.jpg)
MUSCULAR ENDURANCE TEST(SIT-UP)+(PUSH-UP)
• SIT-UP TO ASSESS LOWER BODY.• PUSH-UP TO ASSESS UPPER BODY.• TWO MINUTE EACH TEST.
![Page 69: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/69.jpg)
MEN PUSH-UP ( TWO MINUTE)
FITNESSLEVEL
AGE
20>29 30>39 40>49 50+
LEVEL 4 >71 >64 >57 >49
LEVEL 3 61-70 54-63 46-56 39-49
LEVEL 2 37-60 31-53 24-45 20-38
LEVEL 1 27-36 21-30 14-23 9-19
![Page 70: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/70.jpg)
WOMEN PUSH-UP (TWO MINUTE TEST)
FITNESSLEVEL
AGE
20>29 30>39 40>49 50+
LEVEL 4 >34 >31 >27 >23
LEVEL 3 29-33 25-30 22-26 18-22
LEVEL 2 11-28 7-24 2-21 1-17
LEVEL 1 1-10 1-6 1-5 1-4
![Page 71: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/71.jpg)
MEN SIT-UP TEST (TWO MINUTE )FITNESSLEVEL
AGE
20>29 30>39 40>49 50+
LEVEL 4 >88 >82 >75 >68
LEVEL 3 77-87 71-81 66-74 61-67
LEVEL 2 48-76 41-60 31-65 27-60
LEVEL 1 36-47 20-30 25-33 19-26
![Page 72: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/72.jpg)
WOMEN SIT-UP TEST (TWO MINUTE)
FITNESSLEVEL
AGE
20>29 30>39 40>49 50+
LEVEL 4 >78 >72 >65 >58
LEVEL 3 67-77 61-71 56-64 51-57
LEVEL 2 38-66 31-60 24-55 17-50
LEVEL 1 26-37 20-30 15-23 9-16
![Page 73: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/73.jpg)
AEROBIC ENDURANCE TEST(10 MINUTE)
• TO DETERMINE STAMINA OF HEART BY CALCULATE THE RECOVERY H.R .
• 10 MINUTE ACT.• REST HR, PEAK HR, RECOVERY HR.
![Page 74: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/74.jpg)
RCR =PEAK HR – RECOVERY HR AFTER 1 MINUTE/10
RECOVERY RATE NO. CONDITION
< THAN 2.0 POOR
2 – 2.9 FAIR
3 – 3.9 GOOD
4 – 5.9 EXCELLENT
> THAN 6.0 OUTSTANDING
![Page 75: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/75.jpg)
• Based on Criteria
* Age
* Gender
Type of assessment:
* Blood Pressure
* Glucose
* BMI
* Stamina
ASSESSMENT
![Page 76: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/76.jpg)
POST PARASOL
COMPANY NAME : RK MARKETING SDN BHD
ADDRESS :NO 13, JALAN MERANTI JAYA 10, TAMAN MERANTI JAYA INDUSTRIAL PARK, 47100 PUCHONG, SELANGOR DARUL EHSAN
TELEPHONE : 03 – 8060 2984
PRICE : WAITING QUOTATION FROM SUPPLIER
DETAILS PRODUCT :
CLASSIC SIDE POST PARASOLS Provides shade & More Utilization Beneath It - Open & Close in less than 5 minutes (Heavy Duty)
CLASSIC SIDE POST PARASOLS Provides shade & More Utilizations Beneath It - Open & Close in less than 5 minutes (Heavy Duty)
• Side post allows unobstructured movement below parasols• Enhance Separate Raised air vent allows better air circulation, more stability • Powder-coated white structural aluminum alloy frame • Stainless Steel Fasteners • Minimal visibility of bolts & nuts • Bigger frames • Customize shapes & sizes to fit your location (up to 4m)
![Page 77: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/77.jpg)
TENSILE PARASOL
COMPANY NAME : RK MARKETING SDN BHD
ADDRESS :NO 13, JALAN MERANTI JAYA 10, TAMAN MERANTI JAYA INDUSTRIAL PARK,
47100 PUCHONG, SELANGOR DARUL EHSAN
TELEPHONE : 03 – 8060 2984
PRICE : WAITING QUOTATION FROM SUPPLIER
DETAILS PRODUCT :
TENSILE PARASOLS Futuristic Solutions (Super Heavy Duty)
TENSILE PARASOLS Futuristic Solutions (Super Heavy Duty)
• Innovative, stylish effects • Enhances your outdoor shade with a new & exciting look • Powder coated Galvanized frame • 659g/m2 PVC roof cover
![Page 78: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/78.jpg)
TENSION UMBRELLA HEXAGON (3 M X 3 M)
COMPANY NAME : TK KANVAS SDN BHD
ADDRESS : 4054 JALAN PERMATANG PAUH, 13400 BUTTERWORTH, PENANG,
COUNTRY : MALAYSIA
TELEPHONE NO : 012-5168 505 / 04-3235505
PRICE : WAITING QUOTATION FROM SUPPLIER
DETAILS
Engineered to stand wind speed above 120km/h Size - 3m Diameter Material - PVC coated polyester
- PVC Tarpaulin Frame - Mild Steel Frame
- Galvanized Mild Steel Frame - Aluminium Alloy Frame
Color - White, Blu.e, Red, Green, Yellow, Grey etc.
Tension Umbrella - Hexagon Tent is suitable for:-- Suitable for Garden
- Cafe - Food Outlet - Food Court
![Page 79: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/79.jpg)
SUN UMBRELLA
COMPANY NAME : FOSHAN DSIN OUTDOOR FURNITURE FACTORY
Tel. :+86-757-23871076/79/73
Mobile :+86-13702618798
Fax :+86-757-23871078
E-mail :[email protected] (MSN)
AddRESS .:Shibu Changlu Road,LongJiang Town,Foshan City,Guangdong province,China
PRODUCT INFO : That umbrella material is iron frame and polyester, base is injecting water 100kg.
PRICE : US $ 95
![Page 80: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/80.jpg)
PARASOL
COMPANY NAME : BEYOND SUPPLY SDN BHD
ADDRESS : 17, Jalan PMS1, 75400 Plaza Melaka Sentral, MELAKA
TELEPHONE : 06- 2825772
FAX : 06 – 2826772
DESIGN & STRUCTURE :
General Use : OUTDOOR FURNITUREBRAND NAME : SUNLESSPANEL MATERIAL : POLYSTERBASE MATERIAL : ALUMINIUMPOLE MATERIAL : ALUMINIUM
QUOTATION
• DIMENSION: 2.0 M X 2.0 M (6 FT X 6 FT) : RM 800.00• DIMENSION: 2.5 M X 2.5 M (8 FT X 8 FT) : RM 1200.00• DIMENSION : 3.0 M X 3.0 M (10 FT X 10 DFT) : RM 1500.00
![Page 81: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/81.jpg)
![Page 82: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/82.jpg)
NURSING SYSTEM
2ND NOVEMBER 2011
![Page 83: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/83.jpg)
Phase 1 – RECORD TRANSACTION
• Training – In Progress (Base On List Name)• User Name & Password – (David) Done • Hardware :
• Mini PDA – Awaiting Quotation From Supplier– (Target – End Of This Week Settle)
• Workstation Trolley – In Progress– (Target – PO & Money Order End Of This Week Settle)
PHASE 2 – PHYSIO REQUEST ONLINE
• STATUS SYSTEM – In Progress (David)
![Page 84: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/84.jpg)
RECORD TRANSACTIONPRINT PREVIEW
SCREEN PREVIEW
![Page 85: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/85.jpg)
OT REGISTRATION SYSTEM - WARD
![Page 86: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/86.jpg)
FLOW CHART ORS
PT’S WITH REGISTRATION SLIP
(PROCEED FOR OPERATION)
OT STAFF(CHECK
REGISTRATION SLIP)
FROM WARD(REGISTER PT’S
FOR OP)PRINT
(EVIDANCE)
PT’S WITHOUT REGISTRATION SLIP(DELAY CASE)
DO NOT ACCEPT PT’S
RETURN PT’S TO WARD
![Page 87: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/87.jpg)
CONT,
ADALAH MENJADI KESALAHAN PROSIDUR JIKA OT MENERIMA
PESAKIT TANPA :‘PRINTED OT REGISTRATION SLIP’
![Page 88: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/88.jpg)
![Page 89: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/89.jpg)
SCREEN PREVIEW
PRINT PREVIEW
Ors system
![Page 90: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/90.jpg)
Penawar Nursing Services
![Page 91: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/91.jpg)
![Page 92: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/92.jpg)
Nursing ListNO NAME RECORD PHYSIO OT SYS
1 EN. MOHD ALI
2 HA ANANDHI
3 HA MANIMEGALAI
4 HA MUNIYAMA UPL UPL UPL
5 HA NORSALHA
6 HA SITI AISHAH
7 JM SHUHADA
8 MA MOHD AFFENDY
9 SEN ARNIDA TRAINED
10 SEN NORAINI TRAINED
11 SEN RUZAINEE TRAINED
12 SEN SUTIMAH
13 SRN AMIRA
14 SRN AZMIRA TRAINED
15 SRN CHE MOHD HAFFIZUDIN
16 SRN ELLYUSNITA TRAINED
17 SRN EMY SHAFIQ
18 SRN FAIZAH TRAINED
19 SRN MOHD MUKHLIS
20 SRN NOOR AZIMAH
![Page 93: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/93.jpg)
21 SRN NOR ASIKIN TRAINED
22 SRN NOREEN TRAINED
23 SRN NORFARHANA TRAINED
24 SRN NORHAZIMAH TRAINED
25 SRN NORIDA
26 SRN NORIDA ERA
27 SRN NORMALA TRAINED
28SRN NUR AINI KHADIJAH TRAINED
29 SRN NUR SITI HANISAH TRAINED
30 SRN NURSUHAILA
31 SRN NURUL ASYIKIN TRAINED
32 SRN RAJA NAZATUL SL SL SL
33 SRN ROGAYAH AKMAR TRAINED
34 SRN ROSMAWATI
35 SRN ROSZILA TRAINED
36 SRN ROZZANA TRAINED
37 SRN SARUNI
38 SRN SERI
39 SRN SHAIRULSAIFUDIN
40 SRN SITI FATIMAH
41 SRN YATIMAH
42
SL = STUDY LEAVE UPL = UNPAID LEAVE
![Page 94: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/94.jpg)
THE FLOWERS CAFEDEVELOPMENT & IMPROVEMENT
TARGET 4 NOVEMBER 2011
FLOWER CAFE
![Page 95: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/95.jpg)
Menu
Display
Propose Hawkers Area1. Peti Sejuk 2. Tambah 1 dapur (2
dapur)3. Microwave4. Cabinet (Pingan &
Makanan)5. Stainless Table
FLOWER CAFE
![Page 96: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/96.jpg)
FROOZEN & CHILLER
Budget prize
1. 430 L RM 1580
2. 350 L RM 1350
FLOWER CAFE
![Page 97: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/97.jpg)
STAINLESS TABLE
FLOWER CAFE
Budget prize
1. RM 980
Budget prize
1. RM 900
![Page 98: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/98.jpg)
MICROWAVE
Budget prize
1. RM 1500
FLOWER CAFE
CARBINET
MICROWAVE & CARBINET PINGGAN/MAKANAN
Budget prize
1. RM ?
![Page 99: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/99.jpg)
FLOWER CAFE
NEW WORKING HOURS CHEFF
1. CHEFF YUSOF 7 AM – 4 PM
2. CHEFF SITI 9 AM – 6 PM
BREAKFAST PROVIDE BY OUTSOURCE
LUNCH PROVIDED AS USUAL BY CHEFF
![Page 100: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/100.jpg)
NASI ANEKA MEE
• Nasi Goreng Cina• Nasi Goreng Kampung
• Burger
• Mee Goreng Mamak• Mee Hoon Goreng• Kuew Tiaw Goreng• Kuew Tiaw Kerang
PROPOSE MENU - HAWKER
Menu di atas dicadangkan untuk permulaan dan akan ditambah dari masa ke semasa
PAGI
• Roti Canai• Omelet• Telur ½ masak
• Mee rebus• Mee Sup• Mee Kari• Mee Soto
FLOWER CAFE
![Page 101: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/101.jpg)
FLOWER CAFE
Promotion
• Promotion Flyers on new Hawker offerings / launching- Distribution at neighboring companies & shops- In hospital building- In Cafe
• Mini Signboard – To publish Menu offerings
• Menu Card – for customer to refer
• Poster & Banner Display
NEED APPROVAL: To give special offering – buy 2 plates of hawker fare and get 1 additional free plate (To attract crowd) from 3.00 pm – 7.00 pm
![Page 102: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/102.jpg)
Activities
Project Dateline Status
Menu publish 1/11/11 Roti canai,Roti Bakar, Nasi Lemak, Mee Kari, Mee Sup,Nasi/Mee/Bihun/Kew Tiau Goreng
Menu by light box 11/11/11 4 light box/RM 600 (Changeable)(Get approval by doctor)
Menu atas meja 11/11/11 1 set menu / RM 15(Get approval by doctor)
Signboard Café Flowers (Gazebo)
11/11/11 Get quotation from MP
Gazebo 11/11/11 Propose new design gazebo
Flyers 5/11/11 Order by 1/11/11
FLOWER CAFE
![Page 103: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/103.jpg)
FLOWER CAFE
![Page 104: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/104.jpg)
LAUNCHING
Launching target on 3 Nov 2011
• Mini Menu distribute • Special offer by group - Dessert
FLOWER CAFE
![Page 105: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.](https://reader030.fdocuments.us/reader030/viewer/2022012314/5518148a550346a2318b45c2/html5/thumbnails/105.jpg)
TRAINING TEBAR ROTI CANAI
TRAINER: CHEF YUSOFF / WAHIDTIME : GROUP 1 – 2 PM – 3PM, GROUP 2 – 3 PM – 4 PM
DATE : 2 WEEK (1 – 14/11/11)
PESERTA : STAFF CAFÉ
FLOWER CAFE