Engage was brought onto the Hospice project by Lett Architects after the initial land rezoning phase. We were tasked with seeking servicing cost efficiencies and refinement of the site plan to both accommodate the existing historic building layout while maintaining a complex site plan design and approval process. Design Features Improving site access and egress Incorporating site grading into existing historic building layout Engaging with the project team to review potential costing efficiencies throughout the design phase Development of a treatment train low impact development design, including underground storage, sediment removal systems and bio-retention cell Site plan amendment to address demolition of existing building and building foorprint Construction administration Coordinate building mechanical service relocation CLIENT SERVICES COMPLETION Lett Architects Site Servicing Stormwater Management Project Management Contract Administration Site Inspections August 2019 HOSPICE PETERBOROUGH CARE CENTRE RELATIONSHIPS AGILITY OWNERSHIP INTEGRITY COMMUNITY BALANCE

Transcript of HOSPICE PETERBOROUGH CARE CENTRE - Engage Engineering · 2019. 2. 19. · Engage was brought onto...

Page 1: HOSPICE PETERBOROUGH CARE CENTRE - Engage Engineering · 2019. 2. 19. · Engage was brought onto the Hospice project by Lett Architects after the initial land rezoning phase. We

Engage was brought onto the Hospice project by Lett Architects after the initial land rezoning phase. We were tasked with seeking servicing cost efficiencies and refinement of the site plan to both accommodate the existing historic building layout while maintaining a complex site plan design and approval process.

Design Features Improving site access and egress Incorporating site grading into existing historic building layout Engaging with the project team to review potential costing efficiencies throughout the design phase Development of a treatment train low impact development design, including underground storage, sediment removal systems and bio-retention cell Site plan amendment to address demolition of existing building and building foorprint Construction administration Coordinate building mechanical service relocation

CLIENT SERVICES

COMPLETION

Lett Architects Site Servicing Stormwater Management Project ManagementContract AdministrationSite Inspections

August 2019

HOSPICE PETERBOROUGH CARE CENTRE

RELATIONSHIPS AGILITY OWNERSHIP INTEGRITY COMMUNITY BALANCE