Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation,...

15
Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC

Transcript of Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation,...

Page 1: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Horst Schindler Budapest, September 17th, 2013Danube Commission, Budapest

Conditions of navigation, Bottlenecks, 2 Recommendations of the DC

Page 2: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

• Masterplan for achieving recommended fairway parameters

• Joint Statement – Annex 3

• Recommendations on Parameters of Fairway

OverviewOverview

Page 3: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Masterplan for achieving recommended fairway parameters

Basis

Belgrade ConventionTEN-T priority areasWaterway ClassificationReports of Memberstates

Structure

IntroductionStatus Quo

Development of InfrastructureIdentification of priority areas

Masterplan

Masterplan

Structure follows ClassificationBridges and fairway distinguishedFields of actionGeneral descriptions of projects

Adopted

through DecisionDK/TAG 77/13

from the 25th December 2011

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 4: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Masterplan for achieving recommended fairway parameters

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 5: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Wachau

Masterplan for achieving recommended fairway parameters

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 6: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Port Devinska Nova Ves

Bratislava/WolfsthalGabcikovo/Nagymaros

Masterplan for achieving recommended fairway parameters

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 7: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Study Szob-Mohács

Apa

tinV

erm

elj/P

etre

sS

takl

ar

7 cr

itica

l sec

tions

Masterplan for achieving recommended fairway parameters

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 8: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

7 cr

itica

l sec

tions

ISPA 2ISPA 1B

elen

eB

atin

Sulina Canal

Masterplan for achieving recommended fairway parameters

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 9: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Joint Statement

a guiding document for

• the maintenance of the currentinland navigation

• the planning and the investments infuture infrastructure andenvironmental protection projects

• the development of a‚Programme of Measures‘

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 10: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Joint Statement

an approach towards

• integrated and interdisciplinary planning

• public communication and stakeholder involvement

• sustainable infrastructure projects

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 11: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Joint Statement

5. Joint Statement Follow Up MeetingZagreb, November 18-19, 2013

• national Reports

• Project list & Report template

• Update of Annex 3

• t.b.d.

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 12: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Recommendations on Parameters of the Fairway

Basis

Analysis of the waterwayDemands and needs of IWTSustainability

Structure

IntroductionDefinitions

Specific Chapters and Paragraphsetc.

Adopted

through DecisionDK/TAG 77/13

from the 25th December 2011

in Forcefrom the 1st of January 2013

Result

Harmonized draught conditionsFlexibility of major parametersFocus on Safety

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 13: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

min.waterdepth

freeflowing sectors

sectors with backwater

h………..min.waterdepthB………..widthENR……Regulation low waterN.r.min…lowest backwater level

Recommendations on Parameters of the Fairway

OLD definition schemes

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 14: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

min.waterdepth

Recommendations on Parameters of the Fairway

NEW definition schemes

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Page 15: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.

Thank you for your attention

Horst SchindlerChief Engineer

Danube CommissionBenczúr utca 251068 Budapest

[email protected]

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013