Hoover Toyota - Used Car Building - Rivesrives.com/wp-content/uploads/2016/09/G001-Cover...ds...

1
Sheet Number: Project Number: Project Name: Client: Copyright (c) 2017 Praxis3, LLC All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by Praxis3 shall retain all common law, statutory and other reserved rights, including copyright thereto. This drawing may not be reproduced in whole or in part without written permission of Praxis3. It is to be returned upon request. Scales as stated are valid on the original drawings. 100 Peachtree St NW Suite 1450 Atlanta, GA 30303 404-875-4500 tel 404-876-8884 fax . RELEASED FOR CONSTRUCTION AND PERMIT Sheet Title: architecture + multidisciplinary design www.praxis3.com 4/19/2017 8:47:09 AM 2686 John Hawkins Parkways Hoover, AL 35244 G001 Cover, Project Directory, Sheet Index #16080 Mr. Gordon Stewart Hoover Toyota - Used Car Building 2686 John Hawkins Parkway Hoover, AL 35244 Hoover Toyota - Used Car Building Hoover, AL Permit & Construction Set - 04.18.2017 Sheet Index SHEET # SHEET NAME 04.18.17 - Permit & Construction G001 Cover, Project Directory, Sheet Index O AD200 Demolition Elevations & Wall Sections O A200 Exterior Elevations & Wall Sections O CLIENT ARCHITECT CONTRACTOR Mr. Gordon Stewart Hoover, AL 35244 2686 Hwy 150 Praxis3 LLC 100 Peachtree St NW, Suite 1450 Atlanta, GA 30303 404-875-4500 Brian Shepherdson [email protected] Craig James, Principal Rives Construction Birmingham, AL 5200 Granswood Road 205-443-5000 Ryan Farrell [email protected] NOT TO SCALE Location Map Hoover Toyota 2686 John Hawkins Pkwy Hoover, AL 35244 Hoover Toyota Used Cars Building THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE REQUIREMENTS LISTED IN THE PROJECT MANUAL AND THE DRAWINGS (CONTRACT DOCUMENTS) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: 1. FIELD VERIFIES ALL CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING ANY WORK. VERIFY EXISTING ELEVATIONS AND LOCATIONS TO BE JOINED PRIOR TO COMMENCING CONSTRUCTION. NOTIFY THE ARCHITECT OF ALL INCONSISTENCIES. DO NOT COMMENCE THE WORK PRIOR TO RECEIPT OF MODIFICATIONS FROM THE ARCHITECT. 2. DO NOT SCALE THE DRAWINGS. IF DIMENSIONS ARE MISSING, NOTIFY THE ARCHITECT. 3. REVIEW AND APPROVE ALL SUBMITTALS BEFORE SUBMITTING TO THE ARCHITECT. THE ARCHITECT SHALL REVIEW SUBMITTALS FOR GENERAL CONFORMANCE WITH THE CONTRACT DOCUMENTS. ARCHITECTS APPROVAL OF SPECIFIC COMPONENTS DOES NOT INDICATE APPROVAL OF THE COMPLETE ASSEMBLY. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR CORRECTING ALL NONCOMPLYING WORK INSTALLED WITHOUT APPROVED SUBMITTALS. 4. SOLELY RESPONSIBLE FOR ALL WORK AND MATERIALS INCLUDING THAT OF ALL SUBCONTRACTORS. 5. REPORT TO THE ARCHITECT ALL ERRORS, INCONSISTENCIES OR OMISSIONS FOUND IN THE CONTRACT DOCUMENTS. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CORRECTING ALL ERRORS NOT BROUGHT TO THE ATTENTION OF THE ARCHITECT. CORRECTION OF ERRORS SHALL BE APPROVED BY THE ARCHITECT. 6. LOCATE ALL EXISTING UTILITIES INCLUDING ANY NOT SHOWN IN THE CONTRACT DOCUMENTS. PROTECT ALL EXISTING UTILITIES FROM DAMAGE DURING THE EXECUTION OF THE WORK. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR CORRECTING ANY DAMAGE CAUSED BY OPERATIONS DURING THE EXECUTION OF THE WORK. 7. PROVIDE ALL TEMPORARY SUPPORT FACILITIES INCLUDING BUT NOT LIMITED TO: a. WATER b. ELECTRICAL POWER c. TOILET FACILITIES. 8. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR SAFETY AND SECURITY OF THE SITE UNTIL THE COMPLETION OF PROJECT CLOSEOUT. 9. REMOVE ALL DEBRIS FROM THE SITE DAILY. THE SITE SHALL BE KEPT BROOM CLEAN AT ALL TIMES. 10. PERMANENTLY IDENTIFY ALL FIRE AND SMOKE BARRIERS AND PARTITIONS, INCLUDING BUT NOT LIMITED TO: a. RATED CORRIDOR WALLS. b. SMOKE BARRIERS AND PARTITIONS. c. HORIZONTAL EXITS. d. EXIT ENCLOSURES. WITH MINIMUM ONE INCH HIGH LETTERS IN SIGNS OR STENCILING, LOCATED ABOVE CEILING OR OTHER CONCEALED LOCATIONS, SPACED A MAXIMUM OF 10 FEET ON CENTER; PROVIDE THE FOLLOWING CONTENT: “FIRE AND/OR SMOKE RATED WALL-PROTECT ALL OPENINGS” 11. MAINTAIN ALL FIRE AND SMOKE RATINGS SHOWN IN THE CONTRACT DOCUMENTS. PROVIDE A RATED ASSEMBLY, APPROVED BY A NATIONALLY RECOGNIZED TESTING AGENCY, AT ALL OPENING AND PENETRATIONS. 12. SWING ALL DOORS IN THE MEANS OF EGRESS IN THE DIRECTION OF EXIT TRAVEL. PROVIDE EMERGENCY HARDWARE ON ALL EXIT ENCLOSURES AND AT ALL EXIT DISCHARGE. 13. PROVIDE LEVER HANDLE OR PUSH OPERATED HARDWARE ON ALL DOORS NOT IN THE MEANS OF EGRESS. 14. PROVIDE ONE AND ONE HALF INCH TUBES FOR ALL HANDRAILS AND GUARDRAILS. SMALLER TUBE AND PIPE SIZED ARE ALLOWED FOR THE SUPPORT ASSEMBLY IN COMPLIANCE WITH ALL CODES ADOPTED BY THE JURISDICTION HAVING AUTHORITY. 15. DO NOT INTERCONNECT DUCT SYSTEMS WITH OTHER BUILDING EXHAUST SYSTEMS. 16. COMBUSTIBLE INTERIOR TRIM SHALL BE CLASS A, B OR C WITH A FLAME SPREAD RATING OF 200 OR LESS. 17. MAINTAIN AND PROTECT ONE SET OF APPROVED PERMIT DOCUMENT ON SITE AT ALL TIMES. DO NOT ALLOW WORKMEN ACCESS TO THE PERMIT DOCUMENTS. 18. MAINTAIN AND KEEP CURRENT, RECORD DOCUMENTS INCLUDING BUT NOT LIMITED TO THE DRAWINGS AND THE PROJECT MANUAL. POST ALL ADDENDA, CHANGE ORDERS AND MINOR CHANGES IN THE WORK DAILY. CONFIRM ALL CONSTRUCTION DRAWINGS ARE CURRENT. General Notes #/FT PER FOOT @ AT A/C AIR CONDITIONING AB ANCHOR BOLT ABV ABOVE AC AIR CONDITIONING ACMU ARCHITECTURAL CONCRETE MASONRY UNIT ACM ALUMINUM COMPOSITE METAL ACOUST ACOUSTICAL ACP ACOUSTICAL CEILING PANEL ACT ACOUSTICAL CEILING TILE ADJ ADJACENT AFF ABOVE FINISHED FLOOR AIA AMERICAN INSTITUTE OF ARCHITECTS AIB AIR INFILTRATION BARRIER AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION ALT ALTERNATE ALUM ALUMINUM ANSI AMERICAN NATIONAL STANDARDS INSTITUTE APPROX APPROXIMATE ARCH ARCHITECT ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS AUTO AUTOMATIC B/ BOTTOM OF... BD BOARD BF BOARD FOOT BFA BARRIER FREE ACCESSIBLE BLKG BLOCKING BLW BELOW BM BEAM BOC BACK OF CURB BRK BRICK BTWN BETWEEN C CHANNEL CAB CABINET CC COLOR CHANGE CER CERAMIC CFMF COLD-FORMED METAL FRAMING CIP CAST-IN-PLACE CJ CONTROL JOINT CL CENTER LINE CLG CEILING CMU CONCRETE MASONRY UNIT CO CLEAN OUT COL COLUMN CONC CONCRETE MASONRY UNIT CONT CONTINUOUS CSI CONSTRUCTION SPECIFICATIONS INSTITUTE CT CERAMIC TILE D4S DRESSED FOUR SIDES DBL DOUBLE DET DETAIL DIAG DIAGONAL DLO DAYLIGHT OPENING DS DOWNSPOUT DWG DRAWING E/ EDGE OF.... EB EXPANSION BOLT EFC EPOXY FLOOR COATING EIFS EXTERIOR INSULATION FINISHING SYSTEM EJ EXPANSION JOINT ELEC ELECTRICAL EOS EDGE OF SLAB EQ EQUAL EQUIP EQUIPMENT ERD EMERGENCY ROOF DRAIN ES EACH SIDE EW EACH WAY EXP EXPANSION EXT EXTERIOR F/ FACE OF... FAB FABRICATE FE FIRE EXTINGUISHER - WALL MOUNT FEC FIRE EXTINGUISHER - RECESSED CABINET FFE FINISH FLOOR ELEVATION FIN FINISH FLR FLOOR FR GWB FIRE RATED GYPSUM WALLBOARD FTG FOOTING FV FIELD VERIFY GA GAUGE GALV GALVANIZED GC GENERAL CONTRACTOR GTTR GUTTER GWB GYPSUM WALLBOARD GYP BD GYPSUM WALLBOARD HB HOSE BIBB HGT HEIGHT HORIZ HORIZONTAL IBC INTERNATIONAL BUILDING CODE INSUL INSULATION INT INTERIOR LIA LINE ITEM ALTERNATE LAM LAMINATE LAV LAVATORY LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LSC LIFE SAFETY CODE MATL MATERIAL MAX MAXIMUM MDF MEDIUM-DENSITY FIBERBOARD MECH MECHANICAL MFR MANUFACTURER MIN MINIMUM MISC MISCELLANEOUS MO MASONRY OPENING MOD MODIFIED MOD BIT MODIFIED BITUMEN MR MOISTURE RESISTANT MTD MOUNTED MTL METAL NFPA NATIONAL FIRE PROTECTION ASSOCIATION NIC NOT IN CONTRACT NRP NON-REMOVABLE PIN NTS NOT TO SCALE OC ON CENTER OH OPPOSITE HAND OPNG OPENING PCP PORTLAND CEMENT PLASTER PLAM PLASTIC LAMINATE PFT PORCELAIN FLOOR TILE PL PLATE PLMB PLUMBING PLYWD PLYWOOD PT PAINT OR PRESSURE TREATED PVC POLYVINYL CHLORIDE QT QUARRY TILE RAD RADIUS RCP REFLECTED CEILING PLAN RD ROOF DRAIN REINF REINFORCED REQD REQUIRED RI RIGID INSULATION RJ RAKED JOINT RL RAIN LEADER RO ROUGH OPENING RTD RATED S4S SMOOTH FOUR SIDES SC SOLID CORE SHLV SHELVES SHT SHEET SHTHG SHEATHING SIM SIMILAR SQ SQUARE SS STAINLESS STEEL STD STANDARD STL STEEL STOR STORAGE STR STAIR STRUCT STRUCTURAL SUB SUBCONTRACTOR SUSP SUSPENDED T/ TOP OF… T&G TONGUE AND GROOVE TEL TELEPHONE TEXT TEXTURE THK THICKNESS THOLD THRESHOLD TJ TOOL JOINT TOS TOP OF STEEL TPO THERMOPLASTIC POLYOLEFIN TYP TYPICAL UNO UNLESS NOTED OTHERWISE VB VAPOR BARRIER VCT VINYL CERAMIC TILE VENT VENTILATION VERT VERTICAL VHB VERY HIGH BOND VIF VERIFY IN FIELD VWC VINYL WALLCOVERING W/ WITH WB WEATHER BARRIER WRB WEATHER RESISTIVE BARRIER WWF WELDED WIRE FABRIC WWM WELDED WIRE MESH Abbreviations DRAWING TITLE MARK Symbols Legend SECTION MARK STEEL GRIDLINE - COLUMN CL MASONRY GRIDLINE - F/MASONRY EXISTING GRIDLINE COLUMN BUBBLE & GRID LINES PEMB GRIDLINE DRAWING TITLE SCALE 3 AXXX SHEET WHERE DRAWING IS SHOWN 3 AXXX DRAWING NUMBER SHEET WHERE SECTION IS SHOWN SECTION NUMBER ELEVATION MARK 3 AXXX SHEET WHERE ELEVATION IS SHOWN ELEVATION NUMBER 3 AXXX DETAIL CALLOUT DETAIL NUMBER SHEET WHERE DETAIL IS SHOWN REVISED CLOUD & REVISION TRIANGLE AREA ON HOLD & REVISION TRIANGLE 3 REVISION NUMBER AREA COVERED BY DETAIL 3 REVISION NUMBER HOLD PARTITION TYPE TAG DOOR NUMBER FRAME NUMBER 106a DOOR NUMBER F10 FRAME NUMBER FIRE EXTINGUISHERS WALL MOUNT FIRE EXTINGUISHER FE FIRE EXTINGUISHER CABINET FEC 3 AXXX BUILDING SECTION CUT 3 AXXX 3 AXXX 3 AXXX WALL SECTION CUT DETAIL SECTION CUT FF&E - OWNER vs CONTRACTOR PROVIDED BLACK LINES INDICATE CONTRACTOR PROVIDED FF&E ITEMS GRAY LINES INDICATE OWNER PROVIDED FF&E ITEMS W030 SEE PARTITION TYPE FOR HEIGHT W030 WALL TO X'-XX" ABOVE STRUCTURAL FLOOR X'-XX" W030 WALL TO BOTTOM OF STRUCTURAL DECK ABOVE DECK W030 BOTTOM WALL AT X'-XX" ABOVE STRUCTURAL FLOOR TO BOTTOM OF STRUCTURAL DECK ABOVE ABOVE X'-XX" ROOM NAME & NUMBER ROOM NAME ### Rev Date Comments 04/18/17 Permit & Construction

Transcript of Hoover Toyota - Used Car Building - Rivesrives.com/wp-content/uploads/2016/09/G001-Cover...ds...

Page 1: Hoover Toyota - Used Car Building - Rivesrives.com/wp-content/uploads/2016/09/G001-Cover...ds downspout dwg drawing e/ edge of.... eb expansion bolt efc epoxy floor coating eifs exterior

Sheet Number:

Project Number:Project Name:

Client:

Copyright (c) 2017 Praxis3, LLC

All reports, plans, specifications, computer files, field data, notes andother documents and instruments prepared by Praxis3 shall retain allcommon law, statutory and other reserved rights, including copyrightthereto.

This drawing may not be reproduced in whole or in part without writtenpermission of Praxis3. It is to be returned upon request. Scales as statedare valid on the original drawings.

100 Peachtree St NWSuite 1450Atlanta, GA 30303

404-875-4500 tel404-876-8884 fax

.

RE

LE

AS

ED

FO

R C

ON

ST

RU

CT

ION

AN

D P

ER

MIT

Sheet Title:

architecture + multidisciplinary design

www.praxis3.com

4/1

9/2

017 8

:47:0

9 A

M

2686 John Hawkins ParkwaysHoover, AL 35244

G001

Cover, ProjectDirectory, SheetIndex

#16080

Mr. GordonStewart

Hoover Toyota -Used CarBuilding

2686 John Hawkins ParkwayHoover, AL 35244

Hoover Toyota - Used Car BuildingHoover, AL Permit & Construction Set - 04.18.2017

Sheet Index

SHEET # SHEET NAME 04.1

8.1

7 -

Perm

it &

Co

nstr

ucti

on

G001 Cover, Project Directory, Sheet Index O

AD200 Demolition Elevations & Wall Sections O

A200 Exterior Elevations & Wall Sections O

CLIENT

ARCHITECT

CONTRACTOR

Mr. Gordon StewartHoover, AL 352442686 Hwy 150

Praxis3 LLC100 Peachtree St NW, Suite 1450Atlanta, GA 30303404-875-4500Brian [email protected] James, Principal

Rives ConstructionBirmingham, AL5200 Granswood Road205-443-5000Ryan [email protected]

NOT TO SCALE

Location Map

Hoover Toyota2686 John Hawkins PkwyHoover, AL 35244

Hoover ToyotaUsed Cars Building

THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE REQUIREMENTSLISTED IN THE PROJECT MANUAL AND THE DRAWINGS (CONTRACT DOCUMENTS) INCLUDING BUT NOTLIMITED TO THE FOLLOWING:

1. FIELD VERIFIES ALL CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING ANY WORK. VERIFYEXISTING ELEVATIONS AND LOCATIONS TO BE JOINED PRIOR TO COMMENCING CONSTRUCTION.NOTIFY THE ARCHITECT OF ALL INCONSISTENCIES. DO NOT COMMENCE THE WORK PRIOR TO RECEIPTOF MODIFICATIONS FROM THE ARCHITECT.

2. DO NOT SCALE THE DRAWINGS. IF DIMENSIONS ARE MISSING, NOTIFY THE ARCHITECT.

3. REVIEW AND APPROVE ALL SUBMITTALS BEFORE SUBMITTING TO THE ARCHITECT. THE ARCHITECTSHALL REVIEW SUBMITTALS FOR GENERAL CONFORMANCE WITH THE CONTRACT DOCUMENTS.ARCHITECTS APPROVAL OF SPECIFIC COMPONENTS DOES NOT INDICATE APPROVAL OF THE COMPLETEASSEMBLY. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR CORRECTING ALLNONCOMPLYING WORK INSTALLED WITHOUT APPROVED SUBMITTALS.

4. SOLELY RESPONSIBLE FOR ALL WORK AND MATERIALS INCLUDING THAT OF ALL SUBCONTRACTORS.

5. REPORT TO THE ARCHITECT ALL ERRORS, INCONSISTENCIES OR OMISSIONS FOUND IN THECONTRACT DOCUMENTS. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CORRECTING ALLERRORS NOT BROUGHT TO THE ATTENTION OF THE ARCHITECT. CORRECTION OF ERRORS SHALL BEAPPROVED BY THE ARCHITECT.

6. LOCATE ALL EXISTING UTILITIES INCLUDING ANY NOT SHOWN IN THE CONTRACT DOCUMENTS.PROTECT ALL EXISTING UTILITIES FROM DAMAGE DURING THE EXECUTION OF THE WORK. THEGENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR CORRECTING ANY DAMAGE CAUSED BYOPERATIONS DURING THE EXECUTION OF THE WORK.

7. PROVIDE ALL TEMPORARY SUPPORT FACILITIES INCLUDING BUT NOT LIMITED TO:a. WATERb. ELECTRICAL POWERc. TOILET FACILITIES.

8. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR SAFETY AND SECURITY OF THE SITEUNTIL THE COMPLETION OF PROJECT CLOSEOUT.

9. REMOVE ALL DEBRIS FROM THE SITE DAILY. THE SITE SHALL BE KEPT BROOM CLEAN AT ALL TIMES.

10. PERMANENTLY IDENTIFY ALL FIRE AND SMOKE BARRIERS AND PARTITIONS, INCLUDING BUT NOTLIMITED TO:

a. RATED CORRIDOR WALLS.b. SMOKE BARRIERS AND PARTITIONS.c. HORIZONTAL EXITS.d. EXIT ENCLOSURES.

WITH MINIMUM ONE INCH HIGH LETTERS IN SIGNS OR STENCILING, LOCATED ABOVE CEILING OR OTHERCONCEALED LOCATIONS, SPACED A MAXIMUM OF 10 FEET ON CENTER; PROVIDE THE FOLLOWINGCONTENT:

“FIRE AND/OR SMOKE RATED WALL-PROTECT ALL OPENINGS”

11. MAINTAIN ALL FIRE AND SMOKE RATINGS SHOWN IN THE CONTRACT DOCUMENTS. PROVIDE A RATEDASSEMBLY, APPROVED BY A NATIONALLY RECOGNIZED TESTING AGENCY, AT ALL OPENING ANDPENETRATIONS.

12. SWING ALL DOORS IN THE MEANS OF EGRESS IN THE DIRECTION OF EXIT TRAVEL. PROVIDEEMERGENCY HARDWARE ON ALL EXIT ENCLOSURES AND AT ALL EXIT DISCHARGE.

13. PROVIDE LEVER HANDLE OR PUSH OPERATED HARDWARE ON ALL DOORS NOT IN THE MEANS OFEGRESS.

14. PROVIDE ONE AND ONE HALF INCH TUBES FOR ALL HANDRAILS AND GUARDRAILS. SMALLER TUBEAND PIPE SIZED ARE ALLOWED FOR THE SUPPORT ASSEMBLY IN COMPLIANCE WITH ALL CODESADOPTED BY THE JURISDICTION HAVING AUTHORITY.

15. DO NOT INTERCONNECT DUCT SYSTEMS WITH OTHER BUILDING EXHAUST SYSTEMS.

16. COMBUSTIBLE INTERIOR TRIM SHALL BE CLASS A, B OR C WITH A FLAME SPREAD RATING OF 200 ORLESS.

17. MAINTAIN AND PROTECT ONE SET OF APPROVED PERMIT DOCUMENT ON SITE AT ALL TIMES. DO NOTALLOW WORKMEN ACCESS TO THE PERMIT DOCUMENTS.

18. MAINTAIN AND KEEP CURRENT, RECORD DOCUMENTS INCLUDING BUT NOT LIMITED TO THEDRAWINGS AND THE PROJECT MANUAL. POST ALL ADDENDA, CHANGE ORDERS AND MINOR CHANGESIN THE WORK DAILY. CONFIRM ALL CONSTRUCTION DRAWINGS ARE CURRENT.

General Notes#/FT PER FOOT

@ ATA/C AIR CONDITIONINGAB ANCHOR BOLTABV ABOVEAC AIR CONDITIONINGACMU ARCHITECTURAL CONCRETE MASONRY UNITACM ALUMINUM COMPOSITE METALACOUST ACOUSTICALACP ACOUSTICAL CEILING PANELACT ACOUSTICAL CEILING TILEADJ ADJACENTAFF ABOVE FINISHED FLOORAIA AMERICAN INSTITUTE OF ARCHITECTSAIB AIR INFILTRATION BARRIERAISC AMERICAN INSTITUTE OF STEEL CONSTRUCTIONALT ALTERNATEALUM ALUMINUMANSI AMERICAN NATIONAL STANDARDS INSTITUTEAPPROX APPROXIMATEARCH ARCHITECTASTM AMERICAN SOCIETY FOR TESTING AND MATERIALSAUTO AUTOMATIC

B/ BOTTOM OF...BD BOARDBF BOARD FOOTBFA BARRIER FREE ACCESSIBLEBLKG BLOCKINGBLW BELOWBM BEAMBOC BACK OF CURBBRK BRICKBTWN BETWEEN

C CHANNELCAB CABINETCC COLOR CHANGECER CERAMICCFMF COLD-FORMED METAL FRAMINGCIP CAST-IN-PLACECJ CONTROL JOINTCL CENTER LINECLG CEILINGCMU CONCRETE MASONRY UNITCO CLEAN OUTCOL COLUMNCONC CONCRETE MASONRY UNITCONT CONTINUOUSCSI CONSTRUCTION SPECIFICATIONS INSTITUTECT CERAMIC TILE

D4S DRESSED FOUR SIDESDBL DOUBLEDET DETAILDIAG DIAGONALDLO DAYLIGHT OPENINGDS DOWNSPOUTDWG DRAWING

E/ EDGE OF....EB EXPANSION BOLTEFC EPOXY FLOOR COATINGEIFS EXTERIOR INSULATION FINISHING SYSTEMEJ EXPANSION JOINTELEC ELECTRICALEOS EDGE OF SLABEQ EQUALEQUIP EQUIPMENTERD EMERGENCY ROOF DRAINES EACH SIDEEW EACH WAYEXP EXPANSIONEXT EXTERIOR

F/ FACE OF...FAB FABRICATEFE FIRE EXTINGUISHER - WALL MOUNTFEC FIRE EXTINGUISHER - RECESSED CABINETFFE FINISH FLOOR ELEVATIONFIN FINISHFLR FLOORFR GWB FIRE RATED GYPSUM WALLBOARDFTG FOOTINGFV FIELD VERIFY

GA GAUGEGALV GALVANIZEDGC GENERAL CONTRACTORGTTR GUTTERGWB GYPSUM WALLBOARDGYP BD GYPSUM WALLBOARD

HB HOSE BIBBHGT HEIGHTHORIZ HORIZONTAL

IBC INTERNATIONAL BUILDING CODEINSUL INSULATIONINT INTERIOR

LIA LINE ITEM ALTERNATELAM LAMINATELAV LAVATORYLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLSC LIFE SAFETY CODE

MATL MATERIALMAX MAXIMUMMDF MEDIUM-DENSITY FIBERBOARDMECH MECHANICALMFR MANUFACTURERMIN MINIMUMMISC MISCELLANEOUSMO MASONRY OPENINGMOD MODIFIEDMOD BIT MODIFIED BITUMENMR MOISTURE RESISTANTMTD MOUNTEDMTL METAL

NFPA NATIONAL FIRE PROTECTION ASSOCIATIONNIC NOT IN CONTRACTNRP NON-REMOVABLE PINNTS NOT TO SCALE

OC ON CENTEROH OPPOSITE HANDOPNG OPENING

PCP PORTLAND CEMENT PLASTERPLAM PLASTIC LAMINATEPFT PORCELAIN FLOOR TILEPL PLATEPLMB PLUMBINGPLYWD PLYWOODPT PAINT OR PRESSURE TREATEDPVC POLYVINYL CHLORIDE

QT QUARRY TILE

RAD RADIUSRCP REFLECTED CEILING PLANRD ROOF DRAINREINF REINFORCEDREQD REQUIREDRI RIGID INSULATIONRJ RAKED JOINTRL RAIN LEADERRO ROUGH OPENINGRTD RATED

S4S SMOOTH FOUR SIDESSC SOLID CORESHLV SHELVESSHT SHEETSHTHG SHEATHINGSIM SIMILARSQ SQUARESS STAINLESS STEELSTD STANDARDSTL STEELSTOR STORAGESTR STAIRSTRUCT STRUCTURALSUB SUBCONTRACTORSUSP SUSPENDED

T/ TOP OF…T&G TONGUE AND GROOVETEL TELEPHONETEXT TEXTURETHK THICKNESSTHOLD THRESHOLDTJ TOOL JOINTTOS TOP OF STEELTPO THERMOPLASTIC POLYOLEFINTYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VB VAPOR BARRIERVCT VINYL CERAMIC TILEVENT VENTILATIONVERT VERTICALVHB VERY HIGH BONDVIF VERIFY IN FIELDVWC VINYL WALLCOVERING

W/ WITHWB WEATHER BARRIERWRB WEATHER RESISTIVE BARRIERWWF WELDED WIRE FABRICWWM WELDED WIRE MESH

Abbreviations

DRAWING TITLE MARK

Symbols Legend

SECTION MARK

STEEL GRIDLINE - COLUMN CL

MASONRY GRIDLINE - F/MASONRY

EXISTING GRIDLINE

COLUMN BUBBLE & GRID LINES

PEMB GRIDLINE

DRAWING TITLESCALE

3

AXXX

SHEET WHERE DRAWING IS SHOWN

3

AXXX

DRAWING NUMBER

SHEET WHERE SECTION IS SHOWN

SECTION NUMBER

ELEVATION MARK

3

AXXX

SHEET WHERE ELEVATION IS SHOWN

ELEVATION NUMBER

3

AXXX

DETAIL CALLOUT DETAIL NUMBER

SHEET WHERE DETAILIS SHOWN

REVISED CLOUD &REVISION TRIANGLE

AREA ON HOLD &REVISION TRIANGLE

3

REVISION NUMBER

AREA COVERED BY DETAIL

3

REVISION NUMBER

HOLD

PARTITION TYPE TAG

DOOR NUMBER

FRAME NUMBER

106a

DOOR NUMBER

F10

FRAME NUMBER

FIRE EXTINGUISHERS

WALL MOUNT FIRE EXTINGUISHERFE

FIRE EXTINGUISHER CABINETFEC

3

AXXX

BUILDING SECTION CUT

3

AXXX

3

AXXX

3

AXXX

WALL SECTION CUT

DETAIL SECTION CUT

FF&E - OWNER vs CONTRACTOR PROVIDED

BLACK LINES INDICATECONTRACTOR PROVIDEDFF&E ITEMS

GRAY LINES INDICATEOWNER PROVIDEDFF&E ITEMS

W030 SEE PARTITION TYPE FOR HEIGHT

W030 WALL TO X'-XX" ABOVESTRUCTURAL FLOORX'-XX"

W030 WALL TO BOTTOM OFSTRUCTURAL DECK ABOVEDECK

W030 BOTTOM WALL AT X'-XX" ABOVESTRUCTURAL FLOOR TO BOTTOMOF STRUCTURAL DECK ABOVE

ABOVE X'-XX"

ROOM NAME & NUMBER

ROOM NAME

###

Rev Date Comments

04/18/17 Permit & Construction