HOORRRAAAAYYYYYY GOAL ... ? FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS) ... ? BRIDGE BUILDING PROJECT (bbp)

Transcript of HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY...

Page 1: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

HOORRRAAAAYYYYYY

GOAL . . . ?

FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN

CARRY BEFORE BREAKING!!

PURPOSE: (FOR YOU AS GRADE 7 STUDENTS) . . . ?

BRIDGE BUILDING PROJECT (bbp)

Page 2: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...
Page 3: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...
Page 4: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

THE BRIDGE....

MUST SPAN 30 CM AND BE NO LONGER THAN 40 cm

BE 5 CM ACROSS (WIDE)BE ABLE TO HAVE A WEIGHT HOOKED

OVER THE CENTERINCLUDE AT LEAST 1 TYPE OF BRIDGECANNOT HAVE PILLARSHeight cannot exceed 1/3 of length ANYTHING ELSE??

Page 5: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

ROLES

ACCOUNTANT:

ARTIST:

BUILDER:

PROJECT MANAGER:

BE MORE DOG VIDEO

Page 6: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

Accountant

ACCOUNTANT MUST FILL OUT THE FOLLOWING CHART (SEE WORKSHEET) ESTIMATED VALUES ACTUAL VALUES RETURNS

Budget is 110 000 (10 x $10 000, 10 x $1 000)TAXESKEEP TRACK OF $ (IF YOU LOSE IT, IT’S GONE FOR

GOOD!)FOR EVERY 10 000$, 1 BONUS POINT WILL BE GIVENWORK ON VIDEO/BLOG??

Page 7: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

Artist

COMPLETES THE MAIN DESIGN ALTHOUGH EACH STUDENT ALSO MUST

COMPLETE A DRAWING ON THEIR WORKSHEET

THE DRAWING MUST BE HANDED IN, LABELLED, DETAILED, HAVE MEASUREMENTS AND INCLUDE GROUP IDEAS FOR POSSIBLE CHANGES

THE ARTIST WILL ALSO HELP/OVERSEE BUILDING and make sure it FOLLOWS THE DESIGN

Page 8: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

Builder

BUILDS THE BRIDGE (ARTIST HELPS WITH THIS PART TOO).

OTHER TEAM MEMBERS ARE ALSO A PART OF THIS BY GETTING THE BUILDER MATERIALS, HOLDS THINGS, HELPS GLUE ETC.

Page 9: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

Project Manager

OVERSEES ALL OTHER WORKERS SHOULD BE ORGANIZED AND ON TASK!!!TELL PEOPLE WHAT THEY SHOULD BE

DOING IF GROUP IS OFF TRACK, THE MANAGER GETS PPL

BACK ON TRACK (OTHERWISE FINES ARE GIVEN)

BLOGS/WORKS ON VIDEO! (ARTIST/ACCOUNTANT CAN HELP TOO)

Page 10: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

OUTLINE FOR PROJECT

ASSIGN TASKSDESIGN AS A GROUP

BRAINSTORM IDEAS (SHOULD TAKE ~ 40 MINS) POSTER (NEEDS TO BE HANDED IN W/ REPORT: ARTIST)

THERE CAN BE MANY DRAFTS BUT 1 FINAL ARTIST POSTER ESTIMATED # OF MATERIALS:ACCOUNTANT MANAGER: START BLOG COME UP WITH GROUP NAME (MANAGER?)

BUILD THE BRIDGEHAND EVERYTHING IN...TEST THE BRIDGE

Page 11: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

Cost of Materials

SCISSORS $10 000/20 MINSPAPER $15 000/ SHEETPOPSICLE STICKS $ 2 000/STICKADD’N TOOTHPICKS $ 1 000/PICKPIPECLEANERS $ 1 000/PIPECLEANERTAPE (CLEAR TAPE) $ 10 000/10 CMTAPE (MASKING TAPE) $20 000/ 5 CMSTRING $30 000/ 10 CM

RETURNS MUST BE MADE THE SAME CLASS AND CANNOT BE DAMAGED! PROOF OF PURCHASE REQUIRED (ACCOUNTANT SHEET)

TAXES MUST BE DONE ON FINAL CHART.

Page 12: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

FINAL PROJECT

GO THROUGH EACH PART (report)SELF-ASSESSMENT AND PEER ASSESSMENT (report)

AT THE END: YOU WILL HAND IN 4 REPORTS 1 DETAILED DRAWING 1 ACCOUNTANT CHART BLOG AND/OR VIDEO FINAL BRIDGE MODEL!!!

VIDEO: HOW TO DEFEND YOURSELF BY CHOCHAGAK

Page 13: HOORRRAAAAYYYYYY GOAL... FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...

Blog/video

Every manager must blog about their groups daily activities

Managers can also create a video of their bridge being built every day (this can be done as creatively as desired; will be submitted to me online)

Videos cannot have faces of students in them!! Must only be talking/daily construction of bridge