• Compass Datacenters provides dedicated, standalone data centers
• Built using our Truly
Modular™ Architecture• Patent pending design
• Geographically independent• The building is the module
• Simplify Capacity Planning• Growth in 1.2MW Increments
• Control• Ownership or lease• Operations and security• Expansion
Data Center Landscape—Target Customers
4
End Users of Public Cloud, Private Cloud and Traditional IT
Public Cloud Applications
Servers, OS, SANs, Virtualization, Web, DR,
Network Management
Cross Connects, Racks, Networking, TRS/Helpdesk
Power and Cooling, Security, Network Connectivity, Facility
Management Systems
Building Shell, Utilities, Fiber Pathway
Permits, Entitlements, Incentives
The Common Thread: Inefficiency
5
• Distorts Total Cost of Ownership (TCO)• Dominated by First Cost• On-Going Cost of OpEx
Capital
6
• Bigger isn’t better• $20-$100 million is spent on four walls and a roof
• #1 killer of new projects is the shell to hold the 20 year plan
• Capital should be allocated as needed• Freeing funds for other uses until needed
• Not accounting, it’s common sense
Land
7
• Huge facilities aren’t land efficient• Eliminate the option value
• Ability to use land for other purposes• Destroys the advantage of an appreciating asset
Materials
9
• Lack of standard designs drives materials waste• “Standard” usually just a starting point for customization
discussions• Reason Uptime checks every facility as part of its process
• How much concrete and steel does it take to build a 100,000 square foot facility?• Does anyone know?• What is known:
• Production of 1 cubic yard of concrete generates 400 lbs of CO2• Ex: 6” slab on a 200K square foot building requires 3700 yards of concrete
• Production generates 740 tons of CO2• Production of 1 ton of steel generates 1.9 tons of CO2
• Ex: 440 tons of steel required for a 200K square foot building• Production generates 840 tons of CO2
Resource Inefficiency
10
• Water
• Chemical treatment requirements• Added cost• Eco impact
Average home:• Uses ~95,000
gallons of water per year*
Average 5,000 square foot, 1MW data center**• 17 million gallons
of water annually
Average 15 MW data center**• 131 million
gallons of water annually
Data Center Build Trend
11
• The Data Center Industry is Here• Can’t Drive Costs Any Lower or Quality Any Higher
• The Required Next Step• Most Providers Can’t Make It
The Historical Foundation
"Dr. W. Edwards Deming taught that by adopting appropriate principles of management, organizations can increase quality and simultaneously reduce costs (by reducing waste, rework, staff attrition and litigation while increasing customer loyalty). The key is to practice continual improvement and think of manufacturing as a system, not as bits and pieces.”
12
The Key Principles
• Deming had 14 key principles• These are the most applicable to productization
• Create constancy of purpose toward improvement of product and service, with the aim to become competitive, stay in business and to provide jobs.
• Cease dependence on inspection to achieve quality. Eliminate the need for massive inspection by building quality into the product in the first place.
• Improve constantly and forever the system of production and service, to improve quality and productivity, and thus constantly decrease costs.
• Put everybody in the company to work to accomplish the transformation. The transformation is everybody's job.
13
The Other Element: Standardization
14
• Design product for a specific market segment• Not the entire market
• Ex: 737 vs. 747
• Elements of true standard design• Standard Bill of Materials
• Same for every job• The facility is built using “kits”
• All quantities pre-determined• Reduced transportation requirements• Volume purchase agreements reduce cost
• Reduced disposal requirements
• Standard drawings and processes• More efficient scheduling reduces wasted manpower• Only deviations are due to local requirements
• We don’t have to reinvent• Many examples (auto industry, aviation, consumer electronics)
Define It: The Data Center as a Product
15
Office:2,500 SFOr, WYW space(Whatever YOU Want)
Storage/Staging RoomDedicated1,400 SF
SecurityOPEX Savings
1.2MW – 2NPre-FabricatedPatent Pending
Building: 21,000 SFDatacenter: 10,000 SF
500+ Racks20 kw/Rack with NO containment
Inexpensive expansion
2MW gens @ N+1
Certify It: The Data Center as a Product
16
HARDENED BUILDING1.5 SEISMIC IMP. FACTOR149 MPH
1.2-1.5 PUE@ ALL LOAD LEVELS
DESIGN & CONSTRUCTED
Level 5Commissioning
LEED GOLD
EYP
DCIM
UL
The Value of Standardization and Integration: Beyond First Cost
• Standard design and partners• Simplifies and standardizes operations to drive out on-going costs
• Integration• Provides holistic view of performance without “gaps”
• Enhances customer control and efficiency• Training• Spares• Documentation• Useful Life
17
Supply Chain
• Partner vs. Bid• A virtual team
• Consistency• Replicability
• Forecast vs. Quote• Eliminate the cost and delivery inefficiencies of “one-off”
18
Why Schneider?
• Breadth of product line• UPS• BMS/DCiM• Switchgear• Security• LV Gear
• Personnel and expertise• TCO and supply chain• The Common Thread
• Energy Efficiency
19
Summary
• Data center industry becoming less one-off and more application centric• Increasing requirement for lower costs and higher quality
• Data centers are inherently inefficient• Capital• Land• Materials • Resources
• Productization is the only way to achieve paradox of higher quality at lower price points• Requires combination of successful manufacturing principles and standardized product
• Most providers are not positioned to take this next step• Majority of customers will accept a “solid” standard in place of a mis-mash
of features• Accord vs. Cutlass Supreme
• Cannot transform an industry without partners• Each bringing components to the table for a better system solution