Holi project presentation
description
Transcript of Holi project presentation
![Page 1: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/1.jpg)
PROJECT AREAHOLI – II Small Hydro Project (07 MW)
![Page 2: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/2.jpg)
HOLI – II HEP – 7 MWDistrict – Chamba, Himachal Pradesh
![Page 3: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/3.jpg)
HOLI – II HEP – 7 MWDistrict – Chamba, Himachal Pradesh
![Page 4: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/4.jpg)
PROJECT SUMMERY • Project Name Holi-II Small Hydro Project• Capacity 07 MW• Total Project Land 4.1595 Hect. (Forest Land)• Type of Scheme Run of River• MOU signed on 17th July 2007• DPR Prepared by AHEC, IIT, Roorkee • Major Component Weir, Water Conductor system,
Power House, Muck Disposal Sites, Switch Yard
• Grid Connectivity Holi-I 33Kv Sub-Station• Project Cost Rs. 54.06 Crores• LADA Money 1st Installment Paid• Implementation Agreement Signed on 8th Oct, 2010
![Page 5: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/5.jpg)
Joint Inspection of Project Held on 5th May, 2010
• District Administration– ADM Bharmour/Tehsildar/Patwari
• Gram Panchayat– Gram Pradhan/ Panchayat Member
• Project Administration – Director, Om Energy Generation P. Ltd.
• Pollution Control Board– Asst. Environment Engineer, Chamba
• Forest Department– ACF Bharmour
• IPH Department– Asst. Engineer, Bharmour
• PWD Department– Asst. Engineer, Garola Sub Division
• Mining Department – Mining Inspector, Chamba
![Page 6: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/6.jpg)
Joint Inspection of Project Held on 5th May, 2010
![Page 7: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/7.jpg)
NO OBJECTION CERTIFICATE’S
• Gram Panchayat Received• Wildlife Received• Fisheries Received• I&PH Received• PWD Received• PCB Received • Forest Land Received
![Page 8: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/8.jpg)
CDM Registration for Project
Consultant:
Agrinergy Consultancy Pvt. Ltd.
1st Floor, Mathuradas Mills Compound,
N M Joshi Marg, Lower Parel (w),
Mumbai – 400013 (India)
Website: www.agrinergy.com
Present StatusPre-Consideration Process Completed
with UNFCCC
Website: www.cdm.unfccc.int
![Page 9: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/9.jpg)
PROJECT ADVANTAGES
• Socio Economic Development
• Displacement of CO2 Emissions
• Environmentally Benign source of Energy
• Zero Submergence and No R&R Issue
• Improves Stability and Reliability of Grid System
![Page 10: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/10.jpg)
DEVELOPMENT CONSIDERATION
Om Energy Generation Believes Hydro Power Development
Channels Multi-Region &
Bipartisan Support
Than any other “Clean Energy Technology”
![Page 11: Holi project presentation](https://reader033.fdocuments.us/reader033/viewer/2022061206/5481c5edb4af9f0b318b45b1/html5/thumbnails/11.jpg)
Developed By:Dalip Dua & Sanjay Saklani
M/s Om Energy Generation Pvt. Ltd.
THANK YOU