Introduction

▪ Brian Marick first developed the agile testing matrix [1]

▪ Lisa Crispin then used this in her book “Agile Testing” [2]

▪ There have been many interesting developments of the model [3][4]

▪ The purpose of the agile testing matrix is to categorize test activities in four distinct quadrants to help plan the necessary testing [2]

▪ Categorizing test activities is all about granularity – sometimes it is enough to have 2 categories, sometimes you have to have 20

Page 3: Hoberg's test octagon

ConfidentialPA12013-12-133

Introducing Test Activity Attributes

▪ To be able to categorize test activities we need to know what distinguishes different test activities from each other

▪ We need to identify the different types of attributes that a test activity can have

▪ We also need to identify the different values that the different attributes can have

▪ Once we have done this, we can create any categorization model we want to, which meets our specific granularity needs

Page 4: Hoberg's test octagon

ConfidentialPA12013-12-134

Test Activity Attributes Overview

Generated Value

Stakeholder

Executor

Report Granularity

Scope Flexibility

Definition of Done

Required Tool Support

System Complexity

Page 5: Hoberg's test octagon

ConfidentialPA12013-12-135

Generated Value

▪ What value does the test activity generate?

▪ Finding defects?

▪ Passing certifications and standards?

▪ Meeting customer requirements?

▪ Generating decision material and other information?

▪ Supporting developers in some other way?

▪ Provides start criteria for other test activities?

Page 6: Hoberg's test octagon

ConfidentialPA12013-12-136

Stakeholder

▪ Who are the stakeholders of the test activity?

▪ The project leader?

▪ The developer?

▪ The system architect?

▪ The line manager?

▪ The test leader?

▪ Other testers?

Page 7: Hoberg's test octagon

ConfidentialPA12013-12-137

System Complexity

▪ How predictable is the (sub-)system under test?

▪ A small unit is often more or less predictable if it is tested in a controlled environment

▪ A large system is often unpredictable, even if you have system requirements, and the system is made up of many small predictable units

▪ Sub-systems can be more or less predictable

Page 8: Hoberg's test octagon

ConfidentialPA12013-12-138

Report Granularity

▪ On what level is reporting necessary?

▪ Does every test have to be recorded in detail?

▪ What measurements to the stakeholders need?

▪ Is it enough with general quality feedback?

▪ What will the information in the report be used for?

Page 9: Hoberg's test octagon

ConfidentialPA12013-12-139

Scope Flexibility

▪ What possibilities does the tester have to affect the scope?

▪ Is the scope completely fixed?▪ Certification / Standard

▪ Customer requirements

▪ Is it semi-flexible?▪ Could be that priority 1 test cases have to be executed, but the rest is

risk-based

▪ Is it completely up to the tester?▪ Can you run which ever test sessions you want, without any pre-set

scope?

Page 10: Hoberg's test octagon

ConfidentialPA12013-12-1310

Required Tool Support

▪ Does the activity require certain tools?

▪ Bluetooth testing, power consumption tests, 3GPP tests, all require specific equipment to run the tests

▪ Activities such as integration tests which are run in a continuous integration system need to be automated

▪ User-focused test are examples where no specific tools are usually needed

Page 11: Hoberg's test octagon

ConfidentialPA12013-12-1311

Executor

▪ Who executes the tests?

▪ Dedicated tester?

▪ Developer?

▪ Developer-in-Test?

▪ External User?

▪ Internal User?

▪ External test house?

Page 12: Hoberg's test octagon

ConfidentialPA12013-12-1312

Definition of Done

▪ When is the test activity over?

▪ When all tests are executed?

▪ When a time period has passed?

▪ When the tester says so?

▪ When the first defect is found?

▪ When the stakeholder says so?

Page 13: Hoberg's test octagon

ConfidentialPA12013-12-1313

Evaluating Attributes

▪ Once you have all activities mapped with attributes and values you can start comparing and evaluating them

▪ This can give you insight into for example if two activities are very similar and perhaps redundant

▪ It can also show that there are gaps in some areas, if many activities have similar attribute values, and parts of the value-spectrum is not covered

Page 14: Hoberg's test octagon

ConfidentialPA12013-12-1314

How attributes affect test method

▪ The test activities themselves to not force a specific test method

▪ Scripted testing / Session-based testing / Ad-hoc testing

▪ Manual / Automated / Tool supported

▪ But often if you look at the attributes, you will get hints as to what is more or less suitable as a method for that activity

Page 15: Hoberg's test octagon

ConfidentialPA12013-12-1315

Conclusion

▪ The reason why there are 8 test activity attributes described here is totally arbitrary and only because I wanted to use octagon in the title – which attributes are relevant is completely context dependant

▪ By having all relevant attributes mapped out, it becomes much easier to plan, and find gaps and redundant activities

▪ How many attributes you choose to use is based on what granularity you need for your planning (and if you want to have a cool sounding model name)

Page 16: Hoberg's test octagon

ConfidentialPA12013-12-1316

References

[1] Brian Marickhttp://www.exampler.com/old-blog/2003/08/22/#agile-testing-project-2

[2] Lisa Crispinhttp://lisacrispin.com/2011/11/08/using-the-agile-testing-quadrants/

[3] Gojko Adzichttp://gojko.net/2013/10/21/lets-break-the-agile-testing-quadrants/

[4] Markus Gärtnerhttp://www.shino.de/2012/07/30/the-testing-quadrants-we-got-it-wrong/