|Phase 1& 2 Comprises:
Mixed Use Tower (Block R):
Offices– Levels 4 to 22.
Office 39,162m2.
Apartments- Levels 25 to 75 floors.
Residential 65,737 m2.
456 Apartments Graded into
3 class types
Superior, Economy Plus and Economy
Office Tower (Block О):
Offices
Gross 67,716m2.
Hotel & Serviced Apartments (Block Н):
Hotel- Levels 1-12,
190 rooms.
24,017m2.
Serviced Apartments
100 Apts.
9,715m2.
Retail (Block Р):
Retail 42,168m2.
Basement 4 levels
3232 parking spaces.
119,794m2
Phase 3 Comprises:
175,000m2 under Design
ST. PETERSBURG RENOVATION / CПБ РЕНОBAЦИЯ | SEPT/ СЕНТЯБРЬ 2012
|| Non-Volumetric Pre Assembly (Type 2)
•4 No. 7 storey riverside residential buildings, with a total of 285 apartments
constructed using Alcrete Ireland concrete twin wall system.
•Early stage design freeze on dimensioning including wall services installation. All
walls were 215mm thick, twin wall precast system, site concrete filled and back
propped temporarily with no use of shuttering formwork work.
•Floors were 65mm thick precast wide slabs (2.4m) with 135mm structural topping
and spanning 6m. 200mm thick floor required for sound rating and fire resistance.
•Alcrete designed, supplied and installed entire structure. The manufacture of the
systems were in Co. Kildare, 1 hour from the site and turn around of each panel
from pouring to removing from the tray was 8 hours. All systems were robotically
controlled.
•All walls were finished with Altek surface treatment with no plasterboard or wet
plaster trades. The surface of the concrete was finished to a high quality.
Clancy Barracks Dublin- Twin Wall Systems
ST. PETERSBURG RENOVATION / CПБ РЕНОBAЦИЯ | SEPT/ СЕНТЯБРЬ 2012
|| Non-Volumetric Pre Assembly (Type 2)
Advantages to System:
•Saves time, eliminates expensive formwork and cuts preliminary costs.
•Reduced site labour and thus improved health and safety
•Excellent consistent fire rating and acoustic properties
•Pre finished system with only joint finishing and final coating required using Altek
•1 whole floor panelling was done in one week which was approximately 10 apartments.
Clancy Barracks Dublin- Twin Wall Systems