Who We Are

International Award winning practice with offices in

London, Dubai and Astana.

|

London

Dubai

|

• Urban Density

• Intensification

• Modern Methods of Construction

| Mixed Use Development : Abu Dhabi Plaza, Astana

|Phase 1& 2 Comprises:

Mixed Use Tower (Block R):

Offices– Levels 4 to 22.

Office 39,162m2.

Apartments- Levels 25 to 75 floors.

Residential 65,737 m2.

456 Apartments Graded into

3 class types

Superior, Economy Plus and Economy

Office Tower (Block О):

Offices

Gross 67,716m2.

Hotel & Serviced Apartments (Block Н):

Hotel- Levels 1-12,

190 rooms.

24,017m2.

Serviced Apartments

100 Apts.

9,715m2.

Retail (Block Р):

Retail 42,168m2.

Basement 4 levels

3232 parking spaces.

119,794m2

Phase 3 Comprises:

175,000m2 under Design

|

| Abu Dhabi Plaza, Astana (Phase 1 and 2)

| Mixed Use Development : Minsk, Belarus

|

|Mixed Use Development : Smithfield Dublin

|

|Mixed Use Development : Smithfield Dublin

Mixed Use Development : Smithfield Dublin

| New Urban Settlement : Qatar Mixed Use Development : Clancy Quay, Dublin

ST. PETERSBURG RENOVATION / CПБ РЕНОBAЦИЯ | SEPT/ СЕНТЯБРЬ 2012

|| Non-Volumetric Pre Assembly (Type 2)

•4 No. 7 storey riverside residential buildings, with a total of 285 apartments

constructed using Alcrete Ireland concrete twin wall system.

•Early stage design freeze on dimensioning including wall services installation. All

walls were 215mm thick, twin wall precast system, site concrete filled and back

propped temporarily with no use of shuttering formwork work.

•Floors were 65mm thick precast wide slabs (2.4m) with 135mm structural topping

and spanning 6m. 200mm thick floor required for sound rating and fire resistance.

•Alcrete designed, supplied and installed entire structure. The manufacture of the

systems were in Co. Kildare, 1 hour from the site and turn around of each panel

from pouring to removing from the tray was 8 hours. All systems were robotically

controlled.

•All walls were finished with Altek surface treatment with no plasterboard or wet

plaster trades. The surface of the concrete was finished to a high quality.

Clancy Barracks Dublin- Twin Wall Systems

ST. PETERSBURG RENOVATION / CПБ РЕНОBAЦИЯ | SEPT/ СЕНТЯБРЬ 2012

|| Non-Volumetric Pre Assembly (Type 2)

Advantages to System:

•Saves time, eliminates expensive formwork and cuts preliminary costs.

•Reduced site labour and thus improved health and safety

•Excellent consistent fire rating and acoustic properties

•Pre finished system with only joint finishing and final coating required using Altek

•1 whole floor panelling was done in one week which was approximately 10 apartments.

Clancy Barracks Dublin- Twin Wall Systems

| New Urban Settlement : Qatar

|Mixed Use Development : Commercial Rd, London

ST. PETERSBURG RENOVATION / CПБ РЕНОBAЦИЯ | SEPT/ СЕНТЯБРЬ 2012

|

|Residential Development : Rockbrook, Dublin

ST. PETERSBURG RENOVATION / CПБ РЕНОBAЦИЯ | SEPT/ СЕНТЯБРЬ 2012

|

|

|

| Student Housing: London

| Pocket Housing: London

| Pocket Housing: London

| Hotel Development : Mekkah, Kingdom of Saudi Arabia

|

|

|

|

| New Urban Extension : St Petersburg, Russia

|

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka

MODERN METHODS OF CONSTRUCTION

December 2013

SPb Gutenborg Slavyanka