History of HITACHI POWER EUROPE

Transcript of History of Hitachi Power Europe

  • 5/19/2018 History of Hitachi Power Europe

    1/4

    Hitachi Power Europe ServiceGmbH

    Friedrich-Ebert-Str. 13447229 Duibur!"Germa#$

    History

    1927 Rheinische Rohrleitungsbau GmbH was set up.

    1928 Ferdinand Lentjes Kesselschmiede and Maschinenbau was

    founded.

    1958 Ferdinand Lentjes Foundation was created.

    1980 Acquisition of urmeister ! "ain A#$ % &emar'

    Licence for (enson) forced*circulation steam generator.

    1984 Acquisition of Gottfried ischoff GmbH ! +o. KG

    ,oda- Lurgi ischoff GmbH.

    1985 Acquisition of a /0 sta'e in $tandard'essel Gesellschaft

    $tep up of steam generator acti1ities.

    1990 Metallgesellschaft AG2 Fran'furt#M acquires a 30 sta'e inLentjes AG

    1991 Metallgesellschaft AG2 Fran'furt#M acquires remaining 450sta'e in Lentjes AG

    1992 Lentjes and German abcoc' merge steam generatoracti1ities into a joint enterprise * abcoc' Lentjes

    Kraftwer'stechni' 6LK7

  • 5/19/2018 History of Hitachi Power Europe

    2/4

    1993 8ndustrial boiler acti1ities amalgamated into Lentjes

    8ndustrie'essel GmbH 6L8K7 and ser1ice acti1ities into

    Lentjes 8ndustrie'esselser1ice GmbH 6L8$7

    Lurgi2 Lentjes and &eutscheabcoc' consolidate fluidised

    bed technologies in a separate

    compan- * the LL Lurgi

    Lentjes abcoc' 9nergietechni'

    GmbH * toda- operating as

    Lentjes GmbH.

    1995 8ntegration of Lentjes 8ndustrie'essel GmbH 6L8K7 into

    $tandard'essel AG and relocation of H: to &uisburg.

    1996 Reorganisation of plant area within Metallgesellschaft;

    Lentjes is responsible for the areas; energ-2 # power plant

    technolog- and corresponding en1ironmental protection

    under Lurgi.

    Lurgi Lentjes AG raises its sta'e in $tandard'essel AG from

  • 5/19/2018 History of Hitachi Power Europe

    3/4

    Group alongside $tandard'essel and aumgarte.

    $tandard'essel@s ser1ice di1ision integrated into Lurgi

    Lentjes $er1ice GmbH.

    2004 mg technologies sells its boiler di1ision 6$tandard'essel

    Group7 to &utch H,*8n1estments .B..

    Lurgi Lentjes $er1ice GmbH reorganised as LL$

    $tandard'essel $er1ice GmbH.

    2006 ,h-ssenKrupp Cer1on GmbH acquired the ser1ice

    companies LL$ $tandard'essel $er1ice and aumgarte

    oiler $er1ice as of 3 Danuar- =//E.

    LL$ $tandard'essel $er1ice Gmbh incorporated into,h-ssenKrupp Cer1on 9nerg- GmbH.

    aumgarte oiler $er1ice GmbH amalgamated into

    ,h-ssenKrupp Cer1on 9nerg-.

    2012 As of August 32 =/3= Hitachi ower 9urope GmbH 6H97aqcuired Cer1on 9nerg- GmbH. Cer1on 9nerg- GmbH has

    been renamed to Hitachi ower 9urope $er1ice GmbH

    6H9$7.

    Engineering

    Today, the options for generating energy, steam

    and heat with the aid of oi!er and firing systems

    are greater than e"er# $ %s is the demand for there!e"ant &now$how in order to ma&e the est

    possi!e 'se of these options#

  • 5/19/2018 History of Hitachi Power Europe

    4/4

    >ur engineers are there to ad1ise -ou in all matters concerning plant optimisation2 modernisation

    and maintenance. From basic engineering to detail engineering2 our goal is to bring the efficienc-

    and operational reliabilit- of eisting plants in line and update same when necessar-

    +lic' on our website headings relating to boiler and firing s-stems in order to gain an o1er1iew

    of our full range of products and ser1ices;

    9ngineering ser1ices

    lant optimisation

    Firing s-stems

    Refractor-

    +onstruction and repairs

    rocess optimisation

    $er1icing and maintenance

    +ommissioning and plant management

    $pare parts and =4 hour hotline