HiRadMat WG 2&3 team meeting

5
HiRadMat WG 2&3 team meeting January 29, 2010 1 Activities for next weeks + perturbations TNC cleaning Beam line removal TCX block removal Survey reference points Agenda

description

HiRadMat WG 2&3 team meeting. Agenda. Activities for next weeks + perturbations TNC cleaning Beam line removal TCX block removal Survey reference points. TNC cleaning : status. Visual inspection OK - PowerPoint PPT Presentation

Transcript of HiRadMat WG 2&3 team meeting

Page 1: HiRadMat WG 2&3 team meeting

1

HiRadMat WG 2&3 team meeting

January 29, 2010

• Activities for next weeks + perturbations• TNC cleaning• Beam line removal• TCX block removal• Survey reference points

Agenda

Page 2: HiRadMat WG 2&3 team meeting

2

TNC cleaning : status

January 29, 2010

Visual inspection OKSmear tests taken where contamination was the highest: reduction by a 10 factor

(all smear tests < contamination level)Endel left on last Tuesday after equipment decontamination + RP checksDosimetry below estimates (collective dose 2.2 mSv where 3.2 was estimated)

0

200

400

600

800

1000

1200

day 1 day 2 day 3 day 4 day 5

Staff 1

Staff 2

staff 3

Estimate

Page 3: HiRadMat WG 2&3 team meeting

3

Beam line removal

January 29, 2010

DIMR completed: https://edms.cern.ch/document/1058846/1Work in 5 phases:1- Equipment located between 2 fences DONE2- Equipment ready for move in front of T9 (1 magnet + blocks) DONE3- Prepare remaining equipment in front of T9 (vacuum disconnection)4- Remove remaining equipment in front of T95- Remove 2 monitors at the end of TNC (4 blocks to be moved)

Page 5: HiRadMat WG 2&3 team meeting

5

Survey reference points

January 29, 2010