HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the...
-
Upload
doreen-gilbert -
Category
Documents
-
view
216 -
download
0
description
Transcript of HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the...
![Page 1: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/1.jpg)
HiRadMat –Users Meeting
29/5/2015
Adrian Fabich
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453
![Page 2: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/2.jpg)
A. Fabich 2
HiRadMat beam …
• GlassyC is installed
Waiting for beam …• Some pulses on 15. May• Now waiting for improvements of SPS extraction
29/5/2015
![Page 3: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/3.jpg)
A. Fabich 3
Feed-throughsBetween TNC and TT61• Used already by GlassyC/dBM
Inserts - viewing windows• arrived at CERN• to be installed early June
29/5/2015
EDMS SPSLHRM_0060
![Page 4: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/4.jpg)
A. Fabich 4
TT61 setup
• TT61 will be equipped with– A standard SPS 19” rack (600 mm x 800 mm)– A table
29/5/2015
![Page 5: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/5.jpg)
A. Fabich 5
Cabling databaseDocument in finalization (EDMS 1415953)• Permanent cabling installed
– Connecting TNC and TJ7 (patch rack)– Connecting TJ7 and control room
Already installed, to be added to DB:– Connecting TNC and TT61– 5 x NE48 (TT61 connector to be exchanged)– 12 x CK50
29/5/2015
![Page 6: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/6.jpg)
A. Fabich 6
Cabling overviewAn experimental TNC table is equipped with:
From Control Room– 6 x NE48
• 5 x can be used in manual mode• 1 x on automatic plug-in
– 24 x CK50 e.g. for BPM read-out– Several HV cables – manual mode, e g. for BPM supply
From TT61– 5 x NE48 from TT61
• 5 x on automatic plug-in• E.g. for strain gauges
– 12 x CK50• E.g. for high frequency signals (from BPM)
– Dedicated experimental cables (subject to discussion) via empty cable ducts• E.g. fibre optics• Max diameter 35 mm (also for connectors)• Beyond 35 mm requires dedicated study using 3rd feed-through with inner diameter 100 mm
29/5/2015
![Page 7: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/7.jpg)
A. Fabich 7
Cable proposal forHRMT22 – Ptarg• 5 x NE48 from Control Room
– 2 x in auto-plug-in mode for horizontal stage• Merge to one NE48?
– 2 x in manual mode for vertical stage• Merge to one NE48?
– 1 x in auto-plug-in for LEDs• 2 x NE48 from TT61
– auto-plug-in for vacuum gauges/controls• 4 x CK50 from TT61
– For BPM• No fibres foreseen
This is a preliminary list to be completed by the system responsibles.
29/5/2015
![Page 8: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/8.jpg)
A. Fabich 8
Cable proposal for HRMT24 – BeGrid
• 4 x NE48 from Control Room– 2 x in manual mode for vertical stage– 1 x in auto-plug-in for LEDs– 2 x in manual mode for For BPKG/BTV
• CK50 from Control Room– For BPKG/BTV
• 5 x NE48 from TT61 – In auto-plug-in for strain gauges
• Fibres required?
Such a list should be- Prepared by each experiment- Re-iterated with HRM coordination
29/5/2015
![Page 9: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/9.jpg)
A. Fabich 9
Cable proposal for HRMT 27 - RodTarg
NE48 ? :• 1 x Thermocouple cable 24 pairs, Type K• 1 x Thermocouple cable 8 pairs, Type N• 1 x NE8 copper cable
Special cables – to be discussed:- Should be reduced to a minimum
- Space in feed-throughs is limited- Optimizing installation effort
• 2 x Radiation hard camera cables• 3 x Optic fibres respecting the standard G.652• 1 x LumaSense Pyrometer Optic fibre:
http://www.lumasenseinc.com/uploads/Products/Impac/pdf/Datasheets/Pyrometer/Series_740/IGA740_IGA740_LO_Datasheet.pdf
• 2 x PANDA PM Optic Fibers
29/5/2015
![Page 10: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/10.jpg)
A. Fabich 10
Schedule
29/5/2015
Consider 1-2 additional weeks of back-up for beam slot
![Page 11: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/11.jpg)
A. Fabich 11
Subsistence for travel/accommodationEuCARD-2 “Transnational Access”
29/5/2015
Do not hesitate sending requests to [email protected] info: https://espace.cern.ch/hiradmat-sps/Wiki%20Pages/[email protected]
![Page 12: HiRadMat Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,](https://reader036.fdocuments.us/reader036/viewer/2022062504/5a4d1b677f8b9ab0599b0f48/html5/thumbnails/12.jpg)
A. Fabich 12
Safety file
• See recommendations by Technical Board
– https://edms.cern.ch/project/CERN-0000094595
• Submit response to [email protected] ADVANCE TO BEAM TIME!
29/5/2015