Hinh ảnh công ty Acorp
-
Upload
acorp-viet-nam -
Category
Technology
-
view
1.150 -
download
0
Transcript of Hinh ảnh công ty Acorp
Huanghua core Terminal Project
Quianwan core Terminal Project in Quingdao Port Total 280,000,000 USD (Aug.2000-Sep.2003)
Tianjin Nanjiang core Terminal Project
Dandong core Terminal Project
Rizhao Core Terminal Project, Total 210,000,000 USD (Oct.1999-Aug.2004)
Crude Oil Terminal for Tankers up to 300.000 dwt in Dalian Port Total 183,000,000USD (Mar.2001-Apr.2005)
New Hongguang Oil Terminal in Shenzhen Total 210,000,000USD (Feb.2002-Aug.2008)
Tai’erzhuang Ship Lock for 3000t Ships Total 80,000,000USD (2001-2003)
Secondary Ship Lock in Hanzhuang Total 75,000,000 (2001-2003)
Spill-way Gate for Yuqiao Reservoir in Tiajin Total 21,000,000USD (Mar.2002-Mar.2003)
DazhangZhuang Pumping station in Tiajin Total 124,000,000USD (Jun.2002-Aug.2003)
Regulation work for waterways in the lower reach of the Xijinang River in Guangxi
45,000,000USD (2001-2003)
The River Gate at the water source in Pingshan, Hebei Total 20,000,000USD (2000-2001)
Steel Structure for CHEC Office Building
Steel Structureof the factory buidings for Sianghai Port Total 123,000,000USD (Mar.2003-Apr.2004)
SteelGirder Structure for the Entrance wave Testing Hall in Tianjing research Institute for water Transport Engineering
Steel Structure of the Entrance Gate for Tianjin Port Total 87,000,000USD (Mar.2003-Feb.2004)
Pantuo Mountain Tunnel in Fujian Total 120,000,000USD (Mar.2000-Aug.2002)
Water Diversion Tunnel in Jinshao
Songshan Mountain Tunnel in Qingdao Total 80,000,000USD (Mar.2002-Aug.2005)
Hangzho-Nanjing Express Highway Total 28,000,000USD (Jan2000-Mar.2005)
Tianjing-Jixian Express Highway Total 180,000,000USD (Feb.2001-Aug.2005)
Hangzhou-Quzhou Express Highway Total 254,000,000USD (Jan.2003-Sep.2006)National Highway Mautitania Total 286,000,000USD (Feb.2001-Oct.2005)
Ningbo-Taizhou-Wenzhou Express Highway Total 308,000,000USD (Aug.2000-Oct.2005)
No.1 Bridge over Xinghai Bay in Dalian, with the main span of 130.5m Total
120,000,000USD (Aug.2002-Sep.2006)
Caofeidian Rainbow Bridge, with the main span of 94m Total 80,000,000USD (Aug.2002-
Aug.2005)
Hanzhuang Bridge an extension project for Beijing-Hangzhou Canal, with the main span of
80.8m Total 50,000,000USD (Mar.2000-Jan.2003)
Dandong-Benxi Express Highway Total 280,000,000USD (2001-2004)
Macau international Airport Total 680,000,000USD (Oct.1999-Aug.2003)
Navigational Lighting Aid Project in Shanhaiguan Air Port
Pudong International Airport Shanghai Total 230,000,000USD (Mar.2000-May.2004)
TEDA Football Stadium Total 342,000,000USD
Water discharge outlet for Jiangsu Nuclear Power Plant Total 233,000,000USD (Jan.2000-
Aug.2004)
Railed Express Way Total 189,000,000USD (2000-2003)
Yangtsy Estuary Lager Circular Concrete Caisson Testing Project in Shanghai
Large Steel Circular Pile Revetment Project in Panyu, Guangdong
500t Floating Crane 120m3/h Concrete Mixing
Bargel
18m3 Grab Dredger
Floating Rig for Installing
Prefabricated Drains
Bed Levelling Ship Geotextile Mattress
Laying Barge
Prefabricated Drain
Driving Rig Total
Vibrating Road Roller Total Concrete Mixer Total
Batching and Mixing Plant
for Asphalt Concrete TotalAsphalt Spreader Total
Concrete
Pumps
Batch Plant
Pile Driver