Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government...
Transcript of Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government...
![Page 1: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/1.jpg)
Submission folder
Customer Hotline Customer Hotline Customer Hotline Customer Hotline Customer Hotline Customer Hotline Customer Hotline Customer Hotline
Hong Kong 8228 8118Macau (Toll free) 00800- 8228 8118
Hilti Hilti Hilti Hilti CP672 CP672 CP672 CP672 FirestopFirestopFirestopFirestop Joint Spray Joint Spray Joint Spray Joint Spray
Submission FolderSubmission FolderSubmission FolderSubmission Folder
Product Info. & Method Statement 2 - 4
Test Report
-Efectis Nr. 08-E-294 5 - 38
Government Letters
Buildings Department 39Fire Services Department 40 Architectural Services Dept. 41
Country of Origin 42
LEED Letter 43
Material Safety Data Sheet 44 - 47
Job Reference 48 - 52
1 August 2014
![Page 2: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/2.jpg)
Firestop Systems
273 Customer Hotline: Hong Kong 8228 8118 Macau 00800 8228 8118 (Mon - Fri 8:30 am - 6:00 pm / Sat 8:30 am - 1:00 pm) | Hilti online: www.hilti.com.hk★ Non-Stock Item in HK & Macau
Firestop joint sprayCFS-SP WBA sprayable fire rated seal for use in curtain wall edge of slab and head of wall joints, up to 50% movement capacity
Application Procedure
1. Clean opening 3. Apply CFS-SP WB by paint brush or spray
2. Pack in mineral wool 4. Allow CFS-SP WB to cure
CFS-SP WB
Contributed to LEED IEQ Credit 4.1Low-Emitting Materials-Adhesives & Sealants
Contributed to LEED IEQ Credit 4.1Low-Emitting Materials-Architectural Coating
FMAPPROVED
For Penetration Fire Stops.Consult the Factory Mutual Research Corporation Approval Guide.
R
C
LASSIFIED
FILL, VOID OR CAVITY MATERIALS CLASSIFIED BY
UNDERWRITERS LABORATORIES, INC.FOR USE IN TROUGH-PENETRATION
FIRESTOP SYSTEMS SEE UL FIRE RESISTANCE DIRECTORY
66Y7
(Macau Local FSD Approved)
British StandardBS 476BS 476-20
EN 1364-4EN 1366-4
AcousticSmoke Water Tight
Advantages■ Quick and easy installation with an Airless Sprayer saves you time and money
■ Maximum flexibility, exceeds 500 cycle requirements (Class II and III approval) (ASTME 1966 and UL 2079)
■ Proven to resist seismic type cycling movements
■ Low slump formulation limits product runs in vertical surface application
Applications■ Curtain wall joint
■ Top-of-wall joint
Product Features■ Contains no halogens, solvents or asbestos
■ Water based, easy to clean
■ Sprayable or apply by brush
■ Excellent adhesion to most substrates
■ Paintable
Technical data (at 23˚C and 50% relative air humidity)
CFS-SP WB
Base materials Drywall,masonry,concrete and curtain-wall
For use in Walls and floors
Fire rating Up to 120 mins (BS EN 1364-4)Up to 240 mins (BS EN 1366-4)
Color Red / White
Chemical basis Acrylic water-bsed dispersion
Consistency Can be applied by paint brush or spray
Storage temperature 5˚C to 25˚C
Application temperature 4˚C to 40˚C
Temperature resistance -40˚C to 80˚C
Skin-forming time 2 hours
Curing time 3mm in 24 hour
Ph-value Approx. 8-9
Movement capability Up to 50 %
Smoke Leakage (BS EN 12101-1) 0.5 m³/h/m² at 25Pa ambient temperature
Coating Thickness 3mm (required wet film thickness)1.5mm (single dry film thickness)
Surface burning characteristics(ASTM E 84-06)
Flame spread : 5smoke development : 10
Sound transmission classification(ASTM E 90 - 00)
55 db
Content 19 L (25.5kg)
Shelf life after production 12 months (stored in a dry place)
Ordering
Order designation Color Packaging content (pcs) Item No. Firestop joint spray CFS-SP WB Red 1 (19 litres) 00430815 Firestop joint spray CFS-SP WB White 1 (19 litres) 00430816 ★
Joint width Wtih overlap 12.5mm Metres per 19 liters (mm) either side (mm) pail (meters)
25 50 110 50 75 75 100 125 45 150 175 35 200 225 30
Consumption Guide (based on 3mm wet thickness)
2013_09_Firestop_Eng_final_02.indd 273 12/15/12 4:23 PM
2 August 2014
![Page 3: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/3.jpg)
Hilti (Hong Kong) Ltd.
701-704 | Tower A | Manulife Financial Centre 223 Wai Yip Street | Kwun Tong
Kowloon | Hong Kong P +852-8228 8118 I F +852-2954 1751
www.hilti.com.hk
Subject: Method Statement of CFS-SP WB Material: CFS-SP WB Firestop joint spray Accessory: Nil Setting Operation 1 Clean the opening. Surfaces to which the Firestop
Joint Spray will be applied should be cleaned of loose debris, dirt, oil, wax and grease. The surface should be moisture and frost free.
2 Install the prescribed back filling material type and depth to obtain the desired rating.
3 Apply the Firestop Joint Spray to the required thickness in order to obtain the desired rating (For wet thick: 3mm; For dry thick: 1.5mm). Make sure the Firestop Joint Spray contacts all surfaces and overlaps beyond all surrounding surfaces (Overlap length min 12.5mm). Titan Sprayers have been successful in applying Firestop Joint Spray. Hilti recommends the use of the Titan 600 (for application temperatures above 50°F / 10°C) or Firestop Joint Spray may also be brushed on with a paint brush.
3 August 2014
![Page 4: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/4.jpg)
2
4 Allow the Firestop Joint Spray to fully cure-- approx. 24 hours for typical application thickness (73°F / 23°C and 50% humidity). Users could use simple measuring tools to measure the thickness, for example: cardboard.
5 For maintenance reasons, all Firestop Joint Spray applications can be permanently marked with an identification plate and fastened in a visible position next to the seal.
Safety precautions:
Store in a cool dry area Keep from freezing. Store between 4°C and 25°C. Keep out of reach of children Use with adequate ventilation. Keep container closed when not in use. Do not get into the eyes Do not cover the coating with anything during the curing time. Avoid prolonged or repeated contact with the skin. Never use in areas immersed in water or on hot surface (over 80°C)
4 August 2014
![Page 5: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/5.jpg)
5 August 2014
![Page 6: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/6.jpg)
This test report includes 33 sheets. Copies of this document are allowed only in full.
FIRE RESISTANCE OF BUILDING CONSTRUCTION
FIRE TEST n° 08 - E - 294 According to NF EN 1363-1 and NF EN 1364-4.
Concerning :
Horizontal Linear Gap Sealing System (Perimeter Seal) for Curtain Walling reference: HILTI CP 672.
Fire direction : Internal fire exposure.
Applicant :
HILTI AG FURSTENTUM LI-9494 SCHAAN LIECHTENSTEIN
6 August 2014
![Page 7: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/7.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 2 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
1. SCOPE OF THIS TEST REPORT
Fire resistance test of an horizontal linear gap sealing system, in conformity with the general requirements of standard NF EN 1363-1, the additional or substitute procedures of standard NF EN 1363-2, and the particular requirements of standard NF EN 1364-4 : 2008 : "Fire resistance tests of non-loadbering elements - Part 4 : Curtain walling – Part configuration". According the standard NF EN 1364-4: 2008, we have tested the configuration n° 14 represented on table A1.
2. TEST LABORATORY
Name : EFECTIS France Adresse : Voie Romaine F - 57280 MAIZIERES-Lès-METZ
3. FIRE RESISTANCE TEST
N° of the test : 08 - E - 294 Test date : August 29th 2008
4. REFERENCE AND MANUFATURER OF TEST SPECIMEN
Horizontal linear gap sealing system: Designation: Hilti CP 672 Manufacturer: Hilti AG (FL)
5. ADDITIONAL INFORMATIONS FOR CE MARKING
• Sampling locations: HILTI Deutschland GmbH Distributionscentrum Oberhausen Außenstelle Mülheim
• Sample quantity: 3 buckets of 26 kg. • Manufacturer’s batch number: (10) S333701 • Identification Security Label n°: 3576; 3573; 3575. • Name of the MPA NRW employee: Mrs.Burow-Strathoff • MPA NRW notified bodies n°: 0432.
On the 11.08.2008 an employee of the MPA NRW carried out an official sampling of the CP 672 firestop Spray samples and they were sent directly to EFECTIS France.
7 August 2014
![Page 8: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/8.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 3 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
6. DESCRIPTION OF TEST SPECIMEN
6.1 GENERAL
Note : The test specimen (dimensions, fire direction, supporting frame and assembling) was supplied by the Applicant to the Test Laboratory on his own initiative, in conformity with clause 12 of standard NF EN 1363-1. See plates n° 1 to 6. The test specimen was :
• A glazed facade in part configuration ; • A horizontal linear gap seal system made of CP 672 (HILTI) and mineral wool.
6.2 PART LIST
See plate n° 6.
6.3 DETAILED DESCRIPTION OF THE SPECIMEN
Note : The drawings shown on plates n° 1 to 6 have been provided by the Applicant. They have been checked by the Test Laboratory of EFECTIS France and found in conformity with the test specimen.
6.3.1 Horizontal Linear Gap Seal (Perimeter Seal)
The gap between the supporting floor and the façade was 210 mm. The horizontal seal was made from seven layers of mineral wool board (RPV-40, ROCKWOOL), cut to strips of 200 mm width, with a density of 40 kg/m3
and a thickness of 60 mm compressed to 50%. The strips were installed vertically (compression in the direction vertical to the surface of the floor slab). The Mineral wool was covered on top (non-exposed side) with HILTI CP 672 with a dry film thickness of 1.5 mm to 2 mm. The gap face was formed by the standard supporting floor on the one side and three different types of boards on the other side: Gypsum board, Calcium Silicate board and Al-faced mineral wool board. For further details see 6.3.2.2.
6.3.2 Curtain walling
6.3.2.1 Framework
The façade was made of mullions and transoms n° 76.696 (overall section: 80 x 50 mm and thickness 2 mm), from VISS TV range (JANSEN) straight cut and assembled by welding. The mullions were fixed to the supporting floor, with a system made of:
• One steel piece “T” for the intermediate mullions and one steel piece “L” for the side mullions (dimensions: 170 x 135 x 60 mm for the “T” piece and 225 x 135 x 60 mm for the “L” piece; thickness 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).
• One steel piece (dimensions 150 x 60 x 10 mm) welded on the mullions. The assembly of these pieces was made by nuts and bolts M10 x 40 mm (HILTI).
8 August 2014
![Page 9: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/9.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 4 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
The mullions were fixed to the furnace closure, with a system made of two steel L profiles (dimensions 100 x 100 x 5 mm) fixed on the mullions by nuts and bolts M10 x 80 mm (HILTI) and fixed on the furnace closure by bolts HST M10/30 (HILTI). (See plate n°2) The mullions were associated with a seal reference 455.516 (JANSEN). The transoms were associated with a seal reference 455.536 (JANSEN). The profiles were associated with pins n° 452.478 and 452.486 (JANSEN). The mullions were reinforced by 46 x 5 mm (w x th) steel strengthening plate. (See plate n°4) The backside of the framework was covered by three different panels made of :
1. Aluminium foiled and mineral wool board reference CONLIT 150 U (thickness: 25 mm; density >=150 Kg/m³)
2. Two layers of 15 mm thick Promatect H (PROMAT) 3. Two 15 mm thick Plasterboard.
These panels was fixed to the framework (mullions and transoms) by screws S-MDO 32 (HILTI) Ø 6,3 x 50 mm every 200 mm.
6.3.2.2 Glazing and panels
The framework consisted of 12 openings (6 openings exposed to fire and six openings non-exposed to fire): Opening exposed to fire
• Three, 34 mm thick Contraflam Lite EW 60 ISO (VSGI) exposed to fire; • Three, 34 mm thick sandwich panels reference Conrock Q3, nominal density: 100 kg/m3(ROCKWOOL);
one fire side, the panels were associated with 25 mm thick Promatect H (PROMAT) fixed on the profiles by screws Ø6,3 x 60 mm every 200 mm. The gap between the mullions and the panels was filled with rock wool density 90kg/m3.
Openings non-exposed to fire
• Three different panels located in front of and over the supporting floor, between each mullion and fixed one the backside of the profiles (one panel made of a gypsum boards (2 layers, each 15 mm thick); one panel made of aluminium foiled and mineral wool board reference CONLIT 150 U (thickness: 25 mm; density >=150 Kg/m³) and one panel made of two 15 mm thick Promatect H (PROMAT)
• Three, 34 mm thick sandwich panels reference Conrock Q3, nominal density: 100 kg/m3(ROCKWOOL). The Contraflam Lite EW60 ISO is composed by:
• 5 mm tempered glass • 4 mm intumescent layer • 5 mm tempered glass • 12 mm spacer filled with air gas • 6 mm tempered glass
Each glazing and panel was associated with two 15 x 2 mm intumescent strip reference Promaseal LW.
6.3.2.3 Glazing and panels holding system.
Each glazing or panel was packed, in the lower part with two holding system reference 452.486 and 452.478 (JANSEN) associated with two 453.032 setting blocks. Each glazing or panel was held by stainless steel pressure plate n°400.867 associated with 452.508 and 452.509 CR seal and 407.862 aluminium profiles. The gap bottom clearance is 5 mm. The overlap of the glazing is 15 mm.
9 August 2014
![Page 10: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/10.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 5 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
6.3.3 Vertical edges
On each side, the mullions were associated with 32 mm thick Promatect H (PROMAT) and Steel L profile (dimensions 45 x 50 x 2 mm) between the L profile and the supporting construction was filled with Fernoseal (BLOEM) silicone. On fire side, the vertical seal was made of an L steel profile (dimensions : 70 x 45 x 2 mm) fixed to the mullions by screws Ø 6,3 x 60 every 200 mm. The gap between the mullions, the L steel profile, the Promatect H section and the supporting construction was filled by Rockwool, density 40 kg/m3. (see plates n° 4 and 5)
7. TEST ASSEMBLY
7.1 DEFINITION OF THE TEST SPECIMEN
The choice and the definition of this test specimen were carried out by the Applicant according to paragraph 12 of standard NF-EN 1363-1.
7.2 ASSEMBLING OF THE TEST SPECIMEN
The assembly of the element was realised by the Applicant. For the test configuration, the façade was held on the supporting floor by an additional system made of :
• steel plates dimensions 195 x 60 x 5 mm welded on the mullions, • L steel profiles dimensions 80 x 40 x 5 mm fixed to the supporting floor by bolts HST M10/30 (HILTI) • L steel profiles dimensions 40 x 40 x 5 mm, length 950 mm
See plates n° 2 to 5
7.2.1 Supporting structure
Supporting floor A standard supporting floor was used, made from reinforced concrete (density 2200 kg/m3; thickness 200 mm), supplied by the Laboratory EFECTIS France. The drying duration of the concrete floor was in excess of 28 days. Furnace closure The front furnace closure was made from aerated concrete (density 550 kg/m3; thickness 200 mm). Dimension of fire exposed part of the curtain walling: 3,100 x 1,000 mm (w x h).
7.2.2 Assembling conditions of the test specimen
The facade element was assembled with its two vertical free edges.
10 August 2014
![Page 11: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/11.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 6 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
8. TEST METHOD
8.1 THERMAL PROGRAM
The temperature rise inside the furnace above the ambient temperature was controlled according to the standard thermal program represented by the following function :
T = 345 log10 (8t+1) + 20
where : t = Time [min] T = Temperature inside the furnace at time t [°C]
8.2 DIRECTION OF FIRE
The fire test was carried out with an internal exposition. The mullions and transoms were into the fire. Fire on Contraflam Lite side.
9. FIRE TEST RESULTS
The locations of the sensors are shown on plate n° 15. The readings are recorded in Annex 1 on the plates mentioned hereafter.
9.1 TEMPERATURE MEASUREMENTS
9.1.1 Ambient temperature
It was measured according to NF EN 1363-1, by the thermocouple n° 7.
See plate n°7.
9.1.2 Furnace temperatures
They were measured in conformity with standard NF EN 1363-1 by 6 plate pyrometers positioned according to with their metal face towards the back of the furnace:
See plates n° 8 and 9.
9.1.3 Temperatures of the element
They were measured by 47 thermocouples according to NF EN 1363-1 and located according NF EN 1364-4 :
Location n° Plate
Average temperatures on surface n° 3 8 to 13 10 Maximal temperatures on surface n° 3 14 to 35 11 to 14 Temperatures for information on the mullions 36 and 37 19 Horizontal seal temperatures 38 to 49 15 Temperatures between Rockwool and CP 672 for information
54 to 55 17
Temperature between profile and Rockwool behind the panels for information
56 and 57 18
Temperature on the fixations 58 and 59 16 11 August 2014
![Page 12: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/12.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 7 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
9.2 DISTORSION MEASUREMENTS
In conformity with the requirements of standard NF EN 1364-4, the horizontal bending of the partition was measured and recorded with potentiometric sensors: See plate n° 20.
9.3 PRESSURE MEASUREMENTS
In conformity with the requirements of standard NF EN 1363-1, the pressure inside the furnace was continuously controlled throughout the whole test. The pressure sensor was positioned according to the standard NF EN 1364-4. See plate n° 21.
10. OBSERVATIONS
10.1 DURING THE TEST
TIME [min] OBSERVATIONS 00 Commencement of test. (Picture A) 3 Reaction of the intumescent layer of the glazing. 5 Cracking and falling down of the first tempered glass on fire side.
14 Smoke release from profiles junctions. 15 Nothing particular to report. 20 Nothing particular to report. 30 Nothing particular to report. 45 Nothing particular to report. 60 Nothing particular to report. 92 The glazing starts to fall down.
103 Sustained lighting for a duration of more than 10 seconds on the upper rail of the glazing 2.
106 Smelting of the glazing in the centre of the element. (See picture B) 110 Set up of a blind panel to replace the glazing. 120 Nothing particular to report 144 Maximal temperature rising higher than 180°C noted by the thermocouple n° 35. 150 Maximal temperature rising higher than 180°C noted by the thermocouple n° 34. 155 Maximal rising temperature higher than 180°C noted by the mobile thermocouple
(252°C) on the horizontal seal. 165 Cotton pad test positive on the horizontal seal. (Picture C) 167 End of test. (Picture D)
12 August 2014
![Page 13: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/13.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 8 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
11. FIRE RESISTANCE CRITERIA
In conformity with the standards mentioned in section 1, the times during which the specimen meets the fire resistance criteria may be regarded as follows:
11.1 CRITERIA FOR THE INTERNAL EXPOSITION
INTEGRITY (E) INSULATION (I)
Surface or horizontal seal
Cotton Pad Gap Gauge Flaming Falling parts Average
temperature (140°C)
Maximal Temperature
(180°C and 500°C for fixings)
S3 - * - * - 144 min (TC n°35)
Horizontal Gap Seal 165 min - - * * 155 min (Mobil thermocouple)
Fixing * * * * * -
S2 S5 - * According to NF EN 1364-4, these criteria were not evaluated. - Not failed at the end of the test. TC = Thermocouple
12. FIELD OF DIRECT APPLICATION OF THE TEST RESULTS
The results of a fire test on a specimen exposed to the standard temperature /time curve according to EN 1363-1 are valid for the same specimen exposed to the external fire exposure curve of EN 1363-2. The test results of the first test are directly applicable to constructions which differ from that tested in one or more of the following respects only
a) Decrease in panel width is acceptable provided the details of fixing to the supporting floor remain unchanged.
b) Decrease in mullion and transom spacing or increase in mullion size. c) Increase in floor thickness or horizontal linear gap seal thickness measured vertically. (referring
paragraph 6.3.1) d) Increase in density of the seal when made of mineral wool (but not the change of the type of
seal). (referring paragraph 6.3.1) e) Decrease in distance between fixing centres, vertical and/or horizontal.
The test results of a curtain wall specimen tested in front of a standard floor are valid for other floors of aerated or lightweight or dense concrete provided the thickness as well as the fire resistance with respect to loadbearing capacity of these floors are equal to or greater than that of the standard floor used in the test. The test results of a curtain wall specimen tested in front of a non-standard floor are valid for other floors of the same type provided the thickness as well as the fire resistance with respect to loadbearing capacity, integrity and insulation of these floors are equal to or greater than that of the non-standard floor used in the test. The points a) and b) are also valid for test specimens with non-standard floor constructions.
13 August 2014
![Page 14: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/14.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 9 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
13. WARNING
'This report gives details about the construction method, the testing conditions and the test results achieved when the specific building element described was tested according to the procedure specified in standard NF EN 1363-1 and, where applicable, in standard NF EN 1363-2. As concerns the dimensions, details, loading, stresses and boundary or end conditions, any significant deviation other than that which is not excluded within the field of direct application of the appropriate test procedure is not covered by this report. Because of the nature of the fire tests and of the resulting difficulty in quantifying the uncertainty of the fire resistance assessment, it is impossible to establish any level of accuracy of the results.'
Fait à Maizières-lès-Metz, the 10th of March 2009
Boris FILIPOZZI Fire Safety Technician
Régis KORYLUK Deputy Director
14 August 2014
![Page 15: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/15.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 10 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Plate n°1.
15 August 2014
![Page 16: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/16.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 11 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Plate n° 2.
16 August 2014
![Page 17: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/17.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 12 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Plate n° 3.
17 August 2014
![Page 18: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/18.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 13 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Plate n° 4.
18 August 2014
![Page 19: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/19.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 14 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Plate n° 5.
19 August 2014
![Page 20: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/20.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 15 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Plate n°6.
20 August 2014
![Page 21: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/21.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 16 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Plate n°6.1.
21 August 2014
![Page 22: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/22.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 17 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
To = 18 °C
: Tc 7
08-E-294
Title Test
Plate
Ambient's temperature.
7
0
5
10
15
20
25
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
22 August 2014
![Page 23: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/23.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 18 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Theoretical heating curve according to EN 1363-1
: Tc 1 : Tc 2 : Tc 3 : Tc 4 : Tc 5 : Tc 6
08-E-294
Title Test
Plate
Furnace's temperature.
8
0
200
400
600
800
1000
1200
1400
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)
+/- 100 °C tolerances
Program Curve - 6.0
23 August 2014
![Page 24: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/24.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 19 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Tolerances Deviation Tc 1 Tc 6
08-E-294
Titre Test
Plate
Deviation from the theoretical heating curve according to EN 1363-1
9
-15%
-10%
-5%
0%
5%
10%
15%
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
Dev
iatio
n(%
)
Program Curve - 6.0
F urnace t hermoco up les
used f o r d eviat i on calculation :
à
24 August 2014
![Page 25: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/25.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 20 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Thermocouples average
∆T max (180°C) To = 19 °C
: Tc 8 : Tc 9 : Tc 10 : Tc 11 : Tc 12 : Tc 13
08-E-294
Title Test
Plate
Average temperature.
10
0
50
100
150
200
250
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T average 140°C not reached at the termination of the test. ∆ ≥T max 180°C not reached at the termination of the test.∆ ≥
25 August 2014
![Page 26: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/26.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 21 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
∆T max (180°C) To = 19 °C
: Tc 14 : Tc 16 : Tc 20 : Tc 22 : Tc 26 : Tc 28 : Tc 32 : Tc 34
08-E-294
Title Test
Plate
Temperatures at 250 mm from the floor edge, on the profiles.
11
0
50
100
150
200
250
300
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T max 180°C reached at 2 h 30 min 13 s by Tc 34.∆ ≥
26 August 2014
![Page 27: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/27.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 22 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
∆T max (180°C) To = 19 °C
: Tc 15 : Tc 19 : Tc 21 : Tc 25 Tc 27 : OUT : Tc 31 : Tc 33
08-E-294
Title Test
Plate
Temperatures at 25 mm from the floor edge.
12
0
50
100
150
200
250
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T max 180°C not reached at the termination of the test.∆ ≥
27 August 2014
![Page 28: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/28.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 23 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
∆T max (180°C) To = 19 °C
: Tc 18 : Tc 24 : Tc 30
08-E-294
Title Test
Plate
Temperatures at 250 mm from the floor edge, on the panels.
13
0
50
100
150
200
250
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T max 180°C not reached at the termination of the test.∆ ≥
28 August 2014
![Page 29: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/29.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 24 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
∆T max (180°C) To = 19 °C
: Tc 17 : Tc 23 : Tc 29 : Tc 35
08-E-294
Title Test
Plate
Temperatures at 25 mm from the floor edge, on the profiles.
14
0
50
100
150
200
250
300
350
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T max 180°C reached at 2 h 24 min 11 s by Tc 35.∆ ≥
29 August 2014
![Page 30: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/30.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 25 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
∆T max (180°C)
: Tc 38 : Tc 39 : Tc 40 : Tc 41 : Tc 42 : Tc 43 : Tc 44 : Tc 45
: Tc 46 : Tc 47 : Tc 48 : Tc 49
08-E-294
Title Test
Plate
Horizontal seal temperatures.
15
0
50
100
150
200
250
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T max 180°C not reached at the termination of the test. ∆ ≥To = 19 °C
30 August 2014
![Page 31: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/31.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 26 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
∆T max (500°C) To = 19 °C
: Tc 58 : Tc 59
08-E-294
Title Test
Plate
Temperatures on the fixations.
16
0
100
200
300
400
500
600
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T max 500°C not reached at the termination of the test.∆ ≥
31 August 2014
![Page 32: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/32.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 27 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
To = 19 °C
: Tc 54 : Tc 55
08-E-294
Title Test
Plate
Temperatures between rockwool and silicone on the horizontal sealing.
17
0
20
40
60
80
100
120
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T max 180°C not reached at the termination of the test. ∆ ≥
32 August 2014
![Page 33: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/33.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 28 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
∆T max (180°C) To = 19 °C
: Tc 56 : Tc 57
08-E-294
Title Test
Plate
Internal temperatures, between profiles and rockwool.
18
0
100
200
300
400
500
600
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T max 180°C reached at 1 h 56 min 9 s by Tc 57.∆ ≥
33 August 2014
![Page 34: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/34.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 29 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
∆T max (180°C) To = 19 °C
: Tc 36 : Tc 37
08-E-294
Title Test
Plate
Temperatures on the profiles.
19
0
200
400
600
800
1000
1200
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
tem
pera
ture
(°C
)Program Curve - 6.0
T max 180°C reached at 1 h 27 min 12 s by Tc 37.∆ ≥
34 August 2014
![Page 35: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/35.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 30 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
: Dep 50 : Dep 51 : Dep 52
08-E-294
Title Test
Plate
Deflections.
20
0
10
20
30
40
50
60
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
Def
lect
ion
(mm
)
FEU
- +
Program Curve - 6.0
35 August 2014
![Page 36: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/36.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 31 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Pressure limits (20 Pa)
: Pr 53
08-E-294
Title Test
Plate
Pressure inside the furnace.
21
0
5
10
15
20
25
30
35
40
0 15 30 45 60 75 90 105 120 135 150 165 180
Time (min)
Pres
sure
(Pa)
Program Curve - 6.0
36 August 2014
![Page 37: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/37.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 32 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Picture A (Top) Commencement of test.Picture B(Bottom) Smelting of the glazing in the centre of the element.
37 August 2014
![Page 38: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/38.jpg)
Test report n° 08 – E– 294 NF EN 1364-4
Page 33 / 33
La reproduction de ce document n'est autorisée que sous sa forme intégrale
Picture C (Top) Cotton pad test positive on the horizontal seal Picture D(Bottom) End of test.
38 August 2014
![Page 39: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/39.jpg)
39 August 2014
![Page 40: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/40.jpg)
40 August 2014
![Page 41: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/41.jpg)
41 August 2014
![Page 42: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/42.jpg)
42 August 2014
![Page 43: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/43.jpg)
43 August 2014
![Page 44: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/44.jpg)
Page 1/4
Safety data sheetaccording to 1907/2006/EC, Article 31
Printing date 14.02.2012 Revision: 14.02.2012Version number 1
34.0.4
* 1 Identification of the substance/mixture and of the company/undertaking
· Product identifier
· Trade name: CFS-SP WB· Relevant identified uses of the substance or mixture and uses advised against· Application of the substance / the preparation Construction Chemical
· Details of the supplier of the safety data sheet· Manufacturer/Supplier:Hilti (Hong Kong) Ltd.701-704, 7/F, Tower AManulife Financial Centre223 Wai Yip StreetKwun Tong, KowloonHong KongTel +852 8228 8118Fax +852 2356 7311
· Informing department:see section [email protected]
· Emergency telephone number:Hilti (Hong Kong) Ltd.Tel +852 27734 700Fax +852 2764 3234
2 Hazards identification
· Classification of the substance or mixture
· Classification according to Directive 67/548/EEC or Directive 1999/45/EC· Information concerning particular hazards for human and environment:The product does not have to be labelled due to the calculation procedure of the "General Classification guideline for preparations of the EU" inthe latest valid version.
· Classification system:The classification is in line with the current EC lists. It has been expanded, however, by information from technical literature and by informationfurnished by the suppliers and by national regulations which have to be observed in Chapter 15.
· Other hazards· Results of PBT and vPvB assessment· PBT: Not applicable.· vPvB: Not applicable.
3 Composition/information on ingredients
· Chemical characterization: Mixtures· Description: aequeous acrylic-dispersion
· Dangerous components: Void· Additional information For the wording of the listed risk phrases refer to section 16.
4 First aid measures
· Description of first aid measures· General information No special measures required.· After inhalation Take affected persons into the open air and position comfortably· After skin contact Instantly wash with water and soap and rinse thoroughly. If skin irritation persist, call a physician.· After eye contact Rinse thoroughly with plenty of water for at least 15 minutes and consult a physician.· After swallowing Seek immediate medical advice.· Information for doctor· Most important symptoms and effects, both acute and delayed No further relevant information available.· Indication of any immediate medical attention and special treatment needed No further relevant information available.
5 Firefighting measures
· Extinguishing media· Suitable extinguishing agents Water spray, carbon dioxide (CO2), carbon dioxide blanket, foam, or dry powder.· Special hazards arising from the substance or mixtureCan be released in case of fireCarbon monoxide (CO)Carbon dioxide (CO2)
· Advice for firefighters· Protective equipment: Use personal protective equipment. Ensure adequate ventilation. Remove all sources of ignition.
HK(Contd. on page 2)
44 August 2014
![Page 45: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/45.jpg)
Page 2/4
Safety data sheetaccording to 1907/2006/EC, Article 31
Printing date 14.02.2012 Revision: 14.02.2012Version number 1
Trade name: CFS-SP WB
(Contd. of page 1)
34.0.4
6 Accidental release measures
· Personal precautions, protective equipment and emergency proceduresWear protective clothing.Particular danger of slipping on leaked/spilled product.
· Environmental precautions: No special measures required.· Methods and material for containment and cleaning up:Absorb with liquid-binding material (sand, diatomite, acid binders, universal binders, sawdust).
· Reference to other sections No dangerous materials are released.
7 Handling and storage
· Handling· Precautions for safe handling No special measures required.· Information about protection against explosions and fires: No special measures required.
· Conditions for safe storage, including any incompatibilities· Storage· Requirements to be met by storerooms and containers: Keep packaging securely closed and dry, store at 5 °C to 25 °C.· Information about storage in one common storage facility: Not required.· Further information about storage conditions: None.· Specific end use(s) No further relevant information available.
8 Exposure controls/personal protection
· Additional information about design of technical systems: No further data; see item 7.
· Control parameters· Components with limit values that require monitoring at the workplace:The product does not contain any relevant quantities of materials with critical values that have to be monitored at the workplace.
· Additional information: The lists that were valid during the compilation were used as basis.
· Exposure controls· Personal protective equipment· General protective and hygienic measures The usual precautionary measures should be adhered to general rules for handling chemicals.· Breathing equipment: Not necessary if room is well-ventilated.· Protection of hands:Protective glovesSelection of the glove material on consideration of the penetration times, rates of diffusion and the degradation
· Material of gloves Synthetic gloves· Penetration time of glove materialThe exact break trough time has to be found out by the manufacturer of the protective gloves and has to be observed.
· Eye protection: Safety glasses· Body protection: Protective work clothing.
9 Physical and chemical properties
· Information on basic physical and chemical properties· General Information· Appearance:
Form: pastyColour: Various colours
· Odour: Characteristic
· Change in conditionMelting point/Melting range: Not determinedBoiling point/Boiling range: Not determined
· Flash point: Not applicable
· Self-inflammability: Product is not selfigniting.
· Danger of explosion: Product is not explosive.
· Density Not determined
· Solubility in / Miscibility withWater: mixable
· Other information No further relevant information available.
10 Stability and reactivity
· Reactivity· Chemical stability· Thermal decomposition / conditions to be avoided: No decomposition if used according to specifications.
(Contd. on page 3) HK
45 August 2014
![Page 46: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/46.jpg)
Page 3/4
Safety data sheetaccording to 1907/2006/EC, Article 31
Printing date 14.02.2012 Revision: 14.02.2012Version number 1
Trade name: CFS-SP WB
(Contd. of page 2)
34.0.4
· Possibility of hazardous reactions No dangerous reactions known· Conditions to avoid No further relevant information available.· Incompatible materials: No further relevant information available.· Hazardous decomposition products: No dangerous decomposition products known
11 Toxicological information
· Information on toxicological effects· Acute toxicity:· Primary irritant effect:· on the skin: No irritant effect.· on the eye: No irritant effect.· Sensitization: No sensitizing effect known.· Additional toxicological information:The product is not subject to classification according to the calculation method of the General EC Classification Guidelines for Preparations asissued in the latest version.When used and handled according to specifications, the product does not have any harmful effects according to our experience and theinformation provided to us.
12 Ecological information
· Toxicity· Aquatic toxicity: No further relevant information available.· Persistence and degradability No further relevant information available.· Behaviour in environmental systems:· Bioaccumulative potential No further relevant information available.· Mobility in soil No further relevant information available.· Ecotoxical effects: Not determined· Additional ecological information:· General notes: Do not allow undiluted product or large quantities of it to reach ground water, water bodies or sewage system.· Results of PBT and vPvB assessment· PBT: Not applicable.· vPvB: Not applicable.· Other adverse effects No further relevant information available.
13 Disposal considerations
· Waste treatment methods· Recommendation Smaller quantities can be disposed with household waste.· European waste catalogue08 00 00 WASTES FROM THE MANUFACTURE, FORMULATION, SUPPLY AND USE (MFSU) OF COATINGS (PAINTS,
VARNISHES AND VITREOUS ENAMELS), ADHESIVES, SEALANTS AND PRINTING INKS08 04 00 wastes from MFSU of adhesives and sealants (including waterproofing products)08 04 10 waste adhesives and sealants other than those mentioned in 08 04 09
· Uncleaned packagings:· Recommendation: Dispose of packaging according to regulations on the disposal of packagings.
14 Transport information
· UN-Number· ADR, IMDG, IATA Void
· UN proper shipping name· ADR, IMDG, IATA Void
· Transport hazard class(es)
· ADR, IMDG, IATA· Class Void
· Packing group· ADR, IMDG, IATA Void
· Environmental hazards:· Marine pollutant: No
· Special precautions for user Not applicable.
· Transport in bulk according to Annex II of MARPOL73/78 andthe IBC Code Not applicable.
(Contd. on page 4) HK
46 August 2014
![Page 47: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/47.jpg)
Page 4/4
Safety data sheetaccording to 1907/2006/EC, Article 31
Printing date 14.02.2012 Revision: 14.02.2012Version number 1
Trade name: CFS-SP WB
(Contd. of page 3)
34.0.4
· Transport/Additional information: Not dangerous according to the above specifications.
15 Regulatory information
· Safety, health and environmental regulations/legislation specific for the substance or mixture
· National regulations
· Information about limitation of use: Employment restrictions concerning young persons must be observed.· Chemical safety assessment: not required.
* 16 Other informationThese data are based on our present knowledge. However, they shall not constitute a guarantee for any specific product features and shall notestablish a legally valid contractual relationship.
· Department issuing data specification sheet:Hilti CorporationBusiness Unit ChemicalsQuality/Safety/Environment
FL-9494 Schaan· Contact:Martin [email protected]. 00423 234 3965Fax: 00423 234 7965
· * Data compared to the previous version altered. HK
47 August 2014
![Page 48: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/48.jpg)
Jo
b /
Ap
plic
ati
on
Re
fere
nc
e
Dat
eP
roje
ct N
ame
Co
ntr
acto
rP
rod
uct
Nam
eA
pp
licat
ion
Sep‐12
Kai Tak Develop
men
t Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Nov
‐12
The Ve
netia
n Casino
Resort
Firestop
joint spray CFS‐SP WB red
gap sealing
Jan‐13
Poly‐U Red
evelop
men
t Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Mar‐13
Other Priv
ate Re
side
ntial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall fixing
Apr‐13
Other Com
mercial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
May‐13
Kai Tak Develop
men
t Dragages
Firestop
joint spray CFS‐SP WB red
curtain wall fixing
May‐13
Other Priv
ate Re
side
ntial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall fixing
May‐13
Science Park Phase 3
GAM
MON
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
May‐13
Poly‐U Red
evelop
men
t Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Jun‐13
Other Priv
ate Re
side
ntial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall fixing
Jun‐13
Windsor Arch
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Jun‐13
Poly‐U Red
evelop
men
t Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Jun‐13
Other Com
mercial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Jul‐1
3Shangri‐la and Traders H
otels
Sheraton
and
St. Re
gis H
otels (Parcel 5&6)
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Jul‐1
3Kai Tak Develop
men
t Dragages
Firestop
joint spray CFS‐SP WB red
curtain wall fixing
Jul‐1
3Other Priv
ate Re
side
ntial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall fixing
Jul‐1
3Other Com
mercial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall fixing
Aug‐13
Windsor Arch
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Aug‐13
Other Com
mercial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Sep‐13
Science Park Phase 3
GAM
MON
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Oct‐13
Science Park Phase 3
GAM
MON
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Nov
‐13
Other Priv
ate Re
side
ntial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
70
1-7
04
To
we
r A
, Ma
nu
life
Fia
nci
al C
en
tre
, 22
3 W
ai Y
ip S
tre
et,
Kw
un
To
ng
, Kw
olo
on
, H
on
g K
on
gH
otli
ne
: 82
28
81
18
1
48 August 2014
![Page 49: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/49.jpg)
Jo
b /
Ap
plic
ati
on
Re
fere
nc
e
Dat
eP
roje
ct N
ame
Co
ntr
acto
rP
rod
uct
Nam
eA
pp
licat
ion
Jan‐14
Science Park Phase 3
GAM
MON
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Jan‐14
Seym
our R
oad Re
side
ntial
HIP HING
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Jan‐14
Other Priv
ate Re
side
ntial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Jan‐14
Airport D
evelop
men
t AA
Firestop
joint spray CFS‐SP WB white
channe
l fixing for d
rywall
Feb‐14
Science Park Phase 3
GAM
MON
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Mar‐14
Kai Tak Develop
men
t Dragages
Firestop
joint spray CFS‐SP WB red
curtain wall fixing
Mar‐14
Other Priv
ate Re
side
ntial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sea ling
Mar‐14
Airport D
evelop
men
t AA
Firestop
joint spray CFS‐SP WB white
channe
l fixing for d
rywall
Apr‐14
Other Priv
ate Re
side
ntial Projects
Firestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
Apr‐14
Airport D
evelop
men
t AA
Firestop
joint spray CFS‐SP WB white
channe
l fixing for d
rywall
May‐14
Kai Tak Develop
men
t Dragages
Firestop
joint spray CFS‐SP WB red
curtain wall fixing
May‐14
Yan Ch
ai Hospital D
evelop
men
tCH
INA RO
AD & BRIDG
EFirestop
joint spray CFS‐SP WB red
curtain wall / façade
gap
sealing
70
1-7
04
To
we
r A
, Ma
nu
life
Fia
nci
al C
en
tre
, 22
3 W
ai Y
ip S
tre
et,
Kw
un
To
ng
, Kw
olo
on
, H
on
g K
on
gH
otli
ne
: 82
28
81
18
2
49 August 2014
![Page 50: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/50.jpg)
Job
/Ap
pli
cati
on
Ref
eren
ce (
CF
S-S
P W
B)
Yea
rP
roje
ctC
on
trac
tor
Pro
du
ctA
pp
licat
ion
2012
Ven
etia
n C
asin
o P
arce
l 56
CO
MP
AN
HIA
DE
EN
GE
NH
AR
IAC
FS
-SP
WB
Faç
ade
Join
t
2012
Po
lyU
- R
edev
elo
pm
ent
Jan
gh
o C
urt
ain
Wal
l HK
Ltd
CF
S-S
P W
BF
açad
e Jo
int
2013
Kai
Tak
Cru
ise
Ter
min
alF
ar E
ast
Alu
min
ium
Wo
rks
Co
Ltd
CF
S-S
P W
BF
açad
e Jo
int
2013
Sw
ire
Res
iden
tial
Dev
elo
pm
ent
- S
ai W
an T
erra
ceF
ar E
ast
Alu
min
ium
Wo
rks
Co
Ltd
CF
S-S
P W
BF
açad
e Jo
int
701-
704,
7/F
, Tow
er A
, Man
ulife
Fin
anci
al C
entr
e, 2
23 W
ai Y
ip S
tree
t, K
wun
Ton
g, K
owlo
on, H
ong
Kon
g
50 August 2014
![Page 51: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/51.jpg)
Job Reference of CFS-SP WB Firestop Joint Spray (Formerly named CP672) 20-Feburary-2012 Ref No.
Date (mm-yy)
Project Main Contractor / Contractors
Consultant Engineer
Product Application
1 01-12 China Construction Bank
Building Yuanda Curtain Wall (HK)
Ltd Meinhardt
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
2 09-11 Hysan Place Permasteelisa Hong
Kong Ltd
ALT Cladding & Design
Philippines Inc.
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
3 12-10 Yau Tong Shopping Arcade
(Phase 4) Far East Aluminium
Works Co Ltd HK Housing
Authority Firestop Joint Spray
CP672 Int red Curtain wall / façade gap sealing
4 09-09 Shangri-la and Traders
HotelsSheraton and St. Regis Hotels (Parcel 5&6)
Hingsking Bldg Mat’l & Eng Ltd
Arup Façade Firestop Joint Spray
CP672 Int red Curtain wall / façade gap sealing
5 05-09 Union Square 7, Kowloon
Station Plan In Interior & Contracting Co
Maunsell Firestop Joint Spray
CP672 Int red Top of wall joint sealing
6 05-09 Union Square 7, Kowloon
Station Wui Fai Eng Co Ltd Maunsell
Firestop Joint Spray CP672 Int red
Top of wall joint sealing
7 04-09 Hotel City Plaza Josef Gartner Arup Façade Firestop Joint Spray
CP672 Int red Curtain wall / façade gap sealing
8 01-09 Airport United Soundfair Eng Co
Ltd
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
9 12-08 Four Seasons Hotel, Macau
(Parcel 2) Yuanda Aluminium
Industry Arup Façade
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
10 12-08 City of Dreams Resort Macao Jianghe Curtain-
wall Eng Meinhardt
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
701-704, 7/F, Tower A, Manulife Financial Centre, 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong Hotline : 82288118 Fax : 29541751
HILTI (HONG KONG) LTD.
Job Reference of CFS-SP WB Firestop Joint Spray (Formerly named CP672) 20-Feburary-2012 Ref No.
Date (mm-yy)
Project Main Contractor / Contractors
Consultant Engineer
Product Application
11 12-08 PTM Projects – Hip Hing Josef Gartner & Co (HK)
Ltd
Firestop Joint Spray CP672 Int red
Curtain wall fixing
12 11-08 Four Seasons Hotel, Macau
(Parcel 2) Yuanda Aluminium
Industry Arup Façade
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
13 11-08 Shangri-la and Traders
HotelsSheraton and St. Regis Hotels (Parcel 5&6)
Yuanda Aluminium Industry
Arup Façade Firestop Joint Spray
CP672 Int red Curtain wall / façade gap sealing
14 09-08 Union Square 7, Kowloon
Station Goodwill Eng (HK) Co Ltd Maunsell
Firestop Joint Spray CP672 Int red
Top of wall joint sealing
15 08-08 Galaxy Mega Resort Macao Jianghe Curtain-
wall Eng Meinhardt
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
16 06-08 Lot U Residential
Development, Macau Josef Gartner Meinhardt
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
17 06-08 Shangri-la and Traders
HotelsSheraton and St. Regis Hotels (Parcel 5&6)
Permasteelisa Macau Limited
Arup Façade Firestop Joint Spray
CP672 Int red Curtain wall / façade gap sealing
18 04-08 Union Square 7, Kowloon
Station Successful Eng Co Ltd OAP / JRP
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
19 02-08 City of Dreams Resort Top Professional
Engineers Maunsell
Firestop Joint Spray CP672 Int red
Top of wall joint sealing
20 01-08 City of Dreams Resort San Io Wa Construction Maunsell Firestop Joint Spray
CP672 Int red Top of wall sealing
701-704, 7/F, Tower A, Manulife Financial Centre, 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong Hotline : 82288118 Fax : 29541751
HILTI (HONG KONG) LTD.
51 August 2014
![Page 52: Hilti CCPP667722 CP672 ... Method Statement 2 - 4 Test Report-Efectis Nr. 08-E-294 5 - 38 Government ... 10 mm), fixed on the supporting floor by two bolts reference HST M10/30 (HILTI).](https://reader034.fdocuments.us/reader034/viewer/2022050807/5ae0ef797f8b9a6e5c8e0e70/html5/thumbnails/52.jpg)
Job Reference of CFS-SP WB Firestop Joint Spray (Formerly named CP672) 20-Feburary-2012 Ref No.
Date (mm-yy)
Project Main Contractor / Contractors
Consultant Engineer
Product Application
21 12-07 Four Seasons Hotel, Macau Far East Aluminium / Yuanda Aluminium
OAP / PBA / Arup Façade
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
22 12-07 Science Park Phase 2 Tostem Corporation Meinhardt /
WSP Firestop Joint Spray
CP672 Int red Curtain wall / façade gap sealing
23 05-07 The Venetian Casino Resort & Las Vegas Sands Casino
Extension, Macau
Far East Aluminium Works Co Ltd
OAP / PBA / Hyder / Arup
Façade
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
24 06-04 Wan Chai Police Headquarter Permasteelisa ArchSD Firestop Joint Spray
CP672 Int red Curtain wall / façade gap sealing
25 05-02 Cyber Port – C1 Commercial
Building Paul Y ITC / Chevailer
(Aluminium Eng) Maunsell
Firestop Joint Spray CP672 Int red
Curtain wall / façade gap sealing
701-704, 7/F, Tower A, Manulife Financial Centre, 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong Hotline : 82288118 Fax : 29541751
HILTI (HONG KONG) LTD.
52 August 2014