HILLSIDE 290
Transcript of HILLSIDE 290
Spec Development or Build-to-Suit Opportunity. > 270,400 SF of subdivisible space on 29.56 acres > Within existing Hillside Industrial Park on Hwy 290 > Less than one mile south of I-85 > Approximately seven miles west of I-26 > Within 10 miles of the Inland Port in Greer > Proximity to BMW for just-in-time and just-in-sequence suppliers
HILLSIDE 290CLASS A | 270,400 SF
1320 HOWELL RD DUNCAN, SOUTH CAROLINA 29334
INDUSTRIAL DISTRIBUTION/MANUFACTURING FACILITY
AVAILABLE FOR LEASE
GARRETT SCOTT, SIORVice President864 527 5453
JOHN MONTGOMERYVice President864 527 5422
BROCKTON HALLBrokerage Associate
864 527 [email protected]
This document has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers International and/or its licensor(s). ©2019. All rights reserved.
T.O.P.40’-0”
F.F.E.0’-0”
CL. HT.32’-0”
T.O.P.43’-0”
East Elevation
North Elevation
West Elevation
SHEET
3ATL17-0040-000 3 . 2 7 . 2 0 1 8
Conceptual Exterior ElevationsSCHEME 3 (F.F.E. @ 788’)
T.O.P.40’-0”
F.F.E.0’-0”
CL. HT.32’-0”
T.O.P.43’-0”
East Elevation
North Elevation
West Elevation
SHEET
3ATL17-0040-000 3 . 2 7 . 2 0 1 8
Conceptual Exterior ElevationsSCHEME 3 (F.F.E. @ 788’)
T.O.P.40’-0”
F.F.E.0’-0”
CL. HT.32’-0”
T.O.P.43’-0”
East Elevation
North Elevation
West Elevation
SHEET
3ATL17-0040-000 3 . 2 7 . 2 0 1 8
Conceptual Exterior ElevationsSCHEME 3 (F.F.E. @ 788’)
T.O.P.40’-0”
F.F.E.0’-0”
CL. HT.32’-0”
T.O.P.43’-0”
East Elevation
North Elevation
West Elevation
SHEET
3ATL17-0040-000 3 . 2 7 . 2 0 1 8
Conceptual Exterior ElevationsSCHEME 3 (F.F.E. @ 788’)
Building Specifications
Contact:
Garrett Scott, SIORVice President+1 864 527 [email protected]
John MontgomeryVice President+1 864 527 [email protected]
Brockton HallBrokerage Associate+1 864 527 [email protected]
HILLSIDE 290
145 W Main Street | Ste 300Spartanburg, SC 29306
Ph: 864 297 4950
Trailer Parking: 59 Off-Dock SpacesFire Protection: ESFR NFPA-13Lighting: LED 1 FCElectrical Service: 3000ampsVentilation: 2 air changes/hour
Building Dimensions: 260’ x 1040’Column Spacing: 50’ x 52’ + 60’ speed bayClear Height: 32’ ClearDock Doors: 60
Auto Parking: 315 Spaces
T.O.P.40’-0”
F.F.E.0’-0”
CL. HT.32’-0”
T.O.P.43’-0”
East Elevation
North Elevation
West Elevation
SHEET
3ATL17-0040-000 3 . 2 7 . 2 0 1 8
Conceptual Exterior ElevationsSCHEME 3 (F.F.E. @ 788’)
T.O.P.40’-0”
F.F.E.0’-0”
CL. HT.32’-0”
T.O.P.43’-0”
East Elevation
North Elevation
West Elevation
SHEET
3ATL17-0040-000 3 . 2 7 . 2 0 1 8
Conceptual Exterior ElevationsSCHEME 3 (F.F.E. @ 788’)
INLAND PORT
Key DistancesI-85 0.9 milesFedEx Ground 5.7 milesI-26 7 milesBMW 8 milesInland Port (Greer) 8.4 milesFedEx Freight 3.6 miles
GSP Airport 8.6 milesUPS Freight 11 miles
2929
290
101
80
85
HOWELL ROAD
HILLSIDE 290
Trailer Parking: 59 Off-Dock SpacesFire Protection: ESFR NFPA-13Lighting: LED 1 FCElectrical Service: 3000ampsVentilation: 2 air changes/hour