HIGHWAY ISLANDa 12/12/13 for approval ra legend existing proposed existing proposed existing...

4
January-08-14 - 0276-BASE.DWG LOCATION OF WORK specifications and drawings must comply with the Industrial Health and Safety Regulations of All work done in connection with these the Workers' Compensation Board. BC NOTE: LOCATION OF EXISTING SERVICES ARE SHOWN APPROXIMATELY AND MUST BE CHECKED IN THE FIELD BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF WORK. THE ENGINEER IS TO BE NOTIFIED IMMEDIATELY OF ANY CONFLICTS. PROJECT: LOCATION PLAN NTS DRAWING INDEX DRAWING NUMBER REV SHEET TITLE 0276-01-00 COVER SHEET 0276-01-01 0276-01-02 KEY PLAN 0276-01-03 SITE PLAN SCALE 1:1000 TYPICAL DETAILS TIMBERLAKE-JONES ENG. PROJECT No. DRAWING No. PLAN AND PROFILE - SMH 1 TO SMH 5 CLIENT: HAWTHORNE RISE SANITARY SEWER EXTENSION, FRENCH CREEK REGIONAL DISTRICT OF NANAIMO 6300 Hammond Bay Road, Nanaimo, B.C. V9T 6N2 ISLAND HIGHWAY REGIONAL DISTRICT OF NANAIMO PROJECT No. 5500-20-HR-18-7570 0276-01 0276-01-00 B B B B

Transcript of HIGHWAY ISLANDa 12/12/13 for approval ra legend existing proposed existing proposed existing...

Page 1: HIGHWAY ISLANDa 12/12/13 for approval ra legend existing proposed existing proposed existing proposed cb cb lb lb catch basin ... d1 storm manhole d1 s1 sanitary manhole s1 air valve

Janu

ary-

08-1

4 - 0

276-

BA

SE

.DW

G

LOCATION OF WORK

specifications and drawings must comply withthe Industrial Health and Safety Regulations of

All work done in connection with these

the Workers' Compensation Board.

BC

NOTE: LOCATION OF EXISTING SERVICES ARESHOWN APPROXIMATELY AND MUST BE CHECKEDIN THE FIELD BY THE CONTRACTOR PRIOR TOCOMMENCEMENT OF WORK. THE ENGINEER IS TOBE NOTIFIED IMMEDIATELY OF ANY CONFLICTS.

PROJECT:

LOCATION PLANNTS

DRAWING INDEXDRAWING NUMBER REV SHEET TITLE

0276-01-00 COVER SHEET

0276-01-01

0276-01-02

KEY PLAN

0276-01-03

SITE PLANSCALE 1:1000

TYPICAL DETAILS

TIMBERLAKE-JONES ENG. PROJECT No.

DRAWING No.

PLAN AND PROFILE - SMH 1 TO SMH 5

CLIENT:

HAWTHORNE RISE SANITARY SEWER EXTENSION,FRENCH CREEK

REGIONAL DISTRICT OF NANAIMO6300 Hammond Bay Road,Nanaimo, B.C.V9T 6N2

ISLAND

HIGHWAY

REGIONAL DISTRICT OF NANAIMO PROJECT No. 5500-20-HR-18-75700276-010276-01-00

B

B

B

B

Page 2: HIGHWAY ISLANDa 12/12/13 for approval ra legend existing proposed existing proposed existing proposed cb cb lb lb catch basin ... d1 storm manhole d1 s1 sanitary manhole s1 air valve

Janu

ary-

09-1

4 - 0

276-

BA

SE

.DW

G

Drawing Number: Revision:

Project Name:

Drawing Title:

Project Number:

Client Name:

Prepared by:

Weldon Professional CentreSuite 201 - 177 Weld StreetPO Box 89Parksville, BC, V9P 2G3

Phone: 250-248-2001Fax: 250-248-2553

Email: [email protected]: www.tjeng.ca

APPROVED:

CHECKED:

DRAWN:

DESIGN:

MTJ

RA

MTJ

MTJ FILENAME:

DATE PLOTTED:

DATE:

SCALE:

09/01/2014

December 2, 2013

0276-BASE.DWG

THIS PLAN AND DESIGN ARE, AND AT ALL TIMES REMAIN THEEXCLUSIVE PROPERTY OF TIMBERLAKE-JONES ENGINEERING LTD.AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTENCONSENT. THIS PLAN IS PREPARED FOR THE SOLE USE OF OURCLIENT AND NO REPRESENTATION OF ANY KIND IS MADE TO OTHERPARTIES WITH WHICH TIMBERLAKE-JONES ENGINEERING LTD. HASNOT ENTERED INTO CONTRACT. WRITTEN DIMENSIONS SHALL HAVEPRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALLVERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS ANDCONDITIONS ON THE JOB AND THIS OFFICE SHALL BE INFORMED OFANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWNON THIS DRAWING.

SEAL:

REV DATE REVISIONS BY

1:500

A 12/12/13 FOR APPROVAL RA

LEGENDEXISTING PROPOSED

EXISTING PROPOSED EXISTING PROPOSEDCB CB

LBLB

CATCH BASINLAWN BASIN

PP

TP

PPTP

POWER POLETELEPHONE POLE

BENCHMARKHYDRANT

HYDRANT W/ VALVE FH

FH

FH

FH

CO COCLEANOUT

STANDARD ABBREVIATIONS

AC ASBESTOS CEMENT H HUB

DI DUCTILE IRON F FLANGE

ST STEEL IPT IRON PIPE THREAD

PVC POLYVINYL CHLORIDE CSP CORRUGATED STEEL PIPE

PE POLYETHYLENE

H H

H

D1 D1STORM MANHOLES1 S1SANITARY MANHOLE

AIR VALVE

VALVE

MC or NMC

SERVICE LOCATION

specifications and drawings must comply withthe Industrial Health and Safety Regulations of

All work done in connection with these

the Workers' Compensation Board.

BC

NOTE: LOCATION OF EXISTING SERVICES ARESHOWN APPROXIMATELY AND MUST BE CHECKEDIN THE FIELD BY THE CONTRACTOR PRIOR TOCOMMENCEMENT OF WORK. THE ENGINEER IS TOBE NOTIFIED IMMEDIATELY OF ANY CONFLICTS.

SANITARY SEWERSTORM SEWERWATER MAIN

EDGE OF GRAVELCURBS

EDGE OF PAVEMENT

CENTRELINEPROPERTY LINE

FENCE LINE

MC or NMC

BENCHMARK:

TBM - OIP CORNER LOT 10/11, PLAN 24289,HAWTHORNE RISE, EL. 11.479 NOT GEODETIC

LEGAL DESCRIPTION:

DITCH

B0276-01-01

KEY PLAN

HAWTHORNE RISE SANITARYSEWER EXTENSION

REGIONAL DISTRICT OF NANAIMO

DS

SDA A

NOTES:

1. ELEVATIONS ARE NOT GEODETIC.

2. THE LOCATIONS OF EXISTING SERVICES ARE SHOWN APPROXIMATELY AND MUST BE CHECKED IN THE FIELD BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF WORK. SERVICES MAY REQUIRE ADJUSTMENT WHERE A CONFLICT OCCURS. THE ENGINEER IS TO BE NOTIFIED IMMEDIATELY OF ANY CONFLICT.

3. IF VERTICAL SEPARATION OF > 0.5m CANNOT BE MAINTAINED BETWEEN THE WATERMAIN AND SANITARY SEWER/STORM DRAIN CROSSINGS ALL JOINTS WITHIN 3.0m OF CROSSINGS TO BE SECURED WITH PETROLATUM TAPE OR SHRINK-WRAP AS PER MINISTRY OF HEALTH SPECIFICATIONS.

4. ROADWORKS TO CONFORM TO M.O.T.I. STANDARDS.

6. SANITARY SEWERS TO CONFORM TO REG. DIST. OF NANAIMO STANDARDS.

SANITARY SEWERS - PVC SDR 35, ASTM D3034 SANITARY SERVICES - 100Ø PVC SDR 28, ASTM D3034

MINIMUM COVER ON SANITARY SEWERS IN TRAVELLED AREAS - 1.5m MINIMUM COVER ON SANITARY SEWERS IN UNTRAVELLED AREAS - 1.0m

7. PRIOR TO FINAL PAVING, SANITARY SEWERS TO BE "POWER-JET" FLUSHED AND VIDEO INSPECTED. VIDEO INSPECTION TO OCCUR WITHIN TWENTY-FOUR (24) HOURS OF FLUSHING.

5500-20-HR-18-7570

B 8/01/14 ISSUED FOR TENDER CH

Page 3: HIGHWAY ISLANDa 12/12/13 for approval ra legend existing proposed existing proposed existing proposed cb cb lb lb catch basin ... d1 storm manhole d1 s1 sanitary manhole s1 air valve

Janu

ary-

09-1

4 - 0

276-

BA

SE

.DW

G

Drawing Number: Revision:

Project Name:

Drawing Title:

Project Number:

Client Name:

Prepared by:

Weldon Professional CentreSuite 201 - 177 Weld StreetPO Box 89Parksville, BC, V9P 2G3

Phone: 250-248-2001Fax: 250-248-2553

Email: [email protected]: www.tjeng.ca

APPROVED:

CHECKED:

DRAWN:

DESIGN:

MTJ

RA

MTJ

MTJ FILENAME:

DATE PLOTTED:

DATE:

SCALE:

09/01/2014

December 2, 2013

0276-BASE.DWG

THIS PLAN AND DESIGN ARE, AND AT ALL TIMES REMAIN THEEXCLUSIVE PROPERTY OF TIMBERLAKE-JONES ENGINEERING LTD.AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTENCONSENT. THIS PLAN IS PREPARED FOR THE SOLE USE OF OURCLIENT AND NO REPRESENTATION OF ANY KIND IS MADE TO OTHERPARTIES WITH WHICH TIMBERLAKE-JONES ENGINEERING LTD. HASNOT ENTERED INTO CONTRACT. WRITTEN DIMENSIONS SHALL HAVEPRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALLVERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS ANDCONDITIONS ON THE JOB AND THIS OFFICE SHALL BE INFORMED OFANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWNON THIS DRAWING.

SEAL:

REV DATE REVISIONS BY

HOR. 1:500 VERT. 1:50

LEGENDEXISTING PROPOSED

EXISTING PROPOSED EXISTING PROPOSEDCB CB

LBLB

CATCH BASINLAWN BASIN

PP

TP

PPTP

POWER POLETELEPHONE POLE

BENCHMARKHYDRANT

HYDRANT W/ VALVE FH

FH

FH

FH

CO COCLEANOUT

STANDARD ABBREVIATIONS

AC ASBESTOS CEMENT H HUB

DI DUCTILE IRON F FLANGE

ST STEEL IPT IRON PIPE THREAD

PVC POLYVINYL CHLORIDE CSP CORRUGATED STEEL PIPE

PE POLYETHYLENE

H H

H

D1 D1STORM MANHOLES1 S1SANITARY MANHOLE

AIR VALVE

VALVE

MC or NMC

SERVICE LOCATION

specifications and drawings must comply withthe Industrial Health and Safety Regulations of

All work done in connection with these

the Workers' Compensation Board.

BC

NOTE: LOCATION OF EXISTING SERVICES ARESHOWN APPROXIMATELY AND MUST BE CHECKEDIN THE FIELD BY THE CONTRACTOR PRIOR TOCOMMENCEMENT OF WORK. THE ENGINEER IS TOBE NOTIFIED IMMEDIATELY OF ANY CONFLICTS.

SANITARY SEWERSTORM SEWERWATER MAIN

EDGE OF GRAVELCURBS

EDGE OF PAVEMENT

CENTRELINEPROPERTY LINE

FENCE LINE

MC or NMC

BENCHMARK:

REM. LOT A, PLAN VIP71091 & REM. LOT 1, PLAN6267, DL 85, NEWCASTLE DISTRICT

LEGAL DESCRIPTION:

DITCH

B0276-01-02

PLAN AND PROFILESMH 1 TO SMH 5

HAWTHORNE RISE SANITARYSEWER EXTENSION

REGIONAL DISTRICT OF NANAIMO

DS

SDA A

5500-20-HR-18-7570

A 12/12/13 FOR APPROVAL RA

TBM - OIP CORNER LOT 10/11, PLAN 24289,HAWTHORNE RISE, EL. 11.479 NOT GEODETIC

B 8/01/14 ISSUED FOR TENDER CH

Page 4: HIGHWAY ISLANDa 12/12/13 for approval ra legend existing proposed existing proposed existing proposed cb cb lb lb catch basin ... d1 storm manhole d1 s1 sanitary manhole s1 air valve

Janu

ary-

09-1

4 - 0

276-

BA

SE

.DW

G

Drawing Number: Revision:

Project Name:

Drawing Title:

Project Number:

Client Name:

Prepared by:

Weldon Professional CentreSuite 201 - 177 Weld StreetPO Box 89Parksville, BC, V9P 2G3

Phone: 250-248-2001Fax: 250-248-2553

Email: [email protected]: www.tjeng.ca

APPROVED:

CHECKED:

DRAWN:

DESIGN:

MTJ

RA

MTJ

MTJ FILENAME:

DATE PLOTTED:

DATE:

SCALE:

09/01/2014

December 2, 2013

0276-BASE.DWG

THIS PLAN AND DESIGN ARE, AND AT ALL TIMES REMAIN THEEXCLUSIVE PROPERTY OF TIMBERLAKE-JONES ENGINEERING LTD.AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTENCONSENT. THIS PLAN IS PREPARED FOR THE SOLE USE OF OURCLIENT AND NO REPRESENTATION OF ANY KIND IS MADE TO OTHERPARTIES WITH WHICH TIMBERLAKE-JONES ENGINEERING LTD. HASNOT ENTERED INTO CONTRACT. WRITTEN DIMENSIONS SHALL HAVEPRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALLVERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS ANDCONDITIONS ON THE JOB AND THIS OFFICE SHALL BE INFORMED OFANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWNON THIS DRAWING.

SEAL:

REV DATE REVISIONS BY

1:500

LEGENDEXISTING PROPOSED

EXISTING PROPOSED EXISTING PROPOSEDCB CB

LBLB

CATCH BASINLAWN BASIN

PP

TP

PPTP

POWER POLETELEPHONE POLE

BENCHMARKHYDRANT

HYDRANT W/ VALVE FH

FH

FH

FH

CO COCLEANOUT

STANDARD ABBREVIATIONS

AC ASBESTOS CEMENT H HUB

DI DUCTILE IRON F FLANGE

ST STEEL IPT IRON PIPE THREAD

PVC POLYVINYL CHLORIDE CSP CORRUGATED STEEL PIPE

PE POLYETHYLENE

H H

H

D1 D1STORM MANHOLES1 S1SANITARY MANHOLE

AIR VALVE

VALVE

MC or NMC

SERVICE LOCATION

specifications and drawings must comply withthe Industrial Health and Safety Regulations of

All work done in connection with these

the Workers' Compensation Board.

BC

NOTE: LOCATION OF EXISTING SERVICES ARESHOWN APPROXIMATELY AND MUST BE CHECKEDIN THE FIELD BY THE CONTRACTOR PRIOR TOCOMMENCEMENT OF WORK. THE ENGINEER IS TOBE NOTIFIED IMMEDIATELY OF ANY CONFLICTS.

SANITARY SEWERSTORM SEWERWATER MAIN

EDGE OF GRAVELCURBS

EDGE OF PAVEMENT

CENTRELINEPROPERTY LINE

FENCE LINE

MC or NMC

BENCHMARK:

LEGAL DESCRIPTION:

DITCH

B0276-01-03

TYPICAL SANITARYSEWER DETAILS

HAWTHORNE RISE SANITARYSEWER EXTENSION

REGIONAL DISTRICT OF NANAIMO

DS

SDA A

5500-20-HR-18-7570

A 12/12/13 FOR APPROVAL RA

TBM - OIP CORNER LOT 10/11, PLAN 24289,HAWTHORNE RISE, EL. 11.479 NOT GEODETIC

B 8/01/14 ISSUED FOR TENDER CH