High School #13
Construction Document Presentation, Daniel Lubeley,Acting Director, Capital Planning and Construction
Project Update• With an increased design capacity of 1,650, this is the fourth
iteration of the prototype plan with the program reviewed and modified for each iteration
• The purchase of the property by the County occurred on September 12, 2019. Anticipated property transfer from County to HCPSS by December 2019
• Continued coordination with the County and adjacent property owner with regards to utility access to the school, the public road and site access, and walkways on the school site to surrounding neighborhoods
Project Update (continued)• Refinements of the site plan include further design
development of the cafeteria outdoor dining area, the art patio, and storm water management facilities
• Some of the floor plan refinements include reconfiguration of the Physical Education locker room area, reconfiguration of the kitchen to promote a more efficient circulation for both students and staff, increase in individual corridor widths; and inclusion of additional display areas to assist with wayfinding at corridor intersections
• LEED ‘Silver’ certificate project under the new LEED for Schools version 4 maintaining a projected 54 LEED credits
Site Plan
Proposed First Floor Plan
AREA 'A'AREA 'D'
AREA 'B'AREA 'G'
AREA
'F'
AREA
'E'
AREA
'E'
AREA
'D'
AREA
'G'
AREA
'E'
AREA 'C'AREA 'A'
AREA
'B'
AREA
'C'
AREA
'B'
AREA
'A'
AREA 'H'AREA 'G'
AREA
'H'
AREA
'G'
AREA 'G'AREA 'F'
AREA 'H'ADD-ALTERNATE
AREA 'C'AREA 'A'
AREA 'C'AREA 'B'
AREA 'B'AREA 'G'
AREA 'A'AREA 'E'
AREA
'F'
AREA
'E'
AREA
'E'
AREA
'D'
SERVICE AREA
KITCHEN
COOLER
FREEZERDRY S
OFF
CAN
S
MOW
CAFETERIA
E
TR
EQ
GENS
TL
L
SHOPBSM OFF
ELEC
MECHANICAL
FIRE
S
S.E. RES 4
TR
MAT STORPLAN
CTE ENGINEERING /
TECH ED
CTE ENGINEERING /
TECH ED
CTE ENGINEERING /
TECH ED
STORSTOR STORSTOR
S
S
CONTRACT ROOM
SUPPAEP
TR
TT
T T
S
S
SS
TOFF
OFFCOT
HEALTH
EXAMWOMEN
MENCC
ART STORPLAN
ART STOR
ART STUDIO 1
ART STUDIO 2
PHOTO STUDIO
SCULPT /KILN
DARK ROOM
WOMENMEN
CC T
T
T
T
T
S
S
SROPRINC
PAR VOLFIN OFF
CONFREC
PRINCSEC
AP 2
AP 1WKRM
MAIN OFFICET
ATTEND
CAREER CENTER
OFF OFF OFF OFF OFF
OFF
OFF
OFF
OFF
DATA CLERK
CONF
WKRMREC
STAFF DINING
S.E. RES 1 (ALS)
S.E. SS
SE RES 3
ESOL 1 SE PLAN SE
CONF
S ELECTRONIC ENSEMBLEINSTR EQUIP
REPAIR
INSTRUMENTAL MUSICTTR CC T E UNIFORM
AUDITORIUM
S
SOFF
TOFF
TRS
P1
P2
P3
P4
CHORAL ROOM
DRAMA
OFF
CHANGE RM 1
CHANGE RM 2
T
T T
DANCE
S
S
TIX
STAGE
WORK SHOP
M
T
W
S
S
POLICELIAS
GYMNASIUM
PE S
TEAM S
TEAM S
TEAM ROOM
LAUN
TICKET
AUXILIARY GYMNASIUM
M W
T
CTE FACS LAB
WEIGHT TRAINING
CONCESSION
HEALTH CR 2
HEALTH CR 1
TRAINING
EXT. P.E. S
AD
CPLAN
CPLAN
CPLAN
T
SHWR SHWR
WOMEN LOCKERS
MEN LOCKERS
P.E. PLAN
P.E. PLAN
S
WRESTLING ROOM
ESOL 2
E
E TR CCT
M W
T
EXT SKITCHILD DEVEL.
CENTER
PRODUCTION
DISHCC
TL
STUDENTORG
STORE
S.E. RES 2 (ALS)
STUDENTDININGPATIO
OUTDOOREQUIPMENT
AREA
ARTPATIO
PLAYAREA
ELEV
ELEV
SEXT
S
TEAM ROOM
TEAM ROOM
TEAM ROOM TR
S S
S
OFF
ENCLOSEDMECHANICAL
EQUIPMENTAREA
0 8 16 32
ii
i
iiii
iv
v
vi
vii
Proposed Second and Third Floor Plans
Second Floor Third Floor
CONTROL ROOMS
S
OPEN TO
AUDITORIUM BELOW
CATWALK
CATWALKROOF
BELOW
ROOFBELOW
ROOFBELOW
OPEN TO
GYMNASIUM BELOW
OPEN TO
STAGEBELOW
MECHANICAL
OPEN TO
AUX GYMBELOW
CR1
CR2
CR3
SCC
T T
STAFF DINING
CR4
CR5
CR6
CR7
CR8
CR9
STOR
WKRME
STOR
AP 4
CONF
CR&DSEMINAR
1
GIFTED & TALENTED
G/T OFF
CR&DOFF
WORKROOM
PLANNING 1
CR10
CR11
CR12
CR13
CR15
CR14
BSAP
WOMENMEN
TCC
OPEN TO
COMMONS BELOW
MEDIA CENTER
MEDIA OFF
SMGRP
AREA
SMGRP
AREA
SMALLGROUPAREA
SER
MEDIA S
WOMEN
MEN
SET
S SEMPLAN(CTE)
CTE CAREERACADEMY
COMP. SCI 4
CTE CAREERACADEMY
COMP. SCI 3
CTE CAREERACADEMY
COMP. SCI 2
S SEMPLAN(CTE)
CTE CAREERACADEMY
COMP. SCI 1
INNOVATIONLAB
CONTROL ROOM
TV STUDIO
ES
SPT
SE RES 6
SE ST
E
TR
S
S
S
OT /PT
PREP
SEM
LIFE SCIENCE CR 4
LIFE SCIENCE CR 3
LIFE SCIENCE CR 2
LIFE SCIENCE CR 1
EARTH/SPACESCIENCE CR 1
EARTH/SPACESCIENCE CR 2S.E. RES 4
(ALS)JOURN /
YEARBOOK
SCIPLAN
ADD-ALTERNATEROOF BELOW
0 8 16 32
ELEV
ELEV
UP
UP
DN
UP
UP
DN
UP
UPUP
DN
UP
UP
DN
UP
ii
i
i
iii iv
iii
iii
iii iii
ROOFBELOW
ROOFBELOW
ROOFBELOW
CR23
CR24
CR23
TRCC
T T
STAFF DINING
CR24
CR27
CR28
CR29
CR30
CR31
S
WKRME
S
AP 4
CONF
MINI AUDITORIUM / TESTING
WORKROOM
PLANNING 1
CR10
CR33
CR34
CR35
CR37
CR36
HISPLIAS
WOMENMEN
TCC
OPEN TO
COMMONS BELOW
SEMINAR2
R
WOMEN
MEN
S.E.T
ES
T
PROFESSIONAL DEVELOPMENT
T
E
TR
S
SESOL
3
PREP
PHYSICAL SCIENCECR 4
PHYSICAL SCIENCECR 3
PHYSICAL SCIENCECR 2
PHYSICAL SCIENCECR 1
SCIENCEPLANNING
EARTH/SPACESCIENCE CR 3
EARTH/SPACESCIENCE CR 4
OPEN TO
MEDIA CENTER BELOW
CR38
CR39
PLANNING 4
PLANNING 3
CR40
SEM3
S
CR22
CR21
CR20
CR
CR17
CR16
CR18
STOR
SEM
0 8 16 32
DN
DN
ELEV
ii
i
i
iii
iii
iii
iv iv
iii iii
Architectural Character
Front North-Facing Elevation
Side West-Facing Elevation
Rear South-Facing Elevation
Side East-Facing Elevation
Total Project BudgetBase Construction EstimateArchitect/Engineering FeeConstruction Management FeeRelated CostsProject ContingencyEquipment and TechnologyProject Total Budget
Funding ProjectionsApproved Appropriations (FY19,FY20)FY21FY22FY23FY24Total Funding Projections
$107,932,041$6,457,700$4,868,574$5,404,000$5,404,000$5,404,000$135,470,315
$15,732,000$34,817,000$34,837,000$34,816,000$19,920,000$140,122,000
Summary• Request approval to bid the project for construction
• Contingent upon state approval of the Construction Document submission:
– Construction award May 2020
– Construction complete April 2023
– New facility occupied September 2023