innovation, Energy and Mines APPLICATION FOR WELL LICENCE In comphance with Ihe Oil and Gas Act and the Drilhng and Production Regulation, application is hereby made for a well licence for. Well Name Hi mark North Har ave 12-24-12-27 Well Location 12 24 12 27 (LSD) (Quadrant) (Section) (Township) (Range) Name of Well Owner HIGH~ EXPLORATION INC. hfanitoba Corporation No 6852719 Address of Well Owner 1560 2002 Victoria Avenue Re 'na SK S4P OR7 Telephone 306 -790-1723 Surface Location 12 (LSD) Ground Elevation 473 67 Fax 306 -751-0811 24 12 27 (Quadraat) (Seciion) (Township) (Rmge) metres above sea level Surface Co-ordinates 684.96m S of N of Sec 24 114.94m E of Wof Sec 24 Directional or Horizontal Well BottomHoie Co-ordinates 684.96m S of N of Sec 24 114.94m Eof Wof Sec 24 Surface Owner Richard 8c Brenda Reeves Occupant None Royalty Owner(s) See attached Freehohl Oil and Gas Rights Leased By Crown Reservation or Lease No. Mammoth Land Tem leton (Nane of Otl md Gas Lease Agent aad Corporation) Type of Well OIL Projected Total Depth 693m in Mississi ian Casing Size Oj). mm 1. 219.10 139.70 Weight im 35.70 20.83 Grade J-5 5 J-55 From Surface Surface To 140.00 693.00 Estimated Cemented Interval Surface Surface Drilhng Contractor To Be Determined Expected Spud Date 25-Oct-2014 Rig No. 0 0$ -Oct-2014 (Date) DD.'h9 Ihl YYYY (Signature of applicaat) For assistance in completing this form contact Paulette Seymour at (204) 945-6575 or Dan Smzyshyn at (204) 945-8102. For Department Use Only Well Licence No.: 10154 UWIt 100.12-24-012-27W1.00 Well ClassifscationtEXPLORATORY (NEW FIELD WILDCAT) Please see attached conditions. 2~ct2014 Date of Issue

Transcript of HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf ·...

Page 1: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

innovation, Energy and Mines

APPLICATIONFOR WELL LICENCEIn comphance with Ihe Oil and Gas Act and the Drilhng and Production Regulation, application is hereby made for a well

licence for.

Well Name Hi mark North Har ave 12-24-12-27

Well Location 12 24 12 27(LSD) (Quadrant) (Section) (Township) (Range)

Name of Well Owner HIGH~EXPLORATION INC.

hfanitoba Corporation No 6852719

Address of Well Owner 1560 —2002 Victoria Avenue Re 'na SK S4P OR7

Telephone 306 -790-1723

Surface Location 12(LSD)

Ground Elevation 473 67

Fax 306 -751-0811

24 12 27(Quadraat) (Seciion) (Township) (Rmge)

metres above sea level

Surface Co-ordinates

684.96m S of N of Sec 24

114.94m E of Wof Sec 24

Directional or Horizontal WellBottomHoie Co-ordinates

684.96m S of N of Sec 24

114.94m Eof Wof Sec 24

Surface Owner Richard 8c Brenda Reeves

Occupant None

Royalty Owner(s) See attached

Freehohl Oil and Gas Rights Leased By

Crown Reservation or Lease No.

Mammoth Land Tem leton(Nane of Otl md Gas Lease Agent aad Corporation)

Type of Well OIL

Projected Total Depth 693m in Mississi ian

Casing SizeOj). mm

1. 219.10

139.70

Weightim

35.70

20.83

Grade

J-5 5

J-55

From

Surface

Surface

To

140.00

693.00

EstimatedCemented Interval

Surface

Surface

Drilhng Contractor To Be Determined

Expected Spud Date 25-Oct-2014Rig No. 0

0$ -Oct-2014(Date) DD.'h9 Ihl YYYY (Signature of applicaat)

For assistance in completing this form contact Paulette Seymour at (204) 945-6575 or Dan Smzyshyn at (204) 945-8102.

For Department Use Only

Well Licence No.: 10154 UWIt 100.12-24-012-27W1.00

Well ClassifscationtEXPLORATORY (NEW FIELD WILDCAT)Please see attached conditions.

2~ct2014Date of Issue

Page 2: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Lic. No. 10154 Highmark North Hargrave 12-24-12-27 (WPM)

A licence to drill a well known as Highmark North Hargrave 12-24-12-27 (WPM) is hereby

granted to HIGHMARKEXPLORATION INC..

The Licensee shall comply with all the provisions of the Oil and Gas Act, the Drilling and

Production Regulation and the following terms and conditions:

1. A copy of a fully executed surface lease (i.e. signed by Highmark Exploration Inc.) is to be

forwarded to the Surface Rights Board at 360-1395 Ellice Avenue, Winnipeg, Manitoba R36

3P2, attention Barb Miskimmin.

2. Highmark is to provide samples taken at Sm intervals from the surface casing shoe to T.D.

One set of samples is to be washed, dried and preserved in vials that are labeled with the name

of the well and the depth at which each sample was taken (in accordance with Subsection

111(2) of the regulation) and shipped to the Rock Preparation Lab at 10 Midland Street in

Winnipeg.

3. Highmark must ensure that the cover of each sample cutting tray is labeled with the licence

¹, location and intervals for that particular tray.

4. Effective June 1, 2013. All submissions are now required to be submitted in digital format,

emailed to [email protected], as per Informational Notice 13-05.

Please ensure that the following is included in the subject line of your email: Company name,

well licence ¹, location (bottomhole) and the type of report (see Appendix 1) for logs see

Appendix 3.

Lic. No. 10154 Highmark North Hargrave 12-24-12-27 (WPM)

A licence to drill a well known as Highmark North Hargrave 12-24-12-27 (WPM) is hereby

granted to HIGHMARK EXPLORATION INC..

The Licensee shall comply with all the provisions of the Oil and Gas Act, the Drilling and

Production Regulation and the following terms and conditions:

1. A copy of a fully executed surface lease (i.e. signed by Highmark Exploration Inc.) is to be

forwarded to the Surface Rights Board at 360-1395 Ellice Avenue, Winnipeg, Manitoba R3G

3P2, attention Barb Miskimmin.

2. Highmark is to provide samples taken at 5m intervals from the surface casing shoe to T.D.

One set of samples is to be washed, dried and preserved in vials that are labeled with the name

of the well and the depth at which each sample was taken (in accordance with Subsection

111(2) of the regulation) and shipped to the Rock Preparation Lab at 10 Midland Street in

Winnipeg.

3. Highmark must ensure that the cover of each sample cutting tray is labeled with the licence

#, location and intervals for that particular tray.

4. Effective June 1, 2013. All submissions are now required to be submitted in digital format,

emailed to [email protected], as per Informational Notice 13-05.

Please ensure that the following is included in the subject line of your email: Company name,

well licence #, location (bottomhole) and the type of report (see Appendix 1) for logs see

Appendix 3.

Page 3: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Lie. No. 10154 Highmark North Hargrave 12-24-12-27 (WPM)

MANIT BA BMI I NRE IREMENT F RNEWWELL

The following notiTications and information must be provided to the appropriate district office.

OPERATIONS IN TOWNSHIPS 1 TO 6Dept. of Innovation, Energy and MinesPetroleum BranchBox 22023 Railway AvenueWaskadaMB ROM2EOPhone: 2044I73-2472 (24 hour service)Fax: 204-673-2767

OPERATIONS NORTH OF TOWNSHIP 6Dept. of Innovation, Energy and MinesPetroleum BranchBox 1359227 King Street WestVlrden MB ROM 2CO204-7484260 (24 hour service)204-748-2208

DRILLING, COMPLETION AND INITIALPRODUCTION SUBMSSION REGUIREMENTS

COMPANY REPRESENTATIVE ATWELLSITE IS RESPONSIBLE FOR ITEMS 1 TO 9.

1. 24 hours advance noses of Intent to spud a well.

FOR OEPr, u% ONLY

RECEIVED

2, 2 hours advance notice of intent to run and cement surface casing or production casing.

3. 2 hours advance notice of intent to pull pipe after running a DST.

4. 2 hours advance notice of a dry hole abandonment. Verbal approval to abandon must be obtained

horn the district oNce.

5, Weekly status reports on all acdvitles up to rig release. R rts tobe called in each MONDAY

6. Acomplete copy of the drilling tours.

7. Two (2) copies of field prints of all logs.

8. Tagged Image Ales of all open hole logs and cased hole logs and LAS (Log ASCII) Flies) for any

log that may be represented in LAS format (submlsed on 1.44 floppy disk, CD or DVD format) as

per Informational Nodce 054I5.

Two (2) copies of any directional sunreys run (submitted in digital format as per Informational

10. Aone (1) litre sample of drilling fluids. Squeezing of a pit is not to proceed without the consent of

the district office.

11. Any drill cutting samples and cores are to be shipped to: Rock Preparation Lab, 10 Midland

Street, Winnipeg MB, R3E 2Y6.

12. Two (2) copies of all reporls of drill stem tests, oore analyses or of any other test. (E.g, fluid

analyses, pressure surveys, etc.)

13. Two (2) copies of any Geological Repon,

14. Chronological report of all completion operations incluMng full details.

15. Two (2) copies of all completion logs.

16. Two (2) copies of the Initial Produchon Report (lorms ssached).

Lic. No. 10154 Highmark North Hargrave 12-24-12-27 (WPM)

Page 4: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

H'ghma«jI 4-25

I20m. HighmarkA/R to 4-25 12m. MTS Caveat

No. 1116389/2WaterWell

SHEET 1 of 3

gran'd Residence

30.175Medium Grade Gravel-Road Government Road (70N) Allowance 30.175

to00ro

0

to

ro0

rb

E

tb 1

0U

1

Co srP co

ON

cc

Fd. 0.025Sq. I.B.

Low Area(Wet)

307 .012AZ=91'37'55

Old Bar

Old Building

160 pp

~rt

Cb

~o"

Overhead Power Line

(Operator: MB Hydro)

Abn'd Resid

13

Q Trail

CAUTION'/BHydro

0/H Power Line(Ht=+6.88m.)

Buried Water Line In Vicinity(Operator: RM of Wallace) //////

(///~Bins (x8)

I

X—20 ppm

Access Road

Low Area~~/

///

I.I

14-24J

530.229 Over ea Power LineAZ=91'37'55" (Operator: MB Hydro)

Fd. 0.025Sq. I.B.

rbcc0tb

tb

Barbed Wire

208'52'00"196.81

(Tie-Line)

SEEDETAIL

//

//

/

ITE PLAN

150 200 250m.

1: 5,000

12 -27WPM

Plan Showing Survey of

HIGHMARKNORTH HARGRAVE12-24-12-27WPM

I certify that the survey represented by this planis correct to the best of my knowledge and wascompleted on the 10th day of September, 2014.

Manitoba La Wit

Azimuths are NAD 83 (Zone 14) UTM Grid.All distances shown are horizontal and at ground level.

Combined Scale factor derived = 0.999790

Well Site and Access RoadL.S.12 Sec.24 Twp.12 Rge.27 WPMR.M. of Wallace

ELEVATIONON GROUNDATWELL LOCATION= 473.67

CO-ORDINATES:684.96 m. S of N Bdy. )

( Sec. 24114.94 m. E of W Bdy. (

GEO Co-ordinates UTM Co-ordinates

50 01 40'496 tI NAD ~ 5543759'194 N

101'03'20.770" $ ( 352759.838 E

50'01'40.485" ) $ 5543539.093 N101'03'19.100" $ ( 352788.216 E

Tar et Co-ordinates

19.9B North rIFrom SW Corner of Oil Target

14.94 East (Datum: Elevations shown are referenced to the Province

of Manitoba Mon. 82R723 Vertical Geodetic DatumCGVD28.

AREAS: HECTARES ACRES

Well SiteAccess Road

Total

1.2101.307

2.517

CERTIFICATEOF TITLE:NW 24-12-27WPM CT No. 2130164/2Richard Cowley ReevesBrenda Joy Reeves

2.993.23

6.22

Legal Survey Posts (found / planted)—Planted Wood HubSurveyed Well Centre - ———---Oo Producer-- ~Standing Well- —--———--—-- e Abandoned Producer--+Injection Well (Former Producer) 4 Abandoned Dry--4Abandoned Water Injection ———-4 Injection Well-- gSurface Location - Horizontal / Directional / Slant- ——————x-Portions referred to outlined thusDistances are in metres.

OPERATOR:

HIGHMARKEXPLORATION INCAltus Geomatics ~

Manitoba ~Toll Free: 1-800-465-6233

www.altos eomaticsmb.corn

NTS Sheet: 62 K/3

Client File No AFE No.:

REV Revision

Date: September 17, 2014 Job No.: 178208

Initials: SM - MB/KP - PFSFile: 178208W

Page 5: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

SHEET 2 of 3

HIGHMARKa x p u 0 R AT I ro Ia

ib

Q iorv w

oi

O

riocill

xv

otx

eEEQl

0O

wecl0eivmc

DETAIL

0 20 40 60 80 100m

Scale -1: 2,000

YES NO- Is at least 1 5 km from the Corporate Limits of a City,

Town or Village 8 0- Is at least 75 m from any shoreline El 0- Is at least 75 m from any Surface Improvements El 0- Is at least 45 m from any Surveyed Road (III 0- Is at least 75 m. from any Aircraft Runway or Taxiway (III Q- Is at least 75 m from any Water Well 8 0- Approximately 13 7 km from the nearest Urban Centre (Elkhorn)- Approximately 1 0 km. from the nearest Residence (SWH 25-12-27WPM)

Client File No AFE Nox

REV Revision

Date: September 17, 2014 Job No 4 178208

Initials: SM - MB/KP - PFSFile: 178208W

Facilities shown on this plan are forinformational purposes only Prior to anyconstruction on lease or access road,HIGHMARKEXPLORATION INC, MTSCommunications Inc., Manitoba Hydro, andManitoba I-lydro-Gas Operations MUST becontacted for location of any undergroundfacilities that may exist.

H)GHMARKNORTH HARGRAVE12-24-12-27WPM

Page 6: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

SHEET 3 of 3

HIGHMARKa XP L0 R A7 I 0 Ia

SURFACE DEVELOPMENT

0 05 1 15 2 25kmScale - 1: 50,000

NOTE:Residences are shown thus:- ————————- ~

70

~Le end:

Cl HOSPITAL

S LIFE FLIGHT EMERGENCY SERVICE

~256 SECONDARY HIGHWAY

Q2 PRIMARY HIGHWAY

~44N MUNICIPAL ROAD

Q TRANSCANADAHIGHWAY

ELKHORN

QSS

HtGHMARKNORTH HARGRAVE12-24-12-27WPMClient File No

REV Revision

AFE Noc

Date: September 17, 2014 Job No J 178208

Initials: SM - MB/KP - PFSFile: 178208W

Page 7: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

HIGHMARK

Plan Showing Photo Mosaic of

HIGHMARKNORTH HARGRAVE12-24-12-27WPMfrom a Surface Location in

L.S.12 Sec.24 Twp.12 Rge.27 WPM

WELL SITE PHOTO PLAN

0 100 200 300 400 500m.

Scale - 1: 10,000

Photo Date: Ma 11,2012.

~D

Altus Geomatics QManitoba MEM6ER

Toll Free: 1-000e65-6233wwwerttuegeometioemb.oom

Client File No AFE No.:

REV Revision

Date: September 17, 2014 Job No.: 178208

File: I 78208W Initials: SM - MB/KP - PFS

Page 8: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

San elTECHNICALJOB DESIGN

Pumping Services

August 30, 2014

Primary Cementing Procedure

Highmark North Hargrave16-21-12-27 W1M

Revision 1 - Revised the Production blend to lead and tail

Prepared For: Highmark Exploration inc.c/o Magus Engineering Limited

444 5th Ave SW

Calgary, AB T2P 2T8

Attention: Leland MelbyOffice: 403.767.3212

Cell: [email protected]

Client Solutions Representative: Tom McCarthyP 403.835.4934

[email protected]

Prepared By:

Revised By:

Bingchang WuP 403.542.3865

bwu@sanjel. corn

Chetan Kadhe

Service Location: Estevan, SKP 1.800.926.2216

Pressure Pumping ~ Completionssanj el. Com

Canada ~ USA ~ International

TECHNICAL JOB DESIGNPumping Services

Highmark North Hargrave16-21-12-27 W1M

Revision 1 - Revised the Production blend to lead and tail

Prepared For: Highmark Exploration Inc.c/o Magus Engineering Limited

444 5th Ave SWCalgary, AB T2P 2T8

Attention: Leland MelbyOffice: 403.767.3212

Cell: [email protected]

Client Solutions Representative: Tom McCarthyP 403.835.4934

[email protected]

Prepared By: BingChang Wu P 403.542.3865 ■ Professional Park Tours [email protected] Revised By: Chetan Kadhe ■ Cementing Schools

Service Location: Estevan, SKP 1.800.926.2216

■ Suretech Completion Technology

August 30, 2014

Speak to Your Sanjel Representative About:

Primary Cementing Procedure

Page 9: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Sangel Pride by Performance.

BE AWARE OF YOUR SURROUNDINGS AND ASSOCIATED HAZARDSEVERY JOB IS WORTH TAKINGTIME TO PERFORM IT SAFELY

COMMON CEMENTING HAZARDS

Dust

High pH

High Pressure

Hours of Operation

Communication

Noise

Footing

Mounting andDismounting

Weather

Eye protection

Spotting Equipment

Wear dust masks when operating bulk cement binsCement has a very high pH. Ensure skin is washed clean when in contact withcement

Treatment iron has a high pressure potential. Ensure people are not near iron

during pressure test or during the cementing job

Do not operate equipment when fatigued. Ensure all workers are alert and able toperform

Use radios to communicate with Sanjel crew, rig crew and location consultantwhen lines of sight are compromised

Wear earplugs when operating equipment or around engines or blowers during

job

Identify when the ground is not level, slippery or wet and implement controlmeasures

Use stairs when available. Avoid stepping over or jumping off equipment with

slippery conditions and uneven ground

Be prepared for all weather conditions and address appropriatelyPoor road conditions

Cold weatherWet equipment

Wear eye protection at all times when on location

Always use a guide when backing up. Make sure that clear lines of sight areavailable and noise is not amplified by surrounding equipment

Site Awareness

Wildlife

Casing Buoyancy

PPE

Lifting

All workers on location must know where the Muster Point and eye wash stationsare located

Be aware of wildlife while driving and on location

Understand the chaining requirements of each job. Especially important onsurface jobs

Ensure proper PPE is used at all times for each specific job

Use a helper to lift objects

REPORT ALLUNSAFE CONDITIONS

Pressure Pumping ~ Completions

Canada ~ USA ~ International

COMMON CEMENTING HAZARDS

Dust Wear dust masks when operating bulk cement binsHigh pH

High Pressure

Hours of Operation

Communication

Noise

Footing

WeatherPoor road conditionsCold weatherWet equipment

Eye protection Wear eye protection at all times when on locationSpotting Equipment

Site Awareness

Wildlife Be aware of wildlife while driving and on locationCasing Buoyancy

PPE Ensure proper PPE is used at all times for each specific jobLifting Use a helper to lift objects

Wear earplugs when operating equipment or around engines or blowers during job

Always use a guide when backing up. Make sure that clear lines of sight are available and noise is not amplified by surrounding equipment

Be prepared for all weather conditions and address appropriately

Use stairs when available. Avoid stepping over or jumping off equipment with slippery conditions and uneven ground

Mounting and Dismounting

REPORT ALL UNSAFE CONDITIONS

Identify when the ground is not level, slippery or wet and implement control measures

All workers on location must know where the Muster Point and eye wash stations are located

Understand the chaining requirements of each job. Especially important on surface jobs

Treatment iron has a high pressure potential. Ensure people are not near iron during pressure test or during the cementing job

Do not operate equipment when fatigued. Ensure all workers are alert and able to perform

Cement has a very high pH. Ensure skin is washed clean when in contact with cement

BE AWARE OF YOUR SURROUNDINGS AND ASSOCIATED HAZARDSEVERY JOB IS WORTH TAKING TIME TO PERFORM IT SAFELY

Use radios to communicate with Sanjel crew, rig crew and location consultant when lines of sight are compromised

Page 10: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave Revision 1

16-21-12-27 W1M

Surface Casing

Hole Size:

Casing Size:

Depth:Annular Capacity:Excess:

311.2 mm219.1 mm, 35.72 kg/m J-55, ST8 C140 m

0.0384 m'/m

50 % (Gauge)

Cement Blend

Cement Data

SSi + 0.15% CFR-2 + 2.00% CaCI2 + 0.15% CDF-4P140 m to Surface = 140 m AER Code: 01

Note: If losses occur while drilling add 3% LCC-1 to the cement blend

Water RequirementYield

DensitySack WeightMix Water DensityThickening TimeCompressive Strength

Temperature

:m'/t:m'/t

:kg/m'kg

:kg/m'hrs:min

:MPa/hrs

. 0C

0.5470.8971750102310004:002/84/1620

Calculations

0.03845.40.48.5

m'/m x140 mm'+ 50% excessm'+ 0% excessm' 0.897 m'/t

5.4m'.1

m'.4

m'.5

tonnes

Highmark North Hargrave Revision 116-21-12-27 W1M

Surface Casing

Hole Size: 311.2 mmCasing Size: 219.1 mm, 35.72 kg/m J-55, ST&CDepth: 140 mAnnular Capacity: 0.0384 m³/mExcess: 50 % (Gauge)

Cement Blend140 m to Surface = 140 m AER Code: 01

Note: If losses occur while drilling add 3% LCC-1 to the cement blendCement Data

Water Requirement :m³/t 0.547Yield :m³/t 0.897Density :kg/m³ 1750Sack Weight :kg 1023Mix Water Density :kg/m³ 1000Thickening Time :hrs:min 4:00Compressive Strength :MPa/hrs 2/8

4/16Temperature :°C 20

Calculations

0.0384 m³/m x 140 m = 5.4 m³5.4 m³ + 50 % excess = 8.1 m³0.4 m³ + 0 % excess = 0.4 m³8.5 m³ / 0.897 m³/t = 9.5 tonnes

SSi + 0.15% CFR-2 + 2.00% CaCl2 + 0.15% CDF-4P

Page 11: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave Revision 1

16-21-12-27 W1M

Surface Casing Procedure

NOTE: Casing must be tied down with 2 x 0.5 inch Grade 40 chain(s)

1. Make up float equipment and centralizers as required on 219.1 mm surface casing and run in to totaldepth.

2. Break circulation and condition hole and drilling fluid as required prior to cementing.

3. Rig in a Sanjel single cementing unit, surface casing treating lines and a 219.1 mm swage to casing.

4. Pump a 3.0 m'resh water pref lush and pressure test surface treating lines to 16 MPa.

5. Mix and pump 9.5 t (8.5 m') SSi+ additives at 1750 kg/m'.

6. Drop a 219.1 mm wood top plug and displace to floats with water. Bump with a minimum of 3.5 MPaover final pumping pressure.

NOTE ~ Stop at calculated displacement point, and follow procedures to confirm plug has beendropped. If the plug has been dropped, consult with Client Representative on location andcontinue to displace as directed. Also, confirm procedure with Sanjel operations.

7. Hold pressure for 2 minutes, then bleed back casing pressure to ensure float is holding.

8. If float does not hold, install a pressure gauge on the swage and maintain 500 kPa pressure overfinal pumping pressure for a minimum of 4 hours.

9. W.O.C. a minimum of 8 hours prior to drillout.

The cement being pumped has thixotropic properties; do not stage-displace. Cementmust move continuously.

Highmark North Hargrave Revision 116-21-12-27 W1M

Surface Casing Procedure

NOTE: Casing must be tied down with 2 x 0.5 inch Grade 40 chain(s)

1.

2. Break circulation and condition hole and drilling fluid as required prior to cementing.

3.

4. Pump a 3.0 m³ fresh water preflush and pressure test surface treating lines to 16 MPa.

5. Mix and pump 9.5 t (8.5 m³) SSi + additives at 1750 kg/m³.

6.

NOTE:

7. Hold pressure for 2 minutes, then bleed back casing pressure to ensure float is holding.

8.

9. W.O.C. a minimum of 8 hours prior to drillout.

The cement being pumped has thixotropic properties; do not stage-displace. Cement must move continuously.

Make up float equipment and centralizers as required on 219.1 mm surface casing and run in to total depth.

Rig in a Sanjel single cementing unit, surface casing treating lines and a 219.1 mm swage to casing.

Drop a 219.1 mm wood top plug and displace to floats with water. Bump with a minimum of 3.5 MPa over final pumping pressure.

If float does not hold, install a pressure gauge on the swage and maintain 500 kPa pressure over final pumping pressure for a minimum of 4 hours.

Stop at calculated displacement point, and follow procedures to confirm plug has been dropped. If the plug has been dropped, consult with Client Representative on location and continue to displace as directed. Also, confirm procedure with Sanjel operations.

Page 12: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave Revision 1

16-21-12-27 W1M

Production Casing

Hole Size:

Casing Size:

Depth:Excess (Lead):Excess (Tail):Surface Casing:

200.0 mm

139.7 mm, 20.83 kg/m J-55, ST&C700 m

30 % (gauge), 20 % (caliper)30 % (gauge), 20 % (caliper)219.1 mm, landed at 140 m

Cement Blends

Lead Cement iGain (Sask) + 0.05% CFL-3+ 1.00% FWCA-H + 0.25% SMS + 0.15% CDF-4P + 3.00%LCC-1

500 m to Surface = 500 m

Tail Cement iBond + 0.20% CFL-3+ 0.30% LTR + 1.50% FWCA+ 0.15% CDF-4P700 m to 500 m = 200 m AER Code: 01

Cement Data

Water RequirementYield

DensitySack WeightMix Water Density

Thickening TimeTT40Compressive Strength

TemperatureFluid Loss

Free WaterCalculationsScavenger 3.0 m' 2.57 m'It

BHST: 30'C

:m'/t:m'/t

:kg/m'kg

:kg/m'hrs:min

:hrs:min

:MPa/hrs

C:cc/ 30 min

BHCT: 32'C

Lead Cement0.9351.3001500

10151000

3:302:20

1.9/163.9/245.9/48

30

38

0.0

1.2 tonnes

Tail Cement0.501

0.8561780

10221000

3:302:402.5/812/16

17.5/24

3020

<0.1

~Scaven er

2.21

2.571250

Lead CementIn Casing 0.0179 m'Im x 140 m + 0% excess

In OH 0.0161 m'Im x 360 m + 30% excessTonnage (2.5 m'+ 7.5 m') / 1.30 m'It

25m'5

m'.7

tonnes

Tail Cement

In OHIn ShoeTonnage

0.0161 m'/m x 200 m + 30% excess

0.0127 m'/m x 10 m + 0% excess

4.4 m'/0.86 m'/t

43m'.1

5.0 tonnes

Highmark North Hargrave Revision 116-21-12-27 W1M

Production Casing

Hole Size: 200.0 mmCasing Size: 139.7 mm, 20.83 kg/m J-55, ST&CDepth: 700 mExcess (Lead): 30 % (gauge), 20 % (caliper)Excess (Tail): 30 % (gauge), 20 % (caliper)Surface Casing: 219.1 mm, landed at 140 m

Cement Blends

Lead Cement

500 m to Surface = 500 m AER Code: 42

Tail Cement700 m to 500 m = 200 m AER Code: 01

Cement Data BHST: 30°C BHCT: 32°C

Lead Cement Tail Cement ScavengerWater Requirement :m³/t 0.935 0.501 2.21Yield :m³/t 1.300 0.856 2.57Density :kg/m³ 1500 1780 1250Sack Weight :kg 1015 1022Mix Water Density :kg/m³ 1000 1000Thickening Time :hrs:min 3:30 3:30TT40 :hrs:min 2:20 2:40Compressive Strength :MPa/hrs 1.9/16 2.5/8

3.9/24 12/165.9/48 17.5/24

Temperature :°C 30 30Fluid Loss :cc/ 30 min 38 20Free Water :% 0.0 <0.1

CalculationsScavenger 3.0 m³ / 2.57 m³/t = 1.2 tonnes

Lead CementIn Casing 0.0179 m³/m x 140 m + 0% excess = 2.5 m³In OH 0.0161 m³/m x 360 m + 30% excess = 7.5 m³Tonnage (2.5 m³ + 7.5 m³) / 1.30 m³/t = 7.7 tonnes

Tail Cement

In OH 0.0161 m³/m x 200 m + 30% excess = 4.3 m³In Shoe 0.0127 m³/m x 10 m + 0% excess = 0.1Tonnage 4.4 m³ / 0.86 m³/t = 5.0 tonnes

iGain (Sask) + 0.05% CFL-3 + 1.00% FWCA-H + 0.25% SMS + 0.15% CDF-4P + 3.00% LCC-1

iBond + 0.20% CFL-3 + 0.30% LTR + 1.50% FWCA + 0.15% CDF-4P

Page 13: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave Revision 1

16-21-12-27 W1M

Production Casing Procedure

1. Make up float equipment as required on 139.7 mm casing and run in to total depth.

2. Break circulation and condition hole and drilling fluid prior to cementing.

3. Rig in a Sanjel single cementing unit, surface treating lines with pump-out 'T'nd a 139.7 mm plug loadinghead to casing.

4. Fill surface treating lines with water and pressure test to 21 MPa.

5. Drop a bottom rubber wiper plug and mix and pump the following:~ 2.0 m'resh water~ 3.0 m'isweep Spacer mixed at 1100 kg/m'

3.0 m'cavenger slurry mixed at 1250 kg/m'1.2 tonnes)~ 7.7 tonne (10.0 m') iGain (Sask) + additives mixed at 1500 kg/m'

5.0 tonne (4.3 m') iBond + additives mixed at 1780kg/m'.

Pump out lines through pump-out 'T'nd drop a top rubber plug and displace to float collar with water at 1.0m'/min.

7. Bump plug with a minimum of 3.5 MPa over final pumping pressure.

8. Hold pressure for 2 minutes, then bleed back casing pressure to ensure float is holding.

9. If float does not hold, install a pressure gauge on the cementing head and maintain 500 kPa pressure overfinal pumping pressure for a minimum of 4 hours.

10. W.O.C. a minimum of 24 hours.

IF MUD DENSITY > 1050 kgim':* Weight pref lush to a minimum of the equivalent mud density, unless otherwise specified* lfpref lush is water, use 1.0 m'or pressure test and increase spacer volume* Weight spacer to a minimum of the equivalent mud density + 50 kglm'

Highmark North Hargrave Revision 116-21-12-27 W1M

Production Casing Procedure

1. Make up float equipment as required on 139.7 mm casing and run in to total depth.

2. Break circulation and condition hole and drilling fluid prior to cementing.

3.

4. Fill surface treating lines with water and pressure test to 21 MPa.

5. Drop a bottom rubber wiper plug and mix and pump the following:■ 2.0 m³ fresh water■ 3.0 m³ Visweep Spacer mixed at 1100 kg/m³ ■ 3.0 m³ scavenger slurry mixed at 1250 kg/m³ (1.2 tonnes)■ 7.7 tonne (10.0 m³) iGain (Sask) + additives mixed at 1500 kg/m³■ 5.0 tonne (4.3 m³) iBond + additives mixed at 1780 kg/m³

6.

7. Bump plug with a minimum of 3.5 MPa over final pumping pressure.

8. Hold pressure for 2 minutes, then bleed back casing pressure to ensure float is holding.

9.

10. W.O.C. a minimum of 24 hours.

IF MUD DENSITY > 1050 kg/m³:* Weight preflush to a minimum of the equivalent mud density, unless otherwise specified* If preflush is water, use 1.0 m³ for pressure test and increase spacer volume* Weight spacer to a minimum of the equivalent mud density + 50 kg/m³

If float does not hold, install a pressure gauge on the cementing head and maintain 500 kPa pressure over final pumping pressure for a minimum of 4 hours.

Rig in a Sanjel single cementing unit, surface treating lines with pump-out 'T' and a 139.7 mm plug loading head to casing.

Pump out lines through pump-out 'T' and drop a top rubber plug and displace to float collar with water at 1.0 m³/min.

Page 14: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave16-21-12-27 W1M

PRIMARY CEMENTING QUOTATION:

1.0 Surface Casing1.1 Pumping Services: Cementing Base Charge (6 hours), Unit Travel,

Cementing Plugs, Environmental Surcharge

1.2 SSi + 0.15% CFR-2+ 2.00% CaCI2+ 0.15% CDF-4P /tonne1.3 Estimated Cost (Based on 9.7 tonnes)

$ 1,800.00

$ 490.00

$ 6,553.00

2.0 Setup Charge 3

2.1 Pumping Services: Cementing Base Charge (6 hours), Unit Travel,Cementing Plugs, Radios

$ 2,525.00

2.2 iGain + 0.05% CFL-3+ 1.00% FWCA-H + 0.25% SMS /tonne

2.3 iBond + 0.20% CFL-3+ 0.30% LTR+ 1.50% FWCA+ 0.15% CDF-4P/tonne

$ 515.00

$ 685.00

2.4 Visweep Spacer (3.0 m')

2.5 Estimated Cost (Based on 9.0 tonnes lead and 5.1 tonnes tail)

$ 870.00

$ 11,523.50

3.0

3.1

3.2 Bin Rental - per job (if required)3.3 Bin Delivery - per hour (if required)

MiscellaneousAdditional Location Time after initial 6 hours location time - per hour, per unit

Twin PumperSingle PumperBulker

$ 410.00 *

$ 345.00 *

$ 180.00 *

$ 540.00 *

$ 225.00 *

4.0 Additional Services and Materials

Applies to any services and materials not included in this tenderCurrent Price List Less 64%

* Not Subject to Discount** Pricing subject to change** A fuel surcharge, when applicable, will apply** Prices quoted are in effect for 30 days from the date of the proposal** Provincial and Federal taxes, where applicable, are additional** A surcharge of 4.0% will be applied to jobs performed in the province of British Columbia

Please refer to the General Terms and Conditions (the "Terms" ) contained on the last page of thisProposal. Allpricing and services (including any supply of materials or consumables) described in thisProposal, and any other services performed or materials or consumables supplied by Sanjel to Customerwhich may be outside the scope of this Proposal, are subject to the Terms, which form part of thisProposal. By accepting this Proposal (either expressly or by calling out Sanjel for any services orsupply), Customer hereby agrees to be bound by the Terms. Such acceptance shall constitute anacknowledgment by Customer that it has reviewed the Terms and has had the opportunity to seek properlegal advice.

Highmark North Hargrave16-21-12-27 W1M

PRIMARY CEMENTING QUOTATION:

1.0 Surface Casing1.1 $1,800.001.11.2 $490.001.3 $6,553.00

2.0 Setup Charge 32.1 $2,525.002.12.12.2 $515.002.22.3 $685.002.32.32.4 $870.00

2.5 $11,523.50

3.0 Miscellaneous3.1 Additional Location Time after initial 6 hours location time - per hour, per unit

Twin Pumper $410.00 *Single Pumper $345.00 *Bulker $180.00 *

3.2 Bin Rental - per job (if required) $540.00 *3.3 Bin Delivery - per hour (if required) $225.00 *

4.0 Additional Services and MaterialsApplies to any services and materials not included in this tender

Current Price List Less 64%* Not Subject to Discount** Pricing subject to change** A fuel surcharge, when applicable, will apply** Prices quoted are in effect for 30 days from the date of the proposal** Provincial and Federal taxes, where applicable, are additional** A surcharge of 4.0% will be applied to jobs performed in the province of British Columbia

Please refer to the General Terms and Conditions (the “Terms”) contained on the last page of this Proposal. All pricing and services (including any supply of materials or consumables) described in this Proposal, and any other services performed or materials or consumables supplied by Sanjel to Customer which may be outside the scope of this Proposal, are subject to the Terms, which form part of this Proposal. By accepting this Proposal (either expressly or by calling out Sanjel for any services or supply), Customer hereby agrees to be bound by the Terms. Such acceptance shall constitute an acknowledgment by Customer that it has reviewed the Terms and has had the opportunity to seek proper legal advice.

Estimated Cost (Based on 9.7 tonnes)

Pumping Services: Cementing Base Charge (6 hours), Unit Travel, Cementing Plugs, Environmental Surcharge

SSi + 0.15% CFR-2 + 2.00% CaCl2 + 0.15% CDF-4P /tonne

Visweep Spacer (3.0 m³)

Estimated Cost (Based on 9.0 tonnes lead and 5.1 tonnes tail)

Pumping Services: Cementing Base Charge (6 hours), Unit Travel, Cementing Plugs, Radios

iGain + 0.05% CFL-3 + 1.00% FWCA-H + 0.25% SMS /tonne

iBond + 0.20% CFL-3 + 0.30% LTR + 1.50% FWCA + 0.15% CDF-4P /tonne

Page 15: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

General Terms and Conditions

I Agreement for Services. San/el Canada Ltd ("San/el") and the customer for whom San/el is

providing the Services ("Customer', (cogectively, the 'Parbes"), expressly understand and agree

that the terms and conditions in this agreement (the 'Agreement" ) shall govern and control the

provision of all services provided by San/el to Customer, including any services, matenals or

consumables provided or performed by Sanlel under wntten or oral requests for services or/oh

orders('Services" )

2 Entire Agreement and Conflict. Sub/ect to any Master Service Agreement ('MSA") in effect

between the Parties, this Agreement constitutes the entire agreement of the Parties with respect

to the sub/ect matter herein This Agreement shall not be superseded or replaced by any other

agreement (including any terms and conditions which may be found in any purchase order,

service order or invoice produced by the Customer) unless speaficagy agreed to by the Parbes in

wnting If there is any conffict between the terms of this Agreement and the MSA, the provisions

of the MSA shall prevail

3 Results of Service. The Customer acknowledges and agrees that the Services are of such a

nature that no results of the work performed can be guaranteed and San/el speaficagy does not

make any representations, warranties or guarantees with respect to the results of the Services

4 Price and Price Changes. Customer shall pay for the Services at the rates set out in San/el's

current Pnce Book ('Pnce Book') All rates and pnces quoted in the Pnce Book are sub/ect to

change without pnor notice to the Customer, including the imposition of fuel or other surcharges

related to increases in commodity pnces Special lobe undertaken by San/el outside of the scope

of the Services shall not be sub/ect to Pnce Book or any previously agreed upon discounts

5 Taxes. All pnces are exclusive of taxes imposed on the sale of the Services

6 Additional Service Requests. Services or matenals not hated in the Pnce Book but

purchased by San/el at Customer's request shall be charged to Customer at actual cost plus

twenty five percent (25%)

7 Payment Terms. Payment terms are cash, net thirty (30) days Interest shall be charged at

eighteen percent (18%) per annum on ag overdue accounts, and where necessary, all costs of

collection of overdue accounts, including any legal fees and disbursements

6 Standby Charge. In the event that San/el is unable to perform a Iob or provide requested

Services to Customer due to arcumstances beyond its control, including instances of force

maleure, San/el retains the nght to charge Customer seventy five percent (75%) of the appkcable

base charge, plus one hundred percent (100%) of arsis including, but not kmited to, mileage,

blending, matenal handing/hauling, matenals and/or return dekvery and restocking charges, and

all location time in excess of the location time allowance

9 Warranties. Sanlel warrants only that title to the product, supplies and matenals, shall pass

and vest in Customer, free and clear of ag liens, claims and encumbrances of any nature, and that

the same are free from defects in workmanship There are no warranties, express or implied, of

merchantability, use, fitness or otherwise which extend beyond those expressly stated herein

10 Proprietary Rights. Customer acknowledges that any intellectual property which is used by

San/el for the provisions of Services, or is created or developed by Sanlel in the course of

performing the Services, is and shall remain the property of and is owed by San/el at all times

11 Confidentiality. The Parbes agree to take all reasonable precautions to protect the

confidential information of the other from unauthonzed use and disclosure and each Party shall

use the confidential information of the other only for the purpose of conducting the Services

12. Liability and Indemnity. (a) Subject to Sections 13 and 14 below, Customer shall be

liable to Sanjel for all claim, demands, actions, causes of action, damages, losses,

deficiencies, costs, liabilities, expenses (including legal fees, on a solicitor-client basis)

("Claims" ), that may be made or brought against Sanjel (either directly by Customer, its

affiliates or subsidiaries or by any third party) or which Sanjel may suffer or incur as a

result of, arising out of or incident to this Agreement or any Services provided hereunder,

whether such claim is found in contract, tort or any other cause of action whatsoever,

unless caused by the negligence or willful misconduct of Sanjel. (b) Notwithstanding

section 12(a), Customer shall at all times be solely liable for any Claims made or brought

against Sanjel (either by Customer, its affiliates or subsidiaries or by any third parly) or

which Sanjel may suffer or incur as a result of, arising out of or incident to: well blowout or

any uncontrolled well condition, fire, cratering, redrill or sidetracking, seepage or reservoir

damage, loss or damage to the hole (including tubulars and casing), pollution and

contamination except sudden and accidental pollution originating above the surface of the

earth and emanating from Sanjel's equipment while such equipment is in Sanjel's care,

custody and control; even if caused in whole or in part by the sole, joint or concurrent

negligence, gross negligence, willful misconduct or other fault (active or passive) of Sanjel

or any other person. (c) Customer shall release, protect, defend, indemnify and save

harmless Sanjel, its affiliates and subsidiaries from and against aff the Claims described in

sections 12(a) and 12(b) above.

13. Liability Cap. Notwithstanding Section 12 or any other term herein to the contrary,

Sanjel's maximum liability to Customer arising out of or in connection with this Agreement

and any services provided hereunder is limited to the cost of the products or services

supplied for the particular job in which such damages arose.

14 Consequential Damages. Notwithstanding section 12 or any other term herein to the

contrary, neither Party shall be liable to the other for business interruptions, punitive, indirect or

consequential damages relating thereto (including but not kmited to any loss of profit, loss of

expected revenue, loss of hydrocarbons or ng time)

15 Equipment and Materials. Customer shall be bable to Sanlel for any and ag loss or damage

to San/el's equipment, tools or matenals (i) while being used down hole, and (a) while being

transported to or from the work-site by Customer at any time or while such equipment, tools or

matenal are being loaded onto or attached to any transportation unit or vehicle furnished by or

arranged for by Customer In the event any San/el equipment is lost, damaged or destroyed

dunng the provision of Service, Customer shall use reasonable efforts to dikgently recover or

repair said equipment, and in the event recovery or repair are not possible, Customer agrees to

reimburse San/el for the lost, damaged or destroyed equipment at actual replacement cost value

plus twenty-five percent (25%)

16 Disposal of Chemicals. Customer shall arrange for and be responsible for the disposal of

any used chemicals, hazardous matenal(s), including but not limited to, any waste produced or

accumulated dunng the provision of Services

17 Waiver. Failure to enforce any or ag of the above terms and conditions shall not relieve the

Parties of their nghts and obligations hereunder or constitute a waiver thereof or preclude

subsequent enforcement of same

16 Amendments. This Agreement may only be amended by a wntten agreement between the

Parties signed by a duly authonzed representative of each Party

19 Governing Law. This Agreement shall be governed by the laws of the Province of Alberta

Customer shall not bnng any action or proceeding related to the Services except in the ludiaal

distnct of Calgary, AB, provided however that this shall not restnct any nght of appeal

Effective Starclr 1, 2013Effective March 1, 2013

1. Agreement for Services. Sanjel Canada Ltd. (“Sanjel”) and the customer for whom Sanjel is

providing the Services (“Customer”), (collectively, the “Parties”), expressly understand and agree

that the terms and conditions in this agreement (the “Agreement”) shall govern and control the

provision of all services provided by Sanjel to Customer, including any services, materials or

consumables provided or performed by Sanjel under written or oral requests for services or job

orders (“Services”).2. Entire Agreement and Conflict. Subject to any Master Service Agreement (“MSA”) in effect

between the Parties, this Agreement constitutes the entire agreement of the Parties with respect

to the subject matter herein. This Agreement shall not be superseded or replaced by any other

agreement (including any terms and conditions which may be found in any purchase order,

service order or invoice produced by the Customer) unless specifically agreed to by the Parties in

writing. If there is any conflict between the terms of this Agreement and the MSA, the provisions

of the MSA shall prevail.

14. Consequential Damages. Notwithstanding section 12 or any other term herein to thecontrary, neither Party shall be liable to the other for business interruptions, punitive, indirect orconsequential damages relating thereto (including but not limited to any loss of profit, loss ofexpected revenue, loss of hydrocarbons or rig time).

7. Payment Terms. Payment terms are cash, net thirty (30) days. Interest shall be charged at

eighteen percent (18%) per annum on all overdue accounts, and where necessary, all costs of

collection of overdue accounts, including any legal fees and disbursements.

4. Price and Price Changes. Customer shall pay for the Services at the rates set out in Sanjel’s

current Price Book (“Price Book”). All rates and prices quoted in the Price Book are subject to

change without prior notice to the Customer, including the imposition of fuel or other surcharges

related to increases in commodity prices. Special jobs undertaken by Sanjel outside of the scope

of the Services shall not be subject to Price Book or any previously agreed upon discounts.

3. Results of Service. The Customer acknowledges and agrees that the Services are of such a

nature that no results of the work performed can be guaranteed and Sanjel specifically does not

make any representations, warranties or guarantees with respect to the results of the Services.

13. Liability Cap. Notwithstanding Section 12 or any other term herein to the contrary,

Sanjel’s maximum liability to Customer arising out of or in connection with this Agreement

and any services provided hereunder is limited to the cost of the products or services

supplied for the particular job in which such damages arose.

General Terms and Conditions

12. Liability and Indemnity. (a) Subject to Sections 13 and 14 below, Customer shall be

liable to Sanjel for all claim, demands, actions, causes of action, damages, losses,

deficiencies, costs, liabilities, expenses (including legal fees, on a solicitor-client basis)

(“Claims”), that may be made or brought against Sanjel (either directly by Customer, its

affiliates or subsidiaries or by any third party) or which Sanjel may suffer or incur as a

result of, arising out of or incident to this Agreement or any Services provided hereunder,

whether such claim is found in contract, tort or any other cause of action whatsoever,

unless caused by the negligence or willful misconduct of Sanjel. (b) Notwithstanding

section 12(a), Customer shall at all times be solely liable for any Claims made or brought

against Sanjel (either by Customer, its affiliates or subsidiaries or by any third party) or

which Sanjel may suffer or incur as a result of, arising out of or incident to: well blowout or

any uncontrolled well condition, fire, cratering, redrill or sidetracking, seepage or reservoir

damage, loss or damage to the hole (including tubulars and casing), pollution and

contamination except sudden and accidental pollution originating above the surface of the

earth and emanating from Sanjel’s equipment while such equipment is in Sanjel’s care,

custody and control; even if caused in whole or in part by the sole, joint or concurrent

negligence, gross negligence, willful misconduct or other fault (active or passive) of Sanjel

or any other person. (c) Customer shall release, protect, defend, indemnify and save

harmless Sanjel, its affiliates and subsidiaries from and against all the Claims described in

sections 12(a) and 12(b) above.

5. Taxes. All prices are exclusive of taxes imposed on the sale of the Services.6. Additional Service Requests. Services or materials not listed in the Price Book butpurchased by Sanjel at Customer’s request shall be charged to Customer at actual cost plustwenty five percent (25%).

10. Proprietary Rights. Customer acknowledges that any intellectual property which is used by

Sanjel for the provisions of Services, or is created or developed by Sanjel in the course of

performing the Services, is and shall remain the property of and is owed by Sanjel at all times.

17. Waiver. Failure to enforce any or all of the above terms and conditions shall not relieve theParties of their rights and obligations hereunder or constitute a waiver thereof or precludesubsequent enforcement of same.18. Amendments. This Agreement may only be amended by a written agreement between theParties signed by a duly authorized representative of each Party.11. Confidentiality. The Parties agree to take all reasonable precautions to protect the

confidential information of the other from unauthorized use and disclosure and each Party shall

use the confidential information of the other only for the purpose of conducting the Services.

19. Governing Law. This Agreement shall be governed by the laws of the Province of Alberta.Customer shall not bring any action or proceeding related to the Services except in the judicialdistrict of Calgary, AB; provided however that this shall not restrict any right of appeal.

15. Equipment and Materials. Customer shall be liable to Sanjel for any and all loss or damage

to Sanjel’s equipment, tools or materials: (i) while being used down hole; and (ii) while being

transported to or from the work-site by Customer at any time or while such equipment, tools or

material are being loaded onto or attached to any transportation unit or vehicle furnished by or

arranged for by Customer. In the event any Sanjel equipment is lost, damaged or destroyed

during the provision of Service, Customer shall use reasonable efforts to diligently recover or

repair said equipment, and in the event recovery or repair are not possible, Customer agrees to

reimburse Sanjel for the lost, damaged or destroyed equipment at actual replacement cost value

plus twenty-five percent (25%).

8. Standby Charge. In the event that Sanjel is unable to perform a job or provide requested

Services to Customer due to circumstances beyond its control, including instances of force

majeure, Sanjel retains the right to charge Customer seventy five percent (75%) of the applicable

base charge, plus one hundred percent (100%) of costs including, but not limited to, mileage,

blending, material handling/hauling, materials and/or return delivery and restocking charges, and

all location time in excess of the location time allowance.9. Warranties. Sanjel warrants only that title to the product, supplies and materials, shall pass

and vest in Customer, free and clear of all liens, claims and encumbrances of any nature, and that

the same are free from defects in workmanship. There are no warranties, express or implied, of

merchantability, use, fitness or otherwise which extend beyond those expressly stated herein.

16. Disposal of Chemicals. Customer shall arrange for and be responsible for the disposal ofany used chemicals, hazardous material(s), including but not limited to, any waste produced oraccumulated during the provision of Services.

Page 16: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Hi hmark Exploration inc.

kPa mKB mSS k Im3 FORMATION TOPS CASING snd CEMENT HOLE SIZE MUD

Surface Coordinates

684.96m South of North114 94m East of West

414emKB

S Hey I/ssmMs m m allo abledc sion 4 1 5'19

Imm, J-55, ST&C,35 7 kg/m

311mm Gal

Press TVD MD SS EMD

6 eye ery150mMa atmed Dc atone 3dcgMa dcg Icg 4 I dcg/ssmDc nots r eysccrcs S an R er

Cement.Cement to Surface Use Min 50%excessSee cement program for details Floe Water

1969 201

263

Zsei 292

sess 350

sess 391

3891 397

cess 478

523

5314 542

5549 566

6010 613

6305 643

erne 686

679 693

277

215

186

128

87

81

-45

-64

-88

-135

-165

-208

-215

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

Carlile

Assinibome mbr

Upper Ashvige

Newcastle Mbr

Swan Rwer

Upper Melita

Lower Melita

Reston

Upper Amaranth Mbr

Virden Mbr ¹

Scallion Mbr ¹

Bakken

Total Depth

200 mm

Mud Up pnor toMelita on the fly oras hole conditions

dictate

Gel Chem

KEY' Pnmary Zone, 4 = Secondary Zone, AP = Potent el Abnormal Pressure, LC = Potent sr Lost C rculsion

Special Instructions

1 - Note that this well will be cored, 25m Lodgepole core from 566m -591m, please confirm vnth Wegsite Geologist.

2- Ensure that the gas detector is up and running after dngout of surface shoe

Magus Engineering Limited:

Contacts

Leland Melby

Steve Magus

Office

403-767-3212

403-767-3201

Residence

403-288-4410

Cellular

403-540-2182

403-860-0891

island.melb ma usen .corn

steve.ma us ma usen corn

Highmark Exloration Inc

Operations Scott Blommaert

Erwin Sison

Jeff Gross 306-790-1723

403-814-3263

403-4084171

306-533-0575

scott hi hmarkex loration corn

erwm hi markex loration corn

eff hi hmarkex loration corn

Qct 7 2014 - LM a us En ineerin Limited

Well Name:

UWI: est.KB: 477.67 m

Type: Vertical KB-GL: 4.00 m

Substance: Vertical Oil Well GL: 473.67 m

LIC #:

kPa mKB FORMATION TOPS CASING and CEMENT HOLE SIZE MUD

Surface Casing Setting Depth

Press TVD MD SS

0

0

0

0

1969 201 Carlile

0 2577 263 Assiniboine mbr

0 2861 292 Upper Ashville

0 3430 350 Newcastle Mbr

0 3832 391 Swan River

0 3891 397 Upper Melita

0 4686 478 Lower Melita

0 5127 523 Reston

0 5314 542 Upper Amaranth Mbr

0 5549 566 Lodgepole

0 6010 613 Virden Mbr #

0 6305 643 Scallion Mbr #

0 6726 686 Bakken

6795 693 Total Depth

KEY: = Primary Zone, # = Secondary Zone, AP = Potential Abnormal Pressure, LC = Potential Lost Circulation

Special Instructions

1 - Note that this well will be cored, 25m Lodgepole core from 566m - 591m, please confirm with Wellsite Geologist.

2 - Ensure that the gas detector is up and running after drillout of surface shoe.

Magus Engineering Limited:

Contacts Office Cellular

Leland Melby 403-767-3212 403-540-2182 [email protected]

Steve Magus 403-767-3201 403-860-0891 [email protected]

Highmark Exloration Inc

Operations Scott Blommaert 403-816-3263 [email protected]

Erwin Sison 403-608-6171 [email protected]

Jeff Gross 306-790-1723 306-533-0575 [email protected]

agus Engineering Limited

-215

-165

-208

-135

81

0

-45

-64

-88

128

277

215

EMD

±140mKB

87

1000

186

Highmark Exploration Inc.

Oct 7, 2014 - LM

Residence

403-288-4410

mSS kg/m3

AFE:Highmark North Hargrave 12-24-12-27WPM

100/12-24-12-27W1/00

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

Gel

200mm

311mm

Survey 1/30m Maximum allowable deviation is 1.5°

Survey every 150m. Max allowed Deviation is 3 deg. Max dog leg is 1 deg/30m. Do not survey accros Swan River

Gel Chem

Floc Water

Surface Coordinates:

684.96m South of North 114.94m East of West

Samples: Gas Detector: Sour Zones: Logging: Highmark: 5m fr SRFC to TD, 1 set Yes, SRFC to TD Watrous Grp Gamma, Induction, Density/Nuetron IEM: As per license See Logging Program for details.

CASING BOWL:

229mmm X 219mm

14000 kPa W.P.

Production Casing:

139.7mm, J-55, ST&C, 20.83 kg/m Cement: See cement program for details. Use Min 30% excess over caliper.

Surface Casing: 219.1mm, J-55, ST&C, 35.7 kg/m Cement: Cement to Surface. Use Min 50% excess. See cement program for details.

Mud Up prior to Melita on the fly or as hole conditions

dictate.

Page 17: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

DRILLING PROGRAM

NORTH HARGRAVE4 TWO CREEKS AREAVertical Oil Well

Prepared for

Highmark Exploration Inc.

By

Leland MelbyOct 7, 2014

agus Engineering Limited

DRILLING PROGRAM

NORTH HARGRAVE & TWO CREEKS AREA

Vertical Oil Well

Prepared for

Highmark Exploration Inc.

By

Leland Melby

Oct 7, 2014

agus Engineering Limited

Page 18: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark Exploration lnc. is the Prime Contractor at this location.

Highmark Exploration Inc. is committed to creating a safe work environment for itsemployees and contract personnel at our job sites.

It is the responsibility of Highmark's representative (wellsite supervisor) to adhere to safeindustry practice and to follow the appropriate provincial OHBS Act and regulatory guidelines.This safe work practice should be instilled in all contract personnel working on location toensure they are conducting their work in a manner consistent with safety procedures that applyto their business or industry. If personnel are unclear of the safety procedures applicable totheir task, they must seek clarification from their supervisor or a Highmark Exploration Inc.representative.

Safety meetings must be held as a minimum, as per contracted companies safety policies, andWHS, WCB, and the provincial energy regulator (SER, ERCB or IEM) requirements. Morespecifically, Highmark will expect a meeting at all crew changes, operation changes andunforeseen changes in scope from what was covered in the last safety meeting. Meetingsshould be structured to encourage personnel involvement to identify hazards associated andeveryone present should be well aware and understand all that has been discussed before themeeting is ended. The Highmark representative must be present for safety meetings, orreview the safety meeting minutes with the participants as soon as possible.

Each person, upon arrival at the Highmark Exploration Inc. location must be given a wellsiteorientation. If the Highmark Exploration Inc. representative is not present, this task must bedone by the rig manager or principle contractor supervisor. A generic copy of the wellsiteorientation form must be posted in the doghouse.

All meetings and orientations should be documented on the appropriate contactors safetymeeting paper work and in the absence of such a document, Highmark safety meetingpaperwork should be filled out. A copy of this record should be kept in a clearly marked folderfor quick access in the event of an audit and forwarded to Calgary with the final wellsitepaperwork.

For personnel whose task has them leaving the site as a normal part of their work, such aswater/vacuum/gravel truck operators, their route and expected time of travel must bemonitored. It must be clear who will be responsible for this monitoring and an emergencyresponse plan must be in place in the event that the expected travel time is exceeded.

When a work site is more than 30 minute drive, under moderate road conditions, from a 24hrhealth care facility, medical aid must be on site, or available as a shared service with a 20minute response time to this location.

In the event of a reportable incident, the appropriate Highmark reports must be filled inand emailed to your Calgary contacts.

North Hargrave k Two Creeks Area Drilling Program Page 2 of 9

North Hargrave & Two Creeks Area Drilling Program Page 2 of 9

Highmark Exploration Inc. is the Prime Contractor at this location. Highmark Exploration Inc. is committed to creating a safe work environment for its employees and contract personnel at our job sites.

It is the responsibility of Highmark’s representative (wellsite supervisor) to adhere to safe industry practice and to follow the appropriate provincial OH&S Act and regulatory guidelines. This safe work practice should be instilled in all contract personnel working on location to ensure they are conducting their work in a manner consistent with safety procedures that apply to their business or industry. If personnel are unclear of the safety procedures applicable to their task, they must seek clarification from their supervisor or a Highmark Exploration Inc. representative. Safety meetings must be held as a minimum, as per contracted companies safety policies, and WHS, WCB, and the provincial energy regulator (SER, ERCB or IEM) requirements. More specifically, Highmark will expect a meeting at all crew changes, operation changes and unforeseen changes in scope from what was covered in the last safety meeting. Meetings should be structured to encourage personnel involvement to identify hazards associated and everyone present should be well aware and understand all that has been discussed before the meeting is ended. The Highmark representative must be present for safety meetings, or review the safety meeting minutes with the participants as soon as possible. Each person, upon arrival at the Highmark Exploration Inc. location must be given a wellsite orientation. If the Highmark Exploration Inc. representative is not present, this task must be done by the rig manager or principle contractor supervisor. A generic copy of the wellsite orientation form must be posted in the doghouse. All meetings and orientations should be documented on the appropriate contactors safety meeting paper work and in the absence of such a document, Highmark safety meeting paperwork should be filled out. A copy of this record should be kept in a clearly marked folder for quick access in the event of an audit and forwarded to Calgary with the final wellsite paperwork. For personnel whose task has them leaving the site as a normal part of their work, such as water/vacuum/gravel truck operators, their route and expected time of travel must be monitored. It must be clear who will be responsible for this monitoring and an emergency response plan must be in place in the event that the expected travel time is exceeded. When a work site is more than 30 minute drive, under moderate road conditions, from a 24hr health care facility, medical aid must be on site, or available as a shared service with a 20 minute response time to this location. In the event of a reportable incident, the appropriate Highmark reports must be filled in and emailed to your Calgary contacts.

Page 19: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

SERVICES LIST

SERVICE SUPPLIER

Ensign 640

LOCATION

Matt Charron

TELEPHONE

403-880-3393

Bits

Casing

Surface —J an L SupplyCalgary Sales —Nick LobayMain hole —Baker Hughes

Calgary Sales —Ryan Johnson

Apex Distribution —Meaghan RoszlerTrucking —TBDFloat, centralizers, etc to be supplied by Apex

403-512-1054

403-669-5417

403-660-8464

Casing Bowl andWellhead

Metra —Estevan 306-634-6325

Cement

Construction

Sanj el —Estevan

Calgary Sales —Tom Mcarthy

Tutthill Construction

800-926-2216403-835-4934

204-845-2405

Coring

Drilling Mud

Environmental 4Land Spreading

TBD

CES —Moose MountainWarren Dublonko

Poplar Environmental Services

403-850-7046

306-452-8088

Logging

Shack andSurface Rentals

(pumps, tanks)

Weather ford

As per present rig set-up... any changes to be run through Calgary.

North Hargrave k Two Creeks Area Drilling Program Page 3 of 9

North Hargrave & Two Creeks Area Drilling Program Page 3 of 9

SERVICES LIST

SERVICE SUPPLIER LOCATION TELEPHONE

Rig Ensign 640 Matt Charron 403-880-3393

Bits Surface – J an L Supply

Calgary Sales – Nick Lobay 403-512-1054

Main hole – Baker Hughes

Calgary Sales – Ryan Johnson 403-669-5417

Casing Apex Distribution – Meaghan Roszler 403-660-8464

Trucking – TBD

Float, centralizers, etc to be supplied by Apex

Casing Bowl and Metra - Estevan 306-634-6325

Wellhead

Cement Sanjel - Estevan 800-926-2216

Calgary Sales – Tom Mcarthy 403-835-4934

Construction Tutthill Construction 204-845-2405

Coring TBD

Drilling Mud CES – Moose Mountain

Warren Dublonko 403-850-7046

Environmental & Poplar Environmental Services 306-452-8088

Land Spreading

Logging Weatherford

Shack and As per present rig set-up…any changes to be run through Calgary.

Surface Rentals

(pumps, tanks)

Page 20: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

1.0 CONTACTINFORMATION

Contact OfficeFIELD SUPERVSIORRod Carriere (Drilling)Jason Makeiff (Geology)

Cell

403-580-0022306-717-0997

Fax email

[email protected]@gmail. corn

MAGUS OFFICE 264-3309Leland Melby ext 212Steve Magus ext 201

540-2182860-0891

[email protected]@maguseng. corn

HIGHMARKOFFICE —OPERATIONSErwin Sison 403-608-6171Scot Blommaert 403-816-3263Jeff Gross 306-533-0575

[email protected]@highmarkexploration. corn

j eff@highmarkexploration. corn

HIGHMARK24 HOURS EIEMGENCY NUMBER: 1-306-790-1723

1.1 GENERAL WELL INFORMATION

See Individual Stick Diagram for each location for the details.

1.2 HOLE SIZES / CASING SPECS / CEMENT

Surface Hole: 311mm hole to approximately +/- 140mKB219.1mm, 35.7 kg/m, J-55 ST&CCasingCement to surface.

Main Hole: 200mm hole to +/- 700mKBDepth —may be altered pending drilling results by Geology139.7mm, 20.83kg/m, J-55, ST&CcasingCement to surface.

1.3 DRILLING MUD

Please refer to the attached drilling fluids program for specific details, product information and cost ofproducts.

Surface Hole: Drill with fresh water and Gel —mud up if losses encountered.

Main Hole: Drill out float and shoe with Floe water system. Mud up to Gel Chem system

prior to entering Melita formation or as hole conditions dictate.

North Hargrave & Two Creeks Area Drilling Program Page 4 of 9

North Hargrave & Two Creeks Area Drilling Program Page 4 of 9

1.0 CONTACT INFORMATION

Contact Office Cell Fax email

FIELD SUPERVSIOR Rod Carriere (Drilling) 403-580-0022 [email protected]

Jason Makeiff (Geology) 306-717-0997 [email protected]

MAGUS OFFICE 264-3309 264-3314

Leland Melby ext 212 540-2182 [email protected]

Steve Magus ext 201 860-0891 [email protected]

HIGHMARK OFFICE – OPERATIONS

Erwin Sison 403-608-6171 [email protected]

Scot Blommaert 403-816-3263 [email protected]

Jeff Gross 306-533-0575 [email protected]

HIGHMARK 24 HOURS EIEMGENCY NUMBER: 1-306-790-1723

1.1 GENERAL WELL INFORMATION

See Individual Stick Diagram for each location for the details.

1.2 HOLE SIZES / CASING SPECS / CEMENT

Surface Hole: 311mm hole to approximately +/- 140mKB

219.1mm, 35.7 kg/m, J-55 ST&C Casing

Cement to surface.

Main Hole: 200mm hole to +/- 700mKB

Depth – may be altered pending drilling results by Geology

139.7mm, 20.83kg/m, J-55, ST&C casing

Cement to surface.

1.3 DRILLING MUD

Please refer to the attached drilling fluids program for specific details, product information and cost of

products.

Surface Hole: Drill with fresh water and Gel – mud up if losses encountered.

Main Hole: Drill out float and shoe with Floc water system. Mud up to Gel Chem system

prior to entering Melita formation or as hole conditions dictate.

Page 21: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

1.4 EVALUATION

Wellsite Geologist will be responsible for sample collection and correspondence with Calgary geology.

DST:Core:Samples

Logs

NoneLodgepole formation —25m core interval. See stick diagram for details.

Highmark: One Set - 1/5m from SRFC to total depth —as per wellsite geologyIEM: One Set —1/5m from SRFC to total depth (washed/vialed)

Gas Detector: A as detector is to be run from surface shoe to total de th.

Please ensure that the PASON gas detector is running after drilling out of the surface

casing shoe.

Gamma, Induction, Density/Neutron. See logging program for details.

1.5 SAFETY

Highmark Exploration Inc stresses the importance of safety in all its operations. It is the responsibilityof contractors and wellsite supervisors to adhere to the Highmark Exploration Inc HS&EOrientationHandbook and safe industry practice and to follow the appropriate OH&SAct and other Regulatoryguides, regulations and acts. This safe work practice should be instilled in all contract personnel workingon location to ensure they are conducting their work in a manner consistent with safety procedures that

apply to their business or industry. Ifpersonnel are unclear of the safety procedures applicable to theirtask, they must seek clarification from their supervisor or Highmark Exploration Inc representative.

HSE Manual: Please ensure you have received a copy of Highmark Exploration Inc's corporate HSEmanual that should be reviewed, understood and followed throughout the operations you are

conducting. As a secondary reference Magus Engineering is utilizing Libra Systems for our corporateonline electronic Health, Safety and Environment Manual. This is an excellent resource of informationon emergency response procedures, government regulations and a variety of forms. Ensure thatwhenever possible Highmark's forms should take precedence over the Libra forms but regardless, allthat are filled out should be included with the final drilling package.

Libra System: www.abcanada.or Login: Magus2 Password: MDrilling

Incident Reporting: Ifan incident does occur, you must fill out the Highmark Exploration Inc incidentforms as well as ensuring that any third party services involved in the incident and investigation supplytheir fully completed forms which should all be sent to your superintendent in Calgary. In order to meetthe requirements of the Magus Engineering HSE program, we have subscribed to a service to track allincidents across all of our operations clients for internal Magus use and therefore this must also be done

on top of any other forms. The ABCan-Track system allows for incidents to be done through theirwebsite in an online submission. Please ensure that you attach any of the other forms electronicallywhen prompted during the submission.

ABCan-Track: www.abcanadaco .ca Login and Password will be supplied individually.

Safety meetings: Highmark Exploration Inc expects a meeting at all crew changes, operation changes

and unforeseen changes in scope from what was covered in the last safety meeting. Meetings should be

structured to encourage personnel involvement to identify hazards associated and everyone presentshould be well aware and understand all that has been discussed before the meeting is ended. The

North Hargrave & Two Creeks Area Drilling Program Page 5 of 9

North Hargrave & Two Creeks Area Drilling Program Page 5 of 9

1.4 EVALUATION

Wellsite Geologist will be responsible for sample collection and correspondence with Calgary geology.

DST: None

Core: Lodgepole formation – 25m core interval. See stick diagram for details.

Samples: Highmark: One Set - 1/5m from SRFC to total depth - as per wellsite geology

IEM: One Set – 1/5m from SRFC to total depth (washed/vialed)

Gas Detector: A gas detector is to be run from surface shoe to total depth.

Please ensure that the PASON gas detector is running after drilling out of the surface

casing shoe.

Logs: Gamma, Induction, Density/Neutron. See logging program for details.

1.5 SAFETY

Highmark Exploration Inc stresses the importance of safety in all its operations. It is the responsibility

of contractors and wellsite supervisors to adhere to the Highmark Exploration Inc HS&E Orientation

Handbook and safe industry practice and to follow the appropriate OH&S Act and other Regulatory

guides, regulations and acts. This safe work practice should be instilled in all contract personnel working

on location to ensure they are conducting their work in a manner consistent with safety procedures that

apply to their business or industry. If personnel are unclear of the safety procedures applicable to their

task, they must seek clarification from their supervisor or Highmark Exploration Inc representative.

HSE Manual: Please ensure you have received a copy of Highmark Exploration Inc’s corporate HSE

manual that should be reviewed, understood and followed throughout the operations you are

conducting. As a secondary reference Magus Engineering is utilizing Libra Systems for our corporate

online electronic Health, Safety and Environment Manual. This is an excellent resource of information

on emergency response procedures, government regulations and a variety of forms. Ensure that

whenever possible Highmark’s forms should take precedence over the Libra forms but regardless, all

that are filled out should be included with the final drilling package.

Libra System: www.abcanada.org Login: Magus2 Password: MDrilling

Incident Reporting: If an incident does occur, you must fill out the Highmark Exploration Inc incident

forms as well as ensuring that any third party services involved in the incident and investigation supply

their fully completed forms which should all be sent to your superintendent in Calgary. In order to meet

the requirements of the Magus Engineering HSE program, we have subscribed to a service to track all

incidents across all of our operations clients for internal Magus use and therefore this must also be done

on top of any other forms. The ABCan-Track system allows for incidents to be done through their

website in an online submission. Please ensure that you attach any of the other forms electronically

when prompted during the submission.

ABCan-Track: www.abcanadacorp.ca Login and Password will be supplied individually.

Safety meetings: Highmark Exploration Inc expects a meeting at all crew changes, operation changes

and unforeseen changes in scope from what was covered in the last safety meeting. Meetings should be

structured to encourage personnel involvement to identify hazards associated and everyone present

should be well aware and understand all that has been discussed before the meeting is ended. The

Page 22: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

wellsite supervisor must be present for safety meetings, or review the safety meeting minutes with the

participants as soon as possible.

Orientations: Each person, upon arrival at the Highmark Exploration Inc location must be given a

wellsite orientation. If the wellsite supervisor is not present, this task must be done by the rig manageror principle contractor supervisor.

Inspections: Critical components (BOP system, etc) of the drilling rig and supplementary equipmentshall be jointly inspected by the rig manager/driller and drilling supervisor (operator representative)

prior to use or after any change or disassembly to ensure they are properly assembled and in satisfactoryoperating condition to meet the job expectations.

Offsite travel: For personnel whose task has them leaving the site as a normal part of their work, such

as water/vacuum/gravel truck operators, their route and expected time of travel must be monitored. Itmust be clear who will be responsible for this monitoring and an emergency response plan must be in

place in the event that the expected travel time is exceeded.

Medical proximity: When a work site is more than 30 minute drive, under moderate road conditions,from a 24hr health care facility, medical aid must be on site, or available as a shared service with a 20

minute response time to this location. Note that this regulation varies slightly between provinces so

verify for your particular location.

1.6 SPECIAL INSTRUCTIONS

1. Measure and record KB to GL and CF. Ensure that construction is contacted to ensure that anycuts or fills are recorded on GL. Report proper cut/fill with surface casing details.

2. Measure out last trip before coring, testing, and at T.D.

3. Submit the Drilling Report to Magus Engineering's office before 07:30 hours, with 07:00 hour'

status. Reports run 00:00 - 23:59 hours each day. Also email a quick status report at 16:00 hours

daily.

4. Wellsite representative must ensure that all pertinent data (casing, logs, tests, lost circulation,kicks etc.) are properly recorded on the tour sheets.

5. Any lost circulation encountered on surface hole will be repaired before proceeding with the

surface hole.

6. Monitor and record any and all lost circulation, documenting the volume and the depth at whichthe losses occurred. Also, measure and record any losses that may occur as a result of seepage

into the formation while drilling.

7. The Manitoba Energy Board must be notified as per the following:24 hours advance notice prior to spudding well2 hours advance notice of intent to run and cement surface or production casing2 hours advance notice of dry hole abandonment —verbal approval must be obtained fromdistrict office.

North Hargrave k Two Creeks Area Drilling Program Page 6 of 9

North Hargrave & Two Creeks Area Drilling Program Page 6 of 9

wellsite supervisor must be present for safety meetings, or review the safety meeting minutes with the

participants as soon as possible.

Orientations: Each person, upon arrival at the Highmark Exploration Inc location must be given a

wellsite orientation. If the wellsite supervisor is not present, this task must be done by the rig manager

or principle contractor supervisor.

Inspections: Critical components (BOP system, etc) of the drilling rig and supplementary equipment

shall be jointly inspected by the rig manager/driller and drilling supervisor (operator representative)

prior to use or after any change or disassembly to ensure they are properly assembled and in satisfactory

operating condition to meet the job expectations.

Offsite travel: For personnel whose task has them leaving the site as a normal part of their work, such

as water/vacuum/gravel truck operators, their route and expected time of travel must be monitored. It

must be clear who will be responsible for this monitoring and an emergency response plan must be in

place in the event that the expected travel time is exceeded.

Medical proximity: When a work site is more than 30 minute drive, under moderate road conditions,

from a 24hr health care facility, medical aid must be on site, or available as a shared service with a 20

minute response time to this location. Note that this regulation varies slightly between provinces so

verify for your particular location.

1.6 SPECIAL INSTRUCTIONS

1. Measure and record KB to GL and CF. Ensure that construction is contacted to ensure that any

cuts or fills are recorded on GL. Report proper cut/fill with surface casing details.

2. Measure out last trip before coring, testing, and at T.D.

3. Submit the Drilling Report to Magus Engineering’s office before 07:30 hours, with 07:00 hour’s

status. Reports run 00:00 - 23:59 hours each day. Also email a quick status report at 16:00 hours

daily.

4. Wellsite representative must ensure that all pertinent data (casing, logs, tests, lost circulation,

kicks etc.) are properly recorded on the tour sheets.

5. Any lost circulation encountered on surface hole will be repaired before proceeding with the

surface hole.

6. Monitor and record any and all lost circulation, documenting the volume and the depth at which

the losses occurred. Also, measure and record any losses that may occur as a result of seepage

into the formation while drilling.

7. The Manitoba Energy Board must be notified as per the following:

- 24 hours advance notice prior to spudding well

- 2 hours advance notice of intent to run and cement surface or production casing

- 2 hours advance notice of dry hole abandonment – verbal approval must be obtained from

district office.

Page 23: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Weekly status reports on all activities up to rig release. Reports to be called in each MondayMorning prior to 9AM.

IEM Virden Field Office 204-748-4260

7. Ensure all field and delivery tickets correctly show the AFE ¹, Operator's name and location.Stamp/sticker, sign and code all tickets. Forward field tickets to Highmark's office with all

other records.

8. All invoices will be submitted to the following address:

Magus Engineering Limited1200-444 5've SW

Calgary. AlbertaT2P 2T8

c/o: Leland Melby

Ensure that Construction will have mousehole and rathole as well as any pits back-filledimmediately after the drilling rig moves off. Also ensure that when the casing bowl is installed toleave adequate space for lease fill when the location is reclaimed after drilling.

10. Ifthe well is abandoned, leave the casing bowl on and be sure the casing is full of fluid. In winterensure fluid is a minimum of 3m below GL. Do not to offwith diesel fuel.

11. Any tangible equipment to be Material Transferred to a Highmark stock point or to the

appropriate 3'arty, if so instructed.

2.0 SURFACE HOLE

1. Surface hole size will be 311mm. Spud in with fresh water allowing the native clay to buildviscosity, mixing Bentonite and small amounts of lime as required. Refer to the mud program fordetails of drilling fluid to be used on this well.

2. Survey every 30m to surface casing TD. Maximum allowable deviation is -1.0 degree.

3. The surface hole will be drilled to a minimum depth of 140.0mKB. Ensure that surface hole TDis set in a competent formation. Circulate and condition hole upon reaching surface hole TD.

4. Tally surface casing in order to finalize surface hole TD. Ensure that final depth is sufficient to land

casing on bottom and have no more than lm of casing stick-up above the floor. Circulate for a

minimum of two complete circulations and wiper trip to surface —monitor returns to ensure hole is

clear of debris.

5. Run 219.1mm, 35.72kg/m, J-55, 8-round, STOIC new surface casing. Surface casing to be run withconsist of one centralizer over a stop collar on the bottom joint and one centralizer over the second

casing collar and then 1 every 50m to surface. Use free floating single bow centralizers.

North Hargrave k Two Creeks Area Drilling Program Page 7 of 9

North Hargrave & Two Creeks Area Drilling Program Page 7 of 9

- Weekly status reports on all activities up to rig release. Reports to be called in each Monday

Morning prior to 9AM.

IEM Virden Field Office 204-748-4260

7. Ensure all field and delivery tickets correctly show the AFE #, Operator’s name and location.

Stamp/sticker, sign and code all tickets. Forward field tickets to Highmark’s office with all

other records.

8. All invoices will be submitted to the following address:

Magus Engineering Limited

1200-444 5th

Ave SW

Calgary. Alberta

T2P 2T8

c/o: Leland Melby

9. Ensure that Construction will have mousehole and rathole as well as any pits back-filled

immediately after the drilling rig moves off. Also ensure that when the casing bowl is installed to

leave adequate space for lease fill when the location is reclaimed after drilling.

10. If the well is abandoned, leave the casing bowl on and be sure the casing is full of fluid. In winter

ensure fluid is a minimum of 3m below GL. Do not top off with diesel fuel.

11. Any tangible equipment to be Material Transferred to a Highmark stock point or to the

appropriate 3rd

party, if so instructed.

2.0 SURFACE HOLE

1. Surface hole size will be 311mm. Spud in with fresh water allowing the native clay to build

viscosity, mixing Bentonite and small amounts of lime as required. Refer to the mud program for

details of drilling fluid to be used on this well.

2. Survey every 30m to surface casing TD. Maximum allowable deviation is ~1.0 degree.

3. The surface hole will be drilled to a minimum depth of 140.0mKB. Ensure that surface hole TD

is set in a competent formation. Circulate and condition hole upon reaching surface hole TD.

4. Tally surface casing in order to finalize surface hole TD. Ensure that final depth is sufficient to land

casing on bottom and have no more than 1m of casing stick-up above the floor. Circulate for a

minimum of two complete circulations and wiper trip to surface – monitor returns to ensure hole is

clear of debris.

5. Run 219.1mm, 35.72kg/m, J-55, 8-round, ST&C new surface casing. Surface casing to be run with

consist of one centralizer over a stop collar on the bottom joint and one centralizer over the second

casing collar and then 1 every 50m to surface. Use free floating single bow centralizers.

Page 24: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

6. Circulate and condition hole prior to cementing (minimum '/2 hour). Reciprocate casing whilecirculating to break gel strength of the mud.

7. Rig in cementers. Perform cementing job according to cement program provided - use enoughexcess (-75/o) to ensure that returns will be obtained at surface. Reciprocate casing throughcementing.

Note: A sample of water to be used for the production casing cement job should be collected and

sent to the cementing company.

8. Bump plug with 3500 kPa over final displacement pressure and hold for five minutes. Monitor flowback to ensure plug is holding. If float is holding —rig out cementing equipment. If float does nothold, re-bump plug and hold pressure on the casing until surface cement samples are set-up.

9. Wait on cement for 8 hours or until surface samples have set up. Cut casing and weld on a new229mm x 219.1mm, 14MPa casing bowl with one 14MPa side outlet ball valve.

10. Nipple up BOPs and pressure test as per IEM requirements, check motor kills and accumulatorpressure. Record test of BOPs in tour book. This should be done as often as required by IEM. Aspacer spool will be used, if required, to allow the casin bowl flan e to be a maximum of 0.3mabove GL.

Install PVT when nippling up.

(a) PVT must be operational before drilling out casing shoe.

(b) APVT system will be installed with a probe in each active mud compartment. System is

sensitive to +/- 0.5m and will alarm at +/- 1.0m .

3.0 MAINHOLE

1. Main hole will be drilled with a 200mm PDC out of surface shoe.

2. Drill ahead following the mud program —drill out using Floe water system. Mud up at

approximately 400m or as hole conditions dictate.

3. Drill ahead as per stick diagram to core point, circ and condition mud and perform a wiper trip tosurface. Once hole conditions are good POOH and pick up core assembly. NOTE: Only some wellswill be cored, please check with Geologist or see individual stick diagram for details. Ifthe wellis not to be cored, continue drilling ahead as per stick diagram to TD.

4. RIH with core tools and begin cutting core as per core hand and Geologist, once core has been cutPOOH and lay down core BHA.

5. Once BHA is laid down, pick up a 200mm bit and RIH. RIH and drill ahead as per stick diagram toTD. Total Depth may be altered as per geological results.

North Hargrave k Two Creeks Area Drilling Program Page 8 of 9

North Hargrave & Two Creeks Area Drilling Program Page 8 of 9

6. Circulate and condition hole prior to cementing (minimum ½ hour). Reciprocate casing while

circulating to break gel strength of the mud.

7. Rig in cementers. Perform cementing job according to cement program provided - use enough

excess (~75%) to ensure that returns will be obtained at surface. Reciprocate casing through

cementing.

Note: A sample of water to be used for the production casing cement job should be collected and

sent to the cementing company.

8. Bump plug with 3500 kPa over final displacement pressure and hold for five minutes. Monitor flow

back to ensure plug is holding. If float is holding – rig out cementing equipment. If float does not

hold, re-bump plug and hold pressure on the casing until surface cement samples are set-up.

9. Wait on cement for 8 hours or until surface samples have set up. Cut casing and weld on a new

229mm x 219.1mm, 14MPa casing bowl with one 14MPa side outlet ball valve.

10. Nipple up BOPs and pressure test as per IEM requirements, check motor kills and accumulator

pressure. Record test of BOPs in tour book. This should be done as often as required by IEM. A

spacer spool will be used, if required, to allow the casing bowl flange to be a maximum of 0.3m

above GL.

Install PVT when nippling up.

(a) PVT must be operational before drilling out casing shoe.

(b) A PVT system will be installed with a probe in each active mud compartment. System is

sensitive to +/- 0.5m3 and will alarm at +/- 1.0m

3.

3.0 MAINHOLE

1. Main hole will be drilled with a 200mm PDC out of surface shoe.

2. Drill ahead following the mud program – drill out using Floc water system. Mud up at

approximately 400m or as hole conditions dictate.

3. Drill ahead as per stick diagram to core point, circ and condition mud and perform a wiper trip to

surface. Once hole conditions are good POOH and pick up core assembly. NOTE: Only some wells

will be cored, please check with Geologist or see individual stick diagram for details. If the well

is not to be cored, continue drilling ahead as per stick diagram to TD.

4. RIH with core tools and begin cutting core as per core hand and Geologist, once core has been cut

POOH and lay down core BHA.

5. Once BHA is laid down, pick up a 200mm bit and RIH. RIH and drill ahead as per stick diagram to

TD. Total Depth may be altered as per geological results.

Page 25: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

6. Once the well is at TD, circ and cond mud and POOH to perform a wiper trip. Perform a wiper tripand circ and condition mud for logging. Once the hole is conditioned POOH to pick up loggingtools.

7. Make up logging tools and RIH and log well as per geology, once logging is complete POOH and

lay down logging tools and prepare to cement abandonment plugs or run production casing as perprogram.

8. Ifthe well is to be cased run in with the following production casing string design:

1 —139.7mm bull nose guide/float shoe

ljt —139.7mm 20.83 kg/m, J-55, STOIC casing stub —approx. 5m1 —139.7mm float collar threaded into box of first joint139.7mm, 20.83 kg/m, J-55, STOIC casing to surface

Marker Joints: Run 2 or 3 short joints spaced out near the producing formations.Centralization: Run bow spring centralizers every 3'ollar from TD to surface.

9. Tag bottom of hole with casing to confirm tally, then reciprocate casing and circulate a minimum of2 annular volumes —Mud Man should be on location to ensure properties are ideal for cementing as

good bond is essential for proper completion of this well.

10. Pump cement as per Sanjel cement program.

11. Conduct a 5-minute float check after releasing pressure. If float does not hold, re-bump plug andshut-in well. Flush BOP's and release cementers.

12. Install the slips and cut off the casing stub maintaining proper height for wellhead and arrange tohave wellhead (Metra) crew install wellhead or cap-off flange.

Oct 7, 2014 —LM

North Hargrave k Two Creeks Area Drilling Program Page 9 of 9

North Hargrave & Two Creeks Area Drilling Program Page 9 of 9

6. Once the well is at TD, circ and cond mud and POOH to perform a wiper trip. Perform a wiper trip

and circ and condition mud for logging. Once the hole is conditioned POOH to pick up logging

tools.

7. Make up logging tools and RIH and log well as per geology, once logging is complete POOH and

lay down logging tools and prepare to cement abandonment plugs or run production casing as per

program.

8. If the well is to be cased run in with the following production casing string design:

1 – 139.7mm bull nose guide/float shoe

1jt – 139.7mm 20.83 kg/m, J-55, ST&C casing stub – approx. 5m

1 – 139.7mm float collar threaded into box of first joint

139.7mm, 20.83 kg/m, J-55, ST&C casing to surface

Marker Joints: Run 2 or 3 short joints spaced out near the producing formations.

Centralization: Run bow spring centralizers every 3rd

collar from TD to surface.

9. Tag bottom of hole with casing to confirm tally, then reciprocate casing and circulate a minimum of

2 annular volumes – Mud Man should be on location to ensure properties are ideal for cementing as

good bond is essential for proper completion of this well.

10. Pump cement as per Sanjel cement program.

11. Conduct a 5-minute float check after releasing pressure. If float does not hold, re-bump plug and

shut-in well. Flush BOP’s and release cementers.

12. Install the slips and cut off the casing stub maintaining proper height for wellhead and arrange to

have wellhead (Metra) crew install wellhead or cap-off flange.

Oct 7, 2014 – LM

Page 26: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

GEOLOGICALREPORTHIGHMARKNORTH HARGREAVE

12-24-12-27 W1MWELL LICENSE ¹: 10154

November 2014

Prepared for: Jordan LeugnerPrepared by: Kevin Haynes (P. Geo.),

per: Tallman Geological Consulting Ltd.

GEOLOGICAL REPORT

HIGHMARK NORTH HARGREAVE

12-24-12-27 W1M

WELL LICENSE #: 10154

November 2014

Prepared for: Jordan Leugner

Prepared by: Kevin Haynes (P. Geo.),

per: Tallman Geological Consulting Ltd.

Page 27: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

TABLE OF CONTENTS

GENERAL WELL DATA.

GEOLOGICALMARKERS.

LOGGING REPORT .

SAMPLE DESCRIPTIONS.

DAILYDRILLING SUMMARY

BIT RECORD.

DAILYMUD PROPERTIES .

SURVEYS BUILD & LEG 1

SUMMARY.

OPERATIONS.

STRIP LOGS IN BACKPOCKET

WELL-PATH PROFILE ATBACKOF REPORT

Tallman Geological Consulting Ltd.1

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

1

TABLE OF CONTENTS

GENERAL WELL DATA ........................................................................................................... 2

GEOLOGICAL MARKERS ........................................................................................................ 3

LOGGING REPORT ................................................................................................................... 4

SAMPLE DESCRIPTIONS ......................................................................................................... 5

DAILY DRILLING SUMMARY ................................................................................................ 7

BIT RECORD .............................................................................................................................. 7

DAILY MUD PROPERTIES ...................................................................................................... 8

SURVEYS BUILD & LEG 1 ...................................................................................................... 9

SUMMARY ................................................................................................................................. 10

OPERATIONS ............................................................................................................................. 10

STRIP LOGS IN BACK POCKET

WELL-PATH PROFILE AT BACK OF REPORT

Page 28: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

GENERAL WELL DATA

WELL NAME:

WELL LOCATION:

UWI:

STATUS:

AREA:

LICENCE NO.:

ELEVATIONS:

Highmark North Hargrave 12-24-12-27 W1M

Lsd. 12 Sec. 24, Twp. 012, Rge. 27 W1 Mer.

100/12-24-012-27W1/00

Lodgepole Vertical oil well.

North Hargrave

10154

Ground: 473.7 mKelly Bushing: 478.1 m

OPERATOR:

CONTRACTOR:

SPUD DATE:

TOTALDEPTH:

Highmark Exploration Inc.

Ensign Drilling Rig ¹ 640

14-11-24-0045 hrs.

630.0 meters;

Date and Time: 14-11-28-0448 hrs.

HOLE SIZE: Surface: 311.0 mmMain Hole: 200.0 mm

SURFACE CASING: Ran 14 jts of 219.1 mm, 35.7 kg/m, J-55 Star

Casing landed @ 149.0 m. Plug down at 14-11-24-2008 hrs.

Drilled out at 14-11-25-0915 hrs.

CORE POINT: 550.0 meters

Date and Time: 14-11-25-1900 hrs

DITCH SAMPLES: One set of five meter samples from 160 to 630.0 meters washed and

vialed for Manitoba Innovation, Energy and Mines. One set forHighmark Exploration Inc.

Tallman Geological Consulting Ltd.2

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

2

GENERAL WELL DATA

WELL NAME: Highmark North Hargrave 12-24-12-27 W1M

WELL LOCATION: Lsd. 12 Sec. 24, Twp. 012, Rge. 27 W1 Mer.

UWI: 100/12-24-012-27W1/00

STATUS: Lodgepole Vertical oil well.

AREA: North Hargrave

LICENCE NO.: 10154

ELEVATIONS: Ground: 473.7 m

Kelly Bushing: 478.1 m

OPERATOR: Highmark Exploration Inc.

CONTRACTOR: Ensign Drilling Rig # 640

SPUD DATE: 14-11-24-0045 hrs.

TOTAL DEPTH: 630.0 meters;

Date and Time: 14-11-28-0448 hrs.

HOLE SIZE: Surface: 311.0 mm

Main Hole: 200.0 mm

SURFACE CASING: Ran 14 jts of 219.1 mm, 35.7 kg/m, J-55 Star

Casing landed @ 149.0 m. Plug down at 14-11-24-2008 hrs.

Drilled out at 14-11-25-0915 hrs.

CORE POINT: 550.0 meters

Date and Time: 14-11-25-1900 hrs

DITCH SAMPLES: One set of five meter samples from 160 to 630.0 meters washed and

vialed for Manitoba Innovation, Energy and Mines. One set for

Highmark Exploration Inc.

Page 29: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

GEOLOGICALMARKERS

K.B. ELEVATION:478.1 m

FORMATION SAMPLESUBSEA (m)

SAMPLEDEPTH (m)

LOG Depth(m)

LOGSubsea(m)

Newcastle

Swan River

U er Melita

Lower Melita

Reston

U er Amaranth

Core Point¹1

Core Point ¹2

Lod e ole

Core Point ¹3

Cruik

Virden

109.1

81.1

45.1

-17.4

-33.9

-56.9

-71.9

-78.6

-84.4

-93.1

369.0

397.0

433.0

495.5

512.0

535.0

550.0

556.7

562.5

571.2

366

405.5

433.5

492.0

511.0

532.5

562.0

590.0

598.0

112.1

72.6

44.6

-13.9

-32.9

-54.4

-83.9

-101.9

-109.9

Total Depth -151.9 630.0 629.0 -150.9

Tallman Geological Consulting Ltd.3

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

3

GEOLOGICAL MARKERS

K.B. ELEVATION: 478.1 m

FORMATION SAMPLE

SUBSEA (m)

SAMPLE

DEPTH (m)

LOG Depth

(m)

LOG

Subsea(m)

Newcastle 109.1 369.0 366 112.1

Swan River 81.1 397.0 405.5 72.6

Upper Melita 45.1 433.0 433.5 44.6

Lower Melita -17.4 495.5 492.0 -13.9

Reston -33.9 512.0 511.0 -32.9

Upper Amaranth -56.9 535.0 532.5 -54.4

Core Point#1 -71.9 550.0 - -

Core Point #2 -78.6 556.7 - -

Lodgepole -84.4 562.5 562.0 -83.9

Core Point #3 -93.1 571.2 - -

Cruik - - 590.0 -101.9

Virden 598.0 -109.9

Total Depth -151.9 630.0 629.0 -150.9

Page 30: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

LOGGING REPORT

LOGGING COMPANY: Weatherford Wireline Ltd.

ENGINEER: Sean Pendergast

DISTRICT: Red Deer

UNIT: 13118

TIMES: Total Depth:Circulation Stopped:Tool on Bottom:Finished Logging:Received Prints:

11-28-2014-0448 hrs

11-28-2014-1200 hrs

11-28-2014-1300 hrs

11-28-2014-1345 hrs

11-28-2014-1419 hrs

K.B.:Surface Casing:Total Depth:

SURVEYS

STI —SP

HB C-GR-CAL

Driller478.1 m149.m

630.0 m

Logger

148.7 m629.0 m

SCALE

1:240

1:240

INTERVAL

T.D. to surface casing

T.D. to surface casing

CNL-FD (SPED) 1:240

1:120

T.D. to surface casingT.D. to surface casing

MUD TYPE: Gel Chem

MAINHOLE SIZE: 200 mm

FINALPRINTS: 2

DISPOSITION OF PRINTS: 1 set left at well site with field Geologist,

REMARKS: Logs run in tandem, no problems to report.

Tallman Geological Consulting Ltd.4

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

4

LOGGING REPORT

LOGGING COMPANY: Weatherford Wireline Ltd. DISTRICT: Red Deer

ENGINEER: Sean Pendergast UNIT: 13118

TIMES: Total Depth: 11-28-2014-0448 hrs

Circulation Stopped: 11-28-2014-1200 hrs

Tool on Bottom: 11-28-2014-1300 hrs

Finished Logging: 11-28-2014-1345hrs

Received Prints: 11-28-2014-1419 hrs

Driller Logger

K.B.: 478.1 m

Surface Casing: 149.m 148.7 m

Total Depth: 630.0 m 629.0 m

SURVEYS SCALE INTERVAL

STI – SP 1:240 T.D. to surface casing

HBC-GR-CAL 1:240 T.D. to surface casing

CNL-FD (SPED) 1:240 T.D. to surface casing

1:120 T.D. to surface casing

MUD TYPE: Gel Chem

MAIN HOLE SIZE: 200 mm

FINAL PRINTS: 2

DISPOSITION OF PRINTS: 1 set left at well site with field Geologist,

REMARKS: Logs run in tandem, no problems to report.

Page 31: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

SAMPLE DESCRIPTIONS

VERTICALSECTION

Interval Litholo A Comments

366.0 Newcastle, 112.1 m MSL.

405.5 Swan River 72.6 m MSL.

433.5

492.0

511.0

Lower Melita, -13.9 m MSL.

Reston, -32.9 m MSL.

520 —525 Shale (80%), varicolored, medium to dark gray, lime green, sub fissile to platy, friable;Sandstone (15%), glass clear to tan, upper fine to lower medium grained, sub angular tosub rounded, well sorted, unconsolidated and loose; Limestone (5%), off white, lightgray, abundant quartz sand grains, poor to tight intergranular porosity, no shows.

525 —535 Sandstone (100%), clear, frosted tan, translucent, upper fine to lower medium grained, sub

angular to sub rounded, well sorted, unconsolidated and loose, no shows.

535 —540 Sandstone (65%), glass clear to tan, upper fine to lower medium grained, sub angular tosub rounded, well sorted, unconsolidated and loose, no shows; Shale (35%),varicolored, medium to dark gray, sub fissile to platy, friable.

540 —542.5 Shale (70%), varicolored, medium to dark gray, sub fissile to platy, friable; Sandstone

(30%), light gray, off white, upper fine to lower medium grained, sub angular to sub

rounded grains, common calcareous cement, poor intergranular porosity, no shows.

542.5 —545 Shale (80%), light gray, sub fissile to blocky, calcareous in part, firm; Sandstone (20%),tan, limey, lower to upper fine grains, tight to poor intergranular porosity, no shows.

545 —550 Shale (90%), medium to dark gray, fissile to platy, minor pyrite grains, friable; Sandstone

(7%), tan, calcareous, tight; Limestone (3%), tan, off white, buff, mudstone, slightanhydritic, dolomitic in part, tight intergranular fabric,

550 Core Point, —71.9 m MSL

550.0 Core¹1, 550 to 556.7 meters, 6.7 meters cut, 5.7 meters recovered.

560.0 L~od e ole, -83.94 m MSL.

556.7 Core¹2, 556.7 to 572.23 meters, 14.53 meters cut, 12.94 meters recovered.

Tallman Geological Consulting Ltd.5

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

5

SAMPLE DESCRIPTIONS

VERTICAL SECTION

Interval Lithology & Comments

366.0 Newcastle, 112.1 m MSL.

405.5 Swan River 72.6 m MSL.

433.5 Upper Melita, 44.6m MSL.

492.0 Lower Melita, -13.9 m MSL.

511.0 Reston, -32.9 m MSL.

520 - 525 Shale (80%), varicolored, medium to dark gray, lime green, sub fissile to platy, friable;

Sandstone (15%), glass clear to tan, upper fine to lower medium grained, sub angular to

sub rounded, well sorted, unconsolidated and loose; Limestone (5%), off white, light

gray, abundant quartz sand grains, poor to tight intergranular porosity, no shows.

525 - 535 Sandstone (100%), clear, frosted tan, translucent, upper fine to lower medium grained, sub

angular to sub rounded, well sorted, unconsolidated and loose, no shows.

535 - 540 Sandstone (65%), glass clear to tan, upper fine to lower medium grained, sub angular to

sub rounded, well sorted, unconsolidated and loose, no shows; Shale (35%),

varicolored, medium to dark gray, sub fissile to platy, friable.

540 - 542.5 Shale (70%), varicolored, medium to dark gray, sub fissile to platy, friable; Sandstone

(30%), light gray, off white, upper fine to lower medium grained, sub angular to sub

rounded grains, common calcareous cement, poor intergranular porosity, no shows.

542.5 - 545 Shale (80%), light gray, sub fissile to blocky, calcareous in part, firm; Sandstone (20%),

tan, limey, lower to upper fine grains, tight to poor intergranular porosity, no shows.

545 - 550 Shale (90%), medium to dark gray, fissile to platy, minor pyrite grains, friable; Sandstone

(7%), tan, calcareous, tight; Limestone (3%), tan, off white, buff, mudstone, slight

anhydritic, dolomitic in part, tight intergranular fabric,

550 Core Point, - 71.9 m MSL

550.0 Core#1, 550 to 556.7 meters, 6.7 meters cut, 5.7 meters recovered.

560.0 Lodgepole, - 83.94 m MSL.

556.7 Core#2, 556.7 to 572.23 meters, 14.53 meters cut, 12.94 meters recovered.

Page 32: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

Interval Litholo A Comments

572.2 Core¹3, 572.2 to 573.74 meters, 1.54 meters cut, 2.35 meters recovered.

575 —580 Limestone (30%), rust tan, off white, microcrystalline, argillaceous in part, poor earthyporosity, minor bright white anhydritic stringers, no shows; ~Cavin s (70%), abundant

shale and uphole material.

580 —585 Limestone (85%), pink, to rust tan, off white, microcrystalline to very fine crystalline,common rust argillaceous laminae, poor intercrystalline to poor earthy porosity, no

shows; Anhydrite (15%), bright white, cryptocrystalline, massive and dense chips, tightintercrystalline fabric, no shows.

590.0 Cruik, -101.9 m MSL.

585 —595 Limestone (100%), buff to tan, off white, pink, microcrystalline in part, increasingwackestone texture, minor fossil grains, tight to poor intergranular porosity, no shows.

598.0 Virden, -109.9 m MSL.

595 —605 Limestone (100%), buff to tan, off white, microcrystalline in part, increasing wackestone

texture, minor fossil grains, tight to poor intergranular porosity, no shows.

605 —615 Limestone (100%), buff to tan, off white, microcrystalline in part, increasing wackestone

texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing

bright white lime mudstone stringers, tight.

615- 625 Limestone (100%), pink to salmon tan, off white, microcrystalline in part, wackestone

texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing

bright white lime mudstone stringers, tight.

625- 630 Limestone (100%), pink to salmon tan, off white, microcrystalline in part, wackestone

texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing

bright white lime mudstone stringers, tight.

630.0 ~Total De th, -tgt.9 m MSL.

Tallman Geological Consulting Ltd.6

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

6

Interval Lithology & Comments

572.2 Core#3, 572.2 to 573.74 meters, 1.54 meters cut, 2.35 meters recovered.

575 - 580 Limestone (30%), rust tan, off white, microcrystalline, argillaceous in part, poor earthy

porosity, minor bright white anhydritic stringers, no shows; Cavings (70%), abundant

shale and uphole material.

580 - 585 Limestone (85%), pink, to rust tan, off white, microcrystalline to very fine crystalline,

common rust argillaceous laminae, poor intercrystalline to poor earthy porosity, no

shows; Anhydrite (15%), bright white, cryptocrystalline, massive and dense chips, tight

intercrystalline fabric, no shows.

590.0 Cruik, -101.9 m MSL.

585 - 595 Limestone (100%), buff to tan, off white, pink, microcrystalline in part, increasing

wackestone texture, minor fossil grains, tight to poor intergranular porosity, no shows.

598.0 Virden, -109.9 m MSL.

595 - 605 Limestone (100%), buff to tan, off white, microcrystalline in part, increasing wackestone

texture, minor fossil grains, tight to poor intergranular porosity, no shows.

605 - 615 Limestone (100%), buff to tan, off white, microcrystalline in part, increasing wackestone

texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing

bright white lime mudstone stringers, tight.

615- 625 Limestone (100%), pink to salmon tan, off white, microcrystalline in part, wackestone

texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing

bright white lime mudstone stringers, tight.

625- 630 Limestone (100%), pink to salmon tan, off white, microcrystalline in part, wackestone

texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing

bright white lime mudstone stringers, tight.

630.0 Total Depth, -151.9 m MSL.

Page 33: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

DAILYDRILLING SUMMARYDATE

14-11-24

DEPTH m@ 2400 hrs

149

24 HOURPROGRESS

149.00

RATEm/hr33.10

ROTATINGHOURS

4.50

ACTIVITY@ 0700hours (next da )

Pre Drill-Out inspection.

14-11-25

14-11-26

14-11.27

14-11-28

550

561

573.74

630

401

11.00

12.74

56.26

100.30

1.30

1.75

22.50

4.0

8.25

7.25

2.50

Run into hole with clean

out bit @ 550 meters

Pulling out of hole toretrieve core ¹2

Pulling out of hole forloggers @ 630 meters

Preparing to rig move.

TOTALROTATINGHOURS: 26.25 hrs.

BIT RECORDBIT¹

MAKE TYPE SIZEmm

DEPTHIN

DEPTHOUT

DRILLED HOURS

Baker

HughesBaker—Hughes

Baker

Hughes

Baker

HughesCore

Baker

HughesCore

Baker

HughesCore

Baker

Hughes

MX1KKK

DP505F

LB 1051

BHC-406Z

BHC-406Z

BHC-406Z

DP505F

311

200

200

171

171

171

200

149

550

550

556.0

572.5

573.74

149

550

550

556.7

572.5

573.74

630

144

401

6.7

16.23

1.24

56.23

5.75

4.00

1.0

3.25

3.5

6.25

2.5

Tallman Geological Consulting Ltd.7

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

7

DAILY DRILLING SUMMARY DATE DEPTH m

@ 2400 hrs

24 HOUR

PROGRESS

RATE

m/hr

ROTATING

HOURS

ACTIVITY @ 0700

hours (next day)

14-11-24 149 149.00 33.10 4.50 Pre Drill-Out inspection.

14-11-25 550 401 100.30 4.0 Run into hole with clean

out bit @ 550 meters

14-11-26 561 11.00 1.30 8.25 Pulling out of hole to

retrieve core #2

14-11.27 573.74 12.74 1.75 7.25 Pulling out of hole for

loggers @ 630 meters

14-11-28 630 56.26 22.50 2.50 Preparing to rig move.

TOTAL ROTATING HOURS: 26.25 hrs.

BIT RECORD BIT

#

MAKE TYPE SIZE

mm

DEPTH

IN

DEPTH

OUT

DRILLED HOURS

1 Baker

Hughes

MX1KKK 311 0 149 144 5.75

2 Baker -

Hughes

DP505F 200 149 550 401 4.00

3 Baker

Hughes

LB1051 200 550 550 0 1.0

4 Baker

Hughes

Core

BHC-406Z 171 550 556.7 6.7 3.25

5 Baker

Hughes

Core

BHC-406Z 171 556.0 572.5 16.23 3.5

6 Baker

Hughes

Core

BHC-406Z 171 572.5 573.74 1.24 6.25

7 Baker

Hughes

DP505F 200 573.74 630 56.23 2.5

Page 34: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

DAILYMUD PROPERTIESDATE

14-11-24

DEPTH @

-1200 hrs

32

DENSITY

1020

VISCOSITY

36

WATERLOSS

FILTERCAKE

pH

8.0

Chloride/Calcium

300/ 80

14-11-25 151 1005 28 11.5 340 / 2480

14-11-26 555 1125 54 7.2 0.9 10.5 1100 / 250

14-11-27

14-11-28

571

630

1140

1140

40

90

7.9

7.0

0.9

0.9

10.0

10.0

1490 / 80

1490 / 80

Tallman Geological Consulting Ltd.8

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

8

DAILY MUD PROPERTIES DATE DEPTH @

~1200 hrs

DENSITY VISCOSITY WATER

LOSS

FILTER

CAKE

pH Chloride/

Calcium

14-11-24 32 1020 36 - - 8.0 300 / 80

14-11-25 151 1005 28 - - 11.5 340 / 2480

14-11-26 555 1125 54 7.2 0.9 10.5 1100 / 250

14-11-27 571 1140 40 7.9 0.9 10.0 1490 / 80

14-11-28 630 1140 90 7.0 0.9 10.0 1490 / 80

Page 35: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

SURVEYS BUILD R LEG 1

Tallman Geological Consulting Ltd.9

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

9

SURVEYS BUILD & LEG 1 DEPTH (m) SURVEY(deg) DEPTH (m) SURVEY (deg)

28.0 0.50 56.0 0.37

84.0 0.73 121.0 0.25

139.0 0.35 195.0 0.56

299.0 0.79 393.0 0.71

500.0 0.42 620.0 0.15

Page 36: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Highmark North Hargrave 12-24-12-27 W1M

SUMMARY

Highmark North Hargrave 12-24-12-27-W1M was planned as a vertical test in the NorthHargrave area of Southwest Manitoba targeting Lodgepole reservoir potential.

Coring of the Lodgepole formation began in the base of the Upper Amaranth shale around

550.0 meters. Slow penetration rates, shale chips from grab samples and other engineering parameters

suggested a possible milling scenario, so after 6.7 meters, a decision to pull out to check bit condition and

evidence of core was made @ 556.7 meters, 5.7 meters (86%) of core ¹1 was recovered. A second

coring run was conducted from 556.7 to 571.23 meters, 12.94 meters ( 89%) of core 2 was recovered Athird core run was done from 572.5 to 573.74 meters, 2.35 meters ( 100%) of core ¹3 + (5%) of core 2)was recovered The core was sleeved in aluminum tubing and sealed for detailed analysis at core lab inEstevan, Saskatchewan.

The vertical well was terminated @ 630 meters within the Virden formation.

Wire line logging was provided by Weatherford loggers of Red Deer, Alberta.

OPERATIONS

1)

2)3)4)5)6)7)8)9)10)

11)

12)

13)

14-11-24-0045 hrs

14-11-25-0930 hrs

14-11-25-1900 hrs

14-11-26-0833 hrs

14-11-26-1318 hrs

14-11-26-2011 hrs

14-11-26-2105 hrs

14-11-27-0508 hrs

14-11-27-1140 hrs

14-11-27-1414 hrs

14-11-27-1200 hrs

14-11-27-0448 hrs

14-11-28-1418 hrs

Spud well.Drill out surface casing with 200 mm bit.Reach Core Point @ 550.0 meters.

Begin cutting Lodgepole core with Baker Hughes @ 550.0 meters

Pull out to check core bit and retrieve core ¹1 @ 556.7 meters.

Recover 5.7 meters of 6.7 meter core ¹1.Begin cutting core ¹2 @ 556.7 meters.

Pull out core ¹2 @ 572.5 meters.

Recover 12.94 meters of 15.53 meters.

Begin cutting core ¹3 @ 572.5 meters.

Recover core ¹3 @ 573.74 meters.

Total Depth of 630.0 meters.

Complete wireline logs with Weatherford Wireline.

The core was shipped to Core Labs, Estevan for detailed lab analysis of cored zones. 2.5 meter

grab samples along cored interval indicated hydrocarbon shows in the 562.5 —572.5 meter range.

Wireline logs and core examination exhibited sufficient hydrocarbon presence with the Lodgepole zone

and production casing was run into the Highmark North Hargrave 12-24-12-26 W1M well.

Kevin M Haynes (P.Geo.)

Tallman Geological Consulting Ltd.10

Highmark North Hargrave 12-24-12-27 W1M

Tallman Geological Consulting Ltd.

10

SUMMARY

Highmark North Hargrave 12-24-12-27-W1M was planned as a vertical test in the North

Hargrave area of Southwest Manitoba targeting Lodgepole reservoir potential.

Coring of the Lodgepole formation began in the base of the Upper Amaranth shale around

550.0 meters. Slow penetration rates, shale chips from grab samples and other engineering parameters

suggested a possible milling scenario, so after 6.7 meters, a decision to pull out to check bit condition and

evidence of core was made @ 556.7 meters, 5.7 meters (86%) of core #1 was recovered. A second

coring run was conducted from 556.7 to 571.23 meters, 12.94 meters ( 89%) of core 2 was recovered A

third core run was done from 572.5 to 573.74 meters, 2.35 meters ( 100%) of core #3 + (5%) of core 2)

was recovered The core was sleeved in aluminum tubing and sealed for detailed analysis at core lab in

Estevan, Saskatchewan.

The vertical well was terminated @ 630 meters within the Virden formation.

Wire line logging was provided by Weatherford loggers of Red Deer, Alberta.

OPERATIONS

1) 14-11-24-0045 hrs: Spud well.

2) 14-11-25-0930 hrs: Drill out surface casing with 200 mm bit.

3) 14-11-25-1900 hrs: Reach Core Point @ 550.0 meters.

4) 14-11-26-0833 hrs: Begin cutting Lodgepole core with Baker Hughes @ 550.0 meters

5) 14-11-26-1318 hrs: Pull out to check core bit and retrieve core #1 @ 556.7 meters.

6) 14-11-26-2011 hrs: Recover 5.7 meters of 6.7 meter core #1.

7) 14-11-26-2105 hrs: Begin cutting core #2 @ 556.7 meters.

8) 14-11-27-0508 hrs: Pull out core #2 @ 572.5 meters.

9) 14-11-27-1140 hrs: Recover 12.94 meters of 15.53 meters.

10) 14-11-27-1414 hrs: Begin cutting core #3 @ 572.5 meters.

11) 14-11-27-1200 hrs: Recover core #3 @ 573.74 meters.

12) 14-11-27-0448 hrs: Total Depth of 630.0 meters.

13) 14-11-28-1418 hrs: Complete wireline logs with Weatherford Wireline.

The core was shipped to Core Labs, Estevan for detailed lab analysis of cored zones. 2.5 meter

grab samples along cored interval indicated hydrocarbon shows in the 562.5 – 572.5 meter range.

Wireline logs and core examination exhibited sufficient hydrocarbon presence with the Lodgepole zone

and production casing was run into the Highmark North Hargrave 12-24-12-26 W1M well.

Kevin M Haynes (P.Geo.)

Page 37: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

3131 of 1

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

23:45 24:00

0

17:45

23:45

0

18:00

18:00

12:15

17:4516:15

0.25

16:1516:00

16:00

387

LABLAB

ROD CARRIERE

2014/11/24 00:45

1 of 1

FAIR

ENSIGN CANADIAN DRILLING

390

390

2014/11/29 12:00

1.00

11

100/12-24-012-27W1/00

-15.00

VERT

CLINTON RADFORD

KYLE WENDZ

LARRY BREAULT

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

0

CALMNW

0

10154

HELD PRE-RIG MOVE SAFETY MEETING WITH FAST TRUCKING (S/M # 192339)

10

MOVE RIG (LOAD OUT RIG AT 04-25-12-27 W1 & DRIVE TO 12-24-12-27 W1 & SPOTRIG)

ONE

ONE

0

0

0.75

5.75

0.25

1.50

0

0.25

0

0.25

3.75 1A

210.25

DLSMB

HIGHMARK EXPLORATION INC.

24:00

140

08:00

16:00

152

152

140

0

0

12-24-012-27W1

0

3.75

0

RAISE DERRICK & RIG TO SPUD

PRE-SPUD INPECTION & SAFETY MEETING

RIG UP TO RAISE DERRICK

PRE-DERRICK RAISING INSPECTION & SAFETY MEETING (REVIEW JSA (LAB)

AND WINDY CONDITIONS.

1

SAFETY MEETING WITH CREWS ON PROPER RIG UP PROCEDURE AND WORKING IN THECOLD

0Z41640_20141123_2A

2

1

21

1

21

21

2

1

7.25

2014

12:15

12:00

06:00

8

0

11.00

10.5

LAB

LAB

GRC

12.00

4.00

8.00

23

00:00

16:00

08:00

PARTLY CLOUDY

Pason

LARRY BREAULT

Page 38: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

1 of2

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

29.80

18:00

17:00

17:15

11

16:15

x

16:45

x

0.25

x

5

16:00

387 2014/11/24 00:45

2

1.50

57

1.25

57

1.75

0

0.75

0

2.00

0.50

0.25

1.25

400

395

1870.00

11

1

1

1

1

2A

25

2

2B

21

1A

14.314.314.314.3

2

CLINTON RADFORD

19:15

SHANE DEMAS

19:00

SHANE DEMAS

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

56m

28m

139m121m84m

BIT

9.26m

BIT SUB

DC (6.25 IN)

30.00kdaN

X/O

CREW CHANGE OVER SAFETY MEETING (S/M #192342)

10154

STRAP DC'S, H.W.T. STRING SURVEY LINE

SPUD WITH 251mm BIT (DRILL 251mm HOLE FROM 0m - TO 14m)

28.00kdaN

DRILL RATHOLE

CREW CHANGE OVER AND PRE TOUR SAFEY MEETING # 192344

RIG SERVICE- LOCKED OUT BRAKE HANDLE AND DWWKSDRILL 311MM F/ 45M- 149M (SURFACE TD)

22.51m

0.35

CONDITION MUD & CIRCULATE

TRIP IN HOLE // MAKE UP REAMER AND RIH F/ BANK TO 149M (SURFACE TD)

2.00

CIRC HOLE CLEAN FOR WIPER

2.00

DEVIATION SURVEY - WIRELINE SURVEYS AND CONNECTIONS ACC

ONE

WIPER TRIP POOH F/ 149M (SURFACE TD) TO BANK --STRAP OUT--

1.75

BLOW KELLY BACK // INSTALL BAILS AND ELEVATORS

PICK UP 8" MAKE UP BIT, BIT TORQUED UP PREMATURELY, BIT SUB SEAT & BIT NOT

DRILL MOUSEHOLE

2000

8" MAKE UP 6" DC & 311mm BIT

2000

IN CONTACT, REVERSE OUT, THREAD DAMAGE ON BIT, BREAK OFF BIT SUB & LAY OUT

0.5

0.37

DRILL 311mm HOLE FROM 14m - TO 45m.

0.73

2014/11/24

0.25

0.75

149.00m

1.00

0.25

0.75

0.25

0.25

140

0.25

0

0.50

1.250.25

0.253.50

1.00

0.25

1.00

0.25

1.00

2

4350.00

7

21

18:30

6B

16:00

5

DLS

5

0.25

10

5

6A

MB

22:15

0

24:00

HIGHMARK EXPLORATION INC.

1

12.00m

20:15

22:15

0.252.000.75

12-24-012-27W1

SX

3.50

5.500.50

12

5

21B

12B

21

12A

21

6B

0.501.00

DRILL SURFACE

PRESPUD

2014

WIPER W/ REAMER

00:45

00:15

149m

08:00

03:30

01:30

06:30

04:45

0.25

8

2.501.75

8

9.000.50

LABLABLABLAB

92.02m

0.44m

0.33m

8.00

24.00

8.00

8.00

40s/l

24

0.58m

515

00:00

16:00

08:00

62s/l

5kdaN

PARTLY CLOUDY

LARRY BREAULT

19:15

SINGLE

19:00

4

18:00

17:15

08:15

17:00

16:45

16:15

1

13:3013:15

12:0008:30

LAB

16:00

15:45

14:45

13:45

311

ROD CARRIERE

1 of 2

20:15

FAIR

ENSIGN CANADIAN DRILLING

140

0

311

0.00m

222

1.75

311

152

152

1.25

0

0

0

00

158

159

100/12-24-012-27W1/00

.33m

1

.44m

9.17m

21kdaN

.57m

19.00

3.50

RR01036

8

VERT

0

37.02m

311

CALMNW

WIRELINE

WIRELINEWIRELINE

14m3

WIRELINE

0.00m

7

14.8m3

WIRELINE

10

11

9.35m

45m

STIX

0

SX

ONE

1

ONE

SXSX

149

SINGLE

SINGLE

102

REVIEW J.S.A #C, C1, C2, C3

SINGLE

D.W.A. & INSPECT BRAKES, LINIKAGE, FUNC.CROWNSAVER

CUT CSG. WELD BOWL

returns.

WAIT ON CEMENT

10 tonne (8.98m3) of SSI w/.15% CFR-2 + 2% Calc2 + .15% CDF-4. Release plug

& displace w/ 4.83m3 h20, plug landed at 2008 hrs with 2m3 of good cement

DWA- CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER

2

24:00

08:00

16:00

152

152

140

DESCO II CF

SAWDUSTGEL

130

140

0

5.00

SOAP STICKSGEL

3000

2

2014/11/24470

CEMENTING 219.1MM CASING- Cement surface casing. Preflush w/ 3m3 h20. Pump

CONDITION MUD & CIRCULATE

JSA (JOB SAFETY ANALYSIS) W/ SANJEL

RUN CASING - 219.4MM CASING (ELEVATOR CIRT #63049) F/ BANK TO 149M // FILL

149m

TO TEST FLOAT AND ON FLY

149m

SAFETY MEETING - W/ TONG HAND TO RUN CASING (ORIANTATED TONG HAND TO RIG)

RIG UP TO RUN CASING

1

TRIP OUT OF HOLE F/ 149M (SURFACE TD) TO BANK W/ REAMER // BLOW KELLY BACK

0Z41640_20141124_1A

PRE TOUR SAFETY MEETING AND CREW CHANGE OVER #192345

BIT SUB

BIT

X/O

1

DC (6.25 IN)

2

14

13

1.75

PRE SPUD CHECKLIST COMPLETE PRIOR TO SPUD

MX1KKK

DWA-CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER// DO IT REVIEW COMPLETE // BOILER BLOWDOWN2X @ 120L DISCHARGE

2.00

13:30

MX1KKK

13:15

14:45

13:45

08:15

08:00

12:00

08:30

06:00

15:45149

10:0011:1512:45

13:30

09:00

11

GRCGRCGRC

DRILL

GRCGRCGRCGRC

1160.00

1

1

1.750.25

1.25 1.752.002.00

10.5

14.314.3

0.00

14.3 14.3

1

10

Pason

1

1

17kdaN

RR01036

00:00

00:15

00:45

01:3003:30

04:45

230

06:30

Page 39: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387

e e e e

Tour Sheet Senal No

0241640 20141124 IA

Surface Location

12-24012-27WI

Vendor Software Version

Pason

Year Month Day

2014 11 24

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27WII00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractors Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Rig No

640

Wee Type

VERT

Spud Date Time

2014111I24 00.45

Rig Release Date Time

Re-Entry

Pason

Tour No.

2 JSAREVIEW

3 JSAREVIEW

3 SITE ORIENTATION

Event No.

C2- SPUD AND DRILL SURFACE

C3- MAKE CONNECTION

TO SANJEL 8000699

Description Time Depth

08.00

16 00

18.00

vli

2of2

SPECIAL EVENTS

Tour No. Event No. Description Time Depth

Pason

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

V. 1.1

0Z41640_20141124_1A

387 2014/11/24 00:45

ROD CARRIERE

2 of 2

10

ENSIGN CANADIAN DRILLING

17.00

2

3

3

11

0.44

0.33

100/12-24-012-27W1/00

12.00 9.26

21.00

VERT

0.58

92.02

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

57.2

57

37.020.00

0.00

0.00

10154

BIT

BIT SUB

19:00

16:00

08:00

X/O

DC (6.25 IN)

DLSMB

HIGHMARK EXPLORATION INC.

DC (6.25 IN)

X/O

BIT

BIT SUB

12-24-012-27W1

JSA REVIEW

SITE ORIENTATION

JSA REVIEW

2014

22.51 149.00

1

1

1

10

.57

.44

9.17

.33

158

0 2

158.81

1

0.00 9.35

C2- SPUD AND DRILL SURFACE

24

TO SANJEL #000699

C3- MAKE CONNECTION

311

152

152

102

Pason

1

1

311.00

222.00

LARRY BREAULT

1 2

Page 40: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

1 of6

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

18:00

18:15

17:15

17:30

16:15

15

17:00

x

x

0.50

16:00

1

x

387

0.00

2014/11/24 00:45

1

1.00

0.25

3.00

0

0

2.75

0

0.25

0

301

0.25

0.25

1.75

375

402

5.79m

1890.00

11

1

1

10

1

15B

15A

14A

21B

21

21B

10.310.3

10.3

16:15

10.310.310.3

6A

SHAKER

10.3

18:30

CLINTON RADFORD

KYLE WENDZ

12:0010:00

SHANE DEMAS

SHAKER

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

299m

195m

393m

08:00

500m

11.25m

BIT

BIT SUB

DC (6.25 IN)

X/O

31.00kdaN

CREW CHG. OVER SAFETY MEETING #192346

10154

JSA (JOB SAFETY ANALYSIS)

NIPPLE UP BOPS

30.00kdaN

JSA (JOB SAFETY ANALYSIS) W/ 4 STAR PRESS. TESTING

PRE TOUR SAFETY MEETING AND CREW CHANGE OVER #192347

DRILLS/BOP, -- HELD BOP DRILL W/ CREW MEMBERS WENT OVER JOBS AND KICK

WARNING SIGNS... WELL SUCCESSFULLY SHUT IN 96 SECONDS

105.78m

DRILL 200MM F/ 302M- 499M

SEC O/C

FLOAT @ 143M AND SHOE @ 149M

DRILL CEMENT/DRILL OUT CEMENT/DRILL FLOAT&SHOE// TAGGED CEMENT @ 143M --

RIG SERVICE- LOCEKD OUT DWWKS AND BRAKE HANDLE, FNC PIPE RAMS F/ REMOTE.. 6

ONE

DRILL 200MM F/ 149M- 302M

& KILL VALVES, STABBING VALVE, 7000 H 1400 L 10min. EACH

PRESSURE TEST MANIFOLD VALVES, HYDRIL, PIPE & BLIND RAMS, OUTSIDE INSIDE HCR

4200

1min. 12sec. PRECHARGE PRESS. 5500 KPA, FUNC. MTR. KILLS & HORN

4200

FUNC. TEST, OPER. PRESS. 20000, PRESS. AFTER 3 FUNC. 13000, PRESS. UP TIME

0.56

0.79

MAKE UP B.H.A. TRIP IN HOLE, TAG @ 142.46m

0.71

2014/11/25

0.25

499.00m

0.25

0.50

0.25

0.25

0.25

0

0.25

117

0.75

0.75

0.25

10701070

2.00

0.50

2.75

0.25

17880.00

21A

21

18:15

7

16:15

2

DLS

0.25

2C

2

MB

21:45

20:15

19:15

0

24:00

23:00

HIGHMARK EXPLORATION INC.

60

62 142

.24m

0.70m

5

.42

23:00

12.17m

19:15

20:15

21:45

SX

19:00

92.23m0.58m

92.02m

0.25

12-24-012-27W1

SX

5.50

SXSX

0.251.00

0.00m

5

7

5

2

5

2

21

2

3.00

WIRELINE

1.253.25 0.25

DRILL OUT

PRESS. TEST

2014

HOUSEKEEPING

00:30

00:15

499m

06:45

07:45

550m

03:30

03:15

06:30

07:45

131

0.75

8

2.253.25

LAB

8

LAB

8.50

LAB

1100

LABLABLABLAB

92.02m

0.70m

0.33m

8.00

24.00

8.00

8.00

42s/l

25

6

0.58m

15

92.23m

00:00

1010

RIG SERVICE FUNC. CROWNSAVER CAODC PRE-DRILLOUT INSPECTION

30s/l

16:00

30s/l

08:00

550

35s/l

BELOWSHAKER

BELOWSHAKER

14.3

5kdaN

14.3 14.3

1010

6kdaN

PARTLY CLOUDY

LARRY BREAULT

18:30

18:15

.5

18:00

08:15

17:30

17:15

17:00

16:15

10

09:15

08:30

14:15

LABLAB

12:15

LAB

12:00

200

ROD CARRIERE

1 of 6

26.3m3 29m3

19:00

FAIR

ENSIGN CANADIAN DRILLING

140

8

149

499m DRILL

61

0.00m

311

156

200

156

156

1.50

0

3.252.75

0

LB1051

0

101

102

156

100/12-24-012-27W1/00

7

.31m

.70m

1

92.02m

28kdaN

1

.58m

5.50

1

-4.00

1

110

7129136

8

VERT

358.44m

1

200

10

8

301.89m

200

UP TO 19 KM/HNW

WIRELINE

WIRELINE

0.00m

29.9m3

0

WIRELINE

29.6m3

10

11

0.00m

149m

149

PAILS

3

SX

ONE

2RR

ONE

SXSX

SXSTIX

PAILS

SINGLE

SINGLE

S.W.P. ISSUED TO DEREK LOEPPKY, MATT & BJ SHAW ( VAC HAULERS) #0019110

14:15

102

REVIEW J.S.A. #E1, E2, E3, F1, F5, F2

SINGLE

LOCK OUT DWKS. PUMP, MUDTANKS

D.W.A. & INSPECT BRAKES, LINKAGE, FUNC. CROWNSAVER, INSPECT TONG LINES, PINS, CLEVISES

550

101102

0

156

156

R.I.H. WITH CLEAN OUT BIT

1126kPa

CONDITION MUD & CIRCULATE

1235kPa

WIPER TRIP TO SURFACE/CHANGE BIT F/CHECK@ 496M,270M,100M CALC VOL. 3.2M3

1235kPa

MEAS. 2.8M3 DIFF. -.4M3

16:00

DRILL 200MM F/545-550M CORE POINT

CONDITION MUD & CIRCULATE

DWA INSPECTION VISUALLY INSPECT TONG HANGING LINES AND BRAKE LINKAGES

F/T CROWN SAVER

REVIEW JSA# F2,F2A,F4,F8,F9,F9A,F10,F13,F17

460

DEVIATION SURVEY AND CONNECTIONS ACC

300m183m

CH27MS

16

19

0

24:00

08:00

16:00

140

140

152

ENERPAC REGULARSAWDUST

CALCIUM NITRATESHALE SPERSE

SOAP STICKSENERPAC REGULAR

SODA ASH

62

GEL

SODA ASH

115

311

0

5.50

2

1.00

SHALE SPERSECALCIUM NITRATE

4300

1

2014/11/25

2014/11/25

460

CIRCULATE 545M SAMPLE/ANALYZE

RIG SERVICE/ LOCKOUT DRAWWORKS/BRAKE HANDLE, F/T PIPE RAMS CLOSE 3SECS,OPEN

3SECS.

CIRCULATE 540M SAMPLE/ANALYZE

DRILL 200MM F/540-545M

506m

CIRCULATE 535M SAMPLE/ANALYZE

540m

DRILL 200MM F/535-540M

DRILL 200MM F/499M-535M

1

SAFETY MEETING/CREW CHANGEOVER (192348)

0Z41640_20141125_1A

5

2

BIT SUB

BIT

0.25

HWDP(4.0 IN)

2

X/O

1

10 DC.S

6A

5

2A

1.25

1.00

550.00m

0.25

MUD UP ON FLY @ 375M

1.00

INSPECTED FLARE LINES, DEGASSER, BOWL, BOP EQUIP, FLARE STACK

DP505F

1.50

DWA- CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER // DO IT REVIEW COMPLETE // BOILERBLOWDOWN 2X @ 120L DISCHARGE

09:15

DP505F

12:00

08:15

08:00

08:30

06:00

12:15350

BAKER

12:3014:00

10:30

10

GRCGRC

DRILL

GRCGRCGRCGRCGRC

1710.00

2RR

0

0.75

1.75

HWDP(4.0 IN)

1.75

X/O

10 DC.SBIT SUB

3.25

BIT

2.75

1.00

390

10.3

10.3 10.3 10.3

10.3

0.00

10.3 10.3

0

1

1

10

Pason

0

0

1

0

28kdaN

1

17kdaN

7129136

230

BAKER

00:00

00:15

00:30

03:1503:30

17kdaN

06:30

220

06:45

Page 41: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387

e e e e

Tour Sheet Senal No

0241640 20141125 IA

Surface Location

12-24012-27WI

Vendor Software Version

Pason

Year Month Day

2014 11 25

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27WV00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractors Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Rig No

640

WerrType

VERT

Spud Date Time

2014)1 V24 00.45

Rig Release Date Time

Re-Entry

Pason

No

I BIT

I BITSUB

I 10DCS

I'

Component OD ID Length No

311 00 0 00 0 33 I BIT

1 56.00 0 00 0.70 I BIT SUB

156.00 000 92.02

Component

I'

OD ID Length

31100 0.00 24

15600 0.00 070

4 r rr err r I YJO 10200 0.00 058

I HWDP(4 0 IN) 101 92.23 10 HWDP(4 0 IN) 101 92 23

I Drill Pipe

Drill Pipe

Kelly Down

Stands 301,89 19 Drill Pipe

Singles 0.00 0 Drill Pipe

11.25 Kelly Down

Total

Stands 358 44

Singles 0 00

579

550 00

Ii «s'lWeight of DC 17 00

Weight of String 28.00 Weight of String 28 00

Tour No.

I SITE ORIENTATION

2 JSAREVIEW

3 JSAREVIEW

3 LOOKOUTS

Event No.

RAMOAN SANE(PRESS TESTER)

F2- MAKE CONNECTION

REVIEW F2,F2A,F4,F8,F9,F9A, F1 0, F1 3, F17

RIG SERVICE

Description Time Depth

02.00

08 00

16.00 500

21.30 540

vri

2of6

SPECIAL EVENTS

Tour No. Event No. Description Time Depth

Pason

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

V. 1.1

0Z41640_20141125_1A

387

0.70

2014/11/24 00:45

ROD CARRIERE

0

.24

92.23

0.58

2 of 6

92.02

0

3

0

17.00

ENSIGN CANADIAN DRILLING

17.00

1

2

3

3

11

0.70

0.33

100/12-24-012-27W1/00

12.17 11.25 5.79

28.00 28.00

VERT

92.23

0.58

92.02

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

0.00

0.00

358.44301.890.00

0.00

0.00 0.00

10154

BIT

BIT SUB

21:30

16:00

08:00

02:00

HWDP(4.0 IN)

X/O

10 DC.S

BIT

10 DC.S

BIT SUB

0.00

0.00

0.00

DLS

X/O

HWDP(4.0 IN)

MB

HIGHMARK EXPLORATION INC.

DC (6.25 IN)

X/O

BIT

BIT SUB

12-24-012-27W1

JSA REVIEW

JSA REVIEW

LOCKOUTS

SITE ORIENTATION

2014

105.78 499.00 550.00

1

1

1

10

1

.58

.70

92.02

.31

102.00

101

0 16

156.00

19

10

1

1

1

1

0.00 0.00 0.00

1

10

102.00

101

RAMOAN SANE (PRESS. TESTER)

311.00

156.00

156.00

25

REVIEW F2,F2A,F4,F8,F9,F9A,F10,F13,F17

F2- MAKE CONNECTION

RIG SERVICE

500

200

540

156

156

102

Pason

1

1

311.00

156.00

LARRY BREAULT

1 2

Page 42: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tour Sheet Senal No

0241640 20141125 IA

Vendor Software Version

Pason

Year Month Day

2014 11 25

License No Well Name

10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)

Operator

HIGHMARKEXPLORATION INC.

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Surface Location

12-24 012-27WI

Contractor

ENSIGN CANADIAN DRILLING

Contractor's Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Prov Loc Type Unique Well Id

MB DLS 100I12-24-012-27WII00

Rig No Well Type

640 VERT

Spud Date Time

2014II 024 00 45

Rig Release Date Time

Re-Entry

Pesos

2 GELICHEM X

Time 10;00 12:00 14:00

Densky 1010kg/m31010kg/m31020kg/m3

Funnel Viscosky 30s/I 30sl 31s/I

Fluid Loss

Roid pH

Lccadcn of SampleBELOW BELOW ELOW

SHAKER HAKER HAKER

Depth 183m 300m 400

PVT 26.3m3 29m3 29m3

Test t

Type

(Eu Chlorides)

Value

Test 2

Type

(ex: Sandyt)

Value

Test 3

Type

(ex: Hard Ca)

Value

Test 4

Type

(ex Sulfides)

Value

V 11

3 of 6

Time

Density

Funnel Viscosity

Fluid Loss

Fluid pH

Location of Sample

Depth

PVT

Test 1

Type (Ex: Chlorides)

Value

Test 2

Type (ex: Sand%)

Value

Test 3

Type (ex: Hard Ca)

Value

Test 4

Type (ex: Sulfides)

Value

MUD SAMPLE REMARKS

TOUR MUD TYPE WATER OIL OTHER

Pason

MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

V. 1.1

30s/l

640

31s/l

12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

30s/l

HIGHMARK EXPLORATION INC.

0Z41640_20141125_1A

BELOWSHAKER

BELOWSHAKER

387

BELOWSHAKER

11

ROD CARRIERE

2014/11/24 00:45

100/12-24-012-27W1/00

3 of 6

x

Pason

10154 DLS

ENSIGN CANADIAN DRILLING

10:00 12:00 14:00

MB

2014

1010kg/m3 1010kg/m3

VERT

183m

1020kg/m3

26.3m3

25

29m3 29m3

GEL/CHEM

LARRY BREAULT

300m 400m

2

Page 43: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tour Sheet Senal No

0241640 20141125 IA

Vendor Software Version

Pason

Year Month Day

2014 11 25

License No Well Name

10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)

Operator

HIGHMARKEXPLORATION INC.

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Surface Location

12-24 012-27WI

Contractor

ENSIGN CANADIAN DRILLING

Contractor's Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Prov Loc Type Unique Well Id

MB DLS 100I12-24-012-27WII00

Rig No Well Type

640 VERT

Spud Date Time

2014II H24 00 45

Rig Release Date Time

Re-Entry

Pesos

v'

GEL/CHEM X

Time 16;15 18;15 23:45

Densky 1070kg/m31070kg/m31090kg/m3

Funnel Viscosky 35s/I 426/ 52s/I

Fluid Loss 8cm3

Roid pH

Location of SaniPle SHAKER HAKER HAKER

Depth 506m 540m 550

PVT 29.6m3 29.9m3 27.3m3

Test t

Type

(Eu Chlorides)

Value

Test 2

Type

(ex: Sandyt)

Value

Test 3

Type

(ex: Hard Ca)

Value

Test 4

Type

(ex Sulfides)

Value

V 11

4 of 6

Time

Density

Funnel Viscosity

Fluid Loss

Fluid pH

Location of Sample

Depth

PVT

Test 1

Type (Ex: Chlorides)

Value

Test 2

Type (ex: Sand%)

Value

Test 3

Type (ex: Hard Ca)

Value

Test 4

Type (ex: Sulfides)

Value

MUD SAMPLE REMARKS

TOUR MUD TYPE WATER OIL OTHER

Pason

MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

V. 1.1

35s/l

640

52s/l

12-24-012-27W1

8cm3

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

42s/l

HIGHMARK EXPLORATION INC.

0Z41640_20141125_1A

SHAKERSHAKER

387

SHAKER

11

ROD CARRIERE

2014/11/24 00:45

100/12-24-012-27W1/00

4 of 6

x

Pason

10154 DLS

ENSIGN CANADIAN DRILLING

16:15 18:15 23:45

8

MB

2014

1070kg/m3 1070kg/m3

VERT

506m

1090kg/m3

29.6m3

25

29.9m3 27.3m3

GEL/CHEM

LARRY BREAULT

540m 550m

3

Page 44: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tour Sheet Senal No

0241640 20141125 IA

Vendor Sokware Version

P

Year Month Day

2014 11 25

Ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24 12 27 Wl (367)

Surbce Location

12-24-012-27W1

Prov Loc Type Unique Well Id

MB DLS 100712-24-012-27W1)00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractor's Job No

Signature of Contractu(a Rig Manager

LARRY BREAULT

Rig No

640

367

Well Type

VERT

Spud Date Time

Rig Release Date Time

Re-Entry

2014II U24 0045

Peace

Dexfrption Make Model Provided by Expenseof Rental Company Usage Quwttty Quanbty Used

DRILL SPOOL

Remarks

FLARE TANK(CHANDEL)

Remarks

LOADERWIGRAPPLE

Remarks

11.2I3MX 9.2I3M CONTRACTOR

CONTRACTOR

CONTRACTOR

PERATOR HANDEL RENTALS

PERATOR HANDEL RENTALS CER-155 4

PERATOR NSIGNCANADIANDRILLING P15939 24

NE

Remarks

Boiler No Make

WILLIAMS 5 DAVIS 100 HP

Model

CONTRACTOR OPERATOR CD

Rental Company

BO-765

Serial

N Hours Today

Remarks

Remarks

Swee I Screen 2

Shaker No Make Model

Pwutw bze SueenCtewdt Ner Poshin bze ScneCtegerP Newt Pete Size Screen Chsrwdt Newt Pwutw Size ScrwChsngedt Nev

Remarts

I SWACO MONGOOSE I 325 X 2 235 X 3 235 X 4 165 X

Remarts

Remarts

Pump No Make Model Pnwidedby Expense of Rental Company

Serial

N Hours Today Stroke Length Rod Sire Pump Styh

Remarks

I DENVER GARDNER PZB CONTRACTOR PERATQR ENSIGN MP4279 55 X3mm 152mm TRIPLEX

2 RS

Rema ksCHANE HEAD AND LINERS T0 502 QCT 172014

FIXB CONTRACTOR PERATQR ENSIGN MP4324 9 254mm I Xmm TRIPLEX

Remarks

anh Size

I 2 3 4

Ilmechmr Tne Snilih

I 2 3 4 5 6 7

Tohl Qeuia. Cotii49 Snicells

tkms Run Ove Hours Entry oe

6 Today Run SrM Sage OXTe MDC IX Rwen Rated Total Rui foMI

TeIrI

f12

2RR

""mm

IRR""

mm

IRR""

mm

3

0000.

mm

BAKER DP505F 7129136

BAKER DP505F7129136

mm

BAKER DP505F7129136

mm

LB1051 CH27MS1430

mm

1030 1030. 103. 103. 1030. 103tl-

m mm Omm Omm mm mm

1030 1030. 103. 103. 1030. 103tl-

m mm Omm Omm mm mm

1030 1030. 103. 103. 1030. 103tl-

m mm Omm Omm mm mm

1430 1430.

m mm

14900m 00 14I1025

14900m 35000m 5X 55 140025

14900m55000m 40100m 4X 95 140025

55000m55000m Boom I X 10 140025

422lmlhr 3

0oonuhr 3

5 of 6

GENERAL EQUIPMENT & SERVICE

Description Make Model Provided by Expense of Rental Company Serial No Usage Quantity Quantity Used

Remarks:

Remarks:

Remarks:

BOILERS

Boiler No Make Model Provided by Expense of Rental Company Serial No Hours Today

Remarks:

Remarks:

Remarks:

MUD PUMPS

Pump No Make Model Provided by Expense of Rental Company Serial No Hours Today Stroke Length Rod Size Pump Style

Remarks:

Remarks:

Remarks:

BITS

Bit No SizeIADC Code

Manufacturer Type Serial NoJets Depth

InDepth Out

Total Drilled

Total Hours Run

Today

Cumula-tive Hours

RunEntry Date

Cutting StructureTour

1 2 3 4 1 2 3 4 5 6 7 8 TI T0 MDC LOC BRG Gage ODC Reason Pulled Total Run m/Hr

Pason

SHALE SHAKERS

Shaker No Make ModelScreen 1 Screen 2 Screen 3 Screen 4

Position Size ScreenChanged? New? Position Size Screen Changed? New? Position Size Screen Changed? New? Position Size Screen Changed? New?

Remarks:

Remarks:

Remarks:

EQUIPMENT & SERVICESTour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

V. 1.2

3

SP-15939

HIGHMARK EXPLORATION INC.

CER-155

0Z41640_20141125_1A

2RR

2RR

3

387

ROD CARRIERE

2014/11/24 00:45

TRIPLEX

TRIPLEX

5 of 6

2RR

OPERATOR

X X X X

5.5

100 HP

ENSIGN CANADIAN DRILLING

9.50

5.50

8

0.00

1

200.00-mm

1.00

24

200.00-mm

24

200.00-mm200.00-mm

CONTRACTOR

24

1

1

4

2

3

3

2

11-2/3M X 9"-2/3M

401.00m

12-24-012-27W1

CHANDEL RENTALS

0.00m

CHANDEL RENTALS

350.00m

ENSIGN CANADIAN DRILLING

11

14/11/25

14/11/25

14/11/25

100/12-24-012-27W1/00

ONE

14/11/25

MP-4279

MP-4324

10.30-mm

SWACO

10.30-mm

10.30-mm

10.3-0mm

10.3-0mm

5.50

10.30-mm

OPERATOR

4.0010.30-mm

325

OPERATOR

235 235 165

550.00m

550.00m

CONTRACTOR

CONTRACTOR

2014

10.30-mm

10.30-mm

VERT

10.30-mm

10.30-mm

10.30-mm

10.3-0mm

10.3-0mm

CONTRACTOR

CONTRACTOR

24

CONTRACTOR

1.00

640

550.00m

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

149.00m

149.00m

149.00m

203mm

254mm2

1

MONGOOSE

10154

0.00m/hr

42.21m/hr

OPERATOR

140mm

OPERATOR

OPERATOR

25

152mmPZ8

F1000 ENSIGN

ECD

DENVER GARDNER ENSIGN

RS

DRILL SPOOL

LOADER W/GRAPPLE

FLARE TANK (CHANDEL )

14.30-mm

14.30-mm

7129136

14.30-mmCH27MS

BAKER

BAKER 10.30-mm7129136

7129136

10.3-0mm

10.30-mm

BAKER

10.30-mm

10.3-0mm

LB1051

Pason

WILLIAMS & DAVIS

DP505F

10.30-mm

DLS

10.30-mmDP505F

DP505F

MB

BO-765

CHANE HEAD AND LINERS TO 51/2" OCT 17 2014

LARRY BREAULT

1

Page 45: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tour Sheet Senal No

0241640 20141125 IA

Vendor Sotware Version

P

Year Month Day

2014 11 25

Ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24 12 27 Wl (367)

Surbce Location

12-24-012-27WI

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27WU00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractor's Job No

Signature of Contractors Rig Manager

LARRY BREAULT

Rrg No

640

367

Well Type

VERT

Spud Date Time

Rig Release Date Time

Re-Entry

~pc/]2014IIII24 00.45

Pesos

Demflptloh Make Model Provided by Enpenseof Rental Company Usage Quantity Ouanhty Used

PENLESS RECORDER PASON

Remarks

CONTRACTOR PERATOR ASON

Remarks

Remarks

Boiler No Make Model Rental Company

Serial

N Hours Today

Remarks

Remarks

Remarks

Sworn I Screen 2

Shaker No Make Model

Peutrm bze Sueencttammt Neer Poehln bze SctmnCtumerP Newt Pmnun Size Screen cmrqdt Newt Peutrm Size ScramChangedt Neer

Remarts

Remarts

Remarts

Pump No Make Model Pnwidedby Expanse of Rental Company

Serial

N Hours Today Stroke Length Rod Sire Pump Styh

Remarks

Remarks

Remarks

anm size

I

Ilmmchwr Tne Sell Ih

2 I 4 2 I 4 s r

Tohl Omula. Cuor49 Rnroallu

tkms Run Ove nauru Entry'

Today Run Te Moc Ioc Gage ox Reams Rated Total Rui fnmr

Terri

f12

6 of 6

GENERAL EQUIPMENT & SERVICE

Description Make Model Provided by Expense of Rental Company Serial No Usage Quantity Quantity Used

Remarks:

Remarks:

Remarks:

BOILERS

Boiler No Make Model Provided by Expense of Rental Company Serial No Hours Today

Remarks:

Remarks:

Remarks:

MUD PUMPS

Pump No Make Model Provided by Expense of Rental Company Serial No Hours Today Stroke Length Rod Size Pump Style

Remarks:

Remarks:

Remarks:

BITS

Bit No SizeIADC Code

Manufacturer Type Serial NoJets Depth

InDepth Out

Total Drilled

Total Hours Run

Today

Cumula-tive Hours

RunEntry Date

Cutting StructureTour

1 2 3 4 1 2 3 4 5 6 7 8 TI T0 MDC LOC BRG Gage ODC Reason Pulled Total Run m/Hr

Pason

SHALE SHAKERS

Shaker No Make ModelScreen 1 Screen 2 Screen 3 Screen 4

Position Size ScreenChanged? New? Position Size Screen Changed? New? Position Size Screen Changed? New? Position Size Screen Changed? New?

Remarks:

Remarks:

Remarks:

EQUIPMENT & SERVICESTour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

V. 1.2

640

12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

PASON

HIGHMARK EXPLORATION INC.

0Z41640_20141125_1A

387

PENLESS RECORDER

11

ROD CARRIERE

2014/11/24 00:45

100/12-24-012-27W1/00

6 of 6

PASON

Pason

10154 DLS

ENSIGN CANADIAN DRILLING

MB

2014

VERT

OPERATOR 24

25

CONTRACTOR

LARRY BREAULT

Page 46: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

1of5

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

18:30

1.85

19:45

18:00

18:15

16:15

5

17:30

x

1

x

0.25

16:00

1

x

387 2014/11/24 00:45

1

0

0

2.25

0

0

3.25

0

00

0.25

0

10

2.00

10

0.25

558

2

375

400

6.24m

1900.00

11

1

1

1

1

3

1

1

10

6A

0

4A21B

21

6B

00

SHAKER

20:30

CLINTON RADFORD

20:00

KYLE WENDZ

11:0008:30

SHANE DEMAS

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

0

0

0

0

HWDP(4.0 IN)

8.90m

BIT

CORE BBL

TOP SECTION

JARS-HYD

31.00kdaN

CREW CHG. OVER SAFETY MEETING

10154

DOUBLE PIN

TRIP OUT OF HOLE F/ CORE BBLS, FL. CK. @ 543m, 458m, 110m, O.O.H, EST. DISP.

10 DC.S

3.17, ACTUAL 3.84, DIFF. +.67m3, TALLY 542.69m, STRAP 542.86m, DIFF. +.17m

X/O

35.00kdaN

JSA (JOB SAFETY ANALYSIS) W/ CORE HAND

PRE TOUR SAFETY MEETING AND CREW CHANGE OVER # 192351

CORING (CUT CORE # ONE 171MM F/ 550M- 556M)CIRCULATE BOTTOM HOLE SAMPLE

580.47m

TRIP OUT OF HOLE W/ CORE F/ 556M TO BANK... (PIPE SPINNER) .... FLOW CHECK

BLOW KELLY BACK

HANDLE CORE BRLS

ONE

ON BOTTOM AND 480M, 264, 120 AND OUT OF HOLE

TORQUE.

MAKE UP CORE BRLS, CHG. OUT STABALIZERS TO NEW, TORQUE UP BREAK & RE -

6390

6390

TRIP IN HOLE, FILL HALF WAY, CONTINUE RUN IN HOLE, LAY OUT 3 JTS. DP.

2014/11/26

0.25

556.00m

0.25

0.50

0.25

1.25

0.50

0.25

0

0.25

120

1.25

0.252.25

4.250.50

1110

3.50

0.50

5

14190.00

4

21

4A

21:45

DLS

6B

0.25

5

MB

02:45

19

HIGHMARK EXPLORATION INC.

2600

0.34m

27.48m

3

5.79m

92.23m0.58m

92.02m

0.70m

0.21m2.11m

1.27m

2.250.75

12-24-012-27W1

4.75

3.25 4.25

17.11m

4

5

4A

8F

6A

6A

7

21

4A

24.4m3

5.25 1.750.25 0.250.25

POOH

MAKE UP CORE BBLS

2014

WORKING IN COLD WEATHER

02:15

00:15

556m

08:00

561m

02:3005:45

0.250.2513.25

8

8.251.00

LAB

8

LABLAB

LAB

10

LABLAB

1.27m

27.48m

0.34m

8.00

24.00

0.00m

8.00

8.00

0.70m

92.02m

26

2

2.11m

1

0.21m

0.58m

92.23m

00:00

1090

55s/l

16:00

55s/l

08:00

556

1090

58s/l

BELOWSHAKER

BELOWSHAKER

2.5kdaN

1110

4kdaN

PARTLY CLOUDY

28kdaN

LARRY BREAULT

20:30

SINGLE

20:00

19:45

3

18:30

08:15

18:15

18:00

17:30

16:15

15:30

3

13:15

13:0012:30

LAB

16:00

LAB

ROD CARRIERE

171

1 of 5

26.7m3 26.3m3

24:00

FAIR

ENSIGN CANADIAN DRILLING

140

556m

550

CORE

0.00m

159

159

171

159

159

1.00

92.02m

.21m

92.23m

0.58m

101

102

156

BHC406Z

156

159

159

159

1

1

110

100/12-24-012-27W1/00

.34m

27.48m

2

1.27m

31kdaN

1

2.11m

1

3.25

-4.00

1

11

7122872

8

VERT

550.74m

TANKS

200.00Nm

320.71m

171

5

320.71m

171

UP TO 19 KM/HNW

358.44m

0

25.6m3

2

10.5

11

9.45m

550m

550

SXSX

4C

SX

ONE

3C

ONE

SXSX

556

SINGLE

SINGLE

156

8cm3

102

REVIEW J.S.A. F9, G3, F10

159

LOCK OUT PUMP

159

SINGLE

D.W.A & INSPECT BRAKES, LINKAGE, FUNC. CROWNSAVER, INSPECT TONG LINES, PINS, CLEVISES, LIFTING/HOISTING,B.O.P & RELATED EQUIP. MANIFOLD ALIGN.

101

159159

159

159

101102

156

156

1089kPa

1089kPa

DWA INSPECTION VISUALLY INSPECT BRAKE LINKAGES AND TONG B/U LINES

8cm3

REVIEW JSA F2,F2A,F4,F8,F9,F9A,F10,F13,F17

F/T AIR TOGGLE CROWN SAVER, RE-CAL RIG SMART AND F/T

55s/l

554m550m

7137919

17

17

5

BAKER

24:00

08:00

16:00

140

140

152

ENERPAC LO VIS

82

SAWDUST

107

159

0

3.25

3.50

SODA ASHENERPAC REGULARGEL

8000

1

2014/11/26

0

2014/11/26

3000

CUT CORE # 2 F/556M TO 561M (102mm)

CIRCULATE BOTTOM HOLE SAMPLE

M/U CORE PUP JOINTS AND DROP BALL

FIX RIG SMART, RE-RUN POWER CORD FOR PAY-OUT & CALBRAITE

CONTINUE TO R.I.H TO CORE POINT

557m

R.I.H WITH NEW BIT AND FILL PIPE AT 280M

RIG SERVICE, CHECK DRIVELINE BOLTS

RACK BACK CORE BARRELS, INNER BARRELS AND CHANGE OUT CORE BIT

1

SAFETY MEETING/CREW CHANGEOVER (140376)

0Z41640_20141126_1B

CORE BBLS

BIT

BIT SUB

DOUBLE PIN

2

JARS-HYD

1

TOP SECTION

10 DC.S

X/O

HWDP(4.0 IN)

561.00m

9cm39cm3

bhc406z

DWA- CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER // DO IT REVIEW COMPLETE// BOILERBLOWDOWN 2X @ 120L DISCHARGE

13:15

bhc406z

15:30

08:15

08:00

13:00

12:30

06:00

6

BAKER

10.5

GRCGRC

CORE

GRCGRCGRC

GRC

1790.00

3C

1

0.50

DOUBLE PINJARS-HYD

TOP SECTIONCORE BBLS

BIT

3.50

390

8

0.00

0

1

0

1

0

1

0

1

Pason

0

0

1

0

31kdaN

17kdaN

1

17kdaN

1

1

7122872

10

65

BAKER

48

00:00

00:15

02:1502:30

BIT SUB

17kdaN

05:45

10 DC.S

50

X/OHWDP(4.0 IN)

Page 47: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387

I I I ITour Sheet Senal No

0241640 20141126 16

Surface Location

12-24012-27WI

Vendor Software Version

Pason

Year Month oay

2014 11 26

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27W 600

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractors Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Rrg No

640

Wea Type

VERT

Spud Date Time

2014)1 624 00.45

Rig Release Date Time

Re-Entry

gggg

Pason

No

I BIT

3 CORE BBL

Component OD ID Length No

171 0 00 34 1 BIT

159 000 2748 1 CORE BBLS

i'

Component QD ID Length

159 00 0 00 0.34

159.00 000 27.48

No

I BIT

I CORE BBLS

Component

i'

QD ID Length

15900 0.00 034

15900 000 2748

I TOP SECTION 159 127

I JARS-HYD

I DQUBLEPIN

I 10 DC.S

I XIQ

159

159

211 1 JARS-HYD

21 1 DOUBLE PIN

15600 000 9202 1 BITSUB

10200 000 058 1 10DCS

159.00 000 2.11

159.00 000 0.21

156.00 000 0.70

156.00 000 92.02

I DOUBLE PIN

I BITSUB

15900 0.00 021

15600 0.00 070

I 'l I II

10 HWDP(40IN) 101 92 23 I I II III I I XIO 10200 0.00 058

1 HWDP(4 0 IN) 101 0 92.23

19 Drill Pipe

0 Drill Pipe

Kelly Down

Total

Stands 358 44 1 Dnll Pipe

Singles 0 00 1 Drill Pipe

57

58047

Kelly Down

Total

Stands 320.71 17 Drill Pipe

Singles 9.45 3 Drill Pipe

8.90

556.00

Kelly Down

Stands 320 71

Singles 1711

624

Weight of DC

Weight of String

1700

2800

ri «I'lr r r II

Weight of DC

Weight of String

17 00

31 00

Tour No.

2 JSAREVIEW

3 JSAREVIEW

3 LOOKOUTS

Event No. Description

F4- RIG SERVICE

REVIEW JSA6 F2A,F8,F9,FIO,F13

RIG SERVICEILOCKQUT DRWWRKSIBRAKE HANDLE, TIGHTEN DRIVELINE BOLTS

Time Depth

08.00

1600 556

19.00 556

vii

2of5

SPECIAL EVENTS

Tour No. Event No. Description Time Depth

Pason

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

V. 1.1

0Z41640_20141126_1B

387

27.48

2014/11/24 00:45

ROD CARRIERE

3

0.34

0.21

2.11

2 of 5

1.27

1

3

0

17.00

ENSIGN CANADIAN DRILLING

17.00 17.00

2

3

3

92.02

0.70

92.23

0.58

11

27.48

0.34

100/12-24-012-27W1/00

5.79 8.90 6.24

28.00 31.00 31.00

92.23

VERT

0.70

0.21

0.58

92.02

2.11

1.27

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

0.00

0.00

0.00

0.00

0.00

320.71320.71358.44

0.00

0.00

0.00

0.00

0.00

0.00 0.00

10154

BIT

CORE BBLS

HWDP(4.0 IN)

X/O

19:00

10 DC.S

16:00

BIT SUB

08:00

DOUBLE PIN

JARS-HYD

TOP SECTION

0

0.00

0

0.00

0.00

0.00

BIT

TOP SECTION

CORE BBLS

0.00

0.00

0.00

0.00

DLS

JARS-HYD

DOUBLE PIN

MB

HWDP(4.0 IN)

X/O

10 DC.S

BIT SUB

HIGHMARK EXPLORATION INC.

DOUBLE PIN

10 DC.S

TOP SECTION

JARS-HYD

X/O

HWDP(4.0 IN)

BIT

CORE BBL

12-24-012-27W1

JSA REVIEW

LOCKOUTS

10

1

1

156.00

101

JSA REVIEW

102.00

156.00

2014

580.47 556.00 561.00

3

1

1

10

1

1

1

1

1

92.23

92.02

0.58

2.11

.21

27.48

102.00

1.27

101

156.00

.34

156.00

159.00

159.00

1

19 17

10

159.00

17

1

1

1

1

1

1

1

0.00 9.45 17.11

1

1

101

102.00

159.00

159.00

F4- RIG SERVICE

159.00

159.00

159.00

26

1

RIG SERVICE/LOCKOUT DRWWRKS/BRAKE HANDLE, TIGHTEN DRIVELINE BOLTS

REVIEW JSA# F2A,F8,F9,F10,F13

556

556

171

159

159

159

159

156.00

Pason

1

1

159.00

159.00

LARRY BREAULT

1 2

Page 48: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tour Sheet Senal No

0241640 20141126 18

Vendor Software Version

Pason

Year Month Day

2014 11 26

License No Well Name

10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)

Operator

HIGHMARKEXPLORATION INC.

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Surface Location

12-24 012-27WI

Contractor

ENSIGN CANADIAN DRILLING

Contractor's Job No

387

Signature of Contractor's Rig Manager

LARRY RREAULT

Prov Loc Type Unique Well Id

MR DLS 100/12-24-012-27WI/00

Rig No Well Type

640 VERT

Spud Date Time

2014III/24 00 45

Rig Release Date Time

Re-Entry

Pesos

EEL X

Time 02;45

Denshy (090kg/m3

FunnelViscoshy 55s/I

Fluid Loss Scm3

Roid pH

Location of Sample ANKS

Depth 550.74m

PVT 24.4m3

Test t

Type

(Eu Chlorides)

Value

Test 2

Type

(ex: Sandyt)

Value

Test 3

Type

(ex: Hard Ca)

Value

Test 4

Type

(ex Sulfides)

Value

V 11

3of5

Time

Density

Funnel Viscosity

Fluid Loss

Fluid pH

Location of Sample

Depth

PVT

Test 1

Type (Ex: Chlorides)

Value

Test 2

Type (ex: Sand%)

Value

Test 3

Type (ex: Hard Ca)

Value

Test 4

Type (ex: Sulfides)

Value

MUD SAMPLE REMARKS

TOUR MUD TYPE WATER OIL OTHER

Pason

MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

V. 1.1

55s/l

640

8cm3

12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

HIGHMARK EXPLORATION INC.

0Z41640_20141126_1B

387

TANKS

11

ROD CARRIERE

2014/11/24 00:45

100/12-24-012-27W1/00

3 of 5

x

Pason

10154 DLS

ENSIGN CANADIAN DRILLING

02:45

8

MB

2014

1090kg/m3

VERT

550.74m

24.4m3

26

GEL

LARRY BREAULT

1

Page 49: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tour Sheet Senal No

0241640 20141126 18

Vendor Software Version

Pason

Year Month Day

2014 11 26

License No Well Name

10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)

Operator

HIGHMARKEXPLORATION INC.

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Surface Location

12-24 012-27WI

Contractor

ENSIGN CANADIAN DRILLING

Contractor's Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Prov Loc Type Unique Well Id

MB DLS 100H2-24-012-27WI/00

Rig No Well Type

640 VERT

Spud Date Time

2014III/24 00 45

Rig Release Date Time

Re-Entry

Pesos

2 GEL/CHEM X

Time 08;30 11:00 13:00

Densky 1090kg/m31110kg/m31120kg/m3

Funnel Viscosky 55s/I 556/ 54s/I

Fluid Loss 9cm3 9cm3 Bcm3

Roid pH 10 10 10

Lccadcn ofSample

BELOW BELOW ELOW

SHAKER HAKER HAKER

Depth 550m 554m 556

PVT 26.7m3 26.3m3 26m3

Test t

Type

(Eu Chlorides)

Value

Test 2

Type

(ex: Sandyt)

Value

Test 3

Type

(ex: Hard Ca)

Value

Test 4

Type

(ex Sulfides)

Value

V 11

4 of 5

Time

Density

Funnel Viscosity

Fluid Loss

Fluid pH

Location of Sample

Depth

PVT

Test 1

Type (Ex: Chlorides)

Value

Test 2

Type (ex: Sand%)

Value

Test 3

Type (ex: Hard Ca)

Value

Test 4

Type (ex: Sulfides)

Value

MUD SAMPLE REMARKS

TOUR MUD TYPE WATER OIL OTHER

Pason

MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

V. 1.1

55s/l

640

9cm3

54s/l

12-24-012-27W1

8cm3

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

55s/l

9cm3

HIGHMARK EXPLORATION INC.

0Z41640_20141126_1B

BELOWSHAKER

BELOWSHAKER

387

BELOWSHAKER

11

ROD CARRIERE

2014/11/24 00:45

100/12-24-012-27W1/00

4 of 5

x

Pason

10154 DLS

ENSIGN CANADIAN DRILLING

08:30

10

11:00

10

13:00

10

MB

2014

1090kg/m3 1110kg/m3

VERT

550m

1120kg/m3

26.7m3

26

26.3m3 26m3

GEL/CHEM

LARRY BREAULT

554m 556m

2

Page 50: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tour Sheet Senal No

0241640 20141126 18

Vendor Software Version

Pason

Year Month Day

2014 11 26

License No Well Name

10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)

Operator

HIGHMARKEXPLORATION INC.

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Surface Location

12-24 012-27WI

Contractor

ENSIGN CANADIAN DRILLING

Contractor's Job No

387

Signature of Contractor's Rig Manager

LARRY RREAULT

Prov Loc Type Unique Well Id

MR DLS 100/12-24-012-27WI/00

Rig No Well Type

640 VERT

Spud Date Time

2014II H24 00 45

Rig Release Date Time

Re-Entry

Pesos

v'

GEL/CHEM X

Time 21;45

Denshy tftgkg/m3

FunnelViscoshy 58s/I

Fluid Loss 8cm3

Roid pH 10

Locaticn of Sample SHAKER

Depth 557m

PVT 25,8m 3

Test t

Type

(Eu Chlorides)

Value

Test 2

Type

(ex: Sandyt)

Value

Test 3

Type

(ex: Hard Ca)

Value

Test 4

Type

(ex Sulfides)

Value

V 11

5 of 5

Time

Density

Funnel Viscosity

Fluid Loss

Fluid pH

Location of Sample

Depth

PVT

Test 1

Type (Ex: Chlorides)

Value

Test 2

Type (ex: Sand%)

Value

Test 3

Type (ex: Hard Ca)

Value

Test 4

Type (ex: Sulfides)

Value

MUD SAMPLE REMARKS

TOUR MUD TYPE WATER OIL OTHER

Pason

MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

V. 1.1

58s/l

640

8cm3

12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

HIGHMARK EXPLORATION INC.

0Z41640_20141126_1B

387

SHAKER

11

ROD CARRIERE

2014/11/24 00:45

100/12-24-012-27W1/00

5 of 5

x

Pason

10154 DLS

ENSIGN CANADIAN DRILLING

21:45

10

MB

2014

1110kg/m3

VERT

557m

25.6m3

26

GEL/CHEM

LARRY BREAULT

3

Page 51: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

1of5

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

20:30

0.38

20:45

18:30

16:15

18:00

x

x

0.50

16:00

x

387 2014/11/24 00:45

2.32

0

0

1.25

0

0

0

0.25

0

0.50

0

2.50

0

10

3.25

10

0.25

350

400

12.17m

572m

840.00

11

1

1

1

1

1

1

1

1

10

4A

0

21

5

6B

21

4

16

SHAKER

CLINTON RADFORD

23:00

KYLE WENDZ

13:4513:00

SHANE DEMAS

SHAKER

640

0

0

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

0

0

0

0

0

0

0

HWDP(4.0 IN)

X/O

8.88m

BIT

CORE BBLS

TOP SECTION

JARS-HYD

32.00kdaN

CREW CHG. OVER SAFETY MEETING #140377

10154

DOUBLE PIN

CUT 102mm CORE #2 F/561m - 572.23m (PACKED OFF)

BIT SUB

35.00kdaN

CIRCULATE BTMS. UP

10 DC.S

30.00kdaN

P.O.O.H 3 STDS. BLOW KELLY, CONT. TRIP OUT OF HOLE TO RETRIEVE CORE, FL. CK.

PRE TOUR SAFETY MEETING / CREW CHANGE OVER # 140378

SAFETY MEETING W/ CORE HAND TO HANDLE CORESHANDLE CORE BRLS // COLD WEATHER, STEAM FOR EVERYTHING // LAY OUT CORE

572.23m

CONDITION MUD & CIRCULATE -- BRING VIS DOWN TO 40

KELLY AT MID POINT AFTER FILL //

RIG SERVICE - LOCKED OUT DWWKS AND BRAKE HANDLE, FNC ANNULAR F/ REMOTE.. 22

BARRELS, MAKE UP CORE BARRELS

TRIP IN HOLE W/ CORE BARRELS FLOW CHECK & FILL @ 275M AND @ 560M /// BLOW

ONE

SEC O/C /// ADD WATER AND STEAM TO BIRD BATHS

SAFETY MEETING W/ CORE HAND, CREW CHG. OVER

@ 577m, 443m, 292m, 140m, EST. DISP. 3.56, ACTUAL 5.02, DIFF. +1.46m (WET)

4000

101

4000

HANDLE CORE BBLS, RETRIEVE CORE #2

2014/11/27

0.50

573.00m

2.25

1.00

0.25

0.50

2.00

0

0.25

120

1.75

0.25

0.252.00

1130

1.00

1140

2.00

4A

11320.00

21

21

20:00

6A

16:00

DLS

7

0.25

5

MB

7.58m

03:00

18

HIGHMARK EXPLORATION INC.

65

.31m

.70m

4

8.11m

7.58m

572

92.23m.58m

92.02m

0.252.001.00

12-24-012-27W1

4.25

SX

4.50 2.500.50

9.43m

4A

6A

21

5

6B

21

4

24.3m3

4.00 3.000.50

RIH

RETRIEVE CORE BBLS

2014

TRIPPING PIPE

03:30

00:15

573m

08:00

573.74m

06:30

04:00

06:45

101

0.2512.75

8

7.502.00

LAB

8

LABLAB

LAB

10 9.5

LABLAB

1.27m

27.48m

0.34m

8.00

24.00

8.00

8.00

39s/l

0.70m

92.02m

27

2

2.11m

1

0.21m

0.58m

92.23m

00:00

1140

55s/l

16:00

43s/l

08:00

574

1120

10.3

42s/l

6kdaN

10.3

BELOWSHAKER

BELOWSHAKER

10.3

4.5kdaN

10.3

10.3

10.3 10.3

1140

4.5kdaN

PARTLY CLOUDY

2

31kdaN

LARRY BREAULT

24:00

23:00

20:45

3.5

08:15

20:30

18:30

18:00

16:15

10:45

41

10:3008:30

13:45

LAB

12:45

ROD CARRIERE

171

1 of 5

25m3 20m3

FAIR

ENSIGN CANADIAN DRILLING

140

556

573m CORE

0.00m

159

159

159

159

159

1.50

92.23m

0.70m

0.21m

0.58m

92.02m

101

102

156

DP505F

156

159

159

159

100/12-24-012-27W1/00

0.34m

27.48m

1

1.27m

31kdaN

1

2.11m

2.00

1

-32.00

10

110

7122872

8

VERT

572.69m

SHAKER

339.60m

200

4

4

339.60m

171

UP TO 19 KM/HNW

339.60m

24m3

0

25.3m3

10.5

11

0.00m

571m

572

PUP JTS.

2RR

ONE

5C RR

ONE

SXSX

573

3.50

SINGLE

SINGLE

13:45

156

7cm3

156

REVIEW J.S.A. #L33, L22, F4, G3, F9

159

LOCK OUT PUMP

159

SINGLE

D.W.A & INSPECT BRAKES, LINKAGE, FUNC. CROWNSAVER, INSPECT B.O.P. & RELATED EQUIP.

8cm3

102

101

101102

156

156

1052kPa

1115kPa

1115kPa

16:00

DWA INSPECTION, INSPECT TONG HANGING LINES AND BRAKE PINS/LINKAGES

8cm3

REVIEW JSA# F2.F2A.F17,F18,F19

F/T CROWN SAVERS (ORBIT88/RIGSMART)

58s/l

CORING 171MM F/ 572.23m TO - 573

571m571m

7129136

18

18

BAKER

24:00

08:00

16:00

140

2

140

152

SAWDUST

DESCO II CF

110

HUMALITE

115

200

0

2.00

561m

0.00

CORE

8000

2014/11/26

2014/11/27

8330

LAY OUT CORE/BREAK DOWN AND LAY OUT CORE BARRELS

M/U 200MM PDC AND R.I.H. TO REAM RATHOLE

-.18M3

SAFETY MEETING W/ BAKER HUGHES CORE HAND

573m

CIRCULATE BOTTOMS UP AND HOIST TO LAY OUT CORE/BARRELS

573m

P.O.O.H F/C @ 519M,285M,142,O.O.H. CALC. VOL.-3.58M3 MEAS. VOL.-3.4M3. DIFF.

CORE F/573M-573.74M

2

SAFETY MEETING/CREW CHANGEOVER (140379)

0Z41640_20141127_1A

CORE BBLS

BIT

BIT SUB

DOUBLE PIN

1

JARS-HYD

2

TOP SECTION

10 DC.S

X/O

HWDP(4.0 IN)

547.04m

8cm38cm3

BHC406Z

DWA-CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER // BOILER BLOWDOWN 2X @ 120L DISCHARGE

10:30

BHC406Z

10:45

08:15

08:00

08:30

06:00

12:451

BAKER

10

GRCGRC

CORE

GRCGRCGRC

GRC

2030.00

4C

0

0.50

2.25

HWDP(4.5 IN)X/O

DC (6.25 IN)BIT SUB

BIT

0.00

390

PUP JTS.

10

7.00

1

1

1

1

Pason

1

17kdaN

1

17kdaN

1

1

7137919

10

60

BAKER

00:00

00:15

03:30

04:00

06:30

06:45

60

Page 52: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387

I I I ITour Sheet Senal No

0241640 20141127 IA

Surface Location

12-24012-27WI

Vendor Software Version

Pason

Year Month oay

2014 11 27

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27WV00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractors Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Rrg No

640

Wea Type

VERT

Spud Date Time

2014)1 V24 00.45

Rig Release Date Time

Re-Entry

Pason

No

I BIT

I CQREBBLS

I TOP SECTION

Component OD ID Length No

159 00 0 00 0 34 1 BIT

159 00 0 00 27 48 1 CORE BBLS

15900 000 127

i'

Component QD ID Length No

159 00 0 00 0.34 I BIT

159.00 000 27.48 I CORE BBLS

Component

i'

QD ID Length

15900 0.00 034

15900 000 2748

I JARS-HYD

I DQUBLEPIN

I BITSUB

I 10 DC.S

15900 000 211 1 JARS-HYD

15900 000 021 1 DOUBLE PIN

15600 000 070 1 BITSUB

15600 000 9202 1 10DCS

159.00 000 2.11

159.00 000 0.21 I DOUBLE PIN

156.00 000 0.70 I BITSUB

15900 0.00 021

15600 0.00 070

156.00 000 92.02

I 'l I II

I XIQ 10200 000 058 I I II III I I YJO 10200 0.00 058

10 HWDP(40IN)

2 PUP JTS. 101 758 2 PUP JTS

101 0 92 23 1 HWDP(4 0 IN) 101 0 92.23

101 7.58 2 PUP JTS 101 758

18 Drill Pipe

0 Drill Pipe

Kelly Down

Total

Stands 33g 60 1 Drill PiPe

Singles 0 00 Drill Pipe

811

572 23

Kelly Down

Stands 339,60 18 Drill Pipe

Singles 0.00 0 Drill Pipe

8.88 Kelly Down

Total

Stands 33g 60

Singles 0 00

962

573 74

Weight of DC

Weight of String

1700

31 00

ri «I'lr r r II

Weight of DC

Weight of String

17 00

31 00

Tour No.

2 JSAREVIEW

3 JSAREVIEW

Event No.

F2- MAKE CONNECTIONS

REVIEW JSAg F2 F2A FB.F9,FIO,F13,FIT,G3

Description Time Depth

08.00

16 00

Vli

2of5

SPECIAL EVENTS

Tour No. Event No. Description Time Depth

Pason

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

V. 1.1

0Z41640_20141127_1A

387

27.48

2014/11/24 00:45

ROD CARRIERE

0

0.34

0.21

2.11

2 of 5

1.27

0

3

0

17.00

ENSIGN CANADIAN DRILLING

17.00 17.00

2

3

7.58

92.02

0.70

92.23

0.58

11

27.48

0.34

100/12-24-012-27W1/00

8.11 8.88 9.62

7.58

31.00 31.00 31.00

7.58

92.23

VERT

0.70

0.21

0.58

92.02

2.11

1.27

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

0.00

0.00

0.00

0.00

0.00

339.60339.60339.60

0.00

0.00

0.00

0.00

PUP JTS.

0.00

0.00

0.00

0.00

0.00

0

0.00 0.00

10154

BIT

CORE BBLS

HWDP(4.0 IN)

X/O

10 DC.S

16:00

BIT SUB

08:00

DOUBLE PIN

JARS-HYD

TOP SECTION

0

0.00

0

0.00

0.00

0.00

PUP JTS.

BIT

TOP SECTION

CORE BBLS

0.00

0.00

0.00

0.00

DLS

JARS-HYD

DOUBLE PIN

MB

PUP JTS.

HWDP(4.0 IN)

X/O

10 DC.S

BIT SUB

HIGHMARK EXPLORATION INC.

DOUBLE PIN

BIT SUB

TOP SECTION

JARS-HYD

HWDP(4.0 IN)

10 DC.S

X/O

BIT

CORE BBLS

12-24-012-27W1

JSA REVIEW

2

10

1

1

156.00

101

101

JSA REVIEW

102.00

156.00

2014

572.23 573.00 573.74

1

1

1

10

1

1

1

1

1

92.23

2

0.58

0.70

92.02

2.11

101

0.21

27.48

102.00

1.27

101

156.00

0.34

156.00

10

159.00

159.00

1

18 18

1

159.00

18

1

1

1

1

1

1

1

0.00 0.00 0.00

1

1

101

102.00

156.00

159.00

159.00

F2- MAKE CONNECTIONS

159.00

159.00

159.00

27

1

REVIEW JSA# F2.F2A.F8.F9,F10,F13,F17,G3

159.00

159.00

159.00

159.00

159.00

156.00

2

Pason

1

1

159.00

159.00

LARRY BREAULT

1 2

101

Page 53: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387

e e e e

Tour Sheet Senal No

0241640 20141127 IA

Surface Location

12-24012-27WI

Vendor Software Version

Pason

Year Month Day

2014 11 27

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27WII00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractors Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Rig No

640

WeeType

VERT

Spud Date Time

2014111I24 00.45

Rig Release Date Time

Re-Entry

gggg

Pason

Tour No. Event No. Description Time Depth

vli

3 of 5

SPECIAL EVENTS

Tour No. Event No. Description Time Depth

Pason

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

V. 1.1

0Z41640_20141127_1A

387 2014/11/24 00:45

ROD CARRIERE

3 of 5

1

ENSIGN CANADIAN DRILLING

11

100/12-24-012-27W1/00

12.17

VERT640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

339.60

10154 DLSMB

HIGHMARK EXPLORATION INC.

HWDP(4.5 IN)

DC (6.25 IN)

X/O

BIT

BIT SUB

12-24-012-27W1

2014

547.04

1

1

.58

92.23

.70

92.02

.31

18

10

10

1

9.43

27

200

156

156

102

101

Pason

LARRY BREAULT

3

Page 54: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tour Sheet Senal No

0241640 20141127 IA

Vendor Sokware Version

P

Year Month Day

2014 11 27

Ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24 12 27 Wl (367)

Surbce Location

12-24-012-27W1

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27W1)00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractor's Job No

Signature of Contractu(a Rig Manager

LARRY BREAULT

Rig No

640

367

Well Type

VERT

Spud Date Time

Rig Release Date Time

Re-Entry

~pc/]2014II U24 0045

Peace

Dexfrptioh Make Model Provided by Expenseof Rental Company Usage Quwttty Quanbty Used

DRILL SPOOL 11.2I3MX 9.2I3M CONTRACTOR PERATOR NSIGNCANADIANDRILLING P15939 24

Remarks

FLARE TANK(CHANDEL)

Remarks

CONTRACTOR PERATOR HANDEL RENTALS

LOADERWIGRAPPLE

Remarks

CONTRACTOR PERATOR HANDEL RENTALS CER-155 4

NE

Remarks

Boiler No Make

WILLIAMS 6 DAVIS 100 HP

Model

CONTRACTOR OPERATOR CD

Rental Company

80-765

Serial

N Hours Today

Remarks

Remarks

Swee I Screen 2

Shaker No Make Model

Pwutw bze SueenCtewdt Ner Pcshin bze ScneCtegerP Newt Pete Size Screen Chsrwdt Newt Pwutw Size ScrwChsngedt Nev

Remarts

I SWACO MONGOOSE I 325 2 235 3 235 4 165

Remarts

Remarts

Pump No Make Model Pnwidedby Expense of Rental Company

Serial

N Hours Today Stroke Length Rod Sire Pump Styh

Remarks

I DENVER GARDNER PZB CONTRACTOR PERATQR ENSIGN MP4279 IIX3mm 152mm TRIPLEX

2 RS

Rema ksCHANE HEAD AND LINERS T0 502 QCT 172014

FIXB CONTRACTOR PERATQR ENSIGN MP4324 35 254mm I Xmm TRIPLEX

Remarks

anm Size

I

4G

171 00

mm

60 RR

171 00

mm

60 RR

171 00

mm

BAKER 7137919

62

BAKER 7122872

62

BAKER6Z

7122872

Mmufschmr Type Snit ih

I 3 4 5 6 7

Tohl Qmuia. Cctti49 Snicelle

tkms Run Ove Hours Entry oe

8 Today Run Te MDC IX Gage OX

55600m57223m 1623m 3X 70 140026

57223m 57300m 077m 2X 20 140027

57223m57374m 151m 2X 40 140027

Rwen Rated Total Rui fcMI

2 32mihr

TeIrI

038mihr 3

038nuhr 2

f12

ZRR""

mmBAKER DP505F7129136

mm m

1030. 103. 103.

mm Omm Omm

1030. 103tl-

mm mm

SM74 ~ 0X 00 14I1027

4 of 5

GENERAL EQUIPMENT & SERVICE

Description Make Model Provided by Expense of Rental Company Serial No Usage Quantity Quantity Used

Remarks:

Remarks:

Remarks:

BOILERS

Boiler No Make Model Provided by Expense of Rental Company Serial No Hours Today

Remarks:

Remarks:

Remarks:

MUD PUMPS

Pump No Make Model Provided by Expense of Rental Company Serial No Hours Today Stroke Length Rod Size Pump Style

Remarks:

Remarks:

Remarks:

BITS

Bit No SizeIADC Code

Manufacturer Type Serial NoJets Depth

InDepth Out

Total Drilled

Total Hours Run

Today

Cumula-tive Hours

RunEntry Date

Cutting StructureTour

1 2 3 4 1 2 3 4 5 6 7 8 TI T0 MDC LOC BRG Gage ODC Reason Pulled Total Run m/Hr

Pason

SHALE SHAKERS

Shaker No Make ModelScreen 1 Screen 2 Screen 3 Screen 4

Position Size ScreenChanged? New? Position Size Screen Changed? New? Position Size Screen Changed? New? Position Size Screen Changed? New?

Remarks:

Remarks:

Remarks:

EQUIPMENT & SERVICESTour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

V. 1.2

3

SP-15939

HIGHMARK EXPLORATION INC.

CER-155

0Z41640_20141127_1A

5C RR

5C RR

2RR

387

ROD CARRIERE

2014/11/24 00:45

TRIPLEX

TRIPLEX

4 of 5

4C

OPERATOR

8

100 HP

ENSIGN CANADIAN DRILLING

4.00

2.00

3.5

7.00

1

171.00-mm

0.00

24

200.00-mm

24

171.00-mm171.00-mm

CONTRACTOR

24

1

1

4

2

3

3

2

11-2/3M X 9"-2/3M

1.51m

12-24-012-27W1

CHANDEL RENTALS

CHANDEL RENTALS

16.23m

0.77m

ENSIGN CANADIAN DRILLING

11

14/11/26

14/11/27

14/11/27

100/12-24-012-27W1/00

ONE

14/11/27

MP-4279

MP-4324

SWACO

3.50

2.00

OPERATOR

2.00

325

OPERATOR

235 235 165

573.74m

CONTRACTOR

573.00m

CONTRACTOR

572.23m

2014

VERT

CONTRACTOR

CONTRACTOR

24

CONTRACTOR

0.00

640

573.74m

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

572.23m

572.23m

556.00m

203mm

254mm2

1

MONGOOSE

10154

0.38m/hr

OPERATOR

140mm

OPERATOR

OPERATOR

27

152mm

0.38m/hr

2.32m/hr

PZ8

F1000 ENSIGN

ECD

DENVER GARDNER ENSIGN

RS

DRILL SPOOL

LOADER W/GRAPPLE

FLARE TANK (CHANDEL )

10.30-mm

10.30-mm

7137919

10.3-0mm

10.30-mm7129136

BAKER

BAKER 7122872

BAKER

7122872

BAKER

10.30-mmDP505F

Pason

WILLIAMS & DAVIS

BHC40-6Z

10.3-0mm

DLS

10.30-mm

BHC40-6Z

BHC40-6Z

MB

BO-765

CHANE HEAD AND LINERS TO 51/2" OCT 17 2014

LARRY BREAULT

1

Page 55: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tour Sheet Senal No

0241640 20141127 IA

Vendor Sotware Version

P

Year Month Day

2014 11 27

Ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24 12 27 Wl (367)

Surbce Location

12-24-012-27WI

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27WU00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractor's Job No

Signature of Contractors Rig Manager

LARRY BREAULT

Rrg No

640

367

Well Type

VERT

Spud Date Time

Rig Release Date Time

Re-Entry

~pc/]2014IIII24 00.45

Pesos

Demflptloh Make Model Provided by Enpenseof Rental Company Usage Quantity Ouanhty Used

PENLESS RECORDER PASON

Remarks

CONTRACTOR PERATOR ASON

Remarks

Remarks

Boiler No Make Model Rental Company

Serial

N Hours Today

Remarks

Remarks

Remarks

Sworn I Screen 2

Shaker No Make Model

Peutrm bze Sueencttammt Neer Poehln bze SctmnCtumerP Newt Pmnun Size Screen cmrqdt Newt Peutrm Size ScramChangedt Neer

Remarts

Remarts

Remarts

Pump No Make Model Pnwidedby Expanse of Rental Company

Serial

N Hours Today Stroke Length Rod Sire Pump Styh

Remarks

Remarks

Remarks

anm size

I

Ilmmchwr Tne Sell Ih

5 4 I 2 I 4 5 s r

Tohl Omula. Cuor49 Rnroallu

tkms Run Ove nauru Entry'

Today Run Te Moc Ioc Gage ox Reams Rated Total Rui fnmr

Terri

f12

5 of 5

GENERAL EQUIPMENT & SERVICE

Description Make Model Provided by Expense of Rental Company Serial No Usage Quantity Quantity Used

Remarks:

Remarks:

Remarks:

BOILERS

Boiler No Make Model Provided by Expense of Rental Company Serial No Hours Today

Remarks:

Remarks:

Remarks:

MUD PUMPS

Pump No Make Model Provided by Expense of Rental Company Serial No Hours Today Stroke Length Rod Size Pump Style

Remarks:

Remarks:

Remarks:

BITS

Bit No SizeIADC Code

Manufacturer Type Serial NoJets Depth

InDepth Out

Total Drilled

Total Hours Run

Today

Cumula-tive Hours

RunEntry Date

Cutting StructureTour

1 2 3 4 1 2 3 4 5 6 7 8 TI T0 MDC LOC BRG Gage ODC Reason Pulled Total Run m/Hr

Pason

SHALE SHAKERS

Shaker No Make ModelScreen 1 Screen 2 Screen 3 Screen 4

Position Size ScreenChanged? New? Position Size Screen Changed? New? Position Size Screen Changed? New? Position Size Screen Changed? New?

Remarks:

Remarks:

Remarks:

EQUIPMENT & SERVICESTour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

V. 1.2

640

12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

PASON

HIGHMARK EXPLORATION INC.

0Z41640_20141127_1A

387

PENLESS RECORDER

11

ROD CARRIERE

2014/11/24 00:45

100/12-24-012-27W1/00

5 of 5

PASON

Pason

10154 DLS

ENSIGN CANADIAN DRILLING

MB

2014

VERT

OPERATOR 24

27

CONTRACTOR

LARRY BREAULT

Page 56: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

1 of2

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

21:00

21:15

18:15

18:30

30

16:15

x

x

0.50

x

3

16:00

387 2014/11/24 00:45

7.03

1.00

0.75

0.50

0.25

1.25

2.50

10

0.75

0.25

375

400

3.25

574m

630m

3190.00

11

1

10

1

10

1

6M

5

7

3

2

21

6A

56

5

SHAKER

CLINTON RADFORD

22:15

KYLE WENDZ

22:00

08:00

SHANE DEMAS

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

620m

07:30

08:00

BIT

BIT SUB

DC (6.25 IN)

X/O

31.00kdaN

CREW CHG. OVER SAFETY MEETING #140380

HWDP(4.5 IN)

10154

TRIP IN HOLE

35.00kdaN

REAM RATHOLE F/ 555m - 574m

30.00kdaN

DRILL 200mm HOLE F/ 574m - 630m ( T.D.)

PRE TOUR SAFETY MEETING AND CREW CHANGE OVER # 140381

TRIP OUT OF HOLE FOR LOGGERS F/ 630M (TD) FLOW CHECK ON BOTTOM AND 520M,

306M, 110M AND OUT OF HOLE

630.00m

TRIP IN HOLE W/ CLEAN OUT TRICONE BIT F/ BANK TO 630M

LOGS ON BOTTOM @ 1130 HRS

6 SEC O/C

4.25

RIG SERVICE- LOCKED OUT DWWKS AND BRAKE HANDLE, FNC BLIND RAMS F/ REMOTE ...

ONE

LOGGING - OPEN HOLE LOGS- MAI, MFE,MSS,MPD,MDN,MGS,MTC,MCG // TD WAS 629M,

SAFETY MEETING W/ LOGGERS

RIG SERVICE FUNC. PIPE RAMS 4 SEC.> BLOW KELLY

CIRCULATE BTMS. UP

0

586m EST. DISP. .41 ACTUAL .6 DIFF. +.19m3

WIPER TRIP TO 500m, FL. CK. @ 619m, 525m , NUMEROUS TIGHT SPOTS F/620m -

CIRCULATE HOLE CLEAN

0.75

0.75

0.25

2.50

0.25

0

0.25

0.25

2.00

0.25

1.75

1140

1.00

1.75

0.25

3.25

6070.00

6B

21

11A

21:00

21

DLS

0.25

7

6A

MB

02:15 04:15

23

HIGHMARK EXPLORATION INC.

59200

160

575

3

10.27m

SX

630

0.253.500.50

12-24-012-27W1

SX

SXSX

1.252.50 0.252.001.50

12C

5

21

12A

7

21

21

6F

22.1m324.2m3

2.000.75 0.25

POOH

TRIPPING

2014

LAY DOWN DRILL COLLARS

01:00

00:15

06:15

07:15

04:45

02:15

05:30

05:15

07:15

07:30

0.751.25

8

7.502.75

LAB

8

LAB

2.50

LAB

10

LAB

LABLAB

8.00

24.00

8.00

8.00

28

00:00

1140

90s/l

16:00

DEVIATION SURVEY

08:00

TRIP OUT OF HOLE F/ LOGS, STRAP OUT

11301120

9kdaN

2kdaN

68s/l

BELOWSHAKER

PARTLY CLOUDY

32kdaN

LARRY BREAULT

22:15

22:00

21:15

4

21:00

18:30

08:15

18:15

16:15

3

10:15

10:00

LAB

14:45

13:45

10:30

ROD CARRIERE

1 of 2

18m3

24:00

FAIR

ENSIGN CANADIAN DRILLING

140

574

44

0.00m

5

200

156

156

1.50

0.25

92.23m

100/12-24-012-27W1/00

10

6B

.31m

1

.70m

92.02m

.58m

-11.00

8

VERT

574.03m 622.49m

SHAKERSHAKER

1

5

200 WIRELINE

UP TO 19 KM/HNW

0

433.89m

21.4m3

10.5

11

SXSX

ONE

ONE

2.50

CHECK DRIVELINE BOLTS

14:45

8cm3

15:15

0

102

D.W.A. & INSPECT BRAKES, LINKAGE, FUNC. CROWNSAVER, INSPECT B.O.P & RELATED EQUIP. MANIFOLD ALIGNMENT

101

SINGLE

REVIEW J.S.A. #F9, F10, F13, L22

MOTORHAND CATLIN KOKORUDS QUIT WITHOUT NOTICE

1099kPa

1115kPa

7.84m3 h20 w/4m3 cement returns.

1099kPa

8.8 ton (11.4m3) IGain 1500 w/.05% CFL-3/1%FWCA-H/.25%SMS/3%LCC-1. Tail in

15:15

w/5 ton(4.2m3) Ibond 1780 w/.2%CFL-3/.3%LTR/1.5%FWCA/.15%CDF-4. Displc

16:00

8cm3

DWA INSPECTION/ VISUALLY INSPECT DRUM LINE, TONG HANGING LINES AND BRAKE PINS

8cm3

F/T ANTI COLLISION DEVICES (AIR TOGGLE/RIGSMART)

JSA REVIEW# H-1,C-10,H-2,K-7,K-9

1030

65s/l43s/l

TRIP OUT OF HOLE SIDEWAYS F/C @ 589M,318M,142M, MEAS. VOL- M3 CALC. VOL. M3

DIFF, M3

CONDITION MUD & CIRCULATE

630m

24:00

08:00

16:00

152

140

DESCO II CFHUMALITECELLOFLAKE

115

SAWDUST

93

0

574m

555m REAM

DRILL

SODA ASHGEL

1300

2014/11/274300

Cement prod. Pump 3m3 h20/3m3 vis sweep/ 1.2 ton (3m3) scav 1250 Mix/pump

FILL CASING AND CIRCULATE ON BOTTOM (.6M STICKUP)

SAFETY MEETING WITH SANJEL CEMENTERS

RIG IN TONG HAND//M/U FLOAT AND SHOE, RUN CASING

630m

RIG SERVICE LOCKOUT/DRWWKS AND BRAKE HANDLE

3.41M3 CALC. VOL. 3.3M3 DIFF, +.11M3

SAFETY MEETING WITH 3WAY POWERTONGS

1

TRIP OUT OF HOLE SIDEWAYS/LAY DOWN DC'S F/C @ 589M,318M,142M, MEAS. VOL-

0Z41640_20141128_1B

SAFETY MEETING/CREW CHANGEOVER (140382)

0.25

0.50

1

6B

7cm3

TRIP RECORD- CALC=3.41, ACC=3.59, DIFF=0.18M3 /// ORIANTATED LOGGERS /// LOCKED OUT BRAKE HANDLE WHILE LOGGING

DP505F

DWA-CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER // DO IT REVIEW COMPLETE// BOILER BLOWDOWN2X @ 120L DISCHARGE

10:15

10:30

08:15

08:00

10:00

06:00

13:45

10

GRCGRCGRCGRCGRC

GRC

2060.00

2RR

0.75

0.25

0.50

3.25

0.15

0.25 4.25

390

10.3 10

10.3

10

10.3 10.3

10.3 10.3

8.00

10.3

Pason

7129136

BAKER

00:00

00:15

01:00

02:1504:45

05:15

05:30

06:15

Page 57: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387

e e e e

Tour Sheet Senal No

0241640 20141128 16

Surface Location

12-24012-27WI

Vendor Software Version

Pason

Year Month Day

2014 11 28

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27WU00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractors Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Rig No

640

Wee Type

VERT

Spud Date Time

201411U24 0045

Rig Release Date Time

Re-Entry

gggg

Pason

Tour No.

2 JSAREVIEW

3 JSAREVIEW

Event No.

Fl0- POOH

REVIEW JSA6 H-I,C-IONI-2,F-SA,K-T,K-g

Description Time Depth

08.00

1600 630

3 LOOKOUTS RIG SERVICEI LOCKOUT DRWWKS AND BRAKE HANDLE, CHECK DRIVELINE BOLTS 21.00 630

vii

2of2

SPECIAL EVENTS

Tour No. Event No. Description Time Depth

Pason

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

V. 1.1

0Z41640_20141128_1B

387 2014/11/24 00:45

ROD CARRIERE

2 of 2

0

ENSIGN CANADIAN DRILLING

2

3

3

11

100/12-24-012-27W1/00

10.27

32.00

VERT640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

433.89

10154

21:00

16:00

08:00

DLSMB

HIGHMARK EXPLORATION INC.

HWDP(4.5 IN)

DC (6.25 IN)

X/O

BIT

BIT SUB

12-24-012-27W1

JSA REVIEW

LOCKOUTS

JSA REVIEW

2014

630.00

1

1

.58

92.23

.70

92.02

.31

23

10

10

1

0.00

F10- POOH

28

RIG SERVICE/ LOCKOUT DRWWKS AND BRAKE HANDLE, CHECK DRIVELINE BOLTS

REVIEW JSA# H-1,C-10,H-2,F-9A,K-7,K-9

630

630

200

156

156

102

101

Pason

LARRY BREAULT

1

Page 58: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

1 of2

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

0

08:15

0.50

12:0009:00

08:4508:30

387

LABLAB

2014/11/24 00:45

ROD CARRIERE

1 of 2

3.00

0.25

1.25

0.25

2.00

3.75

FAIR

0.25

0.25

ENSIGN CANADIAN DRILLING

2014/11/29 12:00

400

1.25 8.25

2.00

1590.00

11

100/12-24-012-27W1/00

-12.00

22

22

21B

14B

22

21

21B

8

VERT

CLINTON RADFORD

LARRY BREAULT

SHANE DEMAS

640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)

UP TO 19 KM/HNW

0

CREW CHG. OVER SAFETY MEETING #130383

JSA (JOB SAFETY ANALYSIS)

10154

PREP. CELLAR, NIPPLE DOWN BOPS, SET SLIPS, CUT CSG. LAY OUT STACK

10.5

LAY OUT KELLY, TEAR OUT FLOOR, CLEAN TANKS, PREP, DERRICK TO LAY OVER, CONT.

PRE TOUR SAFETY MEETING AND CREW CHANGE OVER # 140384

11

SAFETY MEETING- FOR SLIP AND CUTSLIP/CUT DRILLING LINE -- 20M -- MJ=8913, ACC MJ= 321210

TEAR DOWN (RIG RELEASE NOV./29/2014 @ 12:00 Hrs) (TOTAL DEPTH OF 630m)RIG SERVICE- LOCKED OUT DWWKS // GREASED BLOCKS AND CROWN

ONE

JSA (JOB SAFETY ANALYSIS) PRE-LAYOVER DERRICK MTG.W/ CREW. S.D. L.B.

TEAR OUT,

TEAR DOWN - HANG BLOCKS, SPOOL LINE, TEAR OUT ALL LINES & WINTERIZE, RIG OUT

0

ONE

LAY OVER DERRICK, INSPECT DERRICK, ALL LINES, SHEAVES, STOOLS & PINS

PASON & ELECTRICAL CORDS, PREP. SHACKS FOR NOON MOVE W/ FAST TRUCKING

REVIEW J.S.A. #H4, J2, J7, J3, J6

D.W.A.

0

0.253.00

0.250.25 9A

21

10660.00

21

22

DLS

0.25

7

MB

HIGHMARK EXPLORATION INC.

24:00

08:00

16:00

140

140

0

0.25

12-24-012-27W1

0

0.25

1

0Z41640_20141129_1A

1

MOVE RIG

NIPPLE DWN. SET SLIPS

2014

00:30

00:15

DWA-CR- COMPLETE // DO IT REVIEW COMPLETE / BOILER BLOWN DOWN 1 X @ 120L DISCHARGE

08:00

06:45

09:00

06:15

08:15

02:30

08:00

06:30

08:45

08:30

06:00

0.25 0.25

3

LAB

LABLAB

GRC

8.00

1840.00

12.00

4.00

29

0.75 5.25

00:00

2.00

16:00

08:00

390

PARTLY CLOUDY

Pason

00:00

00:15

00:30

02:30

LARRY BREAULT

06:15

06:30

06:45

Page 59: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

ucense No Well Name

10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387

e e e e

Tour Sheet Senal No

0241640 20141128 IA

Surface Location

12-24012-27WI

Vendor Software Version

Pason

Year Month Day

2014 11 29

Prov Loc Type Unique Well Id

MB DLS 100112-24-012-27WII00

Operator

HIGHMARKEXPLORATION INC

Operator's AFE

Signature of Operator Representative

ROD CARRIERE

Contractor

ENSIGN CANADIANDRILLING

Contractors Job No

387

Signature of Contractor's Rig Manager

LARRY BREAULT

Rrg No

640

Wee Type

VERT

Spud Date Time

2014111I24 00.45

Rig Release Date Time

2014111I28 12.00

Re Facy

Pason

Tour No.

2 JSAREVIEW

Event No.

Al-RIG MOVE

Description Time Depth

11.00

vli

2of2

SPECIAL EVENTS

Tour No. Event No. Description Time Depth

Pason

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day

License No Well Name Surface Location Prov Loc Type Unique Well Id

Operator

Operator’s AFE

Signature of Operator Representative

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

DRILLING ASSEMBLY TOUR

No Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly Down

Total

Weight of DC

Weight of String

V. 1.1

0Z41640_20141129_1A

387 2014/11/24 00:45

ROD CARRIERE

2 of 2

ENSIGN CANADIAN DRILLING

2

2014/11/29 12:00

11

100/12-24-012-27W1/00

VERT640

HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)10154

11:00

DLSMB

HIGHMARK EXPLORATION INC.

12-24-012-27W1

JSA REVIEW

2014

A1- RIG MOVE

29Pason

LARRY BREAULT

Page 60: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Innovation, Energy and Mines

INITIALPRODUCTION REPORT

Two (2) copies of this report are to be completed and submitted to the dishict office within days

following the fifth after the well has been placed on normal production.

Well Name: Hi hmark Virden 12-24 License Number: 10150 eratin Com an: Hi hmark Ex loration inc. 322 Licence ¹10154Battery Well Produced To (name & locations): 12-24-12-27W1

Completion Interval(s): 561.5 m to 570.0 m m to m

Open Hole: Perforated: H

Com letion Oil:Source of Com letion Oil Co, & location:

Volume Su lied: 0.0 m3

F l: ~dod e Pole

Date Supplied:* / /YY MM DD

(Continue on separate sheet ifnecessary)

Disposition of Recovered Completion Oil:

On-Production Date:* 14/12/08YY MM DD

m3

(Co. & location)

* Official on-production date (i.e, date of first new oil production after completion oil recovered).* Date in which the well produces oil in excess of the volume of completion oil used.

Production Test:

Linda M. Watts Production Accountant 403-769-6632(Submitted By)

Remarks: AMENDED

(Position) (Telephone)

INITIAL PRODUCTION REPORT

Two (2) copies of this report are to be completed and submitted to the district office within days following the fifth after the well has been placed on normal production. Well Name: Highmark Virden 12-24 License Number: 1015 Operating Company: Highmark Exploration Inc. (322) Licence #10154 Battery Well Produced To (name & locations): 12-24-12-27W1 Completion Interval(s): 561.5 m to 570.0 m m to m Open Hole: Perforated: Formation: Lodge Pole Completion Oil: Source of Completion Oil (Co. & location):

Volume Supplied: 0.0 m3 Date Supplied:* / / YY MM DD

Date YY MM DD

Completion Oil Used

(m3)

Completion Oil

Recovered (m3)

Completion Oil To Be Recovered

(m3)

Water

Produces (m3)

(Continue on separate sheet if necessary)

Disposition of Recovered Completion Oil: m3 to (Co. & location) On-Production Date:* 14/12/08 YY MM DD * Official on-production date (i.e. date of first new oil production after completion oil recovered). * Date in which the well produces oil in excess of the volume of completion oil used. Production Test:

Date YY MM DD

Hours Produced

Oil Produced

m3

Water Produced

m3

Pumping Flowing Gas-Oil Ratio

(m3/ m3)

Oil Density

(kg/ m3) 14 12 8 4 5.8 8.8 swab 14 12 18 14 6 17 yes 14 12 20 24 .1 32.4 yes 14 12 21 24 2.7 34.5 yes 14 12 22 24 2.7 28.6 yes

Totals

90

17.3

121.3

Linda M. Watts Production Accountant 403-769-6632 (Submitted By) (Position) (Telephone) Remarks: AMENDED

Page 61: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

S TR Consulting

Well Location UWI: 100/12-24-12-27 W1M

Full Location: 12-24-12-27 W1M

Property/Unit Virden

Estimated Cost:

Estimated Payout: Days

Daily Oil Production:m3

HMK Working Interest %

AFE Number (Equip)

AFE Number (Tie-in)

AFE Number (Completion)

WELL License ¹ Expected H2S = 2.0%

Subject: New Well Completion

Prepared by: Scott Robertson Date: December 3,2014

Reviewed by: Erwin Sison Date:

Well Location UWI: 100/12-24-12-27 W1M

Full Location: 12-24-12-27 W1M

Property/Unit Virden

Estimated Cost: $143,000

Estimated Payout: Days

Daily Oil Production:m3

HMK Working Interest % 100.00

AFE Number (Equip)

AFE Number (Tie-in)

AFE Number (Completion) 14CEQ009

WELL License # 10154

Subject: New Well Completion

Prepared by: Scott Robertson Date: December 3,2014

Reviewed by: Erwin Sison Date:

STR Consulting

Completion Reporting Program

Expected H2S = 2.0%

Page 62: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

ComletionSu liersandContacts

Service Coman PhoneNumber

DevinClark

SuckerRods/BHP

Tubin

FluidHaulin

Operator

Encore

BakerPetrolite

TSL

Spearins

Metra

Disosalandtruckin

Rod Elcano

Sheldon(Elcano)

Dale( Elcano)

Cleanupcribandwellhead

AexMoosominTom

FontanaTruckin

Spearins Ga orRick

BrentHorn

StuartButcher

Ja Dobrescu

Eddie

Ga

MorrisHaulin Morris

MorrisHaulin Mike

Office

204-851-5866

306-435-2796

1-204-748-2261

204-854-2231

204-851-0558

403-968-5761

204-748-6858

204-851-1945

204-854-2231

306-634-6325

204-748-7897

204-748-7440

204-748-1958

204-748-7884

204-851-2982

204-851-3958

Spearings Waskada

StreamFlo

H2Steaming

Kylecell

Chris

TuthillConstruction

FluidhaulingandpressuretrueFoxtailtrucking

204-673-2284

204-845-2405

204-838-0031

204-764-0031

306-634-4719

204-688-2186

Service Company Phone Number

Devin Clark Clean up crib and wellhead 204-851-5866Sucker Rods / BHP Apex Moosomin Tom 306-435-2796Tubing Fontana Trucking 1-204-748-2261Fluid Hauling Spearings ( Gary or Rick ) 204-854-2231Operator Brent Horn 204-851-0558Encore Stuart Butcher 403-968-5761Baker Petrolite Jay Dobrescu 204-748-6858TSL Eddie 204-851-1945Spearings Gary 204-854-2231Metra 306-634-6325Disposal and trucking Morris Hauling ( Morris ) 204-748-7897

Morris Hauling ( Mike ) 204-748-7440Office 204-748-1958

Rod ( Elcano ) 204-748-7884Sheldon ( Elcano ) 204-851-2982Dale ( Elcano ) 204-851-3958

Spearings Waskada 204-673-2284

Tuthill Construction 204-845-2405

Fluid hauling and pressure truc Fox tail trucking 204-838-0031

Kyle cell 204-764-0031

Stream Flo Chris 306-634-4719

H2 Steaming 204-688-2186

Completion Suppliers and Contacts

Page 63: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Date:

Location:

December 3,2014

100/12-24-12-27 WIM Final Tubing String/Packer and Tailpipe assembly from Bottom Upward

DATE: December 7,2014

Production Formation Lodge Pole

Bottom Hole Pres (kpa)

Pumping Unit:

5000 Bottomhole Temp (C):

H2S Concentration (%):

26

P P1%

Total Joints Tubin to PSN

No. Description

73mm Bar Collar73mm Tubin Joint J-55 EUE

58 Tubin O.D.

0.139.32

585.89576.57

Len th m Set at Top m Min.ID mm Remarks

73mm

Elevations:Kelt BushinGround LevelKB-GLKOPLe ¹1Le 1SILeg¹ 2PBTDTotal Depth:

PerforationsFrom

478 07473 67

4.4

614 9

To

mKBmKBm

mKBmKBmKBmKBmKBmKB

mTVDmTVDmTVD

73mm Perforated Pup Joint J-55 EUE73mm Pump Seatin Nipple60- 73mm Tubin Joints J-55 EUEStream Flo Split Do nut

Total Strin Len th

K.B to Tubin Han srF(an e PlusSettin Depth K.B.

Casin Bowl 9"

2.470.33

569.380.29

581.924.1

586.92

Size

574.10573.77

4.394.10

Series MakeStream fin 14mpa

Tubin Spool 9" x 7 I/16 Stream fin 14mpa

14 )ts.219 10 mm35 70J55

149 00

kg/mgrademKB

10 tonnes ( 2 Om3 cement

returns ) cement

48139 70

20 8J55

629 00

)ts.mmkg/mgrademKB

Tubintit

)ts.73.00 mm9.67 kg/mJ-55 grade

mKB

mTVD

Remarks:

15 tonnes ( 4 Om3 cement

returns ) cement

Packer (1):Packer (2):

Anchor:

Nipple:

Make: Set at:mKB CEmKB CE

mKB

mKB

API designation: 25-200-RWAC-14-3

Barrel Type: Crome

Pump No: KEYM 8614

Plunger Size: (mm) 508 Length:(m) 09

Make: Type:Standing Valve:Traveling Valve:Hold Down:

Material Spray Metal

Material:

Rod Strin from bottom u

No. of Rods5

44

Diameter (mm)19

19

Make6 per NETB

Plain2014 6-672014 6-67

7.627.62

38.1335.28

Year Grade Length Total length

24 19

19

19

6 per TBScrapered PonyScrapered Pony

2014 6-672014 6-672014 6-67

7.623.051.24

182.883.051.24

Polish RodDiameter (mm)

31 8Grade Length Pin Size

4140 9.14 7/8

Miscellaneous:

BOPFlow TeeStuffing Box:Pumpin Unit:Max Stroke Length

Make TYPE Size (mm)73mm73MM X 50 8 X 25.4MM

Single 73mm

Electric Motor:Make:HP Rating:PhaseVolta e

Rated RPM:

Date: December 3,2014 DATE: December 7,2014Location: 100/12-24-12-27 W1M Final Tubing String/Packer and Tailpipe assembly from Bottom Upward

Production Formation: Lodge Pole Total Joints Tubing (to PSN) 58 Tubing O.D. 73mm

Bottom Hole Pres.(kpa): 5000 Bottomhole Temp (C): 26 No. Description Length (m) Set at Top (m) Min.ID (mm) Remarks

Pumping Unit: H2S Concentration (%): 0.01% 1 73mm Bar Collar 0.13 585.892 73mm Tubing Joint J-55 EUE 9.32 576.57

Elevations: 3 73mm Perforated Pup Joint J-55 EUE 2.47 574.10Kelly Bushing 478.07 mKB 4 73mm Pump Seating Nipple 0.33 573.77Ground Level 473.67 mKB 5 60 - 73mm Tubing Joints J-55 EUE 569.38 4.39KB-GL 4.4 m 6 Stream Flo Split Dognut 0.29 4.10KOP: 0 mKBLeg #1: mKB mTVDLeg 1 S1 mKB mTVDLeg# 2 mKB mTVDPBTD: 614.9 mKB Total String Length 581.92Total Depth: mKB K.B. to Tubing Hanger Flange (Plus) 4.1

Setting Depth K.B. 586.02Perforations

From To Size Series MakeCasing Bowl 9" Stream flo 14mpaTubing Spool 9" x 7 1/16 Stream flo 14mpa

Type Make Size (mm) Master Valve

Casing Valve Production Casing: Choke

14 jts. 48 jts. jts.219.10 mm 139.70 mm 73.00 mm Remarks:35.70 kg/m 20.8 kg/m 9.67 kg/mJ55 grade J55 grade J-55 grade

149.00 mKB 629.00 mKB mKB

10 tonnes ( 2.0m3 cement returns ) cement mTVD

15 tonnes ( 4.0m3 cement returns ) cement

Make: Type: Set at:Packer (1): mKB CEPacker (2): mKB CE

Anchor: mKB

Nipple: mKB

Bottomhole Pump:

API designation: 25-200-RWAC-14-3

Barrel Type: Crome

Pump No: KEYM 8614

Plunger Size: (mm) 50.8 Length:(m) 0.9 Material:Spray Metal

Make: Type: Material:Standing Valve: Traveling Valve: Hold Down:

Rod String (from bottom up)

No. of Rods Diameter (mm) Make Year Grade Length Total length5 19 6 per NETB 2014 S-67 7.62 38.1

44 19 Plain 2014 S-67 7.62 335.2824 19 6 per TB 2014 S-67 7.62 182.881 19 Scrapered Pony 2014 S-67 3.05 3.051 19 Scrapered Pony 2014 S-67 1.24 1.24

Diameter (mm) Grade Length Pin SizePolish Rod 31.8 4140 9.14 7/8

Miscellaneous:Make TYPE Size (mm)

BOP 73mm Flow Tee: 73MM X 50.8 X 25.4MMStuffing Box: Single 73mmPumping Unit: Max. Stroke Length

Electric Motor:Make:HP Rating: Phase: Voltage: Rated RPM:

Well Data Summary Tubing and Wellhead Equipment

0

Surface Casing: Tubing:

Page 64: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

UWI

PREPARED BY:

12-24-12-27 W1M100/1 2-24-1 2-27 W1 M

Scott Robertson

ELEVATIONS (m)

DATE: December 3,2014

KB: 478.07 KB-GL: 4.40 KB-CF: 4.40 TD: 0.0

GL: 473.67 KOP 0.00 KB-TF 4.10 PBTD: 614.9

Surface Csg

Production Csg.

DescriptionSize

[mm]219.1

139.7

Weight(kg/m)35.70

20.60

Grade

J55

J55

Landing DepthmKB149.0

629.0

Tubing 73.0

WELLHEAD

9.67 J-55 0.00

MAKE/TYPE/SIZE/RATING:

Casin Bowl

Tubing Spool

9"

9" x 7 1/16

14m a Stream flo

14mpa Stream flo

e Csg.

490 ITEM No.Jts.

DOWNHOLE CONFIGURATION

DESCRIPTION

73mm Bar Collar

73mm Tubing Joint J-55 EUE

73mm Perforated Pup Joint J-65 EUE

73mm Pump Seating Nipple

60 - 73mm Tubing Joints J-56 EUE

Stream Flo Split Dognut

Total String Length

KB to THF

Bottom of Tubing imKB)

RODS/PUMP

engt(m)

0 13

9 32

2 47

0 33

569 38

0 29

0 00

0 00

0 00

581 92

4 10

586 02

ottom(mKB)

586 02

585 89

576 57

574 10

573 77

4 39

4 10

4 10

4 10

4 10

4 10

BHP

44

24

25-200-RWAC-1 4-3

19

19

19

19

19

6 per NETB

Plain

6 per TB

Sorapered Pony

Sorapered Pony

KEYM 8614

6-67

6-67

6-67

6-67

6-67

Polished Rod 31 8 4140 914

PERFORATIONS/OPEN HOLE SECTION

Zone:

Zone:Zone:

Pump UnitPrime Mover (hp)SPM/SL(position)

Lodge Pole Interval

Interval:Interval:

SURFACE EQUIPMENT

SN

SN

Belts

561.50

563.00

568.00

561.60

564.00

570.00

DATE:

KB: 478.07 KB-GL: 4.40 KB-CF: 4.40 TD: 0.0GL: 473.67 KOP 0.00 KB-TF: 4.10 PBTD: 614.9

Size[mm]

Weight(kg/m) Grade

219.1 35.70 J55139.7 20.80 J55

73.0 9.67 J-557

Casing Bowl 9" 14mpa Stream floTubing Spool 9" x 7 1/16 14mpa Stream flo

Surface Csg.Length

(m) Bottom(mKB)

Se 149.0 ITEM No.Jts.1 73mm Bar Collar 0.13 586.022 73mm Tubing Joint J-55 EUE 9.32 585.893 73mm Perforated Pup Joint J-55 EUE 2.47 576.574 73mm Pump Seating Nipple 0.33 574.105 60 - 73mm Tubing Joints J-55 EUE 569.38 573.776 Stream Flo Split Dognut 0.29 4.39

5 0 0 0.00 4.100.00 4.100.00 4.10

4.104.10

581.924.10

586.02

BHP 25-200-RWAC-14-3 KEYM 8614

5 19 S-67

4 44 19 S-67

24 19 S-67

3 1 19 S-67

1 19 S-67

0 0 0

2 2 1 Polished Rod 31.8 4140 9.14

1 Zone: Interval 561.50 - 561.80Zone: Interval: 563.00 - 564.00Zone: Interval: 568.00 - 570.00

SNSN

Belts

12-24-12-27 W1MUWI 100/12-24-12-27 W1MPREPARED BY: Scott Robertson December 3,2014

ELEVATIONS (m)

Description Landing Depth[mKB]

Surface Csg 149.0Production Csg. 629.0

Bottom of Tubing (mKB)

Tubing 0.00WELLHEAD

MAKE/TYPE/SIZE/RATING:

RODS/PUMP

PERFORATIONS/OPEN HOLE SECTION

0

DOWNHOLE CONFIGURATION

DESCRIPTION

Total String Length

KB to THF

Prime Mover (hp)

Lodge Pole

SURFACE EQUIPMENTPump Unit

6 per NETB

Plain

6 per TB

Scrapered Pony

Scrapered Pony

SPM/SL(position)

Page 65: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Emergency Response Plan / Notice of SupervisorCom an:Location:GPS Co-ordinates:

12-24-12-27 W1M Ri Ea le 68

Directions

Hi hMark Ex loration Date: December 3,2014

From Virden, 9.5km west on Highway ¹1, North 14.8km on ¹83 ( Big Brick School ), Left 1.2km, SouthInto ( through farm yard )

Site Su ervisor:STR Consultin

Hi hmark

Scott Robertson306-575-8032Scott Robertson306-575-8032

Erwin Sison 403-608-6171

Emergency

Ri Mana erOil Co. Foreman Brent Horn 204-851-0558Field Technician

ServicesServiceSTARS

Phone ¹1-888-888-4567

Res onse time Closest location

E.M.S.PoliceHos ital

Fire

911911

911911

20 Min

30 Min

45 Min20 Min

VirdenVirdenVirdenVirden

IEM 1-800-223-5215 Virden

On Lease:Off Lease

Muster Areas/Escape RoutesDo House or u wind ed e of lease Perform head countLease road North out to Grid access road Perform head count

Delegation of Authority

If for any reason the Site supervisor (Scott Robertson) is required to leave the lease or is unable to performhis duties, The Rig Manager ( ) will be in charge of operations.

Company: HighMark Exploration Date: December 3,2014Location: 12-24-12-27 W1M Rig: Eagle 68GPS Co-ordinates:

Site Supervisor: Scott Robertson306-575-8032 Rig Manager:STR Consulting Scott Robertson306-575-8032 Oil Co. Foreman Brent Horn 204-851-0558

Field TechnicianHighmark Erwin Sison 403-608-6171

Service Phone # Response time Closest locationSTARS 1-888-888-4567

E.M.S. 911 20 Min VirdenPolice 911 30 Min VirdenHospital 911 45 Min VirdenFire 911 20 Min Virden

IEM 1-800-223-5215 Virden

On Lease:Off Lease

Emergency Response Plan / Notice of Supervisor

DirectionsFrom Virden, 9.5km west on Highway #1, North 14.8km on #83 ( Big Brick School ), Left 1.2km, South

Into ( through farm yard )

Emergency Services

Muster Areas/Escape RoutesDog House or up wind edge of lease (Perform head count)Lease road North out to Grid access road (Perform head count)

Delegation of Authority

If for any reason the Site supervisor (Scott Robertson) is required to leave the lease or is unable to perform his duties, The Rig Manager ( ) will be in charge of operations.

Page 66: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Daily Completion/Workover Report 1 of21

Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations:Today's Date: Dec 3,2014 Day No. 1 Weather:

SITP (KPA): 0 SICP (KPA):

10:30 AM 1:00 PM Stream Flow crew installed wellhead assembly9" x 7 1/16 tubing hanging spool ( 14mpa ),7 1/16 Full opening Gate valve ( 14 mpa )Bonnet assembly 73mm ( 14mpa )Ratigan assembly 73mmFlow tee 73mm x 50.8mm x 50.8mm

Pressure tested primary and secondary seals to 14mpa for 10 minutes

Performed Surface Casing vent flow check. Good Test, no bubbles

Job Complete

Rig:Reported by:

Rig Time (hrs)Scott Robertson

Rig Rate:

Total Load Fluid Volume

Today's Recovery

Total Fluid Recovered

Load Fluid to Recover

New Fluid Recovered

Today's Fluid Hid to Lease

Today's Fluid Hid Fm Lease

Total Fluid Hid To Lease

Total Fluid Hid Fm Lease

Oil (m3) Water (m3)Service Rig

Supervision ( 1/2 dy)

W ireline (Estimate )

Pressure Truck

Perforating

Stimulation

Snow Removal

Wellhead install

Costs0.00 Wellhead

Rods/BHP

Tubing

Packers

Rentals

Lease

2,381.50

Fluid in Tanks

Daily

APE¹2,381.50 Cumulative

14CEQ009 AFE Amoun

2,381.50143,000

Completion: YESOther (Specify):

Workover: Recompletion: BHP Change:

Daily CompletionIWorkover Report

Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge pole Perforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0Today's Date: Dec 5,2014 Day No. 2 Weather:

Page 1 of 21

Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations:Today's Date: Dec 3,2014 Day No. 1 Weather:

SITP (KPA): 0 SICP (KPA): 0

From To

10:30 AM 1:00 PM Stream Flow crew installed wellhead assembly 9" x 7 1/16 tubing hanging spool ( 14mpa ), 7 1/16 Full opening Gate valve ( 14 mpa )Bonnet assembly 73mm ( 14mpa )Ratigan assembly 73mmFlow tee 73mm x 50.8mm x 50.8mm

Pressure tested primary and secondary seals to 14mpa for 10 minutes

Performed Surface Casing vent flow check. Good Test, no bubbles

Job Complete

Rig: Rig Time (hrs) Rig Rate:Reported by: Scott Robertson

Oil (m3) Water (m3)Total Load Fluid Volume Service Rig 0.00 Wellhead 2,381.50Today's Recovery Supervision ( 1/2 dy) Rods/BHPTotal Fluid Recovered Wireline (Estimate ) TubingLoad Fluid to Recover Pressure Truck PackersNew Fluid Recovered Perforating RentalsToday's Fluid Hld to Lease Stimulation LeaseToday's Fluid Hld Fm Lease Snow RemovalTotal Fluid Hld To Lease Wellhead installTotal Fluid Hld Fm Lease

Daily 2,381.50 Cumulative 2,381.50Fluid in Tanks AFE# 14CEQ009 AFE Amount 143,000

Completion: YES Workover: Recompletion: BHP Change:Other (Specify):

Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0Today's Date: Dec 5,2014 Day No. 2 Weather:

Daily Completion/Workover Report

Daily Completion/Workover Report

Detailed Description of Previous Day Operations

Costs

Page 67: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

SITP (KPA): 0 SICP (KPA): 2of21

7:30 AM N2 Steam arrived on location. Tarped in wellhead and warmed it up.

8:00 AM

8:30 AM

FMC Wireline unit arrived on location.Conducted safety meeting and discussed tasks for the day, and hazards associated withthem. Reviewed FMC JSA, Highmark ERP and Notice of Supervisor

FMC rigged up

FMC ran gauge ring and junk basket down past proposed perforations

9:30 AM FMC ran in and performed casing bond log. Log results were good

11:30 AM Rigged in Clean Harbors pressure truck and pressure tested wellbore to 7000kpa. Good

12:00 PM FMC swabbed well down to 600mkb.

12:45 PM1:00 PM

Clean Harbors pumped 2.0m3 of produced water pad( H2S scavenged and Packer inhibitor )Theoretical fluid level is 450mkbFMC ran in with bottom perforating gun and tagged fluid level at 350 metersPerforated 568.0-570.0 mkb. (2.0m 39 Gm SDP, 17 SPM, 60 degree ) Instant blow, 5 kpa.Pulled gunAll shots were fired and within the carrier scallops

1:45 PM2:15 PM

FMC ran in with top perforating gun and tagged fluid level at 180 meters 19kpa on well

Perforated 561.5 - 561.8 8 563.0 - 564.0 2.5m Gun with 1.2m Blank

( 39 Gm SDP, 17 SPM, 60 degree ) No pressure response, same blow on well .

3:00 PM Pulled gun up, Wait 30 minutes and go back down and tag fluid level, tagged 70 mkb

3:30 PM Pulled gun out of hole, and shots were fired and within the carrier scallops

Rig Out, Job Complete 15:30

Rig:Reported by:

Total Load Fluid Volume

Today's Recovery

Total Fluid Recovered

Load Fluid to Recover

New Fluid Recovered

Today's Fluid Hid to Lease

Today's Fluid Hid Fm Lease

Total Fluid Hid To Lease

Total Fluid Hid Fm Lease

Fluid in Tanks

Oil (m3) Water (m3)Service Rig

Supervision

Wireline

Steamer

Steamer

Stimulation

Fluid Disposal

Tbg anchor/swivel

Daily

APE¹

CostsWellhead

Rods/BHP

18,268.47 Press Truck

787.50 Tank Truck

Chem (Est )

Logging

21,928.27 Cumulative

14CEQ009 AFE Amoun

1,759.80812.50300.00

24,309.77143,000

Completion: yeS

Other (Specify):

Workover: Recompletion: BHP Change:

Page 2 of 21SITP (KPA): 0 SICP (KPA): 0

From To

7:30 AM N2 Steam arrived on location. Tarped in wellhead and warmed it up.

8:00 AM FMC Wireline unit arrived on location.Conducted safety meeting and discussed tasks for the day, and hazards associated withthem. Reviewed FMC JSA, Highmark ERP and Notice of Supervisor

8:30 AM FMC rigged up

FMC ran gauge ring and junk basket down past proposed perforations

9:30 AM FMC ran in and performed casing bond log. Log results were good

11:30 AM Rigged in Clean Harbors pressure truck and pressure tested wellbore to 7000kpa. Good

12:00 PM FMC swabbed well down to 600mkb.

Clean Harbors pumped 2.0m3 of produced water pad( H2S scavenged and Packer inhibitor ) Theoretical fluid level is 450mkb

12:45 PM FMC ran in with bottom perforating gun and tagged fluid level at 350 meters1:00 PM Perforated 568.0 - 570.0 mkb. ( 2.0m 39 Gm SDP, 17 SPM, 60 degree ) Instant blow, 5 kpa.

Pulled gunAll shots were fired and within the carrier scallops

1:45 PM FMC ran in with top perforating gun and tagged fluid level at 180 meters 19kpa on well2:15 PM Perforated 561.5 - 561.8 & 563.0 - 564.0 ( 2.5m Gun with 1.2m Blank )

( 39 Gm SDP, 17 SPM, 60 degree ) No pressure response, same blow on well .

3:00 PM Pulled gun up , Wait 30 minutes and go back down and tag fluid level, tagged 70 mkb

3:30 PM Pulled gun out of hole, and shots were fired and within the carrier scallops

Rig Out, Job Complete 15:30

Rig:Reported by:

Oil (m3) Water (m3)Total Load Fluid Volume Service Rig WellheadToday's Recovery Supervision Rods/BHPTotal Fluid Recovered Wireline 18,268.47 Press Truck 1,759.80Load Fluid to Recover Steamer 787.50 Tank Truck 812.50New Fluid Recovered Steamer Chem (Est ) 300.00Today's Fluid Hld to Lease Stimulation LoggingToday's Fluid Hld Fm Lease Fluid DisposalTotal Fluid Hld To Lease Tbg anchor/swivelTotal Fluid Hld Fm Lease

Daily 21,928.27 Cumulative 24,309.77Fluid in Tanks AFE# 14CEQ009 AFE Amount 143,000

Completion: yes Workover: Recompletion: BHP Change:Other (Specify):

Detailed Description of Previous Day Operations

Costs

Page 68: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

3of21

Daily CompletiontWorkover Report

Property/Unit: VirdenZone: Lodge PoleToday's Date: Dec 7,2014

Well Location: 100/12-24-12-27 W1MPerforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0

Day No. 3 Weather:SITP (KPA): 20 20

8:15 AM 9:00 AM Rig and associated equipment arrived on location

8:15 AM 9:00 AM Attend safety meeting with Eagle personnel. Discuss the tasks for the day and hazardsassociated with them. Perform air quality check

9:15 AM 9:55 AM Rig up rig and associated equipment

9:55 AM 10:00 AM Take pressures on well, TSTM

10:00 AM 10:30 AM Stump test BOP blind rams to 14mpa for 10 minutes.

10:30 AM 11:30 AM Bleed off well to rig tank. Insert Dognut, 3m pup, and stabbingvalve. Strip off master valve, strip on BOPS. Pressure test pipe rams and flange connectionto 10mpa for 10 minutes

1:30 PM Run in hole with completion tubing as follows from bottom up:73mm Bar Collar73mm Tubing Joint73mm Perforated Pup73mm PSN60 Joints of 73mm TubingSplit tubing hanger

1:50 PM Crew stopped for lunch break after running first 5 joints

Land tubing bottom at 585.89mkb ( PSN @ 573.77 )

4:00 PM Rig prepared swabbing equipment and got ready to swab in the am.

5:00 PM Shut down for night

Rig:Reported by:

Rig Time (hrs) Rig Rate:

Total Load Fluid Volume

Today's Recovery

Total Fluid Recovered

Load Fluid to Recover

New Fluid Recovered

Today's Fluid Hid to Lease

Today's Fluid Hid Fm Lease

Total Fluid Hid To Lease

Total Fluid Hid Fm Lease

Oil (m3) Water (m3)Service Rig

Supervision

Haul Tubing

Trucking Water

Steam

Stimulation

Steam

Water Hauling

Daily

Costs6,762.50 Wellhead

1,700.00 Rods/BHP

540.00 Tubing ( Est

687.00 Packers

Rentals

Logging

1,102.50 Misc

21,242.00 Cumulative

10,450.00

45,551.77

Page 3 of 21

Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0Today's Date: Dec 7,2014 Day No. 3 Weather:

SITP (KPA): 20 SICP (KPA): 20

From To

8:15 AM 9:00 AM Rig and associated equipment arrived on location

8:15 AM 9:00 AM Attend safety meeting with Eagle personnel. Discuss the tasks for the day and hazards associated with them. Perform air quality check

9:15 AM 9:55 AM Rig up rig and associated equipment

9:55 AM 10:00 AM Take pressures on well, TSTM

10:00 AM 10:30 AM Stump test BOP blind rams to 14mpa for 10 minutes.

10:30 AM 11:30 AM Bleed off well to rig tank. Insert Dognut, 3m pup, and stabbingvalve. Strip off master valve, strip on BOPS. Pressure test pipe rams and flange connectionto 10mpa for 10 minutes

1:30 PM Run in hole with completion tubing as follows from bottom up :73mm Bar Collar

73mm Tubing Joint73mm Perforated Pup73mm PSN60 Joints of 73mm TubingSplit tubing hanger

1:50 PM Crew stopped for lunch break after running first 5 joints

Land tubing bottom at 585.89mkb ( PSN @ 573.77 )

4:00 PM Rig prepared swabbing equipment and got ready to swab in the am.

5:00 PM Shut down for night

Rig: Rig Time (hrs) Rig Rate:Reported by:

Oil (m3) Water (m3)Total Load Fluid Volume Service Rig 6,762.50 WellheadToday's Recovery Supervision 1,700.00 Rods/BHPTotal Fluid Recovered Haul Tubing 540.00 Tubing ( Est 10,450.00Load Fluid to Recover Trucking Water 687.00 PackersNew Fluid Recovered Steam RentalsToday's Fluid Hld to Lease Stimulation LoggingToday's Fluid Hld Fm Lease Steam 1,102.50 MiscTotal Fluid Hld To Lease Water HaulingTotal Fluid Hld Fm Lease

Daily 21,242.00 Cumulative 45,551.77

Costs

Daily Completion/Workover Report

Detailed Description of Previous Day Operations

Page 69: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Fluid in Tanks 3 APE¹ 14CEQ009 AFE Amoun 143,000 4of21

Completion: YeS

Other (Specify):

Workover: Recompletion: BHP Change:

Daily Completion/Workover Report

Property/Unit: VirdenZone: Lodge PoleToday's Date: Dec 8,2014

Well Location: 100/12-24-12-27 W1MPerforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0

Day No. 4 Weather: OvercastSITP (KPA): TSTM SICP (KPA): TSTM

Perform Walk around hazard assessment and air quality sweep.

7:30 AM 8:00 AM Arrive on location. Conduct safety meeting with all Eagle Discuss the days tasksand hazards associated with them. Discussed the ERP and Notice of Supervisor documentDiscuss swabbing sour fluid and wind direction today

8:00 AM 12:00 PM Rig swabbed for results. Swabbed a total of 14.52m3 of fluid backThe rig swabbed at approximately 4m3/ hour with a fluid level at 95m. Final oil cut was 50%

( See Swab Report )

Rig out swab equipment, Strip off BOP's and install wellhead

2:00 PM 4:15 PM Pail test BHP, appears to pump fine. Start in hole with BHP and rods as follows frombottom up:

25-200-R WAG-14-35 - 19mm S67 Centralized Rods c/w 6 per NETB44 - 19mm S67 Plain Rods24- 19mm S67 scrapered Rods c/w 6 per TB1 - 19mm S67 Scrapered Pony 10 Ft1 - 19mm S67 Scrapered Pony 4 Ft1 - 31.8mm x 9.14 Polished Rod 4140

4:15 PM 4:30 PM Fill hole with rig pump, stroke test pump to 5000kpa. Good test

4:30 PM 5:30 PM Rig out rig and associated equipment. Job Complete

Rig:Reported by:

Rig Time (hrs) Rig Rate:

Total Load Fluid Volume

Today's Recovery

Total Fluid Recovered

Oil (m3) Water (m3)Service Rig

Supervision

Wireline

1,700.00 Rods (Est)

BHP(Est)

7,155.00 Wellhead

12,000.003,000.00

Load Fluid to Recover

New Fluid Recovered

Today's Fluid Hid to Lease

Today's Fluid Hid Fm Lease

Trucking

Truck Fluid

Stimulation

Water hauling

300.00812.50

Packers

Rentals

Logging

Page 4 of 21Fluid in Tanks 3 AFE# 14CEQ009 AFE Amount 143,000

Completion: Yes Workover: Recompletion: BHP Change:Other (Specify):

Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0Today's Date: Dec 8,2014 Day No. 4 Weather: Overcast

SITP (KPA): TSTM SICP (KPA): TSTM

From To

Perform Walk around hazard assessment and air quality sweep.

7:30 AM 8:00 AM Arrive on location. Conduct safety meeting with all Eagle Discuss the days tasksand hazards associated with them. Discussed the ERP and Notice of Supervisor documentDiscuss swabbing sour fluid and wind direction today

8:00 AM 12:00 PM Rig swabbed for results. Swabbed a total of 14.52m3 of fluid back . The rig swabbed at approximately 4m3 / hour with a fluid level at 95m. Final oil cut was 50%

( See Swab Report )

Rig out swab equipment, Strip off BOP's and install wellhead

2:00 PM 4:15 PM Pail test BHP, appears to pump fine. Start in hole with BHP and rods as follows frombottom up :

25-200-RWAC-14-35 - 19mm S67 Centralized Rods c/w 6 per NETB44 - 19mm S67 Plain Rods24- 19mm S67 scrapered Rods c/w 6 per TB1 - 19mm S67 Scrapered Pony 10 Ft1 - 19mm S67 Scrapered Pony 4 Ft1 - 31.8mm x 9.14 Polished Rod 4140

4:15 PM 4:30 PM Fill hole with rig pump, stroke test pump to 5000kpa. Good test

4:30 PM 5:30 PM Rig out rig and associated equipment. Job Complete

Rig: Rig Time (hrs) Rig Rate:Reported by:

Oil (m3) Water (m3)Total Load Fluid Volume Service Rig 7,155.00 WellheadToday's Recovery Supervision 1,700.00 Rods (Est) 12,000.00Total Fluid Recovered Wireline BHP(Est) 3,000.00Load Fluid to Recover Trucking 300.00 PackersNew Fluid Recovered Truck Fluid 812.50 RentalsToday's Fluid Hld to Lease Stimulation LoggingToday's Fluid Hld Fm Lease Water hauling

Daily Completion/Workover Report

Detailed Description of Previous Day Operations

Page 70: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Total Fluid Hid To Lease

Total Fluid Hid Fm Lease

Fluid in Tanks

Daily

APE¹24,967.50 Cumulative

14CEQ009 AFE Amoun

70,519.27143,000

5of21

Completion:

Other (Specify):

Workover: Recompletion: BHP Change:

Daily CompletiontWorkover Report

Property/Unit: VirdenZone: Lodge PoleToday's Date: Sept 9,14

Well Location: 100/12-24-12-27 W1MPerforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0

Day No. 5 Weather: OvercastSITP (KPA): SICP (KPA):

Page 5 of 21Total Fluid Hld To Lease Total Fluid Hld Fm Lease

Daily 24,967.50 Cumulative 70,519.27Fluid in Tanks AFE# 14CEQ009 AFE Amount 143,000

Completion: Workover: Recompletion: BHP Change:Other (Specify):

Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0Today's Date: Sept 9,14 Day No. 5 Weather: Overcast

SITP (KPA): SICP (KPA):

From To

Daily Completion/Workover Report

Detailed Description of Previous Day Operations

Page 71: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

6of21

Rig:

Reported by:

Total Load Fluid Volume

Rig Time (hrs)

Oil (m3) Water (m3)

Rig Rate:

Service Rig

Costs

6,572.00 Wellhead

Today's Recovery

Total Fluid Recovered

Load Fluid to Recover

New Fluid Recovered

Today's Fluid Hid to Lease

Today's Fluid Hid Fm Lease

Total Fluid Hid To Lease

Total Fluid Hid Fm Lease

Supervision

Wireline

Trucking

Safety

Stimulation

Stimulation

1,625.00

1,710.00

12,988.78

6,555.00

Disposal

Tubing

Packers

Rentals

Logging

140.00

7,932.51

Fluid in Tanks

Daily

APE¹

37,523.29 Cumulative

0 AFE Amoun

108,042.56

143,000

Workover: Recompletion: BHP Change:

Completion:

Page 6 of 21

Rig Time (hrs) Rig Rate:

Rig:

Reported by:

Oil (m3) Water (m3)

Total Load Fluid Volume Service Rig 6,572.00 Wellhead

Today's Recovery Supervision Disposal 140.00

Total Fluid Recovered Wireline Tubing

Load Fluid to Recover Trucking 1,625.00 Packers 7,932.51

New Fluid Recovered Safety 1,710.00 Rentals

Today's Fluid Hld to Lease Stimulation 12,988.78 Logging

Today's Fluid Hld Fm Lease Stimulation 6,555.00

Total Fluid Hld To Lease

Total Fluid Hld Fm Lease

Daily 37,523.29 Cumulative 108,042.56

AFE# 0 AFE Amount 143,000

Fluid in Tanks

Workover: Recompletion: BHP Change:

Completion:

Costs

Page 72: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Other (Specify):Page 7of21

Daily Completion/Workover Report

Property/Unit:

Zone: Lodge Pole

Today's Date:

Virden Well Location: 100/12-24-12-27 W1M

Perforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0

Sept 10,14 Day No. 6 Weather: Overcast

SITP (KPA): SICP (KPA):

Rig:

Reported by:

Rig Time (hrs)

Oil (m3) Water (m3)

Rig Rate:

Service Rig

Costs

7,310.00 Wellhead

Total Load Fluid Volume

Today's Recovery

Total Fluid Recovered

Load Fluid to Recover

New Fluid Recovered

Supervision

Wireline

Trucking

Safety

Stimulation

1,666.00

0.00

0.00

0.00

Disposal

Tubing

Packers

Rentals

Logging

0.00

0.00

Today's Fluid Hid to Lease

Today's Fluid Hid Fm Lease

Total Fluid Hid To Lease

Total Fluid Hid Fm Lease

Stimulation

Daily

0.00

8,976.00 Cumulative 117,018.56

Page 7 of 21Other (Specify):

Property/Unit: Virden Well Location: 100/12-24-12-27 W1M

Zone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0

Today's Date: Sept 10,14 Day No. 6 Weather: Overcast

SITP (KPA): SICP (KPA):

From To

Rig Time (hrs) Rig Rate:

Rig:

Reported by:

Oil (m3) Water (m3)

Service Rig 7,310.00 Wellhead

Total Load Fluid Volume Supervision 1,666.00 Disposal 0.00

Today's Recovery Wireline Tubing

Total Fluid Recovered Trucking 0.00 Packers 0.00

Load Fluid to Recover Safety 0.00 Rentals

New Fluid Recovered Stimulation 0.00 Logging

Today's Fluid Hld to Lease Stimulation 0.00

Today's Fluid Hld Fm Lease

Total Fluid Hld To Lease

Total Fluid Hld Fm Lease Daily 8,976.00 Cumulative 117,018.56

Daily Completion/Workover Report

Detailed Description of Previous Day Operations

Costs

Page 73: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

APE¹ 0 AFE AmounPage 8of21

Recompletion: BHP Change:

Page 8 of 21AFE# 0 AFE Amount 143,000

Fluid in Tanks

Workover: Recompletion: BHP Change:

Completion:

Other (Specify):

Property/Unit: Virden Well Location: 100/12-24-12-27 W1M

Zone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0

Today's Date: Sept 11,14 Day No. 7 Weather: Overcast

SITP (KPA): TSTM SICP (KPA): TSTM

From To

Rig Time (hrs) Rig Rate:

Rig:

Reported by:

Oil (m3) Water (m3)

Service Rig 7,265.00 Wellhead

Total Load Fluid Volume Supervision 1,666.00 Disposal 0.00

Today's Recovery Wireline Tubing

Total Fluid Recovered Trucking 0.00 Packers 0.00

Load Fluid to Recover Water Hauling 390.00 Rentals

New Fluid Recovered Stimulation 0.00 Chemical 300.00

Daily Completion/Workover Report

Detailed Description of Previous Day Operations

Costs

Page 74: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Page 9of21

Recompletion: BHP Change:

Page 9 of 21Today's Fluid Hld to Lease Stimulation 0.00

Today's Fluid Hld Fm Lease

Total Fluid Hld To Lease

Total Fluid Hld Fm Lease Daily 9,621.00 Cumulative 126,639.56

AFE# 0 AFE Amount 143,000

Fluid in Tanks

Workover: Recompletion: BHP Change:

Completion:

Other (Specify):

Property/Unit: Virden Well Location: 100/12-24-12-27 W1M

Zone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0

Today's Date: Sept 12,14 Day No. 8 Weather: Overcast

SITP (KPA): TSTM SICP (KPA): TSTM

From To

Daily Completion/Workover Report

Detailed Description of Previous Day Operations

Page 75: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Page 10 of 21

Rig:

Reported by:

Total Load Fluid Volume

Today's Recovery

Total Fluid Recovered

Load Fluid to Recover

Rig Time (hrs)

Oil (m3) Water (m3)

Rig Rate:

Service Rig

Supervision

Wireline

Trucking

Water Hauling

Costs

3,854.00 Wellhead

850.00 Disposal

Wellhead

Packers

845.00 Rentals

576.30

0.00

1,362.85

0.00

New Fluid Recovered Stimulation Chemical

Today's Fluid Hid to Lease

Today's Fluid Hid Fm Lease

Total Fluid Hid To Lease

Total Fluid Hid Fm Lease

Stimulation

Daily 7,488.15 Cumulative 134,127.71

Fluid in Tanks

APE¹ 0 AFE Amoun 143,000

Workover: Recompletion: BHP Change:

Completion:

Other (Specify):

Page 10 of 21

Rig Time (hrs) Rig Rate:

Rig:

Reported by:

Oil (m3) Water (m3)

Service Rig 3,854.00 Wellhead 576.30

Total Load Fluid Volume Supervision 850.00 Disposal 0.00

Today's Recovery Wireline Wellhead 1,362.85

Total Fluid Recovered Trucking Packers 0.00

Load Fluid to Recover Water Hauling 845.00 Rentals

New Fluid Recovered Stimulation Chemical

Today's Fluid Hld to Lease Stimulation

Today's Fluid Hld Fm Lease

Total Fluid Hld To Lease

Total Fluid Hld Fm Lease Daily 7,488.15 Cumulative 134,127.71

AFE# 0 AFE Amount 143,000

Fluid in Tanks

Workover: Recompletion: BHP Change:

Completion:

Other (Specify):

Property/Unit: Virden Well Location: 100/12-24-12-27 W1M

Zone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0

Today's Date: Sept 18,2014 Day No. 9 Weather: Overcast

SITP (KPA): TSTM SICP (KPA): TSTM

From To

Costs

Daily Completion/Workover Report

Detailed Description of Previous Day Operations

Page 76: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Page 11 of 21

Rig:

Reported by:

Rig Time (hrs)

Oil (m3) Water (m3)

Rig Rate:

Service Rig

Costs

6,572.00 Service Rig 1,445.00

Total Load Fluid Volume

Today's Recovery

Total Fluid Recovered

Supervision

Wireline

Trucking

1,666.00

3,090.00

Disposal

Tubing

Rods

0.00

11,060.00

Load Fluid to Recover Water Hauling 395.00 BHP 3,262.39

New Fluid Recovered Stimulation Chemical

Today's Fluid Hid to Lease

Today's Fluid Hid Fm Lease

Total Fluid Hid To Lease

Total Fluid Hid Fm Lease

Fluid in Tanks

Stimulation

Daily

APE¹

27,490.39 Cumulative

0 AFE Amoun

161,618.10

143,000

Workover: Recompletion: BHP Change:

Completion:

Other (Specify):

Page 11 of 21

Rig Time (hrs) Rig Rate:

Rig:

Reported by:

Oil (m3) Water (m3)

Service Rig 6,572.00 Service Rig 1,445.00

Total Load Fluid Volume Supervision 1,666.00 Disposal 0.00

Today's Recovery Wireline 3,090.00 Tubing

Total Fluid Recovered Trucking Rods 11,060.00

Load Fluid to Recover Water Hauling 395.00 BHP 3,262.39

New Fluid Recovered Stimulation Chemical

Today's Fluid Hld to Lease Stimulation

Today's Fluid Hld Fm Lease

Total Fluid Hld To Lease

Total Fluid Hld Fm Lease Daily 27,490.39 Cumulative 161,618.10

AFE# 0 AFE Amount 143,000

Fluid in Tanks

Workover: Recompletion: BHP Change:

Completion:

Other (Specify):

Costs

Page 77: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

SWABREPORT

WellLocation 100/12.24.12.27W1M

ServiceRig Ea le68

RecoveredtoDate. 5.79 m'Oil

Depth.

TankCoef.

561.5-561.88 563.0-564.0& 568.0-570.0

m'/cm LoadFluidtoRecover:

8.76m'WaterLefttoRecover:

2 m'Oil

-6.76m'il

Date Dec8,2012

m'Water

m'Water

SwabNo. Time

Fluid

Level

Swab

Deth

TankGauge

after

Trucked

Out

Tank

Gaue

Gauge

Difference

mm

TotalFluid

ThisRunm'umulativeWater

m'ut%

Water

ThisRunCumulativem''hisRunm'il

Cumulative

m'emarks

8:30

8:45

9:00

9:15

9:30

9:45

10:00

10:15

54 410

95 450

95 450

95 450

95 450

95 450

95 450

95 450

0.53

1.15

0 1.1

0 0.71

0.46

0 1.4

0.75

0.53 35

1.68 90

2.72 95

3.82 90

4.53 50

4.99 35

6.39 60

7.14 50

0.1855 0.1855

1.035 1.2205

0.988 2.2085

0.99 3.1985

0.355 3.5535

0.161 3.7145

0.84 4.5545

0.375 4.9295

0.3445

0.115

0.052

0.11

0.355

0.299

0.56

0.375

0.3445

0.4595

0.5115

0.6215

0.9765

1.2755

1.8355

2.2105

5%BS

1%BS

1%BS

1%BS

1%BS

1%BS

1%BS

1%BS

10:30 95 450 0 0.9 8.04 55 0.495 5.4245 0.405 2.61551%BS

10:45 95 450 0.7 8.74 60 0.42 5.8445 0.28 2.89551%BS

11:00 95 450

95 45011:15

11:30 95 450

0 1.1

0 1.03

0 0.67

9.84 55

10.87 50

11.54 45

0.605 6.4495

0.515 6.9645

0.3015 7.266

0.495

0.515

0.3685

3.3905

3.9055

4.274

0.5%BS

0.5%BS

1%BS

11:45 95 450 0 1.05 12.59 45 0.4725 7.7385 0.5775 4.85150.5%BS

12:00 95 450

95 45012:15

0 1.03

0.9

¹N/A

13.62 55

14.52 50

0.5665 8.305

0.45 8.755

0.4635

0.45

5.315

5.765

0.5%BS

0.5%BS

Well Location 100/12-24-12-27 W1M Depth: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0 Date Dec 8,2012Service Rig Eagle 68 Tank Coef. m³/cm Load Fluid to Recover: 2 m³ Oil m³ Water.Recovered to Date: m³ Oil 8.76 m³ Water Left to Recover: -6.76 m³ Oil m³ Water

Tank Gauge

Swab No. TimeFluid Level

Swab Depth

after Trucked

OutTank

Gauge

Gauge Difference

mm

Total Fluid This Run

m³Cumulative

m³Water Cut %

This Run m³

Cumulative m³

This Run m³

Cumulative m³ Remarks

1 8:30 54 410 0.53 0.53 35 0.1855 0.1855 0.3445 0.3445 5% BS2 8:45 95 450 1.15 1.68 90 1.035 1.2205 0.115 0.4595 1% BS3 9:00 95 450 1.04 2.72 95 0.988 2.2085 0.052 0.5115 1% BS4 9:15 95 450 0 1.1 3.82 90 0.99 3.1985 0.11 0.6215 1% BS5 9:30 95 450 0 0.71 4.53 50 0.355 3.5535 0.355 0.9765 1% BS6 9:45 95 450 0 0.46 4.99 35 0.161 3.7145 0.299 1.2755 1% BS7 10:00 95 450 0 1.4 6.39 60 0.84 4.5545 0.56 1.8355 1% BS8 10:15 95 450 0 0.75 7.14 50 0.375 4.9295 0.375 2.2105 1% BS9 10:30 95 450 0 0.9 8.04 55 0.495 5.4245 0.405 2.6155 1% BS

10 10:45 95 450 0 0.7 8.74 60 0.42 5.8445 0.28 2.8955 1% BS11 11:00 95 450 0 1.1 9.84 55 0.605 6.4495 0.495 3.3905 0.5% BS12 11:15 95 450 0 1.03 10.87 50 0.515 6.9645 0.515 3.9055 0.5% BS13 11:30 95 450 0 0.67 11.54 45 0.3015 7.266 0.3685 4.274 1% BS14 11:45 95 450 0 1.05 12.59 45 0.4725 7.7385 0.5775 4.8515 0.5% BS15 12:00 95 450 0 1.03 13.62 55 0.5665 8.305 0.4635 5.315 0.5% BS16 12:15 95 450 0 0.9 14.52 50 0.45 8.755 0.45 5.765 0.5% BS

#N/A

SWAB REPORT

5.79

Water Oil

Page 78: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

WELL: 12-24-12-27 W1 DATE Sept 8,2014 Size 73mm Wt

Grade:9.67Kci/m Tread

Manufacturer:EUE

Length Length Length Length Length Length

No

01

Joint

9.32

Cum

9.32

No

31

Joint

9.28

Cum

291.13

No

61

Joint

9.68

Cum

578.70

No.

91

Joint Cum No.

121

Joint Gum No. Joint

151

Cum

02 9.06 18.38 32 9.32 300.45 ..62 9.64 588.34 ..92 122 152

03 9.31 27.69 33 9.31 309.76 ..63 93 123 153

04 9.61 37.30 34 9.59 319.35 ..64 94 124 154

05

06

07

08

09

10

9.63

9.06

9.30

9.30

9.31

9.25

93.15

46.93

55.99

65.29

74.59

83.90

93.15

TOTAL

35 9.61

36 9.60

37 9.60

38 9.61

39 9.60

40 9.60

95.12

328.96 ..65

338.56 ..66

348.16 ..67

357.77 ..68

367.37 ..69

376.97 ..70

TOTAL 19.32 TOTAL

95

96

97

98

99

100

0.00 TOTAL

125

126

127

128

129

130

0.00 TOTAL

155

156

157

158

159

160

0.00 TOTAL

No

Le ngth

CumJoint No

Le ngth

CumJoint No

Le ngth

CumJoint No.

ngthLe

Joint Cum No.

Length

Joint Gum No. JointLength

Cum

12

13

14

15

16

17

18

19

9.30

9.60

9.61

9.61

9.36

9.60

9.59

9.60

9.31

102.45

112.05

121.66

131.27

140.63

150.23

159.82

169.42

178.73

42 9.61

43 9.62

44 9.60

45 9.59

46 9.60

47 9.61

48 9.60

49 9.62

41 9.60 386.57 ..71

396.18 ..72

405.80 ..73

415.40 ..74

424.99 ..75

434.59 ..76

444.20 ..77

453.80 ..78

463.42 ..79

101

102

103

104

105

106

107

108

109

131

132

133

134

135

136

137

138

139

161

162

163

164

165

166

167

168

169

20 9.60

95.18

188.33

TOTAL

50 9.60

96.05

473.02 ..80

TOTAL 0.00 TOTAL

110

0.00 TOTAL

140

0.00 TOTAL

170

0.00 TOTAL

Le ngth Le ngth Le ngth Le ngth Length Length

No Joint Cum No Joint Cum No Joint Cum No. Joint Cum No. Joint Gum No Joint Cum

21

22

23

24

25

26

27

28

29

9.59

9.60

9.60

9.60

9.08

9.32

9.28

9.09

9.31

197.92

207.52

217.12

226.72

235.80

245.12

254.40

263.49

272.80

51 9.61

52 9.60

53 9.60

54 9.60

55 9.60

56 9.59

57 9.60

58 9.61

59 9.60

482.63 ..81

492.23 ..82

501.83 ..83

511.43 ..84

521.03 ..85

530.62 ..86

540.22 ..87

549.83 ..88

559.43 ..89

112

113

114

115

116

117

118

119

141

142

143

144

145

146

147

148

149

171

172

173

174

175

176

177

178

179

30 9.05 281.85 60 9.59 569.02 ..90 120 150 180

~ '' ll ~ ' II ~ ' II ~ ' II ~ ' II ~

TALLYSUMMARY(Note - Casing shoe must always be included in first joint. Position of centralizers, scratchers, etc., is to be indicated).

No10

20

30

40

Group Cum NO

93.15 93.15 5095.18 188.33 6093.52 281.85 70

95.12 376.97 80

Group

96.0596.0019.32

0.00

473.02569.02588.34

588.34

90100

110

120

Cum NO Group Cum

0.00 588.340.00 588.340.00 588.34

0.00 588.34

130 0.00140 0.00150 0.00

160 0.00

588.34588.34588.34

588.34

NO. Group Cum NO. Group Cum

¹¹ 0.00 588.34¹¹ 0.00 588.34

588.34

WELL:12-24-12-27 W1MDATE: Sept 8,2014 Size: Wt. TreadGrade: Manufacturer:

Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum..01 9.32 9.32 ..31 9.28 291.13 ..61 9.68 578.70 ..91 121 151..02 9.06 18.38 ..32 9.32 300.45 ..62 9.64 588.34 ..92 122 152..03 9.31 27.69 ..33 9.31 309.76 ..63 ..93 123 153..04 9.61 37.30 ..34 9.59 319.35 ..64 ..94 124 154..05 9.63 46.93 ..35 9.61 328.96 ..65 ..95 125 155..06 9.06 55.99 ..36 9.60 338.56 ..66 ..96 126 156..07 9.30 65.29 ..37 9.60 348.16 ..67 ..97 127 157..08 9.30 74.59 ..38 9.61 357.77 ..68 ..98 128 158..09 9.31 83.90 ..39 9.60 367.37 ..69 ..99 129 159..10 9.25 93.15 ..40 9.60 376.97 ..70 100 130 160

93.15 TOTAL 95.12 TOTAL 19.32 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL

Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum..11 9.30 102.45 ..41 9.60 386.57 ..71 101 131 161..12 9.60 112.05 ..42 9.61 396.18 ..72 102 132 162..13 9.61 121.66 ..43 9.62 405.80 ..73 103 133 163..14 9.61 131.27 ..44 9.60 415.40 ..74 104 134 164..15 9.36 140.63 ..45 9.59 424.99 ..75 105 135 165..16 9.60 150.23 ..46 9.60 434.59 ..76 106 136 166..17 9.59 159.82 ..47 9.61 444.20 ..77 107 137 167..18 9.60 169.42 ..48 9.60 453.80 ..78 108 138 168..19 9.31 178.73 ..49 9.62 463.42 ..79 109 139 169..20 9.60 188.33 ..50 9.60 473.02 ..80 110 140 170

95.18 TOTAL 96.05 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL

Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum..21 9.59 197.92 ..51 9.61 482.63 ..81 111 141 171..22 9.60 207.52 ..52 9.60 492.23 ..82 112 142 172..23 9.60 217.12 ..53 9.60 501.83 ..83 113 143 173..24 9.60 226.72 ..54 9.60 511.43 ..84 114 144 174..25 9.08 235.80 ..55 9.60 521.03 ..85 115 145 175..26 9.32 245.12 ..56 9.59 530.62 ..86 116 146 176..27 9.28 254.40 ..57 9.60 540.22 ..87 117 147 177..28 9.09 263.49 ..58 9.61 549.83 ..88 118 148 178..29 9.31 272.80 ..59 9.60 559.43 ..89 119 149 179..30 9.05 281.85 ..60 9.59 569.02 ..90 120 150 180

93.52 TOTAL 96.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL

TALLY SUMMARYNo. Group Cum No. Group Cum No. Group Cum No. Group Cum No. Group Cum10 93.15 93.15 50 96.05 473.02 90 0.00 588.34 130 0.00 588.34 ## 0.00 588.3420 95.18 188.33 60 96.00 569.02 100 0.00 588.34 140 0.00 588.34 ## 0.00 588.3430 93.52 281.85 70 19.32 588.34 110 0.00 588.34 150 0.00 588.3440 95.12 376.97 80 0.00 588.34 120 0.00 588.34 160 0.00 588.34

PIPE and CASING TALLY

73mm 9.67Kg/m EUE

Length Length Length Length Length Length

Length Length Length Length Length Length

Length Length Length Length Length Length

(Note - Casing shoe must always be included in first joint. Position of centralizers, scratchers, etc., is to be indicated).

588.34

Page 79: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

WELL: 12-24-12-27 W1 DATE: Sept 8,2014 Size 73mm Wt.

Grade9.67Kg/m Tread

0 Manufacturer:EUE

0

Length Length Length Length Length Length

No Joint Cum No Joint Cum No. Joint Cum No. Joint Cum No. Joint Gum No. Joint Cum

181

182

183

184

185

186

187

188

189

190

588.34 211

212

213

214

215

216

217

218

219

220

241

242

243

244

245

246

247

248

249

250

271

272

273

274

275

276

277

278

279

280

301

302

303

304

305

306

307

308

309

310

331

332

333

334

335

336

337

338

339

340

I II ~ ' II ~ ' tt ~ ' II ~ ' II ~ ' II ~

No.

191

192

193

194

195

196

197

198

199

Le ngth

CumJoint No.

221

222

223

224

225

226

227

228

229

Le ngth

CumJoint No.

251

252

253

254

255

256

257

258

259

Le ngth

CumJoint No.

281

282

283

284

285

286

287

288

289

ngthLe

CumJoint No.

311

312

313

314

315

316

317

318

319

Length

Joint Gum No. Joint

341

342

343

344

345

346

347

348

349

Length

Cum

I II ~ ' II ~ ' tt ~ ' II ~ ' II ~ ' II ~

Le ngth Le ngth Le ngth Le ngth Length Length

No.

201

202

203

204

205

206

207

208

209

Joint Cum No.

231

232

233

234

235

236

237

238

239

Joint Cum No.

261

262

263

264

265

266

267

268

269

Joint Cum No.

291

292

293

294

295

296

297

298

299

Joint Cum No.

321

322

323

324

325

326

327

328

329

Joint Gum No. Joint

351

352

353

354

355

356

357

358

359

Cum

I I I I I I ~ I

I II ~ ' II ~ ' tt ~ ' II ~ ' II ~ ' II ~

e - Casing shoe(Not must always be in eluded in first joint. Position of centralizers, scratchers, etc., is to be indicated).

TALLYSUMMARYNo10

20

30

40

Group

0.000.000.00

0.00

Cum

0.000.000.00

0.00

No506070

80

Group

0.000.000.00

0.00

0.000.000.00

0.00

90100

110

120

Cum No Group

0.000.000.00

0.00

Cum

0.000.000.00

0.00

130 0.00140 0.00150 0.00

160 0.00

0.000.000.00

0.00

NO. Group Cum NO. Group Cum

¹¹ 0.00 0.00¹¹ 0.00 0.00

0.00

WELL:12-24-12-27 W1MDATE: Sept 8,2014 Size: Wt. TreadGrade: Manufacturer: 0

Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum181 588.34 211 241 271 301 331182 212 242 272 302 332183 213 243 273 303 333184 214 244 274 304 334185 215 245 275 305 335186 216 246 276 306 336187 217 247 277 307 337188 218 248 278 308 338189 219 249 279 309 339190 220 250 280 310 340

0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL

Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum191 221 251 281 311 341192 222 252 282 312 342193 223 253 283 313 343194 224 254 284 314 344195 225 255 285 315 345196 226 256 286 316 346197 227 257 287 317 347198 228 258 288 318 348199 229 259 289 319 349200 230 260 290 320 350

0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL

Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum201 231 261 291 321 351202 232 262 292 322 352203 233 263 293 323 353204 234 264 294 324 354205 235 265 295 325 355206 236 266 296 326 356207 237 267 297 327 357208 238 268 298 328 358209 239 269 299 329 359210 240 270 300 330 360

0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL

TALLY SUMMARYNo. Group Cum No. Group Cum No. Group Cum No. Group Cum No. Group Cum10 0.00 0.00 50 0.00 0.00 90 0.00 0.00 130 0.00 0.00 ## 0.00 0.0020 0.00 0.00 60 0.00 0.00 100 0.00 0.00 140 0.00 0.00 ## 0.00 0.0030 0.00 0.00 70 0.00 0.00 110 0.00 0.00 150 0.00 0.0040 0.00 0.00 80 0.00 0.00 120 0.00 0.00 160 0.00 0.00

PIPE and CASING TALLY 273mm 9.67Kg/m EUE

0

Length Length Length Length Length Length

Length Length Length Length Length Length

(Note - Casing shoe must always be included in first joint. Position of centralizers, scratchers, etc., is to be indicated).

0.00

Length Length Length Length Length Length

Page 80: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

WellName:

WellsiteSupervisor: ScottRobertson

STRConsulting

FluidSummary

12-24-12-27W1M

Cell¹: 306-575-8032 EnvironmentalCompany:

LicenceNo. 10154

VolumeTransferredtoLocation,m'olumeTransferredfromLocation,m'ate

Report Fluid,m'y

Wt C

Recieved Fluid,m'kt¹

F I Wt C'r

Transferred

Tiket¹ To

Comments

Dec3,2014

2.00 leanHarbor Elcano 7.80 Foxtail 18080 7-18-10-29

Padwater

Dec5,2014

9.00 Foxtail 17168 16-21 Killfluid

Dec7,2014

13.00 Foxtail 18083 7-18-10-29SwabWater

Dec8,2014

Sept9,14

Sept10,14

Sept11,14

Sept12,14

ept18,201

TotalTransfers I II II I II I Il

Well Name : Licence No. 10154Wellsite Supervisor : Cell # : Environmental Company :

Date Report Recieved TransferredDay Oil Water Carrier Ticket # From Oil Water Carrier Ticket # To

2.00 Clean Harbors Elcano 7.80 Foxtail 18080 7-18-10-29

9.00 Foxtail 17168 16-21

13.00 Foxtail 18083 7-18-10-29

Total Transfers 0.00 11.00 0.00 20.80

STR ConsultingFluid Summary

12-24-12-27 W1MScott Robertson 306-575-8032

Volume Transferred to Location, m3 Volume Transferred from Location, m3

CommentsFluid, m3 Fluid, m3

Sept 9,14

Dec 3,2014

1

Dec 5,2014

2

Pad water

Sept 11,14

7

Dec 7,2014

3

Kill fluid

Dec 8,2014

4

Swab Water

Sept 18,2014

9

5

Sept 10,14

6

Sept 12,14

8

Page 81: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

MATERIALTRANSFERSHEETFOR:

MT¹

.'TEM

¹ DATE DESCRIPTION COND. QN. Value$

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

ITEM

TRANSFERREDTO

AFE

MATERIAL TRANSFER SHEET FOR:

MT# :

ITEM # DATE COND. QTY. Value $ VALUE1 A A= NEW 100%2 A B= USED GOOD 80 - 75%3 C= USED FAIR 75 - 50%4 $0.00 D= POOR 25%5 $0.00 JK= SCRAP 0%6 $0.007 $0.008 $0.009 $0.0010 $0.0011 $0.00

ITEM AFE AFE1234567891011

DESCRIPTION CONDITION

TRANSFERRED TO TRANSFERRED FROMLOCATION / ORIGIN

Page 82: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

ENERGY INC.North Hargrave

Highmark North Hargrave 12-24-12-27W1

Location

Date

Prepared by;

Cuny 9k&aOn-Site Supervisor - Fire Sky Energy inc.

(306) 485-7368

l.a mellomCtssasktel.net

Taken By;

'Tretror ttittdeoogTtd

Production Technician - Fire Sky Energy Inc.

(306) 461-5102

tvindevogbel@fireskyenergy ca

Prepared by:

North Hargrave

Highmark North Hargrave 12-24-12-27W1

Location Date

Larry MellomOn-Site Supervisor - Fire Sky Energy Inc.

(306) [email protected]

Taken By:Trevor Vindevoghel

Production Technician - Fire Sky Energy Inc.(306) 461-5102

[email protected]

Page 83: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Fire Sky Energy Inc.

Workover Report Input Sheet

Area:

Well Name:

Location:

UWI:Licence:

Cost Centre:

AFE:KOP

Workover Objective:

North Hargrave

Hi hmark North Har ave 12-24-12-27WI12-24-12-27W I

10154

FS 2017-047

Pull es run tubin um

Perforations/Open Hole:

4)

561.5-561.8

563-564

568-570

Interval Formation

Lodgepole

Lod e ole

Lod e ole

Comments

Date Started: 9/12/2017

Date End: 9/13/2017

Emergency Response Location 12-24-12-27W1

Area: North HargraveWell Name: Highmark North Hargrave 12-24-12-27W1

Location: 12-24-12-27W1UWI:

Licence: 10154Cost Centre:

AFE: FS 2017-047KOP

Workover Objective: Pull esp run tubing pump

Perforations/Open Hole: 1) 561.5-561.8 Lodgepole2) 563-564 Lodgepole3) 568-570 Lodgepole4)

Date Started:Date End:

219.1 35.7 J55 149Intermediate Casing: 1)

2)3)4)

Production Casing: 1) 139.7 20.8 J 55 6292)

Tubing: 1)

2)

478.07 mKB PBTD: 614.9 mKB473.67 mKB TD: 629 mKB473.67 mKB TVD: mKB

4.4 mKB4.4 mKB4.1 mKB

Emergency Response Location 12-24-12-27W1

Name: Larry MellomPosition: On-Site Supervisor - Fire Sky Energy Inc.

Phone: (306) 485-7368Email: [email protected]

Name: Trevor VindevoghelPosition: Production Technician - Fire Sky Energy Inc.

Fire Sky Energy Inc.Workover Report Input Sheet

Interval Formation Comments

9/12/20179/13/2017

TubularsSize Weight Landed

KB - THF:

(mm) (kg/m) Grade (mKB)Surface Casing:

Elevations Depths:KB:GL:CF:

KB - GL:KB - CF:

ContactsRig Supervisor

Primary Head Office Contact

Page 84: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Phone: 306 461-5102

Email: tvindevo het Sreak ener .ca

Other Head Office Contact

Name: Tom Co eland

Position: Vice-President of 0 erations - Fire Sk Ener Inc.

Phone: 306 421-0988

Email: t.co eland fireak enere .ca

Field Contact tel

Name:

Position:

Phone:

Email:

Field Contacti'ame:

Position:

Phone:

Email:

Field Contacti'ame:

Position:

Phone:

Email:

Service Rig Representative (Toolpush)Name: Rob Deis

Position:

Phone:

Email:

Directions to Location:

Junction hiwa 83n and Hiwa 1. North to 60N. 1.2km west. South .5km to well.

Phone: (306) 461-5102Email: [email protected]

Name: Tom CopelandPosition: Vice-President of Operations - Fire Sky Energy Inc.

Phone: (306) 421-0988Email: [email protected]

Name:Position:

Phone:Email:

Name:Position:

Phone:Email:

Name:Position:

Phone:Email:

Name: Rob DeisPosition:

Phone:Email:

Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.

Field Contact #2

Field Contact #3

Service Rig Representative (Toolpush)

Directions to Location:

Other Head Office Contact

Field Contact #1

Page 85: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Tocopytheimages:Rightclicktheimageandselectcopyfromtheshortcutmenu,thenclicktheareaofthedestinationsheetyou

wanttoputtheimageinandrightclickthemouse,selectpaste.Theimagescanberesizedbydraggingthehandlesoftheimages

whiletheyareselected.

Iil1I

~

I

Allrtemscanberesraedbydraggrngttehandlesr

acrapared rodslookgoaloncestratcledlofrt eelltere

Tubing Strings with or without rodsPup Jts (use the ones with borders if more than 1 pup)All items can be resized by dragging the handles!Scrapered rods look good once stretched to fit wellbore

Squeeze Perfs

Open Perfs

RA

To copy the images: Right click the image and select copy from the shortcut menu, then click the area of the destination sheet you want to put the image in and right click the mouse, select paste. The images can be resized by dragging the handles of the images while they are selected.

Page 86: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

FireSkyEnergyInc.

MaterialTransfer

NorthHargrave

73mmtubingyellowband

! Esp

Surfaceequipmentforesp

I Esptubinghanger,spoolandmastervale

liI I

Fontanastock

12-24-12-27

12-24-12-27wl

12-24-12-27wl

IiI I

12-24-12-27W1

Bakerforinspection

stock3-25-12-27

Seaboard

I I i

4 Bl $ 140,00'III

1 Bl

1 Bl

1 Bl

Stufffingboxnewdualpack

tubinghangerandbonnet

Seaboard

Seaboardstock

12-24-12-27

12-24-12-27

1 A

1 Bl

25-325thos24-2-4Q14-139

sp96plain19mmrods

38,lmmkbars

31,8m9,14xm19polishrod

Q2ALS

tsm

tsm

tsm

12-24-12-27

12-24-12-27

12-24-12-27

12-24-12-27

1 A

68 A

8 A

1 A

I 73mmtubing

73mmtubing

I

Fontanayard

12-24-12-27

12-24-12-27

Lshawcor

8 Bl

8 Bl

Condition

A-New

Bl-75%

B2-65%

C-50%

D-35%

JK-Junk

TransferredBy.';arrtSttefol

Date.'pprovedBy.'ate.'emarks

Qty Condition Unit Value TotalA 4 B1 140.00$ 560.00$ B 1 B1 -$ C 1 B1 -$ D 1 B1 -$ E -$ F 1 A -$ G 1 B1 -$ H -$ I -$ J 1 A -$ K 68 A -$ L 8 A -$ M 1 A -$ N -$ O 8 B1 -$ P 8 B1 -$ Q -$ R -$ S -$ T -$ U -$ V -$ W -$ X -$ Y -$ Z -$

Condition Transferred By: RemarksA - New Date:B1 - 75%B2 - 65% Approved By:C - 50% Date:D - 35%JK - Junk

Fire Sky Energy Inc.Material Transfer

North Hargrave

Description Location From Location To73mm tubing yellow band Fontana stock 12-24-12-27W1Esp 12-24-12-27 Baker for inspectionSurface equipment for esp 12-24-12-27w1 stock 3-25-12-27Esp tubing hanger, spool and mastervale 12-24-12-27w1 Seaboard

Stufffing box new dual pack Seaboard 12-24-12-27tubing hanger and bonnet Seaboard stock 12-24-12-27

25-325 thos 24-2-4 Q14-139 Q2 ALS 12-24-12-27sp 96 plain 19mm rods tsm 12-24-12-2738.1mm k bars tsm 12-24-12-2731.8m 9.14 xm 19 polish rod tsm 12-24-12-27

73mm tubing Fontana yard 12-24-12-2773mm tubing 12-24-12-27 \shawcor

Larry Mellom

Page 87: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Fire Sky Energy Inc.Tubing Tally ¹1

North Hargrave

Date: 9/12/2017

Tallied By: Rob Deis

Well Name: Highmark North Hargrave 12-24-12-27W1

Checked By: ra %e/lorn

Location: 12-24-12-27W1

Size:

Tubing Specifications

73.00 mm Weight: 9.67 kg/m Grade: J 55 Thread: 8RD EUE

I ~

l ~

9.60

9.60

9.62

9.61

9.33

9.30

9.18

9.15

9.30

9.29

I I

9.32

9.61

9.62

9.61

9.60

9.40

9.59

9.60

19.20

28.82

38.43

47.76

57.06

66.24

75.39

84.69

93.98I I

484.87

494.48

504.10

513.71

523.31

532.71

542.30

542.30

542.30

542.30

I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I

9.30

9.60

9.60

9.60

9.60

e 9.62

9.60

9.61

9.60

I 961I

~ ~

~ ~

I

I I I

I

I I I

103.28

112.88

122.48

132.08

141.68

151.30

160.90

170.51

180.11

189.72

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

~ l

9.62

9.61

9.60

9.60

9.61

9.62

9.60

9.60

9.60

9.60

's Is

199.34

208.95

218.55

228.15

237.76

247.38

256.98

266.58

276.18

285.78

~ ~

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I

~ ~

~ ~~ ~

~ l

9.61 295.39 9.31 389.77

9.61 305.00 9.60 399.37

9.61 314.61 9.60 408.97

9.31 323.92 9.62 418.59

9.60 333.52 9.61 428.20

9.63 343.15 9.33 437.53

9.30 352.45 9.61 447.14

9.37 361.82 '.61 456.75

9.31 371.13 '.61 466.36

9.33 380.46 I 9.19 475.55I g I I ' I

II

542.30 542.30

542.30 542.30

542.30 542.30

542.30 542.30

542.30 542.30

542.30 ' 542.30

542.30 542.30

542.30 542.30

542.30 542.30

542.30 l I 542.30

I II ~ I I II I

542.30 542.30

542.30 542.30

542.30 542.30

542.30 542.30

542.30 542.30

542.30 s 542.30

542.30 542.30

542.30 542.30

542.30 542.30

542.30 I 542.30

I II ~ I ~ I II I

93.98

C 95.74

96.06

~ 94.68

93.98

189.72

285.78

380.46

66.75 542.30

0.00 542.30

0.00 542.30

0.00 542.30

0.00

0.00

0.00

0.00

542.30

542.30

542.30

542.30

PSN

Tail Joint

Packer

Pup Joint ¹2

Pup Joint ¹3

Pup Joint ¹4

Anchor 10000.00 Pup Joint ¹1

Tubing Tally Page 6 of 19Tubing Tally Page 6 of 19

Checked By:Location:

73.00 mm Weight: 9.67 kg/m Grade: Thread:Tally Cum. Tally Cum. Tally Cum. Tally Cum. Tally Cum.

1 9.60 9.60 11 9.30 103.28 21 9.62 199.34 31 9.61 295.39 41 9.31 389.772 9.60 19.20 12 9.60 112.88 22 9.61 208.95 32 9.61 305.00 42 9.60 399.373 9.62 28.82 13 9.60 122.48 23 9.60 218.55 33 9.61 314.61 43 9.60 408.974 9.61 38.43 14 9.60 132.08 24 9.60 228.15 34 9.31 323.92 44 9.62 418.595 9.33 47.76 15 9.60 141.68 25 9.61 237.76 35 9.60 333.52 45 9.61 428.206 9.30 57.06 16 9.62 151.30 26 9.62 247.38 36 9.63 343.15 46 9.33 437.537 9.18 66.24 17 9.60 160.90 27 9.60 256.98 37 9.30 352.45 47 9.61 447.148 9.15 75.39 18 9.61 170.51 28 9.60 266.58 38 9.37 361.82 48 9.61 456.759 9.30 84.69 19 9.60 180.11 29 9.60 276.18 39 9.31 371.13 49 9.61 466.3610 9.29 93.98 20 9.61 189.72 30 9.60 285.78 40 9.33 380.46 50 9.19 475.55A 93.98 93.98 B 95.74 189.72 C 96.06 285.78 D 94.68 380.46 E 95.09 475.5551 9.32 484.87 61 542.30 71 542.30 81 542.30 91 542.3052 9.61 494.48 62 542.30 72 542.30 82 542.30 92 542.3053 9.62 504.10 63 542.30 73 542.30 83 542.30 93 542.3054 9.61 513.71 64 542.30 74 542.30 84 542.30 94 542.3055 9.60 523.31 65 542.30 75 542.30 85 542.30 95 542.3056 9.40 532.71 66 542.30 76 542.30 86 542.30 96 542.3057 9.59 542.30 67 542.30 77 542.30 87 542.30 97 542.3058 542.30 68 542.30 78 542.30 88 542.30 98 542.3059 542.30 69 542.30 79 542.30 89 542.30 99 542.3060 542.30 70 542.30 80 542.30 90 542.30 100 542.30F 66.75 542.30 G 0.00 542.30 H 0.00 542.30 I 0.00 542.30 J 0.00 542.30

101 542.30 111 542.30 121 542.30 131 542.30 141 542.30102 542.30 112 542.30 122 542.30 132 542.30 142 542.30103 542.30 113 542.30 123 542.30 133 542.30 143 542.30104 542.30 114 542.30 124 542.30 134 542.30 144 542.30105 542.30 115 542.30 125 542.30 135 542.30 145 542.30106 542.30 116 542.30 126 542.30 136 542.30 146 542.30107 542.30 117 542.30 127 542.30 137 542.30 147 542.30108 542.30 118 542.30 128 542.30 138 542.30 148 542.30109 542.30 119 542.30 129 542.30 139 542.30 149 542.30110 542.30 120 542.30 130 542.30 140 542.30 150 542.30K 0.00 542.30 L 0.00 542.30 M 0.00 542.30 N 0.00 542.30 O 0.00 542.30

Tally Cum Tally Cum Tally CumA 93.98 93.98 F 66.75 542.30 K 0.00 542.30 10000.00B 95.74 189.72 G 0.00 542.30 L 0.00 542.30C 96.06 285.78 H 0.00 542.30 M 0.00 542.30D 94.68 380.46 I 0.00 542.30 N 0.00 542.30

Well Name: Highmark North Hargrave 12-24-12-27W1 12-24-12-27W1

Tubing SpecificationsSize: J 55 8RD EUE

Fire Sky Energy Inc.Tubing Tally #1

North HargraveDate: 9/12/2017

Tallied By: Rob Deis Larry Mellom

Tail Joint Pup Joint #3Packer Pup Joint #4

Page 1 Tally SummaryExtras (Reference Letter)

Anchor Pup Joint #1PSN Pup Joint #2

Page 88: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

95.09 475.55

Date: 9/12/2017

0.00 542.30 ~ 0.00 542.30

All tallies observed in meters (m).

Fire Sky Energy Inc.Tubing Tally ¹1

North Hargrave

Coated Joint KB - THE

Tallied By: Rob Deis

Well Name: Highmark North Hargrave 12-24-12-27W1

Checked By: ra Aellom

Location: 12-24-12-27W1

Tubing Specifications

Size: 73.00 mm Weight: 9.67 kg/m Grade: J 55 Thread: 8RD EUE

I 161 ' 171 ' 181 ' 191 '

I ~

I ~

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I I I~

I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I I I~

I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I

~ ~

~ ~

~ ~

~ ~

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I II ~ I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I II ~ I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I II ~ I

~ I~ ~~ ~

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I I I~

I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I I I~

I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I I I I

~ ~

~ ~~ ~

~ ~

~ I

~ ~~ ~

~ ~

~ I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I II ~ I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I II ~ I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I II ~ I

~ ~

~ ~

~ ~

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I I I~

I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I I I~

I

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

542.30

I I I~

I

Tubing Tally Page 7 of 19Tubing Tally Page 7 of 19

E 95.09 475.55 J 0.00 542.30 O 0.00 542.30

Checked By:Location:

73.00 mm Weight: 9.67 kg/m Grade: Thread:Tally Cum. Tally Cum. Tally Cum. Tally Cum. Tally Cum.

151 542.30 161 542.30 171 542.30 181 542.30 191 542.30152 542.30 162 542.30 172 542.30 182 542.30 192 542.30153 542.30 163 542.30 173 542.30 183 542.30 193 542.30154 542.30 164 542.30 174 542.30 184 542.30 194 542.30155 542.30 165 542.30 175 542.30 185 542.30 195 542.30156 542.30 166 542.30 176 542.30 186 542.30 196 542.30157 542.30 167 542.30 177 542.30 187 542.30 197 542.30158 542.30 168 542.30 178 542.30 188 542.30 198 542.30159 542.30 169 542.30 179 542.30 189 542.30 199 542.30160 542.30 170 542.30 180 542.30 190 542.30 200 542.30P 0.00 542.30 Q 0.00 542.30 R 0.00 542.30 S 0.00 542.30 T 0.00 542.30

201 542.30 211 542.30 221 542.30 231 542.30 241 542.30202 542.30 212 542.30 222 542.30 232 542.30 242 542.30203 542.30 213 542.30 223 542.30 233 542.30 243 542.30204 542.30 214 542.30 224 542.30 234 542.30 244 542.30205 542.30 215 542.30 225 542.30 235 542.30 245 542.30206 542.30 216 542.30 226 542.30 236 542.30 246 542.30207 542.30 217 542.30 227 542.30 237 542.30 247 542.30208 542.30 218 542.30 228 542.30 238 542.30 248 542.30209 542.30 219 542.30 229 542.30 239 542.30 249 542.30210 542.30 220 542.30 230 542.30 240 542.30 250 542.30U 0.00 542.30 V 0.00 542.30 W 0.00 542.30 X 0.00 542.30 Y 0.00 542.30

251 542.30 261 542.30 271 542.30 281 542.30 291 542.30252 542.30 262 542.30 272 542.30 282 542.30 292 542.30253 542.30 263 542.30 273 542.30 283 542.30 293 542.30254 542.30 264 542.30 274 542.30 284 542.30 294 542.30255 542.30 265 542.30 275 542.30 285 542.30 295 542.30256 542.30 266 542.30 276 542.30 286 542.30 296 542.30257 542.30 267 542.30 277 542.30 287 542.30 297 542.30258 542.30 268 542.30 278 542.30 288 542.30 298 542.30259 542.30 269 542.30 279 542.30 289 542.30 299 542.30260 542.30 270 542.30 280 542.30 290 542.30 300 542.30Z 0.00 542.30 AA 0.00 542.30 BB 0.00 542.30 CC 0.00 542.30 DD 0.00 542.30

Tally Cum Tally Cum Tally CumP 0.00 542.30 U 0.00 542.30 Z 0.00 542.30Q 0.00 542.30 V 0.00 542.30 AA 0.00 542.30R 0.00 542.30 W 0.00 542.30 BB 0.00 542.30S 0.00 542.30 X 0.00 542.30 CC 0.00 542.30T 0.00 542.30 Y 0.00 542.30 DD 0.00 542.30

Coated Joint KB - THF

Tallied By: Rob Deis Larry MellomWell Name: Highmark North Hargrave 12-24-12-27W1 12-24-12-27W1

All tallies observed in meters (m).

Fire Sky Energy Inc.Tubing Tally #1

North HargraveDate: 9/12/2017

Anchor Pup Joint #1PSN Pup Joint #2

Tail Joint Pup Joint #3

Tubing SpecificationsSize: J 55 8RD EUE

Page 2 Tally SummaryExtras (Reference Letter)

Packer Pup Joint #4Coated Joint KB - THF

Page 89: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Date: 9/12/2017

All tallies observed in meters (m).

Fire Sky Energy Inc.Tubing Tally ¹1

North Hargrave

Tallied By: Rob Deis

Well Name: Highmark North Hargrave 12-24-12-27W1

Checked By: ra Aellom

Location: 12-24-12-27W1

Comments:

Tubing Tally Page 8 of 19Tubing Tally Page 8 of 19

Checked By:Location:

Comments:

Tubing Tally #1North Hargrave

Date: 9/12/2017Tallied By: Rob Deis Larry Mellom

All tallies observed in meters (m).

Fire Sky Energy Inc.

Description (m) (mKB)0.00

Well Name: Highmark North Hargrave 12-24-12-27W1 12-24-12-27W1

Final ConfigurationTally Cumulative

0.000.000.00

0.000.00

0.000.000.00

0.000.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

0.000.00

Page 90: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

FIRE SKY ENERGY INC

Highmark North Hargrave 12-24-12-27W1Date 9/12/2017

Purpose of Job Pull esp run tubing pumpSuPerViecr Larry metom KBCurrent Statue Completed GRDrilling Licence 10154

KOPKB - TH

Casing Description

47807 PBTDI

6/4.9 5685m

473M KBNF

0

41

Strin0 Surface0 Production

Wei ht35.7020.80

GradeJ55J 55

De th Remarks149629

ole

PerforationsInterval561 5-561 8

StatuS Produang

ole 563-564ole 568-570

Tubing Strmg Details

Descnption

Botttom up

73mm bull plug and collar

73mm perl pup

88 9mm shaved collar and 88 9mm x 73mm std swage

25-325 thos 24-2-4 tubm/g pump brass nicarb barrel

73mm new pup

Joints 73mm J55 eue Tubmg

21mpa 73mm tubing dram

Joints 73mm J55 eue Tubmg

73mm J55 eue pup 9 67kg/m

73mm J55 eue pup 9 67kg/m

73mm J55 eue pup 9 67kg/m

Joints 73mm J55 eue Tubmg

Metre split tubing hanger

0.231.860.237.921.259.600.25

523.113.082.481.869.59

4.10

565.56565.33563.47563.24555.32554.07544.47544.22

21.11

18.0315.5513.69

4.104.104.10

Report

LengthBalls

ReportSize

19

19

19

38.1

sp 96

sp 96

sp 96

C

Tubing Bottom is LandedSerial No Q14 139 Size 25.325-thos.24.2M

246 Barrel Brass Ni GarbTitanium Seats Tungsten Magnum 120

Polish Rod New xm19 31.8mm x 9.14m

Grade Scrapers Length

pia 0.62plain 1.24plain 487.68K Bars 60.96

565.56

ON.OFF

550.5

Total 0

TD 629mkb

FIRE SKY ENERGY INCDate 9/12/2017

Purpose of JobSupervisor Larry mellom KB 478.07 PBTD 614.9 568.5m Current Status Completed GR 473.67 KB-CF 4.4Drilling Licence

KOP 0KB - TH 4.1

Casing Description

Size String Weight Grade Depth Remarks219.10 Surface 35.70 J55 149139.70 Production 20.80 J 55 629

PerforationsZone Interval Status ProducingLodgepole 561.5-561.8Lodgepole 563-564Lodgepole 568-570

Tubing String Details Botttom upNO Description

565.561 73mm bull plug and collar 0.23 565.331 73mm perf pup 1.86 563.471 88.9mm shaved collar and 88.9mm x 73mm std swage 0.23 563.241 25-325 thos 24-2-4 tubinjg pump brass nicarb barrel 7.92 555.321 73mm new pup. 1.25 554.071 Joints 73mm J55 eue Tubing 9.60 544.471 21mpa 73mm tubing drain 0.25 544.2256 Joints 73mm J55 eue Tubing 523.11 21.111 73mm J55 eue pup 9.67kg/m 3.08 18.031 73mm J55 eue pup 9.67kg/m 2.48 15.551 73mm J55 eue pup 9.67kg/m 1.86 13.691 Joints 73mm J55 eue Tubing 9.59 4.10

4.10Metra split tubing hanger. 4.10

4.10Pump Report Tubing Bottom is Landed 565.56

Serial No Q14 139 Size 25-325-thos-24-2-4Stroke Length 246 Barrel Brass Ni Carb

Balls Titanium Seats Tungsten Magnum 120 ON-OFFRod Report Polish Rod New xm19 31.8mm x 9.14mNo Size Grade Scrapers Length1 19 sp 96 plain 0.621 19 sp 96 plain 1.2464 19 sp 96 plain 487.68

Fill 8 38.1 C K Bars 60.96Plug Back

568.5 550.5Total 0

TD 629mkb

Highmark North Hargrave 12-24-12-27W1

Pull esp run tubing pump

10154

Page 91: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Fire Sky Energy Inc.Daily Summary

North Hargrave

Date: September 12, 2017

8'or/rover Objective: Pull esp run tubing pump

Day¹: I

~ ~ ~

SITP: SICP:

I I

Pull esp

Run tubing pump

I i ls'lRig up

I I300 kPa

~o- ~ ~

Weather: sunny 25C 5km

8:00

17:00

Spot 40 matts to cover new flowlines

Moved rig to location.

Had safety meeting.

Rigged up equipment.

Reverse circulated well to produced water. Took 4m3 to catch circulation.

Removed esp cable. Master valve and plate.

Installed bop. Installed Redhawk annular.B4

Pulled tubing hanger.

Rigged in Baker. Spooled cable and pulled esp.

Broke esp down and laid down.

Rigged out annular. Rigged out bop.

Removed tubing spool for esp hanger.

Installed bop and tested.

Picked up new Q2 ALS tubing pump Q14-139 25-325-thos-24-2-4.

Run 73mm 1.86m perf pup c/w bull plug

Run 73mm x 88.9mm swage c/w shaved 88.9mm coupling.

Run pump c/w 88.9mm shaved ccoupling on top of pump, 73mm x 88.9mm swage and 1.24m x 73mm pup.

Run I joint of 73mm tubing. Installed 73mm 21mpa tubing drain.

Tallied and run 56 joints of 73mm tubing out of derrick. Picked up 2 joints of 73mm tubing.

Tagged fill at 568.5mkb.

Pulled 2 joints. Pumoed 400L and blew tubing drain at 18mpa.

Secured well for night.

Took $ m3 to break circulation. The other wells were less than 1m3.

~ ~ ~

~ ~

' ~ ~

~ ~

~ ~ ~ ~

~ ~

~ ~ ~

- ~ - ~

~ ~ I

~ ~ ~

See Expense Summary sheet for Daily Cost Summary

Well Name: Licence #:Location: Cost Centre:

UWI: AFE#:

SITP: kPa SICP: 300 kPa Weather: sunny 25C 5kmTime8:00

Reverse circulated well to produced water. Took 4m3 to catch circulation.Removed esp cable. Master valve and plate.

Removed tubing spool for esp hanger.Installed bop and tested.Picked up new Q2 ALS tubing pump Q14-139 25-325-thos-24-2-4.Run 73mm 1.86m perf pup c/w bull plugRun 73mm x 88.9mm swage c/w shaved 88.9mm coupling.Run pump c/w 88.9mm shaved ccoupling on top of pump, 73mm x 88.9mm swage and 1.24m x 73mm pup.Run 1 joint of 73mm tubing. Installed 73mm 21mpa tubing drain.Tallied and run 56 joints of 73mm tubing out of derrick. Picked up 2 joints of 73mm tubing.Tagged fill at 568.5mkb.

17:00

Service Rig: Supervisor:Toolpush: Reported to:

Workover Objective: Pull esp run tubing pump

Fire Sky Energy Inc.Daily Summary

North Hargrave

Date: September 12, 2017

Operation @ 08:00 HRS

Day #: 1Highmark North Hargrave 12-24-12-27W1 1015412-24-12-27W1 00 FS 2017-047

Daily SynopsisPull esp

Run tubing pump

Rigged out annular. Rigged out bop.

Rig upDetailed Daily Summary

Operations SummarySpot 40 matts to cover new flowlinesMoved rig to location.Had safety meeting. Rigged up equipment.

Installed bop. Installed Redhawk annular.B4Pulled tubing hanger.Rigged in Baker. Spooled cable and pulled esp.Broke esp down and laid down.

Took $ m3 to break circulation. The other wells were less than 1m3.

Pulled 2 joints. Pumoed 400L and blew tubing drain at 18mpa.Secured well for night.

See Expense Summary sheet for Daily Cost Summary

Certified Rig 1 Larry MellomRob Deis Trevor Vindevoghel

Site Directions:Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.

0

Page 92: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Date TruckingFirmTicketOil Water Other Oil

IIWater Other To-From

9/12/2017BlackGold 43821 11.00

13-Sep BlackGold 45925 15.00

9/13/2017BlackGold 45929 15.25

3-23-12-27w1

3-23-12-27W1

7-18-10-29Kiwi

26.00

II I ~

0.00 15.25

ls 'e so

DateLocationLoad Fluid Zone Perfs

Fluid In M3 Fluid Out M3 LocationDate Trucking Firm Ticket Oil Water Other Oil Water Other To - From

9/12/2017 Black Gold 43821 11.00 3-23-12-27w113-Sep Black Gold 45925 15.00 3-23-12-27W1

9/13/2017 Black Gold 45929 15.25 7-18-10-29Kiwi

26.00 0.00 15.25Reported By Larry Mellom 306 485-7368

Page 93: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Fire Sky Energy Inc.Expense Summary

North Hargrave

Well Natnet Highmark North Hargrave 12-24-12-27W I

Location: 12-24-12-27WI

UWIt 0

Licence: 10154

Cost Centre: 0

AFEt FS 2017-047

Worlrover Objective: Pull esp run tubing pump

September 12, 2017

September 12, 2017

September 12, 2017

September 12, 2017

September 12, 2017

September 12, 2017

September 12, 2017

September 12, 2017

September 12, 2017

September 12, 2017

September 13, 2017

September 13, 2017

September 13, 2017

September 13, 2017

September 13, 2017

September 13, 2017

September 13, 2017

September 13, 2017

September 13, 2017

September 13, 2017

September 14, 2017

Strad

Certified

Black Gold

Baker Hughes

Red H~awk

Mellom's Oilfield

Weir Seaboard

Fontana

Baher Hughes

Camion

Certified

Black Gold

Mellom's Oilfield

TSM

Q2 ALS

Q2 ALS

Tryton

Camion

Pure Chem

BlackGold

Certified

Spot Rig Matts and pick up

Rig

Tank Truck

Install ESP

Anular rental and trucking

Supervision

stuffing box repair old wellhead

hot shot

Pull ESP send to Leduc

Haul rods wellhead and tbg pump

Rig

Haul water in

Supervision

Rods polish rod

Pump

tubing drain swages and perf pup

scraper and bit

Pick up trailer and do returns

100L od H2S scavenger

empty tank kiwi

return to base

Fire Sky Energy Inc.Expense Summary Page 12 of 19

est

945

43821

26529

2017-05-37

est

29222

27102

2021

946

45925

est

14-3667

14-3685

esdssd0379

2025

est

est

947

$ 5,500.00

$ 7,335.00

$

$ 11,672.00

$ 2,200.00

$ 1,200.00

$ 3,000.00

$ 225.00

$ 7,450.00

$ 1,080.00

$ 8,690.00

$ 190.00

$ 1,325.00

$ 11,000.00

$ 14,885.00

$ 1,160.00

$ 900.00

$ 1,080.00

$ 420.00

$ 500.00

$ 3,870.00

5,500.00

12,835.00

12,835.00

24,507.00

26,707.00

27,907.00

30,907.00

31,132.00

38,582.00

39,662.00

48,352.00

48,542.00

49,867.00

60,867.00

75,752.00

76,912.00

77,812.00

78,892.00

79,312.00

79,812.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

Expense Summary Page 12 of 19

Well Name: Highmark North Hargrave 12-24-12-27W1Location: 12-24-12-27W1

UWI: 0Licence: 10154

Cost Centre: 0AFE: FS 2017-047

Date Invoice # Amount CumulativeSeptember 12, 2017 est 5,500.00$ 5,500.00$ September 12, 2017 945 7,335.00$ 12,835.00$ September 12, 2017 43821 -$ 12,835.00$ September 12, 2017 26529 11,672.00$ 24,507.00$ September 12, 2017 2017-05-37 2,200.00$ 26,707.00$ September 12, 2017 1,200.00$ 27,907.00$ September 12, 2017 est 3,000.00$ 30,907.00$ September 12, 2017 29222 225.00$ 31,132.00$ September 12, 2017 27102 7,450.00$ 38,582.00$ September 12, 2017 2021 1,080.00$ 39,662.00$ September 13, 2017 946 8,690.00$ 48,352.00$ September 13, 2017 45925 190.00$ 48,542.00$ September 13, 2017 1,325.00$ 49,867.00$ September 13, 2017 est 11,000.00$ 60,867.00$ September 13, 2017 14-3667 14,885.00$ 75,752.00$ September 13, 2017 14-3685 1,160.00$ 76,912.00$ September 13, 2017 esdssd0379 900.00$ 77,812.00$ September 13, 2017 2025 1,080.00$ 78,892.00$ September 13, 2017 est 420.00$ 79,312.00$ September 13, 2017 est 500.00$ 79,812.00$ September 14, 2017 947 3,870.00$ 83,682.00$

83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$

Fire Sky Energy Inc.Expense Summary

North Hargrave

Workover Objective: Pull esp run tubing pump

Company Service

Baker Hughes Install ESPRed H|awk Anular rental and trucking

Mellom's Oilfield Supervision

Strad Spot Rig Matts and pick upCertified Rig

Black Gold Tank Truck

Camion Haul rods wellhead and tbg pumpCertified Rig

Black Gold Haul water in

Weir Seaboard stuffing box repair old wellheadFontana hot shot

Baher Hughes Pull ESP send to Leduc

Q2 ALS tubing drain swages and perf pupTryton scraper and bitCamion Pick up trailer and do returns

Mellom's Oilfield SupervisionTSM Rods polish rod

Q2 ALS Pump

Pure Chem 100L od H2S scavengerBlackGold empty tank kiwiCertified return to base

Fire Sky Energy Inc.

Page 94: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Expense SummaryNorth Hargrave

Well Natnet Highmark North Hargrave 12-24-12-27W1

Location: 12-24-12-27W1

UWIt 0

Licence: 10154

Cost Centre: 0

AFEt FS 2017-047

Worirover Objective: Pull esp run tubing pump

Fire Sky Energy Inc.Expense Summary

Expense Summary Page 13 of 19

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

Expense Summary Page 13 of 19

Well Name: Highmark North Hargrave 12-24-12-27W1Location: 12-24-12-27W1

UWI: 0Licence: 10154

Cost Centre: 0AFE: FS 2017-047

Date Invoice # Amount Cumulative83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$

Expense SummaryNorth Hargrave

Workover Objective: Pull esp run tubing pump

Company Service

Fire Sky Energy Inc.Expense Summary

Page 95: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Well Names

Location:

UWIt

Licence:

Cost Centre:

AFEtWorlrover Objective:

Highmark North Hargrave 12-24-12-27W1

12-24-12-27W1

0

10154

0

FS 2017-047

Pull esp run tubing pump

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

83,682.00

Expense Summary Page 14 of 19Expense Summary Page 14 of 19

Well Name: Highmark North Hargrave 12-24-12-27W1Location: 12-24-12-27W1

UWI: 0Licence: 10154

Cost Centre: 0AFE: FS 2017-047

Pull esp run tubing pump

Date Invoice # Amount Cumulative83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$

Workover Objective:

Company Service

Page 96: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Fire Sky Energy Inc.Daily Summary

North Hargrave

Date: September 13, 2017

8'or/rover Objective: Run rods and rig out

Day¹: 2

~ ~ ~

I I

I i ls'l

SITP: vac kPa SICP:

I Ivac kPa

~o- ~ ~

Weather: 24C 10km

7:30 Start and service equipment. Had safety meeting.

Checked crown saver and kills.

Pulled tubing pump out and laid down.

Made up Tryton bit and scraper.

Run 58 joints and installed packoff.

Tagged bottom with 59th joint at 568.5mkb.

Reverse circulated could not make any head way. Tapped bottom firmly and circulated. No head way.

Rotated a bit with tongs. Could not break it up.

Took I m3 to fill tubing. Lost I m3 every 15min while reverse circulating.

Notidy office. Rigged out packoff. Pulled bit and scraper and laid down.

Picked up tubing pump. Run 1.86m 73mm perf pup on bottom c/w bull plug.

Run 73mm x 88.9mm swage c/w shaved 88.9mm collar.

Rerun tubing pump Q2ALS 25-325-thos-24-2-4 Q14-139.

Run I joint of 73mm tubing. Run new tubing drain.

Run 55 joints of 73mm J55 eue tubing 9.67kg/m.

Picked up 3 pups 73mm J55 eue 9.67kg/m.

3.08m 2.48m and 1.86m. Picked up I joint 73mm tubing.

14:00 Land tubing hanger. Rig out bop.

Tubing hanger was wrong style. Ordered right one from Metra. They sent wrong one out.

Wait on tubing hanger.

Install new tubing hanger.

Made up bonet, ratigan and flowtee.

Run latch and 8 38.1mm k Bars. Run 64 19mm pl sp 96 rods and tagged plunger. Suck on tubing on way in.

Unlatched and spaced out. 8 kbars 64 19mm sp 96 I 19mm x 1.24m and I .62m x 19mm pl sp 96 ponies

Latch onto pump. Installed new polish rod xm19 x 9.14m x 31.8mm.

Stroked tubing to 5mpa.

Rigged out and cleaned up. Moved off lease.

Released rig. Park at 4-25-12-27wl

9/14/2017 Return to base in morning

~ ~ ~

~ ~

' ~ ~~ ~

~ ~ ~ ~

~ ~

~ ~ ~

- ~ - ~

~ ~ I

~ ~ ~

See Expense Summary sheet for Daily Cost Summary

Well Name: Licence #:Location: Cost Centre:

UWI: AFE#:

SITP: vac kPa SICP: vac kPa Weather: 24C 10kmTime7:30

Notidy office. Rigged out packoff. Pulled bit and scraper and laid down.Picked up tubing pump. Run 1.86m 73mm perf pup on bottom c/w bull plug.Run 73mm x 88.9mm swage c/w shaved 88.9mm collar.Rerun tubing pump Q2ALS 25-325-thos-24-2-4 Q14-139.Run 1 joint of 73mm tubing. Run new tubing drain. Run 55 joints of 73mm J55 eue tubing 9.67kg/m.Picked up 3 pups 73mm J55 eue 9.67kg/m.3.08m 2.48m and 1.86m. Picked up 1 joint 73mm tubing.

14:00 Land tubing hanger. Rig out bop.Tubing hanger was wrong style. Ordered right one from Metra. They sent wrong one out.

9/14/2017

Service Rig: Supervisor:Toolpush: Reported to:

Workover Objective: Run rods and rig out

Fire Sky Energy Inc.Daily Summary

North Hargrave

Date: September 13, 2017

Day #: 2Highmark North Hargrave 12-24-12-27W1 1015412-24-12-27W1 0

Pulled tubing pump out and laid down.

0 FS 2017-047Daily Synopsis

Operation @ 08:00 HRS

Detailed Daily Summary

Operations SummaryStart and service equipment. Had safety meeting.Checked crown saver and kills.

Latch onto pump. Installed new polish rod xm19 x 9.14m x 31.8mm.

Made up Tryton bit and scraper.Run 58 joints and installed packoff.Tagged bottom with 59th joint at 568.5mkb.Reverse circulated could not make any head way. Tapped bottom firmly and circulated. No head way.Rotated a bit with tongs. Could not break it up.Took 1m3 to fill tubing. Lost 1m3 every 15min while reverse circulating.

Wait on tubing hanger.Install new tubing hanger.Made up bonet, ratigan and flowtee.Run latch and 8 38.1mm k Bars. Run 64 19mm pl sp 96 rods and tagged plunger. Suck on tubing on way in.Unlatched and spaced out. 8 kbars 64 19mm sp 96 1 19mm x 1.24m and 1 .62m x 19mm pl sp 96 ponies

See Expense Summary sheet for Daily Cost Summary

Stroked tubing to 5mpa.Rigged out and cleaned up. Moved off lease.Released rig. Park at 4-25-12-27w1Return to base in morning

Certified Rig 1 Larry MellomRob Deis Trevor Vindevoghel

Site Directions:Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.

0

Page 97: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Fire Sky Energy Inc.Daily Summary

North Hargrave

Date:

8'orhover Objective: Pull esp run tubing pump

Day¹: 3

See Expense Summary sheet for Daily Cost Summary

Well Name: Licence #:Location: Cost Centre:

UWI: AFE#:

SITP: kPa SICP: kPa Weather:Time

Service Rig: Supervisor:Toolpush: Reported to:

Workover Objective: Pull esp run tubing pump

Fire Sky Energy Inc.Daily Summary

North Hargrave

Date:

Operation @ 08:00 HRS

Day #: 3Highmark North Hargrave 12-24-12-27W1 1015412-24-12-27W1 00 FS 2017-047

Daily Synopsis

Detailed Daily Summary

Operations Summary

See Expense Summary sheet for Daily Cost Summary

Larry MellomTrevor Vindevoghel

Site Directions:Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.

0

Page 98: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Fire Sky Energy Inc.Daily Summary

North Hargrave

Date:

8'orhover Objective: Pull esp run tubing pump

Day¹: 0

See Expense Summary sheet for Daily Cost Summary

Well Name: Licence #:Location: Cost Centre:

UWI: AFE#:

SITP: kPa SICP: kPa Weather:Time

Service Rig: Supervisor:Toolpush: Reported to:

Workover Objective: Pull esp run tubing pump

Fire Sky Energy Inc.Daily Summary

North Hargrave

Date:

Operation @ 08:00 HRS

Day #: 0Highmark North Hargrave 12-24-12-27W1 1015412-24-12-27W1 00 FS 2017-047

Daily Synopsis

Detailed Daily Summary

Operations Summary

See Expense Summary sheet for Daily Cost Summary

Larry MellomTrevor Vindevoghel

Site Directions:Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.

0

Page 99: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

TankCoefficient

1)Cylindricallanks:m3/cm:0.0tx(Diameter,inm)2x0.785

2)Rectangularlanka:m3/cm:0.01x(Length,inm)x(Width,inm)

SWABREPORT

PAGE 1

WellName& Location:

LoadFluidToRecover. m'ii, m'aterRecoveredToDate, m Oil;

TankCoef.

m'ater

1m'm; Date

LeftToRecover: m'ii, m'water

Ix .x. I

STARTGUAGE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tank Coefficient1) Cylindrical Tanks: m3/cm: 0.01 x (Diameter, in m) 2 x 0.785 PAGE 12) Rectangular Tanks: m3/cm: 0.01 x (Length, in m) x (Width, in m)

Tank Coef. m3 cm; Date

m3 Oil; m3 Water m3 Oil; m3 Water m3 Oil; m3 Water

Fluid Swab Tank Gauge Total Fluid Water OilLevel Depth Guage Difference This Run Cum. Water This Run Cum This Run Cum Salinity Saver Kpa Kpa

Swab No. Time (m) (m) M3 (cm) (m3) (m3) Cut (m3) (m3) (m3) (m3) % Solids % PH Rubbers Cups Casing Tubing Remarks

1 0.00 0.00 0.00 0.002 0.00 0.00 0.00 0.00 0.003 0.00 0.00 0.00 0.00 0.004 0.00 0.00 0.00 0.00 0.005 0.00 0.00 0.00 0.00 0.006 0.00 0.00 0.00 0.00 0.007 0.00 0.00 0.00 0.00 0.008 0.00 0.00 0.00 0.00 0.009 0.00 0.00 0.00 0.00 0.0010 0.00 0.00 0.00 0.00 0.0011 0.00 0.00 0.00 0.00 0.0012 0.00 0.00 0.00 0.00 0.0013 0.00 0.00 0.00 0.00 0.0014 0.00 0.00 0.00 0.00 0.0015 0.00 0.00 0.00 0.00 0.0016 0.00 0.00 0.00 0.00 0.0017 0.00 0.00 0.00 0.00 0.0018 0.00 0.00 0.00 0.00 0.0019 0.00 0.00 0.00 0.00 0.0020 0.00 0.00 0.00 0.00 0.0021 0.00 0.00 0.00 0.00 0.0022 0.00 0.00 0.00 0.00 0.0023 0.00 0.00 0.00 0.00 0.0024 0.00 0.00 0.00 0.00 0.0025 0.00 0.00 0.00 0.00 0.00 0.0026 0.00 0.00 0.00 0.00 0.00 0.0027 0.00 0.00 0.00 0.00 0.00 0.0028 0.00 0.00 0.00 0.00 0.00 0.0029 0.00 0.00 0.00 0.00 0.00 0.0030 0.00 0.00 0.00 0.00 0.00 0.0031 0.00 0.00 0.00 0.00 0.00 0.0032 0.00 0.00 0.00 0.00 0.00 0.0033 0.00 0.00 0.00 0.00 0.00 0.0034 0.00 0.00 0.00 0.00 0.00 0.0035 0.00 0.00 0.00 0.00 0.00 0.0036 0.00 0.00 0.00 0.00 0.00 0.0037 0.00 0.00 0.00 0.00 0.00 0.0038 0.00 0.00 0.00 0.00 0.00 0.0039 0.00 0.00 0.00 0.00 0.00 0.0040 0.00 0.00 0.00 0.00 0.00 0.0041 0.00 0.00 0.00 0.00 0.00 0.0042 0.00 0.00 0.00 0.00 0.00 0.0043 0.00 0.00 0.00 0.00 0.00 0.0044 0.00 0.00 0.00 0.00 0.00 0.0045 0.00 0.00 0.00 0.00 0.00 0.00

Load Fluid To Recover: Recovered To Date; Left To Recover:

SWAB REPORT

Well Name & Location: 1

START GUAGE

Page 100: HIGH~ - Province of Manitobacontent.gov.mb.ca/iem/petroleum/documents/technical/010154.pdf · Chronological report of all completion operations incluMng full details. 15. ... -Is

Area;NorthHargrave

WellName;HighmarkNorthHargrave12-24-12-27W1

Location;12-24-12-27W1

UWI:0

Licence:10154

FireSkyEnergyInc.

EquipmentReport

NorthHargrave

Remarks;

Area:Well Name:

Location:UWI:

Licence:010154

Wellhead EquipmentDescription Size Manufacturer Model Comments

Fire Sky Energy Inc.Equipment Report

North HargraveNorth HargraveHighmark North Hargrave 12-24-12-27W112-24-12-27W1

Tubing HeadTubing Hanger 73mm Streamflow SplitTubing BonnetRod BOPFlow TeePressure SwitchMaster ValveFlowline ValveCasing Valve #1Casing Valve #2

Pumping UnitDescription Size Manufacturer Model Comments

Stuffing Box

PumpjackElectric MotorGas MotorChemical PumpBeltsController

Remarks: