High Performance Computing · Issue Fund Doc to Performing Activity NO YES Identify YESAcct NO YES...

2
Our capabilies analysis team consists of degreed engineers, senior Navy project managers and MBA graduates with over 30 years of Navy experience. In addion to the capabilies analysis team, Fathom 4 has more than 25 Years of Configuraon Management technical experse and is capable of conducng Configuraon Management across the Hardware and Soſtware spectrum of High Performance Compung. Our on-site team integrates into the client team and carefully and deliberately conducts analysis of the enterprise objecves and the process by which to achieve them. The Fathom 4 team: Is Dedicated, Experienced, and Independent Integrates into current processes Tracks and analyzes rapidly transioning projects Determines overlaps and or shoralls in current capabilies Compiles unbiased requirements based on system future capability Bridges the R&D to Operaons Gap Capabilies Cost and Time Saving Benefits High Performance Compung The Fathom 4 Program Management team brings significant engineering and Navy operaonal experience that applies to any capability analysis, yielding cost savings and a clear course of acon for the future for the client, standardizing cross-client planning processes and sub-processes, with specific focus on the technical capabilies expected to migrate from other organizaons. Praccal applicaons include analysis of High Performance Compung (HPC) requirements for numerical models transioning from Navy R&D to Naval Operaons, and coordinang these transions within the client’s Program Objecve Memorandum (POM) cycle. This ensures the client has the appropriate HPC resources to support fleet operaons of the future. Similar analysis is conducted for the HPC requirements associated with the ingest of Satellite data feeds as they are brought on-line by Navy, Air Force, and other US Government enes. The Fathom 4 team determines the most efficient course of acon, with the highest probability of operaonal success, and presents that to the Navy customers. Our on-site team integrates into the client team, carefully and deliberately conducng analysis of the enterprise objecves and the process by which to achieve them: Reduce prototype to operaonal implementaon me-frame Reduce waste through targeted purchasing goals Track procurement and integraon unl operaonally stable The Fathom 4 Team Fathom 4 is the most professional, responsive, and capable small business I have encountered in 10 years of acquision experience. "US Navy Program Manager" 0 50 100 150 200 250 300 350 400 0 20 40 60 80 100 120 1 2 3 4 1 2 3 4 1 2 3 4 Current 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 FULL SYSTEM REQUIREMENTS - (Lines) COMPUTE REQUIREMENTS - (Bars) Total Compute Requirements in TFLOP / Sec Per Quarter Application 16 Application 15 Application 14 Application 13 Application 12 Application 8 Application 7 Application 6 Application 5 Application 4 Application 3 Application 2 Application 1 Required Local Expected Local Size Total Required Accessible www.fathom4.com A Service-Disabled Veteran-Owned Small Business

Transcript of High Performance Computing · Issue Fund Doc to Performing Activity NO YES Identify YESAcct NO YES...

Page 1: High Performance Computing · Issue Fund Doc to Performing Activity NO YES Identify YESAcct NO YES YES YES Acct Mgr Signature GPC NO Dept Hd Authorize $ Authorize $ NO YES YES Acct

Our capabilities analysis team consists of degreed engineers, senior Navy project managers and MBA graduates with over 30 years of Navy experience. In addition to the capabilities analysis team, Fathom 4 has more than 25 Years of Configuration Management technical expertise and is capable of conducting Configuration Management across the Hardware and Software spectrum of High Performance Computing. Our on-site team integrates into the client team and carefully and deliberately conducts analysis of the enterprise objectives and the process by which to achieve them. The Fathom 4 team:

• Is Dedicated, Experienced, and Independent• Integrates into current processes• Tracks and analyzes rapidly transitioning projects• Determines overlaps and or shortfalls in current capabilities• Compiles unbiased requirements based on system future capability• Bridges the R&D to Operations Gap

Capabilities

Cost and Time Saving Benefits

High Performance Computing

The Fathom 4 Program Management team brings significant engineering and Navy operational experience that applies to any capability analysis, yielding cost savings and a clear course of action for the future for the client, standardizing cross-client planning processes and sub-processes, with specific focus on the technical capabilities expected to migrate from other organizations. Practical applications include analysis of High Performance Computing (HPC) requirements for numerical models transitioning from Navy R&D to Naval Operations, and coordinating these transitions within the client’s Program Objective Memorandum (POM) cycle. This ensures the client has the appropriate HPC resources to support fleet operations of the future. Similar analysis is conducted for the HPC requirements associated with the ingest of Satellite data feeds as they are brought on-line by Navy, Air Force, and other US Government entities. The Fathom 4 team determines the most efficient course of action, with the highest probability of operational success, and presents that to the Navy customers.

Our on-site team integrates into the client team, carefully and deliberately conducting analysis of the enterprise objectives and the process by which to achieve them:

Reduce prototype to operational implementation time-frame

Reduce waste through targeted purchasing goals Track procurement and integration until

operationally stable

The Fathom 4 Team

Fathom 4 is the most professional, responsive, and capable small business I have encountered in 10 years of acquisition experience. "US Navy Program Manager"

0 50

10

0 15

0 20

0 25

0 30

0 35

0 40

0

0 20

40 60

80 100

120

1 2 3 4 1 2 3 4 1 2 3 4

Current 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017

FU

LL S

YSTE

M R

EQU

IREM

ENTS

- (L

ines

)

COM

PUTE REQ

UIREM

ENTS - (Bars)

Total Compute Requirements in TFLOP / Sec Per QuarterApplication 16

Application 15

Application 14

Application 13

Application 12

Application 8

Application 7

Application 6

Application 5

Application 4

Application 3

Application 2

Application 1

Required Local

Expected Local Size

Total Required Accessible

www.fathom4.comA Service-Disabled Veteran-Owned Small Business

Page 2: High Performance Computing · Issue Fund Doc to Performing Activity NO YES Identify YESAcct NO YES YES YES Acct Mgr Signature GPC NO Dept Hd Authorize $ Authorize $ NO YES YES Acct

ProcessCapability AssessmentObserve current research and development programs and projects in order to ascertain completion time-frames, resource utilization, and anticipated operational usageTrack current resource utilization, with an emphasis on capacity trends, and ancillary system capabilitiesAssist in the determination of infrastructure efficiency improvements and limitationConduct Analysis of existing Configuration Management processes and repositories to determine potential areas of improvement $(1,000,000.00)

$-

$1,000,000.00

$2,000,000.00

$3,000,000.00

$4,000,000.00

$5,000,000.00

$6,000,000.00

$7,000,000.00

$8,000,000.00

2014 2015 2016 2017 2018 2019

Fiscal Year

Cost Analysis Recommended Architecture vs. Alternate Solution

HW Total

SW Total

Manning

Annual Total

Running Total

Recommended Architectureresults in an estimated savingsof $7.5M over 5 years

050

010

0015

0020

00

0 100

200 300

400 500

600

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3

Current 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019 2019 2019 2020 2020 2020

PEA

K FU

LL S

YSTE

M R

EQU

IREM

ENTS

- (L

ines

)

COM

PUTE REQ

UIREM

ENTS - (Bars)

Peak Requirement Estimates in TFLOP / Sec Application 17

Application 16

Application 15

Application 14

Application 13

Application 12

Application 8

Application 7

Application 6

Application 5

Application 4

Application 3

Application 2

Application 1

Required Local

Expected System Size

Total Requirements

PlanningCalculate required growth and milestones based on resource deficit and prototype transition datesEvaluate cost of anticipated growth, and balance against budget constraints, the POM cycle, IT Procurement requests and existing system limitationsDesign Configuration Management processes within existing systems to provide stable solutions for the clientUtilize Enterprise level requirements to help determine implementation and testing, strategies and time lines

ExecutionCollect requirements and estimated costs balanced against anticipated budget, into a customer executable list with integrated schedule milestones and constraintsWork with contracting specialists to address uncertainties and assist with technical justification throughout the IT procurement processIntegrate with existing personnel and processes to implement achievable Configuration Management solutionsDocument and recommend improvements based on end-user feedback and potential efficiency gains for existing processes and work flows Integrate with system administrators and installation personnel to provide feedback regarding details and time lines of equipment procurement, delivery and integration enabling faster time to system availability

Requesting Department

PR Routing

Checkbook Holder

ProcurementFacilitator

Program Manager/Account Manager

Contracts Liaison

Comptroller

GPC Holder

Material Handler

RequirementPR

Routing Generate

PRUserSig

Dept HdSig

IT ?

Dept Hd$

Avail ?

PR Returnedto Submitter

CompilePR Pkg

Dept Hd$

Avail ?

NO

NONO

OutsideProcess

NOITPR

Approval?

NO

YES

ITPRReq?

Dept Hd

Purchase

See ReceiptsProcess

ProcessPR

Package

Issue Fund Docto Performing

ActivityNO YES

IdentifyAcctYES YES

NO

YES

YES

YES

Acct MgrSignature

GPC NO

Dept Hd Authorize$

Authorize$

NO

YES

YES

IdentifyAcct

PURCHASE REQUEST PROCESS

We Believe in People Our Troops. Our Clients. Our Team. Fathom 4 has a simple mission: Engineering Freedom - for our country, our clients, and our employees. We delight our DoD clients by providing the best value engineering services. Fathom

4 employees are critical members of the DoD programs we support, by being highly professional, competent, industrious, and ethical. We are a service-disabled veteran-owned small business and an employee-centric company. Fathom 4 was founded on the belief that if we take care of our employees to the best of our ability, then they will do the same for our clients.672 Marina Drive, Suite 202, Charleston, SC 29492 - 843-603-1149 - Fathom4.com

DUNS: 078459585 Cage: 6SG73 NAICS: 541330, 541990, 541512