22
2/13/2013 1 EarthWise HVAC Simon Ho e: [email protected] HIGH PERFORMANCE CHILLED WATER SYSTEMS 2 EarthWise HVAC – High Performance CHW Plants Low Flow Low Temperature Systems Variable Flow Systems Variable CHW Variable CDW Chillers Piping Configurations Chiller Tower Optimization Pumping Optimization

Transcript of HIGH PERFORMANCE CHILLED WATER SYSTEMS … · ... Efficiencies at full load at AHRI (Standard MEPS)...

2/13/2013

1

EarthWise HVAC

Simon Hoe: [email protected]

HIGH PERFORMANCE CHILLED WATER SYSTEMS

2

EarthWise HVAC –High Performance CHW Plants

• Low Flow Low Temperature Systems

• Variable Flow Systems

– Variable CHW

– Variable CDW

• Chillers Piping Configurations

• Chiller Tower Optimization

• Pumping Optimization

2/13/2013

2

3

LOW FLOW LOW TEMPERATURE HIGH EFFICIENCY SYSTEMS

4

Low Flow, Low TemperatureHigh Efficiency

piping

~/~/––$$

ductwork

~/~/––$$

+/+/--$$

air handlers

+/+/--$$

+/+/--$$controls

chillers

+/+/--$$

FIRST COST &OPERATING COST

COMFORT,ACOUSTICS &EFFICIENCY

1.1.Slow the Slow the

FlowFlow

2.2.Drive the Drive the

Chiller Chiller

HarderHarder

3.3.Chillers Chillers

more more

efficient efficient

than than

ancillariesancillaries

2/13/2013

3

5

Low Flow Low Temperature

• Low flow CHW and/or CDW improves system efficiency at part load

– Pumping power reduction more than offset slight increase in chiller power

• Low flow also decreases infrastructure costs

– Piping, valves

– Insulation

– Pumps

– Towers

• CT sizing can reduce with warm (design) condenser water and lower flows

• Re-invest some of the capital back into higher efficiency chillers, towers, coils and controls

6

Chiller Efficiency (Code vs Best in Class)

3.0

3.5

4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

8.0

0 500 1000 1500 2000

MEPS AU2008

1970s

1980s

1990s

2000s

2010s

kW

CO

P

Note: Efficiencies at full load at AHRI (Standard MEPS) conditions – water-cooled chillers

Higher Higher efficiencies efficiencies today allowtoday allowfor better for better

chiller chiller utilizationutilization

2/13/2013

4

7

CHW Design Parameters

Parameter Past/Conventional EarthWise

Leaving CHW, [oC] 6 ~ 7 4 ~ 6

CHW δδδδT, [K] 5 ~ 7 9 ~ 12

CHW Flow, [L/s/MW] 34 ~ 48 20 ~ 26

Leaving CDW, [oC] 35 36 ~ 38

CDW δδδδT, [K] 5.5 8 ~ 10

CDW Flow, [L/s/MW] 54 28 ~ 35

CooltoolsTM Chilled Water Plant Design Guide (Dec 2009) recommends

� 6.7 to 11.1K δT on chilled water and

� 6.7 to 10K δT on condenser δT

Steven Taylor (ASHRAE Dec 2011), “Clearly life-cycle costs will be lower, the higher the

(chilled water) δT ...” within the range of their analysis (up to 13.9K δT)

8

• Chiller efficiency improvements

– Minimum code requirements: MEPS compliant

– AHRI or Eurovent certified; assurance of performance

• CHW Plant Ancillaries do Count !

– CHW pumps

– CDW pumps

– Cooling Tower fans

• CHW Plant System Efficiency [COP] defined by

– Total Power Input includes power input of chillers and ancillaries

CHW Plant Efficiency

COOLING CAPACITY [kW]

TOTAL POWER INPUT [kW]

2/13/2013

5

9

CHW Plant Efficiency Scale

Source: Thomas Hartman, 2001

10

CHW Plant Efficiency

• Conventional CHW plants spend significant portion of operational hours at part load

• Ancillaries’ power input are significant at part load

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

25% 50% 70% 100%

Tower Fans

CDS Pumps

EVP Pumps

Chillers

Plant Capacity

% T

ota

l kW

in

pu

t

Note: Based on two screw chillers in parallel, AHRI conditions and sequenced.

Pump heads at 400/250 kPa, cross-flow towers

2/13/2013

6

11

VARIABLE FLOWCHILLED WATER SYSTEMS

12

13.0°C300 L/s

5.0°C300 L/s

13.0°C

13.0°C 5.0°C100 L/s

1

13.0°C 5.0°C100 L/s

2

13.0°C 5.0°C100 L/s

3

100 L/s(each)

Bypass

Primary–only CVDesign

Primary–only CVDesign

Primary CVpumpsPrimary CVpumps

2/13/2013

7

13

13.0°C250 L/s

5.0°C250 L/s

11.7°C

11.7°C 5.0°C100 L/s

1

11.7°C 5.0°C100 L/s

2

11.7°C 5.0°C100 L/s

3

100 L/s(each)

Bypass

Primary–only CVPart Load

Primary–only CVPart Load

Primary CVpumpsPrimary CVpumps

5.0°C50 L/s

14

13.0°C300 L/s

5.0°C300 L/s

13.0°C

13.0°C 5.0°C100 L/s

1

13.0°C 5.0°C100 L/s

2

13.0°C 5.0°C100 L/s

3

100 L/s (each)

bypass(decoupler)

Primary–secondaryDesign

Primary–secondaryDesign

Primary CVpumpsPrimary CVpumps

secondaryVV pumpssecondaryVV pumps

2/13/2013

8

15

13.0°C250 L/s

5.0°C250 L/s

11.7°C

11.7°C 5.0°C100 L/s

1

11.7°C 5.0°C100 L/s

2

11.7°C 5.0°C100 L/s

3

100 L/s(each)

bypass(decoupler)

Primary–secondaryPart load

Primary–secondaryPart load

Primary CVpumpsPrimary CVpumps

SecondaryVV pumpsSecondaryVV pumps

5.0°C50 L/s

16

Variable primaryDesign

Variable primaryDesign

13.0°C

300 L/s

5.0°C

300 L/s

13.0°C

∆∆∆∆P

13.0°C 5.0°C100 L/s

1

13.0°C 5.0°C100 L/s

2

13.0°C 5.0°C100 L/s

3

((((or flow meter)Primary VVpumpsPrimary VVpumps

0 L/s

150 L/s(each)

2/13/2013

9

17

Variable primaryPart load

Variable primaryPart load

13.0°C

250 L/s

5.0°C

250 L/s

13.0°C

∆∆∆∆P

13.0°C 5.0°C83.3 L/s

1

13.0°C 5.0°C83.3 L/s

2

13.0°C 5.0°C83.3 L/s

3

0 L/s

Primary VVpumpsPrimary VVpumps

125 L/s(each)

((((or flow meter)

18

Variable primarySystem Flow <

Chiller Min Flow

Variable primarySystem Flow <

Chiller Min Flow

13.0°C

20 L/s

5.0°C

20 L/s

9.0°C

∆∆∆∆P

9.0°C 5.0°C40 L/s

1

OFF

2

OFF

3

5.0°C20 L/s

Primary VVpumpsPrimary VVpumps

1 pump 40 L/s

((((or flow meter)

2/13/2013

10

19

VPF - Advantages

• Less capital...more space

• Energy efficient

– Pumping savings during most operating conditions, down to minimum flow

– Pumping kW ∝ {Flow} 2.0 to 2.8

• Improves reliability of system with manifold

arrangement

• Separates pumping duty from cooling duty

– Not operating pumps to start chillers

• Chillers can fully realize its maximum capacity

– Over-pumping during part load to fully load chillers before bringing on the next chiller

20

VPF Chiller Selections

• Flow ‘range-ability’

– Ratio of minimum to design flow rates

– Aim for 1:2 ratio as a minimum

– Better ratios with larger centrifugal chillers than smaller screw type due to HX combinations available

– Higher velocities (high number of passes) will have higher design δP but also better range

� High design δP does not mean high energy consumption as chiller plant runs at part load most of the time

– Low flow designs may have poorer range-ability unless piped in series

– Consult manufacturers with experience

2/13/2013

11

21

VPF System Considerations

• System level Controls, not stand alone loops

• Basic operation

– Enable plant

– Control pumps

– Start lead chiller

– Start and stop lag chillers

– Vary flow to demand with dynamic reset

– Manage chiller and bypass operation at low flow

• Managing lead-lag

• Transient flows

• Sequence of Operation

• System integrator with experience

22

Variable primaryControls

Variable primaryControls

∆∆∆∆P

40 L/s

1

OFF

2

OFF

3

Primary VVpumpsPrimary VVpumps

((((or flow meter)

SYSTEM

LEVEL CONTROLS

∆∆∆∆P

2/13/2013

12

23

System Options and Analysis

• No one ideal flow or temperature for all jobs

– There is a trend of lower operating costs with lower flows up to a certain point

• Need comprehensive analysis, not spreadsheet

24

Full Load – System Input kW

0

50

100

150

200

250

300

350

400

450

500

Parallel AHRI Parallel AHRI, VPF

Low Flow CHW

Low Flow CHW & CDW

Tower Fans

CDS Pumps

EVP Pumps

Chillers

Note: Based on two screw chillers in parallel, sequenced. AHRI conditions compared to Low

Flow CHW 5.5/15.5C; Low Flow CDS 28/36C. Pump heads at 400/250 kPa, cross-flow towers

Syste

m k

W

2/13/2013

13

25

75% Load – System Input kW

0

50

100

150

200

250

300

350

Parallel AHRI Parallel AHRI, VPF

Low Flow CHW

Low Flow CHW & CDW

Tower Fans

CDS Pumps

EVP Pumps

Chillers

Note: Based on two screw chillers in parallel, sequenced. AHRI conditions compared to Low

Flow CHW 5.5/15.5C; Low Flow CDS 28/36C. Pump heads at 400/250 kPa, cross-flow towers

Syste

m k

W

26

50% Load – System Input kW

0

20

40

60

80

100

120

140

160

180

200

Parallel AHRI Parallel AHRI, VPF

Low Flow CHW

Low Flow CHW & CDW

Tower Fans

CDS Pumps

EVP Pumps

Chillers

Note: Based on two screw chillers in parallel, sequenced. AHRI conditions compared to Low

Flow CHW 5.5/15.5C; Low Flow CDS 28/36C. Pump heads at 400/250 kPa, cross-flow towers

Syste

m k

W

2/13/2013

14

27

25% Load – System Input kW

0

20

40

60

80

100

120

Parallel AHRI

Parallel AHRI, VPF

Low Flow CHW

Low Flow CHW & CDW

Tower Fans

CDS Pumps

EVP Pumps

Chillers

Note: Based on two screw chillers in parallel, sequenced. AHRI conditions compared to Low

Flow CHW 5.5/15.5C; Low Flow CDS 28/36C. Pump heads at 400/250 kPa, cross-flow towers

Syste

m k

W

28

Variable Condenser Flow (VCF)

• System efficiency of VCF improvements are less compared to VPF on CHW

– Tower static head remains constant

– Chiller power increases due to higher lift at low flow

– Less or not effective on lift sensitive chillers (VSD)

• Possible Improvement on system efficiency especially at low loads < 50% - requires system level

optimization controls

• Care with centrifugal chillers with surge limit and loss

of VSD benefit

– More sensitive with single stage centrifugals

– Check unloading at various condenser flows and temperatures

2/13/2013

15

29

CHILLER PIPING & CONFIGURATIONS

30

Parallel - Parallel

6.7oC, 47 L/s1100 kW1100 kW

1100 kW1100 kW 6.7oC, 47 L/s12.2oC

12.2oC

34.6oC 34.6oC29.4oC,

59 L/s

Note: Based on two screw chillers in parallel, sequenced at AHRI conditions. Pump heads at

400/250 kPa, cross-flow towers. System COP includes chillers, pumps & tower fans

25 kW

25 kW

20 kW20 kW

29.4oC,

59 L/s

27.9 KWaterside

Lift

COP 6.1

COP 6.1

COP

Chillers 6.1

System 4.6

34.6oC

6.7oC

2/13/2013

16

31

Series - Parallel

5.5oC,

52.4 L/s

1080 kW1080 kW 1020 kW1020 kW15.5oC

34.7oC 34.7oC29.4oC,

57 L/s

Note: Based on two screw chillers in series evap low flow, parallel cond. Pump heads at

400/250 kPa, cross-flow towers. System COP includes chillers, pumps & tower fans

28 kW

19 kW21 kW

29.4oC,

62 L/s

24.6 KWaterside

Lift

COP 5.8COP 6.8

COP

Chillers 6.3

System 5.0

29.2 K

10.1oC

34.7oC

10.1oC

5.5oC

32

Series – Counter-flow

5.5oC,

52.4 L/s

1200 kW1200 kW 1000 kW1000 kW15.5oC

36.1oC28.0oC,

75.5 L/s

Note: Based on two screw chillers in series evap low flow, counter-flow cond. Pump heads at

400/250 kPa, cross-flow towers. System COP includes chillers, pumps & tower fans

28 kW

25 kW31.7oC

26.0 KWaterside

Lift

COP 6.3COP 6.4

COP

Chillers 6.4

System 5.2

26.2 K

10.1oC

36.1oC31.7oC

10.1oC

5.5oC

2/13/2013

17

33

Parallel ConfigurationLarge Capacity Plants

36.0oC

Note: Based on two duplex centrifugal chillers in series evap low flow, counter-flow cond.

Pump heads at 400/250 kPa, cross-flow towers. System COP includes chillers, pumps & tower fans

4 off

2.5MW,

COP 6.59

COP

Chillers 6.6

System 5.7

28.0oC,

349 L/s

116 kWp

113 kWp

5.5oC,

217 L/s16.5oC

30.5

K

5.5oC

36.0oC

Waterside

Lift

34

Parallel ConfigurationLarge Capacity Plants

36.0oC

Note: Based on two duplex centrifugal chillers in parallel evap low flow, counter-flow cond.

Pump heads at 400/250 kPa, cross-flow towers. System COP includes chillers, pumps & tower fans

2 off

5.0 MW,

COP 6.91

COP

Chillers 6.9

System 6.0

28.0oC,

344 L/s

115 kWp

115 kWp

5.5oC,

217 L/s

16.5oC

26.0

K

10.0oC

36.0oC

Waterside

Lift

26.0

K

5.5oC

31.5oC

2/13/2013

18

35

Series – Series (counter-flow)Large Capacity Plants

15.5oC

36.0oC28.0oC,

340 L/s

Note: Based on two duplex centrifugal chillers in series evap low flow, counter-flow cond.

Pump heads at 400/250 kPa, cross-flow towers. System COP includes chillers, pumps & tower fans

127 kWp

113 kWp

31.6oC

23.2

K5.5MW,

COP 7.5

COP

Chillers 7.4

System 6.3

10oC

4.5MW,

COP 7.2

5.5oC,

238 L/s

23.8

K

10oC

33.8oC36.0oC

12.7oC

24.3

K

5.5oC

29.8oC31.6oC

7.7oCWaterside

Lift

36

Summary of EarthWise Chiller Plant Configurations

• Low flow CHW and CDW improves system COP

• Series connection improves performance at full and part load

• Use variable flow to improve pumping efficiency

– VPF with Series chillers maximizes pump savings

• Potential savings with variable condenser water flow at low loads

• Couple with overall chiller, pump and tower

sequencing strategy

• Include optimal tower water control

2/13/2013

19

37

CHILLER, TOWER AND PUMPING OPTIMIZATION

38

Chiller – Tower Optimization

�Cooling Load

�Condenser watertemperature

�Chiller design

�Wet-bulb

�Condenser watertemperature

�Heat Rejection Load

�Tower Design

2/13/2013

20

39

Condenser water controlAt Part Load

• Hot ?

– 26 to 29ºC minimizes tower fan power, increases chiller power

• Cold ?

– 15ºC minimizes chiller power, increases tower fan power

• Wet-bulb + 3K approach ?

– Assumption that Load ∝ WB ... Not always true !

– Approach is not fixed

• Optimized ?

– Dynamic reset based on load & ambient to minimize system energy

40

Chiller – Tower Optimization25% Chiller Load, 14°CWB

CT Cold Basin, °C

Po

wer

Inp

ut,

kW

0

10

20

30

40

50

60

70

80

90

14 16 18 20 22 24

CT kW

CH AFD kW

Total

CH non-AFD kW

Total

Note: AFD = adjustable frequency drive

OPT

OPT

2/13/2013

21

41

Chiller – Tower Optimization

TRACER

SYSTEM LEVEL

CONTROLS

TRH

FF

FF

TT

42

Pumping Optimization

• Variable Flow CHW systems

• System Level critical valve reset

– Keeps critical valve near fully open

– Dynamic reset of δP set point

• Minimizes pumping power

• Better coil and temperature control

• Better acoustics Air Handling Units

Control

Valves

Pressure

Differential

Controller or

Transmitter

VFD

VV CHWPTRACER

SYSTEM LEVEL

CONTROLS

2/13/2013

22

43