High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

28
High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo

description

Nextef Control System ( 2008 ) KLYSTRON MODULATOR Xylitol ( Server ) ( LINUX ) Xylitol ( Server ) ( LINUX ) OPERATION PANEL ( Python ) OPERATION PC ( Windows ) OPERATION PC ( Windows ) ASTEC-X EPICS IOC ・ KLYSTRON ADC DATA ( VK,IK,Vac etc. ) Archiver Viewer ( JAVA ) MODULATOR Control ( HV,TRG,RF SET&READ ) ADC DATA READ ( Channel Access ) PLC LINAC Server ( LINUX ) LINAC Server ( LINUX ) EPICS Channel Archiver HDD DATA STORAGE ・ KLY&ACC ADC DATA ( Vac,RF MONITOR etc. ) CHINO DATALOGGER CHINO DATALOGGER ACC UNIT NEW Server ( LINUX ) --- Software --- Computer ( Nextef ) --- Computer ( LINAC ) S. Ushimoto

Transcript of High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Page 1: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

High gradient study at KEK

CLIC08, Oct. 14-17, 2008

T. Higo

Page 2: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Nextef

Two klystron facility Nextef

One klystron setupKT-1

Inside shield roomT18_VG2.4_Disk

Page 3: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Nextef Control System( 2008)KLYSTRON

MODULATORXylitol( Server)( LINUX)

OPERATIONPANEL(Python)

OPERATION  PC(Windows)ASTEC-X

EPICS IOC ・KLYSTRON ADC DATA(VK,IK,Vac etc.)

Archiver Viewer( JAVA)

MODULATOR Control(HV,TRG,RF SET&READ)

ADC DATA READ(Channel Access)

PLC

LINAC  Server( LINUX)EPICS

Channel Archiver

HDD

DATA STORAGE

・KLY&ACC ADC DATA(Vac,RF MONITOR etc.) CHINO DATALOGGER

ACC UNIT

NEW Server( LINUX) --- Software

--- Computer (Nextef)--- Computer (LINAC)

S. Ushimoto

Page 4: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Nextef data acquisition and analysis

System control PCXylitol, Python, Linux

TDS3034B (300MHz)TDS3054B (500MHz)

VME Acoustic (SLAC)

Modulator PLC

CCG

RF crystal

AM

Data storageKEKB Inj. Control

Epics formatModulator

KlystronLLRF

S/H & DC Amp

Discri

Acoustic

Safety

X-ray

FC

081009

DPO7054(500MHz)

DPO7054(500MHz)

Control PC for OperatorWindows

Data loggerADC

INTLK module

Page 5: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Breakdown related monitors and their recording

• At BD, DPO7054: F, Rs, Ra, T, FC-UP, FC-Mid +?? 8 values– Recording 10 pulses with BD pulse at the last– This gives feed power level just before BD– Use this intensively for breakdown pulse analysis

• Nominal pulses are to be routinely recorded (not yet implemented)– With and without RF, take automatically

• TDS3000: Mod, S, N, S+N, S+N_refl, acoustic, X-ray, ….. – Recording for each BD and every one hour– Recording last pulse and/or a few pulse shapes in png and wfm– These make it possible to distinguish the breakdown whether ACC origin

or due to other components

5

Page 6: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

DPO being developed by Ushimoto

Get histogram

DPO system Want to make this system to be our nominal power reference

Page 7: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

T18_VG2.4_Disk #2 installed and processing started in late September

T18_VG2.4_Disk

GV SLAC3dB hybrid

Acoustic sensors

Plastic scinti.& PMT

FC

Page 8: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

51ns processing trend

14 hours on Oct. 11

RF-CNTL[V]ACC-IN Power [MW]

Changed attenuators

INTLK counted = 290

Page 9: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

081008 16:00 – 081009 16:00

INTLK due to setting reflection threshold too low, but it shows how the program does the processing.CNTL_V, Power, VAC

Page 10: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Power ON period at 51ns, 50Hz, 40kV

• 9/30 ~10/1 22hrs 2.5X(4/7)=1.5MW6MW33MV/m• 10/2 3hrs 3.5X(4/7)=2MW 7MW36MV/m• 10/3 6hrs 5X(4/7)=3MW 9MW40MV/m• 10/6 8hrs 6X(4/7)=3.4MW 10MW42MV/m• 10/8~11 14:00 60hrs 7MW – 9MW 19MW59MV/m• -------------------------------------------------------------------------------• Total up to now 99hrs 19MW, 59MV/m• Total number of INTLK’s since Oct. 3 including other than acc-

structure such as modulator or spurious 290 times

Page 11: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

0

20

40

60

80

100

0 10 20 30 40 50 60 70 80

CombOut CNTLprog reading [MW] --> PPM [MW]

CombOut PPM 47ns [MW]CombOut PPM 110ns[MW]CombOut PPM 169ns [MW]CombOut PPM 209ns [MW]CombOut PPM 246ns [MW]CombOut PPM 289ns [MW]

CombOut PPM [MW]

CombOut CNTL [MW]

Power calibrationCNTL program read crystal PH DC AMP ADC

Calibrated with peak power meter as nominal value

Some insufficient calibration still exists on pulse width

Checked with calorimetric method for output from structure

Page 12: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Initial trend compiled manually

0

20

40

60

80

100

0 50 100 150 200

T18_VG2.4_Disk #2 ProcessingInitial startup period at 51ns, 50Hz

Power in [MW]

ACC [MV/m]

Pow

er in

[MW

] <E

acc>

[M

V/m

]

RF ON Hours

Need to implement an easy tool for this sort of data acquisition

Page 13: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Typical pulse shape

ACC-IN

Nominal pulse BD pulse

RsRa

Tr

Comb

Refl

0

5000

10000

15000

20000

25000

30000

0 200 400 600 800 1000

RF pulse

ACC-IN_0Rs_0Ra_0Tr_0ACC-IN_1Rs_1Ra_1Tr_1

ACC-IN, Rs, Ra, Tr

Time [ns]

-30000

-20000

-10000

0

10000

20000

30000

40000

50000

0 200 400 600 800 1000

FC current pulse at BD

FC-UP_0FC-Mid_0_0RF_0FC-UP_1FC-Mid_1_1RF_1

FC-UP, FC-Mid

Time [ns]

FC-UP

FC-Mid

RF

DPO7054TDS3000

FC-UP

FC-Mid

Page 14: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Under development• Processing control

– Sophistication will be done through T18_VG2.4_Disk processing period

• Data acquisition system– Try DPO to be nominal input power reference– TDS suffer from intermittent lockup– Data storage should be made robust with backup

• Data analysis– Online viewing program is needed– Consistent analysis through longer period is needed

• Need support from outside– In any of these area

Page 15: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Processing control for T18_VG2.4_Disk

• Step-wise pulse width setting– 50-110-170-210-250-290ns

• ACC INTLK – by jump in Rs/FC current/VAC– Rs, FC: Threshold setting is manual, a little above nominal– VAC level nominal 10-4Pa

• System fault– by S+N_refl (reflection to the combiner of two klystron) and VAC

• Recovery from breakdown– Nominal recovery is automatically done by power reduction and

gradual increase.– In case of breakdowns at considerably lower power level than the

highest BD level, say below 50%, decrease pulse width by one step, manually.

15

Page 16: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Recovery pass in (T,P) space

CERN

T

P

50%P, -20%T

SLAC

T

P

20%P, 20nsT

KEK

T

P

aP, -1stepT

16

Page 17: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Comparison of high gradient performances among different systems

• How to compare different high gradient experiments– Power calibration in % level – Processing protocol processing speed, recovery manner– BDR criteria missing energy / reflection amplitude / complex reflection

vector• What to compare

– BDR at lower level is needed• very high gradient ~150MV/m• medium ~>100MV/m• practical ~80MV/m

– The performance until reaching the final status– Performance in long-term running– Other observables than BDR?

• Field enhancement factor, dark current …..

Page 18: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Issues for understanding the performance

• We need to discuss the way to consistently compare and understand

• Gradient level– 80 – 100 – 150– Pulse length, pulse shape, ……

• Relationship – Pulse heating vs BDR– DC Pulse / Waveguide / single cell / pulse heating

Page 19: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Nextef planning as of Aug. 1

5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 122008 2009

Establish system with KX03

T18_VG2.4_Disk #2

TD18_VG2.4_Quad

TD18_VG2.4_Disk

T18_VG2.4_Disk #3

?????

C-band test

2008/5/13-15 192nd collaboration meeting on X-band

Page 20: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Nextef planning1 4 7 10 1 4 7 10 1 4 7 10 1 4 7 10 1 4 7 10

2008 2009 2010 2011 2012

Establish system with KX03T18_VG2.4_Disk #2

TD18_VG2.4_QuadTD18_VG2.4_Disk

T18_VG2.4_Disk #3

High gradient test with C10, Quad, etc.

C-band structure test

Pulse compression??

Evaluation of feasible acceleration gradient with copper-based stucture

Two klystron facility

One klystron test standNarrow waveguide

Klystron test

Basic studies on high field, waveguide components, etc.

Page 21: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Nextef developments• Mission

– Close collaboration with CLIC structure developments– Basic high gradient study

• Nextef operation– Can run 24 hr/day during linac operation– Limited operation during linac maintenance– Should coexists with C-band structure activity

• Further development– Pulse compression in 2009? >150MW, 300ns– Another test stand? using power switching– Acquiring more klystrons?

Page 22: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Structure study in collaboration

• Maximally utilize the present framework– CERN-SLAC-KEK– Design-fabrication-test– Get info in extreme gradient / practical gradient– Cross-check the performance / fabrication

• Want to expand collaboration in Japan– Not yet established

Page 23: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Basic high gradient study at KT-1Yokoyama presentation at LINAC08

Page 24: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

#CU002

Page 25: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

#SUS003

Page 26: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.
Page 27: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Very rough exponential fitting on SUS-003

Page 28: High gradient study at KEK CLIC08, Oct. 14-17, 2008 T. Higo.

Summary • Nextef started processing of T18_VG2.4_Disk. A

series of tests are in test schedule, quad, disk-damp, …..

• Further system developments are needed especially on data acquisition and analysis

• We understand it necessary to establish the quantitative comparison between tests among laboratories

• Basic high gradient test is underway with narrow waveguide