Hidden Cove Reserve Study

download Hidden Cove Reserve Study

of 49

Transcript of Hidden Cove Reserve Study

  • 8/7/2019 Hidden Cove Reserve Study

    1/49

  • 8/7/2019 Hidden Cove Reserve Study

    2/49

  • 8/7/2019 Hidden Cove Reserve Study

    3/49

  • 8/7/2019 Hidden Cove Reserve Study

    4/49

  • 8/7/2019 Hidden Cove Reserve Study

    5/49

  • 8/7/2019 Hidden Cove Reserve Study

    6/49

  • 8/7/2019 Hidden Cove Reserve Study

    7/49

  • 8/7/2019 Hidden Cove Reserve Study

    8/49

  • 8/7/2019 Hidden Cove Reserve Study

    9/49

    PROJECT NAME HIDDEN COVE

    INFLATION RATE 3.00%

    YIELD ON RESERVE FUNDS 0.50%

    BEGINNING YEAR OF FUNDING 2011

    PLANNING HORIZON 20 yrs

    Page 6a

  • 8/7/2019 Hidden Cove Reserve Study

    10/49

    SCHEDULE Ia

    HIDDEN COVE

    SITEWORK ITEMS - PRELIMINARY DATA

    Sitework Units Number Cost Total Cost Estimated Estimated

    Item of of per in Current Useful Remaining Notes

    Description Measure Units Unit Dollars Life Life1 Asphalt Seal Coating S.Y. 8400 $1.50 $12,600 5 1 2

    2 Asphalt Resurface S.Y. 8400 $11.00 $92,400 20 13 2

    3 Sidewalks/Stairs/Curb and Gutter Repair Allow 1 $4,000.00 $4,000 6 4 3

    4 Entry Monument - Repair, Maintain Allow 1 $2,000.00 $2,000 8 3 4

    5 Perimeter Wood Fence - Repair Allow 1 $2,500.00 $2,500 5 0 5

    6 Perimeter Wood Fence - Replace L.F. 1700 $30.00 $51,000 25 15 5

    7 Entry Security Gate and Fence - Repair, Paint Allow 1 $2,000.00 $2,000 6 2 6

    8 Chain Link Fence - Repair Allow 1 $800.00 $800 10 5 1

    9 Retaining Walls - Repair, Maint. Allow 1 $5,000.00 $5,000 10 5 7

    10 Drainage, Erosion, Storm System - Repair Allow 1 $5,000.00 $5,000 6 0 8

    11 Landscaping Allow 1 $10,000.00 $10,000 10 7 9

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    Page 6b

  • 8/7/2019 Hidden Cove Reserve Study

    11/49

    SCHEDULE Ib

    HIDDEN COVE

    SITEWORK ITEMS - REPLACEMENT COST & FUNDING DATA

    First Replacement Second Replacement Third Replacement Fourth Replacement

    Sitework Adjusted Annual Adjusted Annual Adjusted Annual Adjusted An

    Item Cost if Funding Cost if Funding Cost if Funding Cost if Fun

    Description Yr Inflation is Thru Yr Yr Inflation is Thru Yr Yr Inflation is Thru Yr Yr Inflation is Thr

    Replaced 3.00% Replaced Replaced 3.00% Replaced Replaced 3.00% Replaced Replaced 3.00% Rep

    Asphalt Seal Coating 2012 12978 6489 2017 15045 3009 2022 17441 3488 2027 20219 40

    Asphalt Resurface 2024 135693 9692 2044 2064 2084

    Sidewalks/Stairs/Curb and Gutter Repair 2015 4502 900 2021 5376 896 2027 6419 1070 2033

    Entry Monument - Repair, Maintain 2014 2185 546 2022 2768 346 2030 3507 438 2038

    Perimeter Wood Fence - Repair 2011 2500 2500 2016 2898 580 2021 3360 672 2026 3895 7

    Perimeter Wood Fence - Replace 2026 79456 4966 2051 2076 2101

    Entry Security Gate and Fence - Repair, Paint 2013 2122 707 2019 2534 422 2025 3025 504 2031

    Chain Link Fence - Repair 2016 927 155 2026 1246 125 2036 2046

    Retaining Walls - Repair, Maint. 2016 5796 966 2026 7790 779 2036 2046

    Drainage, Erosion, Storm System - Repair 2011 5000 5000 2017 5970 995 2023 7129 1188 2029 8512 14

    Landscaping 2018 12299 1537 2028 16528 1653 2038 2048

    Page 6c

  • 8/7/2019 Hidden Cove Reserve Study

    12/49

    SCHEDULE IIa

    HIDDEN COVE

    EXTERIOR/INTERIOR BUILDING MAINTENANCE ITEMS

    PRELIMINARY DATA

    Exterior/Interior Building Units Number Cost Total Cost Estimated Estimated

    Maintenance Item of of per in Current Useful Remaining Notes

    Description Measure Units Unit Dollars Life Life

    1 Mail Kiosk - Roof Shingles and Gutters Replace Lump Sum 1 $1,000.00 $1,000 20 10 10

    2 Mail Kiosk - Paint Trim Only Lump Sum 1 $200.00 $200 5 1 10

    3 Mail Kiosk - Paint Lump Sum 1 $500.00 $500 10 6 10

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    2021

    22

    23

    24

    25

    26

    27

    28

    29

    30

    Page 6d

  • 8/7/2019 Hidden Cove Reserve Study

    13/49

  • 8/7/2019 Hidden Cove Reserve Study

    14/49

    SCHEDULE IIIa

    HIDDEN COVE

    ELECTRICAL/MECHANICAL/PLUMBING ITEMS - PRELIMINARY DATA

    Electrical Units Number Cost Total Cost Estimated Estimated

    Mechanical of of per in Current Useful Remaining Notes

    Item Description Measure Units Unit Dollars Life Life

    1 Entry Gate Motors - Replace Lump Sum 1 $12,000.00 $12,000 12 4 11

    2 Entry Gate - Call Box, Electronics Lump Sum 1 $3,000.00 $3,000 12 4 11

    3 Plumbing Repairs Allow 1 $5,000.00 $5,000 10 15 12

    4 Sanitary Sewer - Cleaning, Repairs Allow 1 $5,000.00 $5,000 10 15 12

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    2021

    22

    23

    24

    25

    26

    27

    28

    29

    30

    Page 6f

  • 8/7/2019 Hidden Cove Reserve Study

    15/49

    SCHEDULE IIIb

    HIDDEN COVE

    ELECTRICAL/MECHANICAL/PLUMBING ITEMS - REPLACEMENT COST & FUNDING DATA

    First Replacement Second Replacement Third Replacement Fourth Replacement

    Electrical Adjusted Annual Adjusted Annual Adjusted Annual Adjusted Annual

    Mechanical Cost if Funding Cost if Funding Cost if Funding Cost if Funding

    Item Description Yr Inflation is T hru Yr Yr Inflation is Thru Yr Yr Inflation is Thru Yr Yr Inflation is Thru Yr

    Replaced 3.00% Replaced Replaced 3.00% Replaced Replaced 3.00% Replaced Replaced 3.00% Replaced

    Entry Gate Motors - Replace 2015 13506 2701 2027 19256 1605 2039 2051

    Entry Gate - Call Box, Electronics 2015 3377 675 2027 4814 401 2039 2051

    Plumbing Repairs 2026 7790 487 2036 2046 2056

    Sanitary Sewer - Cleaning, Repairs 2026 7790 487 2036 2046 2056

    Page 6g

  • 8/7/2019 Hidden Cove Reserve Study

    16/49

    HIDDEN COVE

    COST & FUNDING RECAP

    Year Annual Funds Future Expenses Net Accumulated Funds

    Current Funds 0

    2011 15,000 7,500 7,538

    2012 15,000 13,184 9,410

    2013 17,000 2,122 24,354

    2014 17,000 2,185 39,272

    2015 19,000 21,385 37,033

    2016 19,000 9,622 46,551

    2017 22,000 21,851 46,871

    2018 22,000 12,299 56,745

    2019 26,000 2,534 80,418

    2020 26,000 0 106,684

    2021 30,000 10,079 126,946

    2022 30,000 20,487 136,852

    2023 35,000 7,129 165,153

    2024 35,000 135,693 64,961

    2025 35,000 3,025 97,186

    2026 35,000 107,967 24,549

    2027 35,000 51,832 7,866

    2028 35,000 16,528 26,444

    2029 35,000 8,512 53,086

    2030 35,000 3,507 84,799

    Page 6h

  • 8/7/2019 Hidden Cove Reserve Study

    17/49

    HIDDEN COVE

    Itemized Projected Costs by Year

    Year Job Cost

    Grand Total $457,4412011 Total 7,500

    2011 Drainage, Erosion, Storm System - Repair 5,000

    2011 Perimeter Wood Fence - Repair 2,500

    2012 Total 13,184

    2012 Asphalt Seal Coating 12,978

    2012 Mail Kiosk - Paint Trim Only 206

    2013 Total 2,122

    2013 Entry Security Gate and Fence - Repair, Paint 2,122

    2014 Total 2,185

    2014 Entry Monument - Repair, Maintain 2,185

    2015 Total 21,385

    2015 Entry Gate - Call Box, Electronics 3,3772015 Entry Gate Motors - Replace 13,506

    2015 Sidewalks/Stairs/Curb and Gutter Repair 4,502

    2016 Total 9,622

    2016 Chain Link Fence - Repair 927

    2016 Perimeter Wood Fence - Repair 2,898

    2016 Retaining Walls - Repair, Maint. 5,796

    2017 Total 21,851

    2017 Asphalt Seal Coating 15,045

    2017 Drainage, Erosion, Storm System - Repair 5,970

    2017 Mail Kiosk - Paint 597

    2017 Mail Kiosk - Paint Trim Only 239

    2018 Total 12,2992018 Landscaping 12,299

    2019 Total 2,534

    2019 Entry Security Gate and Fence - Repair, Paint 2,534

    2021 Total 10,079

    2021 Mail Kiosk - Roof Shingles and Gutters Replace 1,344

    2021 Perimeter Wood Fence - Repair 3,360

    2021 Sidewalks/Stairs/Curb and Gutter Repair 5,376

    2022 Total 20,487

    2022 Asphalt Seal Coating 17,441

    2022 Entry Monument - Repair, Maintain 2,768

    2022 Mail Kiosk - Paint Trim Only 277

    2023 Total 7,129

    2023 Drainage, Erosion, Storm System - Repair 7,129

    2024 Total 135,693

    2024 Asphalt Resurface 135,693

    2025 Total 3,025

    2025 Entry Security Gate and Fence - Repair, Paint 3,025

    2026 Total 107,967

    2026 Chain Link Fence - Repair 1,246

    2026 Perimeter Wood Fence - Repair 3,895 Page 6i

  • 8/7/2019 Hidden Cove Reserve Study

    18/49

  • 8/7/2019 Hidden Cove Reserve Study

    19/49

  • 8/7/2019 Hidden Cove Reserve Study

    20/49

  • 8/7/2019 Hidden Cove Reserve Study

    21/49

  • 8/7/2019 Hidden Cove Reserve Study

    22/49

  • 8/7/2019 Hidden Cove Reserve Study

    23/49

  • 8/7/2019 Hidden Cove Reserve Study

    24/49

  • 8/7/2019 Hidden Cove Reserve Study

    25/49

    0

    10,000

    20,000

    30,000

    40,000

    50,000

    60,000

    70,000

    80,000

    90,000

    100,000

    110,000

    120,000

    130,000

    140,000

    150,000

    160,000

    170,000

    180,000

    CurrentFunds

    2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

    HIDDEN COVE - PROJECTED CASH FLOW

    Annual Funds Future Expenses Net Accumulated Funds

  • 8/7/2019 Hidden Cove Reserve Study

    26/49

    0

    10,000

    20,000

    30,000

    40,000

    50,000

    60,000

    70,000

    80,000

    90,000

    100,000

    110,000

    120,000

    130,000

    140,000

    150,000

    160,000

    170,000

    180,000

    CurrentFunds

    2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

    HIDDEN COVE - PROJECTED CASH FLOW

    Annual Funds Future Expenses Net Accumulated Funds

  • 8/7/2019 Hidden Cove Reserve Study

    27/49

  • 8/7/2019 Hidden Cove Reserve Study

    28/49

  • 8/7/2019 Hidden Cove Reserve Study

    29/49

  • 8/7/2019 Hidden Cove Reserve Study

    30/49

  • 8/7/2019 Hidden Cove Reserve Study

    31/49

  • 8/7/2019 Hidden Cove Reserve Study

    32/49

  • 8/7/2019 Hidden Cove Reserve Study

    33/49

  • 8/7/2019 Hidden Cove Reserve Study

    34/49

  • 8/7/2019 Hidden Cove Reserve Study

    35/49

  • 8/7/2019 Hidden Cove Reserve Study

    36/49

  • 8/7/2019 Hidden Cove Reserve Study

    37/49

  • 8/7/2019 Hidden Cove Reserve Study

    38/49

  • 8/7/2019 Hidden Cove Reserve Study

    39/49

  • 8/7/2019 Hidden Cove Reserve Study

    40/49

  • 8/7/2019 Hidden Cove Reserve Study

    41/49

  • 8/7/2019 Hidden Cove Reserve Study

    42/49

    HIDDEN COVE

    1. Cracked asphalt pavement.

    2. Cracked and settled area of asphalt pavement.

  • 8/7/2019 Hidden Cove Reserve Study

    43/49

    HIDDEN COVE

    3. Repaired section of curb is spalling.

    4. Repaired section of concrete curb.

  • 8/7/2019 Hidden Cove Reserve Study

    44/49

  • 8/7/2019 Hidden Cove Reserve Study

    45/49

    HIDDEN COVE

    7. View of entry monument.

    8. Broken rail at wood perimeter fence.

  • 8/7/2019 Hidden Cove Reserve Study

    46/49

    HIDDEN COVE

    9. Undermined footings and leaning wood fence.

    10. The entry gate is beginning to rust.

  • 8/7/2019 Hidden Cove Reserve Study

    47/49

    HIDDEN COVE

    11. View of segmental block retaining wall.

    12. View of loose cap blocks.

  • 8/7/2019 Hidden Cove Reserve Study

    48/49

  • 8/7/2019 Hidden Cove Reserve Study

    49/49

    HIDDEN COVE

    15. Erosion around entry stoop.