COVE TERMS OF SERVICE Welcome to cove! cove.is website and ...
Hidden Cove Reserve Study
-
Upload
hiddencovehoa -
Category
Documents
-
view
215 -
download
0
Transcript of Hidden Cove Reserve Study
-
8/7/2019 Hidden Cove Reserve Study
1/49
-
8/7/2019 Hidden Cove Reserve Study
2/49
-
8/7/2019 Hidden Cove Reserve Study
3/49
-
8/7/2019 Hidden Cove Reserve Study
4/49
-
8/7/2019 Hidden Cove Reserve Study
5/49
-
8/7/2019 Hidden Cove Reserve Study
6/49
-
8/7/2019 Hidden Cove Reserve Study
7/49
-
8/7/2019 Hidden Cove Reserve Study
8/49
-
8/7/2019 Hidden Cove Reserve Study
9/49
PROJECT NAME HIDDEN COVE
INFLATION RATE 3.00%
YIELD ON RESERVE FUNDS 0.50%
BEGINNING YEAR OF FUNDING 2011
PLANNING HORIZON 20 yrs
Page 6a
-
8/7/2019 Hidden Cove Reserve Study
10/49
SCHEDULE Ia
HIDDEN COVE
SITEWORK ITEMS - PRELIMINARY DATA
Sitework Units Number Cost Total Cost Estimated Estimated
Item of of per in Current Useful Remaining Notes
Description Measure Units Unit Dollars Life Life1 Asphalt Seal Coating S.Y. 8400 $1.50 $12,600 5 1 2
2 Asphalt Resurface S.Y. 8400 $11.00 $92,400 20 13 2
3 Sidewalks/Stairs/Curb and Gutter Repair Allow 1 $4,000.00 $4,000 6 4 3
4 Entry Monument - Repair, Maintain Allow 1 $2,000.00 $2,000 8 3 4
5 Perimeter Wood Fence - Repair Allow 1 $2,500.00 $2,500 5 0 5
6 Perimeter Wood Fence - Replace L.F. 1700 $30.00 $51,000 25 15 5
7 Entry Security Gate and Fence - Repair, Paint Allow 1 $2,000.00 $2,000 6 2 6
8 Chain Link Fence - Repair Allow 1 $800.00 $800 10 5 1
9 Retaining Walls - Repair, Maint. Allow 1 $5,000.00 $5,000 10 5 7
10 Drainage, Erosion, Storm System - Repair Allow 1 $5,000.00 $5,000 6 0 8
11 Landscaping Allow 1 $10,000.00 $10,000 10 7 9
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Page 6b
-
8/7/2019 Hidden Cove Reserve Study
11/49
SCHEDULE Ib
HIDDEN COVE
SITEWORK ITEMS - REPLACEMENT COST & FUNDING DATA
First Replacement Second Replacement Third Replacement Fourth Replacement
Sitework Adjusted Annual Adjusted Annual Adjusted Annual Adjusted An
Item Cost if Funding Cost if Funding Cost if Funding Cost if Fun
Description Yr Inflation is Thru Yr Yr Inflation is Thru Yr Yr Inflation is Thru Yr Yr Inflation is Thr
Replaced 3.00% Replaced Replaced 3.00% Replaced Replaced 3.00% Replaced Replaced 3.00% Rep
Asphalt Seal Coating 2012 12978 6489 2017 15045 3009 2022 17441 3488 2027 20219 40
Asphalt Resurface 2024 135693 9692 2044 2064 2084
Sidewalks/Stairs/Curb and Gutter Repair 2015 4502 900 2021 5376 896 2027 6419 1070 2033
Entry Monument - Repair, Maintain 2014 2185 546 2022 2768 346 2030 3507 438 2038
Perimeter Wood Fence - Repair 2011 2500 2500 2016 2898 580 2021 3360 672 2026 3895 7
Perimeter Wood Fence - Replace 2026 79456 4966 2051 2076 2101
Entry Security Gate and Fence - Repair, Paint 2013 2122 707 2019 2534 422 2025 3025 504 2031
Chain Link Fence - Repair 2016 927 155 2026 1246 125 2036 2046
Retaining Walls - Repair, Maint. 2016 5796 966 2026 7790 779 2036 2046
Drainage, Erosion, Storm System - Repair 2011 5000 5000 2017 5970 995 2023 7129 1188 2029 8512 14
Landscaping 2018 12299 1537 2028 16528 1653 2038 2048
Page 6c
-
8/7/2019 Hidden Cove Reserve Study
12/49
SCHEDULE IIa
HIDDEN COVE
EXTERIOR/INTERIOR BUILDING MAINTENANCE ITEMS
PRELIMINARY DATA
Exterior/Interior Building Units Number Cost Total Cost Estimated Estimated
Maintenance Item of of per in Current Useful Remaining Notes
Description Measure Units Unit Dollars Life Life
1 Mail Kiosk - Roof Shingles and Gutters Replace Lump Sum 1 $1,000.00 $1,000 20 10 10
2 Mail Kiosk - Paint Trim Only Lump Sum 1 $200.00 $200 5 1 10
3 Mail Kiosk - Paint Lump Sum 1 $500.00 $500 10 6 10
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2021
22
23
24
25
26
27
28
29
30
Page 6d
-
8/7/2019 Hidden Cove Reserve Study
13/49
-
8/7/2019 Hidden Cove Reserve Study
14/49
SCHEDULE IIIa
HIDDEN COVE
ELECTRICAL/MECHANICAL/PLUMBING ITEMS - PRELIMINARY DATA
Electrical Units Number Cost Total Cost Estimated Estimated
Mechanical of of per in Current Useful Remaining Notes
Item Description Measure Units Unit Dollars Life Life
1 Entry Gate Motors - Replace Lump Sum 1 $12,000.00 $12,000 12 4 11
2 Entry Gate - Call Box, Electronics Lump Sum 1 $3,000.00 $3,000 12 4 11
3 Plumbing Repairs Allow 1 $5,000.00 $5,000 10 15 12
4 Sanitary Sewer - Cleaning, Repairs Allow 1 $5,000.00 $5,000 10 15 12
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2021
22
23
24
25
26
27
28
29
30
Page 6f
-
8/7/2019 Hidden Cove Reserve Study
15/49
SCHEDULE IIIb
HIDDEN COVE
ELECTRICAL/MECHANICAL/PLUMBING ITEMS - REPLACEMENT COST & FUNDING DATA
First Replacement Second Replacement Third Replacement Fourth Replacement
Electrical Adjusted Annual Adjusted Annual Adjusted Annual Adjusted Annual
Mechanical Cost if Funding Cost if Funding Cost if Funding Cost if Funding
Item Description Yr Inflation is T hru Yr Yr Inflation is Thru Yr Yr Inflation is Thru Yr Yr Inflation is Thru Yr
Replaced 3.00% Replaced Replaced 3.00% Replaced Replaced 3.00% Replaced Replaced 3.00% Replaced
Entry Gate Motors - Replace 2015 13506 2701 2027 19256 1605 2039 2051
Entry Gate - Call Box, Electronics 2015 3377 675 2027 4814 401 2039 2051
Plumbing Repairs 2026 7790 487 2036 2046 2056
Sanitary Sewer - Cleaning, Repairs 2026 7790 487 2036 2046 2056
Page 6g
-
8/7/2019 Hidden Cove Reserve Study
16/49
HIDDEN COVE
COST & FUNDING RECAP
Year Annual Funds Future Expenses Net Accumulated Funds
Current Funds 0
2011 15,000 7,500 7,538
2012 15,000 13,184 9,410
2013 17,000 2,122 24,354
2014 17,000 2,185 39,272
2015 19,000 21,385 37,033
2016 19,000 9,622 46,551
2017 22,000 21,851 46,871
2018 22,000 12,299 56,745
2019 26,000 2,534 80,418
2020 26,000 0 106,684
2021 30,000 10,079 126,946
2022 30,000 20,487 136,852
2023 35,000 7,129 165,153
2024 35,000 135,693 64,961
2025 35,000 3,025 97,186
2026 35,000 107,967 24,549
2027 35,000 51,832 7,866
2028 35,000 16,528 26,444
2029 35,000 8,512 53,086
2030 35,000 3,507 84,799
Page 6h
-
8/7/2019 Hidden Cove Reserve Study
17/49
HIDDEN COVE
Itemized Projected Costs by Year
Year Job Cost
Grand Total $457,4412011 Total 7,500
2011 Drainage, Erosion, Storm System - Repair 5,000
2011 Perimeter Wood Fence - Repair 2,500
2012 Total 13,184
2012 Asphalt Seal Coating 12,978
2012 Mail Kiosk - Paint Trim Only 206
2013 Total 2,122
2013 Entry Security Gate and Fence - Repair, Paint 2,122
2014 Total 2,185
2014 Entry Monument - Repair, Maintain 2,185
2015 Total 21,385
2015 Entry Gate - Call Box, Electronics 3,3772015 Entry Gate Motors - Replace 13,506
2015 Sidewalks/Stairs/Curb and Gutter Repair 4,502
2016 Total 9,622
2016 Chain Link Fence - Repair 927
2016 Perimeter Wood Fence - Repair 2,898
2016 Retaining Walls - Repair, Maint. 5,796
2017 Total 21,851
2017 Asphalt Seal Coating 15,045
2017 Drainage, Erosion, Storm System - Repair 5,970
2017 Mail Kiosk - Paint 597
2017 Mail Kiosk - Paint Trim Only 239
2018 Total 12,2992018 Landscaping 12,299
2019 Total 2,534
2019 Entry Security Gate and Fence - Repair, Paint 2,534
2021 Total 10,079
2021 Mail Kiosk - Roof Shingles and Gutters Replace 1,344
2021 Perimeter Wood Fence - Repair 3,360
2021 Sidewalks/Stairs/Curb and Gutter Repair 5,376
2022 Total 20,487
2022 Asphalt Seal Coating 17,441
2022 Entry Monument - Repair, Maintain 2,768
2022 Mail Kiosk - Paint Trim Only 277
2023 Total 7,129
2023 Drainage, Erosion, Storm System - Repair 7,129
2024 Total 135,693
2024 Asphalt Resurface 135,693
2025 Total 3,025
2025 Entry Security Gate and Fence - Repair, Paint 3,025
2026 Total 107,967
2026 Chain Link Fence - Repair 1,246
2026 Perimeter Wood Fence - Repair 3,895 Page 6i
-
8/7/2019 Hidden Cove Reserve Study
18/49
-
8/7/2019 Hidden Cove Reserve Study
19/49
-
8/7/2019 Hidden Cove Reserve Study
20/49
-
8/7/2019 Hidden Cove Reserve Study
21/49
-
8/7/2019 Hidden Cove Reserve Study
22/49
-
8/7/2019 Hidden Cove Reserve Study
23/49
-
8/7/2019 Hidden Cove Reserve Study
24/49
-
8/7/2019 Hidden Cove Reserve Study
25/49
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
110,000
120,000
130,000
140,000
150,000
160,000
170,000
180,000
CurrentFunds
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
HIDDEN COVE - PROJECTED CASH FLOW
Annual Funds Future Expenses Net Accumulated Funds
-
8/7/2019 Hidden Cove Reserve Study
26/49
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
110,000
120,000
130,000
140,000
150,000
160,000
170,000
180,000
CurrentFunds
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
HIDDEN COVE - PROJECTED CASH FLOW
Annual Funds Future Expenses Net Accumulated Funds
-
8/7/2019 Hidden Cove Reserve Study
27/49
-
8/7/2019 Hidden Cove Reserve Study
28/49
-
8/7/2019 Hidden Cove Reserve Study
29/49
-
8/7/2019 Hidden Cove Reserve Study
30/49
-
8/7/2019 Hidden Cove Reserve Study
31/49
-
8/7/2019 Hidden Cove Reserve Study
32/49
-
8/7/2019 Hidden Cove Reserve Study
33/49
-
8/7/2019 Hidden Cove Reserve Study
34/49
-
8/7/2019 Hidden Cove Reserve Study
35/49
-
8/7/2019 Hidden Cove Reserve Study
36/49
-
8/7/2019 Hidden Cove Reserve Study
37/49
-
8/7/2019 Hidden Cove Reserve Study
38/49
-
8/7/2019 Hidden Cove Reserve Study
39/49
-
8/7/2019 Hidden Cove Reserve Study
40/49
-
8/7/2019 Hidden Cove Reserve Study
41/49
-
8/7/2019 Hidden Cove Reserve Study
42/49
HIDDEN COVE
1. Cracked asphalt pavement.
2. Cracked and settled area of asphalt pavement.
-
8/7/2019 Hidden Cove Reserve Study
43/49
HIDDEN COVE
3. Repaired section of curb is spalling.
4. Repaired section of concrete curb.
-
8/7/2019 Hidden Cove Reserve Study
44/49
-
8/7/2019 Hidden Cove Reserve Study
45/49
HIDDEN COVE
7. View of entry monument.
8. Broken rail at wood perimeter fence.
-
8/7/2019 Hidden Cove Reserve Study
46/49
HIDDEN COVE
9. Undermined footings and leaning wood fence.
10. The entry gate is beginning to rust.
-
8/7/2019 Hidden Cove Reserve Study
47/49
HIDDEN COVE
11. View of segmental block retaining wall.
12. View of loose cap blocks.
-
8/7/2019 Hidden Cove Reserve Study
48/49
-
8/7/2019 Hidden Cove Reserve Study
49/49
HIDDEN COVE
15. Erosion around entry stoop.