Hi Pot Training
Transcript of Hi Pot Training
![Page 1: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/1.jpg)
BV CPS-I TM E02 Revision: 01
Hi-pot Test Training
Reference: UL153
For the benefit of business and people
Prepared By: Emily Tang / Ada Ge Date:
Approved By: Herbert Zhu Date: Jan.19, 05
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 2: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/2.jpg)
2“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
Training Objectives
Training Objective
• To understand why do Hi-pot test
• To know of basic knowledge of Hi-pot test circuit
• To understand operation procedure of Hi-pot test
• To understand how to present the result
![Page 3: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/3.jpg)
3“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
Hi-pot Test Purpose
�Check the insulation according with safety requirement.
Why do High-pot testWhy do High-pot test
![Page 4: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/4.jpg)
4
Hi-pot test circuit
v L Inspected sample
Current tester
Alarm system
Probe with Hi- pot
Another probe
High-pot test circuitHigh-pot test circuit
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 5: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/5.jpg)
5
Explain of Hi-pot test circuit�The test equipment include a transformer having a
sinusoidal output,for our inspection this voltage is adjusted to the voltage required in protocol.
�A current tester system is existed in the equipment to calculate breakdown current, for our inspection we must set up limited of breakdown current which is obtained form protocol.when calculated current out of limit, alarm system will cut off voltage output and alarm.
High-pot test circuitHigh-pot test circuit
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 6: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/6.jpg)
6
�Equipment: Hi-pot tester
Operation procedureOperation procedure
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 7: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/7.jpg)
7
Operation procedureOperation procedure
Verify the equipment�Check this tester visually for any physical damage,
correctly/promptly connection and suitable power source.
�Turn the Power Switch to ON, turn the voltage to the lowest position.
�Press the “Start” button, and set the voltage at a low value.
�Short circuit the two probes, alert activate, OK. If no alert activate, try to ask the factory change another tester.
Verification
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 8: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/8.jpg)
8
�First internal check product to detect construction and determine where need to conduct Hi-pot test:
� All accessible metal part ready to become live during normal operation (see note i)
� Output of transformer or adaptor
� Assemble gap
Note I: normal operation including:
a) Replacing a lamp;
b) Removal or cleaning of all parts not secured by use of tools
Operation procedureOperation procedureWhere need do
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 9: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/9.jpg)
9
Setting dataTest Voltage Knob
Start button
Stop button
LED display
Operation procedureOperation procedureSetting equipment
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 10: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/10.jpg)
10
Procedure
�Step A : set up the tester at appropriate breakdown current limit and appropriate voltage(below value for reference only)
Start test Operation procedureOperation procedure
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 11: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/11.jpg)
11
�Step B : all of the switch and setting on the sample should be placed at ON and at MAX which appropriate
Operation procedureOperation procedureStart test
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 12: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/12.jpg)
12
�Step C : connect live & neutral plug pin or lead wire together to the either polarity of test,otherwise checking should be conducted on each of them.
Start test Operation procedureOperation procedure
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 13: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/13.jpg)
13
�Step D : connect opposite polarity of tester to accessible metal part, earth pin or earth lead wire, press start button,then maintain 1 second
Start test Operation procedureOperation procedure
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 14: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/14.jpg)
14
Operation procedureOperation procedureStart test
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 15: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/15.jpg)
15
�After the test, no breakdown or flashover shall occur; in the meantime pay attention to the voltage displays on Hi-pot tester to ensure the voltage will not drop down.
Operation procedureOperation procedureEstimation
Voltage drop downAlarm
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 16: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/16.jpg)
16
�Hi-pot test time must keep on 1 second,do not only strike probe on inspected sample.
�When Hi-pot test is failed at required breakdown current on protocol,try to recheck with max setting of equipment and call back to office.
�For European product, sometimes different voltage will be applied on product, for example class I product with class II construction, these two type of class need different voltage.
�Since output voltage of Hi-pot tester is always exceed 1000V, all operation must obey safety rule.
Operation procedureOperation procedureNotice
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 17: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/17.jpg)
17
�Turn off Hi-pot tester when you need not to use
�For safety reason, remember to turn off switch before you conduct function check.
�When you do Hi-pot test,keep any part of you body away form product, especially don’t touch product which being conducted Hi-pot test.
Safety caution Operation procedureOperation procedure
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 18: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/18.jpg)
18
Correct action Correct action
Operation procedureOperation procedureSafety caution
Wrong action Wrong action
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 19: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/19.jpg)
19
How to present the result?How to present the result?
� If breakdown was found, visual check the product and find the reason (needn’t to open the unit), then record the defect as critical defect. For example:
� Hi-pot test was failed when test on lampholder at 1200Vac,30mA (max setting of Hi-pot tester)
�Note: Both workmanship and on site test should be failed on this case.
“BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”.
![Page 20: Hi Pot Training](https://reader038.fdocuments.us/reader038/viewer/2022102702/563db809550346aa9a8ff817/html5/thumbnails/20.jpg)
20
END