Heydar Ebrahimi - Resume NEW-1 · LC#!!107" !! !!...
Transcript of Heydar Ebrahimi - Resume NEW-1 · LC#!!107" !! !!...
LC -‐ 107
www.linkedcivil.com.au
Position Preferred xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Civil Designer
Location Maroochydore, QLD
Qualifications, Memberships and Licences
Master’s Degree, Civil Eng. specialised at Road and Transportation -‐ T.M. University
Bachelor’s Degree, Civil Engineering -‐ I.U.S.T. University
Board of Professional Engineer of Queensland (B.P.E.Q) ID: 20841 -‐ Jul 2018
Professional Engineer Area of Civil
National Engineer Register (N.E.R.) – Jun 2018
Professional Engineer
Engineering Australia (M.I.E. Aust.) ID:5810213 -‐ Sep 2017
Professional Engineer
World Educational Services (W.E.S) Canada Assessment Organisation Licence:26337779 -‐ Oct.2014
Assessed Bachelor’s & Master’s Degree
Engineering and Construction Organisation ID:10-‐3-‐0-‐25851 -‐ Dec.2001
(TECO)
Civil3D -‐ May.2015
Novin Parsian Institute
Computer Skills
CostX CCS Candy PRISM G2
Expert Estimator MS Office Suite SAP
Primavera P6 (interpretation of data only)
Buildsoft / BTOS Success Enterprise (Estimating)
www.linkedcivil.com.au
LC -‐ 107
Personal Summary
Registered and experienced professional civil designer with more than 6 years related work experience in Road drainage, Storm water, Flood modelling. Highly organised with meticulous attention to details. Capable of working in teams and individually and Creative problem solver who has consistently completed projects on time and within budget. Easily instil trust and confidence in fellow engineers and clients, with a career path built on knowledge, lessons learned, value engineering humanistic and environmental aspects.
Key Skills:
• Highly accomplished modelling by Civil 3D, AutoCAD, and ACAD land development • An expert user of 12D, Flow master, Sewer and M.S. Office • The expert designer of Site Location layout, Land development, Earthwork, Rough Grading, Fencing, and
Pavement • Advanced knowledge of designing Road drainage, Storm water, Flood modelling, Sewer, Catchment hydrology,
Waste Water, and Contaminated accidentally oily water • Has proven ability to generate documents for Oil & Gas pipeline, refinery, compressor stations, clusters, and
Wellhead Facilities • Designed and executed commercial, industrial and residential development civil projects • Self-‐taught and fully conversant of Queensland design codes (QUDM, SEQ WS&S D&C, ARR) • Practical Knowledge of PMBOK and analytical ability of cost management of civil works • Ability to identify and mitigate the environmental impact of civil works (EIA report) • Perfect communication skills and knowledge about stockholder management • Proficient time management and organisation skills and abilities to meet the deadline • Proven leadership skills and strategic thinking within the organisation to shape the company’s future • Liaise with clients, other consultants, and third party • Flexibility to co-‐ordinate with the multi-‐disciplinary design team • Excellent training skills with a passionate, innovative character as and mentor for junior members
Industry Experience
Job Title Civil Designer Dates Apr 2019-‐Current Company
Key Responsibilties:
• Participated in the Feasibility, Conceptual, Basic and Detail design studies of residential projects • Prepared technical specifications, criteria, procedures and work instructions for Civil work • Designed of Site location layout and Rough Grading, urban drainage, storm water and catchment hydrology
www.linkedcivil.com.au
LC -‐ 107
Job Title
Civil Designer Dates Feb 2013-‐Apr 2019 Company T.O.P COMPANY
From the outset since 1980, T.O.P Engineering Company has been a leading provider in the field of Oil, Gas and Petrochemical and renewable energy industry. T.O.P has successfully performed and delivered major projects in the form of E.P.C.C. (Engineering, Procurement, Construction, and Commissioning) or Project Supervision.
Key Responsibilities:
• Participated in the Feasibility, Conceptual, Basic and Detail design studies • Prepared technical specifications, criteria, procedures and work instructions for Civil work • Conducted major technical analyses of site surveys to develop topographical, soil, hydro-‐logical and other
information and prepared the due technical reports • Designed of Land development, Site location layout and Rough Grading • Planned urban drainage, STORM WATER, Flood modelling, Catchment hydrology, Road drainage • Planned and maintained Waste Water System and Contaminated oily water • Governed surface grading and High Point Floor Level of sites (H.P.F.L.) • Improvised and planned Restricted or Unrestricted road in sites • Designing of precast concrete slabs and Concrete slab on grade including Pavement and Joints • Improvised plans for Detention and Retention Basins, Bond wall, retaining wall and culvert • Designed and upgraded of Underground composite layout and related crossing schedule • Designed OSD tank, Manholes, pits, Dry boxes, Catch basins, Grease trap, API separator, … • Circulated plans of Fence and Gate (chain link, concrete or masonry type) • Conducted and developed of P.D.M.S model • Organised and completed of EIA, QRA, HAZOP, HAZID reports • Reviewed the designs and drawings to estimate the required materials for various parts of the project • Monitored changes to designs, assessed effects on the cost, and measured, valued and negotiating variations
to designs • Analysed the comment sheets issued by the clients in order to apply their comments, in case • Encouraged Health and safety considerations, obtained approval, and informed the stakeholders • time management and organisational skills and abilities to meet the deadline • Maintained all input and output checklist • Supervised junior colleagues’ output and mentored their promotion • Considered verification and validation procedure for all prepared civil documents according to approval
distribution matrix and work in the multi-‐disciplinary design team
Key Achivements:
• Meet Milestone Avg. 5% quicker than forecasted: - By using Input, output Checklist, work instructions, and design procedures - Prepared a distribution Matrix and verification and validation forms - Civil design process control (QC/QA) and Worked in a dynamic model
• Reduced designing cost by 10%: - Reviewed Lessons learned list and updated it / decrease Earthwork Volume
• Reduced Construction and Procurement cost by 5%: - good interaction between the design and construction team - designed gravity systems without pump station and achieved the best different elevations of platforms
• Decrease Environmental Impact: - provided retaining walls and stabilized berms by geotextile to increase green area / Suggested H.D.D
www.linkedcivil.com.au
LC -‐ 107
method - Quick learner and creator of a well-‐managed and knowledge-‐oriented teams - Prepared a method to observe how my junior colleagues being promoted and updated gradually and train
during the projects - Promote me from junior civil designer to Head of Civil Department
Projects
• Hovea -‐Templestowe residential Houses (situated in Melbourne) -‐ 2019 – 2019
• West KARUN Oil Transmission Capacity Increase -‐ 2016 – 2019
- In order to increase the capacity of transmission of heavy and light crude oil network for approximately 1,000,000 B.P.D the client (PEDEC) has defined this project. This project was including 2 Pump stations and 400 Km oil Pipeline. (completion cost App: 500 million Euro)
• NISOC Gas Pipelines Replacement -‐ 2015 – 2017 - The client was NISOC and the project was including detail design42”,30”,12” pipelines (600 Km) and related stations (earthwork: 2.9 million m3, concrete: 20,000 m3 and completion cost App: 108 million Euro)
• NISOC Oil Pipelines Replacement-‐ 2015 – 2018 - The client was NISOC and the project was including detail design 24” ~8” pipelines (240 Km) and related stations and 107 wellheads (earthwork: 23.3 million m3, concrete: 30,000 m3 and completion cost App: 148 million Euro)
• SIAH MAKAN Sludge Catcher and Pipelines -‐ 2015 – 2016 - The client was NISOC and the project was including 4 gas production unit, sludge catcher (vessel Type) and 80 km pipelines from B.B.H 1&2 and R.G.S 2. (completion cost App: 40 million Euro)
• KISH Gas Field Development (phase 1&2) -‐ 2013 – 2015
- The client was PEDEC and the project was including a huge refinery in 200 hectares, 2clusters facilities with 20 wellheads, 56" (94Km) gas transmission onshore pipeline and 32” (17 Km) gas transmission Marine pipeline