HES HKS meeting

9
HES HKS meeting 8Nov 2010 T.Gogami E05-115 experimental setup in JLab Hall C (2009)

description

E05-115 experimental setup in JLab Hall C (2009). HES HKS meeting. 8Nov 2010 T.Gogami. Content. HKS GEANT Committed NMRPort , Chmaber extension2 , flange MaterialList Moller scattering differential cross section in Lab system. Committed ( svn ). src / ChamberExtension2.cc - PowerPoint PPT Presentation

Transcript of HES HKS meeting

Page 1: HES HKS meeting

HES HKS meeting8Nov 2010T.Gogami

E05-115 experimental setup in JLab Hall C (2009)

Page 2: HES HKS meeting

Content

• HKS GEANT– Committed• NMRPort , Chmaber extension2 , flange• MaterialList

• Moller scattering differential cross section in Lab system

Page 3: HES HKS meeting

Committed (svn)• src/– ChamberExtension2.cc– CEF.cc– NMRPort.cc– HKSDetectorConstruction.cc

• include/– ChamberExtension2.hh– CEF.hh– NMRPort.hh– HKSDetectorConstruction.hh

Page 4: HES HKS meeting

Committed (svn)

• /src– MaterialList.cc

• /include– MaterialList.hh

1. Harver2. SUS3043. Concrete

Page 5: HES HKS meeting

Concrete

Concrete

Page 6: HES HKS meeting

Moller scattering CM==> Lab

http://lambda.phys.tohoku.ac.jp/~gogami/HES-HKS/Moller_lab_cm/moller_lab_cm.pdf

Page 7: HES HKS meeting

Moller cross sectiontheta and momentum dependence

in Lab system

GEANTuniform gen. Collimator (-3cm , 12C)

HES acceptance >3 [deg]

thetamomentum

HES

2000 ×2000

collimator OFF

Page 8: HES HKS meeting

Summary and to do• Summary– HKS GEANT

• Committed (subversion)– NMRPort , Chmaber extension2 , flange– MaterialList

– Moller scattering • HES cannot accept Moller electrons

• to do– Analysis

• ee+ background– reconstruct real xx’ distribution with simulation– rejection code– Time difference between ee+ and particles on optics.

• Residual of chambers for each arm.• HES tracking

– Strangeness 2010 in KEK• registration has been done !

Page 9: HES HKS meeting

End

11/6 時点