Herriman City Municipal Water
PowerPoint PresentationMarch 10, 2011
![Page 2: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/2.jpg)
System Maintenance
Service of Booster Pumps & Wells
Fire Hydrant Flushing
Valve Exercising
Tank Cleaning
![Page 3: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/3.jpg)
Service Of Booster Pumps & Wells
• Shut Down Power/Lockout-Tagout
• Disassemble Pump
• Clean All Parts
• Replace All Bearings, Packings & Seals
• Repair Or Replace Other Parts As Needed
• Reassemble Pump
• Realign Pump
• Lubricate With Ultra Sound Equipment
• Test & Bring Back On Line
![Page 4: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/4.jpg)
Pump Shaft Alignment Ultra Sound Equipment
![Page 5: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/5.jpg)
Fire
Hyd
ran
t Flu
sh
ing
& V
alv
e
Exerc
isin
g
• Annually We Flush & Inspect All Fire Hydrants & Dead Ends With The Assistance Of Unified Fire
• Fully Close & Reopen Each Valve In Our Water System
![Page 6: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/6.jpg)
Tank Cleaning
• Clean, Inspect & Video Every 3-5 Years
Why?•This Provides Us With Visual
Conditions Of The Inside Of Our Tanks
•This Allows Us To Clean The Tanks Without Taking Them Off-Line.
• All Our Water Tanks Were Cleaned In November 2010
![Page 7: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/7.jpg)
Projects
•Well 1 Booster Station
•Chlorine & Fluoride Analyzer
•5600 W Culinary & Secondary Water Lines
•Early Stages of Implementation Of Secondary Water System
•Mountain View Corridor Betterments
![Page 8: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/8.jpg)
Well 1
Booster
Pump
Station
Completed
![Page 9: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/9.jpg)
Chlorine & Fluoride Analyzer
• Installed At Well 1, HP Tanks & The RoseCrest Booster Pump Station
•Provides Trending Of Fluoride & Chlorine Levels
•Connected To The SCADA System Which Allows Off Site Tracking & Control Of Chemical Levels.
•Analyzers Provide Additional Safety To The Water System & Our Residents
![Page 10: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/10.jpg)
Silver Spur Construction Won Bid Project Will Begin March 16, 2011
This Project Has A Completion Time Of 90 Days
![Page 11: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/11.jpg)
Secondary Water System
Secondary Water Rate Study-Bowen Collins
Project Will Go Out To Bid Early Summer
Purple Shaded Area Will Be First Area To Receive Secondary Water
![Page 12: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/12.jpg)
Mountain View Corridor March 2011
There Is A 32” Culinary & 10” Secondary HDPE Pipe
The Betterments Are Approximately 50%
Completed Trench is 32’
![Page 13: Herriman City Municipal Water PowerPoint Presentation March 10, 2011.](https://reader030.fdocuments.us/reader030/viewer/2022032523/56649d845503460f94a6b2bc/html5/thumbnails/13.jpg)
? ? ? ? ?Questions