1Hércules-GES-028

HYNERGREEN

Renewable Hydrogen Production by means of Solar Energy as a Fuel for a Hybrid Vehicle based on a

Fuel Cell System

Fuel Cells and Hydrogen Joint Undertaking (FCH JU) 2nd Stakeholders General Assembly

Brussels, 26th October

Verónica Mesa – Hynergreen Technologies, S.A.

Page 2: Hércules-GES-028 Hercules Project

2Hércules-GES-028

HYNERGREEN

Hercules Project:

• Introduction• Objectives• Results• Problems encountered• Possibilities for future collaboration• Follow up activities

Page 3: Hércules-GES-028 Hercules Project

3Hércules-GES-028

HYNERGREEN

Hercules Project:

• Introduction• Objectives• Results• Problems encountered• Possibilities for future collaboration• Follow up activities

Page 4: Hércules-GES-028 Hercules Project

4Hércules-GES-028

HYNERGREEN

Hercules Consortium: 8 Spanish partners (4 Companies, 2 ResearchOrganisations, 1 Public Agency)

• Hynergreen Technologies

• Abengoa Solar New Technologies

• Carburos Metálicos (Air Products)

• Santana Motor

• GreenPower Technologies

• INTA (National Institute for Aerospace Technology)

• AICIA (Association of Research and Industrial Cooperation of Andalusia)

• AAE (Andalusian Energy Agency)

Hercules Consortium

Page 5: Hércules-GES-028 Hercules Project

5Hércules-GES-028

HYNERGREEN

Hercules Project financing:

Budget: 9 Million €

Hercules Project has been partially funded by 3 Spanish Public Organisations:

• Ministry of Science and Innovation

• Innovation and Development Agency of Andalusia

• Technological Corporation of Andalusia

Timescale: January 2006 – December 2009

Budget and Timescale

Page 6: Hércules-GES-028 Hercules Project

6Hércules-GES-028

HYNERGREEN

Hercules Project:

• Introduction• Objectives• Results• Problems encountered• Possibilities for future collaboration• Follow up activities

Page 7: Hércules-GES-028 Hercules Project

7Hércules-GES-028

HYNERGREEN

Hercules Project is divided into three main activities:

• “Las Columnas”: Design and development of a hydrogen filling station, including its production on site by means of solar energy

• “El León”: Design and development of a hybrid vehicle based on a fuel cell system that supplies 85 % of the whole electric power

• “El Olimpo”: Coordination and integration of the other activities (“Las Columnas” and “El León”), technology transfer and dissemination of the results obtained in Hercules Project

General Objectives

Page 8: Hércules-GES-028 Hercules Project

8Hércules-GES-028

HYNERGREEN

• Demonstrate the binomial renewable energy (solar energy) – hydrogen vector

• Generate a new technological market improving the Industrial knowdlegein this area

• Improve the feasibility of developing a filling hydrogen station network in Spain

• Test an alkaline electrolyser to compare with other kind of electrolysers(PEM)

• Compare different solar technologies integrated in the plant to supplyelectricty to the electrolyser

• Optimize the electrical integration between the solar energy and theelectrolyser

“Las Columnas”: Specific Objectives

Page 9: Hércules-GES-028 Hercules Project

9Hércules-GES-028

HYNERGREEN

• Integration of new technologies in the transport sector to reduce the CO2

emissions (hydrogen and fuel cell systems)

• Participation in the automation area of companies that work in othersector that can have an application in the transport (cooling system, compressed systems, instrumentations, control and power systems)

• Acquisition of knowledge in hybrid vehicle based on fuel cell systems

• Design and development of the Balance of Plant in the hybrid vehicle(power and control systems, electric motor, cooling systems andinstrumentation)

“El León”: Specific Objectives

Page 10: Hércules-GES-028 Hercules Project

10Hércules-GES-028

HYNERGREEN

• Guarantee a well managed project

• Participation in the definition of the hydrogen filling station and thehybrid electric vehicle

• Definition of the test protocols for the vehicle and the hydrogen station

• Evaluation and dissemination of the results obtained in the project

• Technology transfer

• Creation of an Hercules Project web-site (www.proyectohercules.es)

“El Olimpo”: Specific Objectives

Page 11: Hércules-GES-028 Hercules Project

11Hércules-GES-028

HYNERGREEN

Hercules Project:

• Introduction• Objectives• Results• Problems encountered• Possibilities for future collaboration• Follow up activities

Page 12: Hércules-GES-028 Hercules Project

12Hércules-GES-028

HYNERGREEN “Las Columnas”: Location

Page 13: Hércules-GES-028 Hercules Project

13Hércules-GES-028

HYNERGREEN “Las Columnas”: Process Description

Page 14: Hércules-GES-028 Hercules Project

14Hércules-GES-028

HYNERGREEN “Las Columnas”: Solar plant

Whole electric power of the solar plant: 65.6 kW

• Two axis tracking: 18.6 kW

• Fixed Structures: 22 kW

• CPV: 15 kW

• Stirling Dish: 10 kW

Page 15: Hércules-GES-028 Hercules Project

15Hércules-GES-028

HYNERGREEN “Las Columnas”: Hydrogen station

Page 16: Hércules-GES-028 Hercules Project

16Hércules-GES-028

HYNERGREEN “Las Columnas”: Electrolyser

10 l/hMaximum water consumed

67 kWhElectric Consumption

4 – 6 bargH2 out pressure

10 Nm3/hContinuous H2 produced

12.5 Nm3/hMaximun H2 produced

Page 17: Hércules-GES-028 Hercules Project

17Hércules-GES-028

HYNERGREEN “Las Columnas”: Purifier

99.9995 %Maximum H2 purity

1 kWhElectric Consumption

2.5 Nm3/hMaximun N2 consumed

10 bargMaximun H2 pressure

Page 18: Hércules-GES-028 Hercules Project

18Hércules-GES-028

HYNERGREEN “Las Columnas”: Filling Unit

350 bargMaximum outlet H2

pressure

Only for electroniccomponents

Electric PowerConsumption

150 – 200 bargMaximun inlet H2

pressure

2 Nm3/hMaximun air compressed

12.5 Nm3/hMaximun H2 produced

Page 19: Hércules-GES-028 Hercules Project

19Hércules-GES-028

HYNERGREEN “Las Columnas”: Hydrogen tanks

150 – 200 bargMaximun H2 pressure

4 - 6 Nm3/hMaximun air compressedconsumed

8 bargMaximun inlet H2 pressure

Page 20: Hércules-GES-028 Hercules Project

20Hércules-GES-028

HYNERGREEN “Las Columnas”: Nytrogen tanks

Page 21: Hércules-GES-028 Hercules Project

21Hércules-GES-028

HYNERGREEN “El León”: Picture

Page 22: Hércules-GES-028 Hercules Project

22Hércules-GES-028

HYNERGREEN “El León”: Vehicle Diagram

Hydrogen Tanks

Power converters

BatteryBatteryFuel Cell

Cooling System

Page 23: Hércules-GES-028 Hercules Project

23Hércules-GES-028

HYNERGREEN

Characteristics of the main components in the vehicle:

Vehicle characteristics: Fuel Cell

Fuel cell (Nuvera):

• Nominal Power: 56 kW

• Maximum Current: 360 A

• Hydrogen recirculation for humidification

• Water cooling system (flow 97 lpm)

• Voltage Rate:150 – 247 V

Page 24: Hércules-GES-028 Hercules Project

24Hércules-GES-028

HYNERGREEN

Characteristics of the main components in the vehicle:

Vehicle characteristics: Hydrogen Tanks

Three Tanks (2´46 kg of hydrogen):

• Hydrogen Capacity: 96 l

� 2 x 34 l

� 1 x 28 l

• Nominal Pressure: 350 bar

Page 25: Hércules-GES-028 Hercules Project

25Hércules-GES-028

HYNERGREEN

Characteristics of the main components in the vehicle:

Vehicle characteristics: Power coverters

Three Power Converters:

• Fuel cell converter:

Increase the out voltage from the fuel cell (150 – 250 V) to 350 VDC

• Battery converter:

Increase the out voltage from the battery 150 VDC to 350 VDC

• Out converter

Increase the voltage from 350 VDC (battery and fuel cell) to 750 VDC (Three-phase electric motor; 1 frecuency controller)

Page 26: Hércules-GES-028 Hercules Project

26Hércules-GES-028

HYNERGREEN Vehicle characteristics: Power diagram

Page 27: Hércules-GES-028 Hercules Project

27Hércules-GES-028

HYNERGREEN

Characteristics of the main components in the vehicle:

Vehicle characteristics: Compression Units

Compression Units:

• Nominal air flow:

� (flow, pressure) = (2,600 lpm, 650 mbarg)

• Nominal hydrogen flow:

� (flow, pressure) = (1,000 lpm, 650 mbarg)

Page 28: Hércules-GES-028 Hercules Project

28Hércules-GES-028

HYNERGREEN “El León”: Test bench Integration and Evaluation

Page 29: Hércules-GES-028 Hercules Project

29Hércules-GES-028

HYNERGREEN “El León”: Test bench Integration and Evaluation

Page 30: Hércules-GES-028 Hercules Project

30Hércules-GES-028

HYNERGREEN

Hercules Project:

• Introduction• Objectives• Results• Problems encountered• Possibilities for future collaboration• Follow up activities

Page 31: Hércules-GES-028 Hercules Project

31Hércules-GES-028

HYNERGREEN

Problems found in Hercules Project:

• Regarding the hydrogen station, the license managment that has been needed to build and start up the hydrogen filling station has delayed the Project

• Electrical and control integration between the solar plant and theelectrolyser

• For the vehicle it has been difficult to find some commercial devices thatcan be used in this application (for weight and volumen reasons)

• The choice of the most appropiate fuel cell (a few amount of fuel cellmanufactures are able to comply with all the requirements: cost, power andexperience)

Problems encountered

Page 32: Hércules-GES-028 Hercules Project

32Hércules-GES-028

HYNERGREEN

Hercules Project:

• Introduction• Objectives• Results• Problems encountered• Possibilities for future collaboration• Follow up activities

Page 33: Hércules-GES-028 Hercules Project

33Hércules-GES-028

HYNERGREEN Possibilities for future collaborations

• Currently the vehicle is being assembled in Santana Motor (Vehiclemanufacture partner). The evaluation in the test bench has finished but wehave to evaluate the integration in the vehicle (final tests)

• Regarding the hydrogen filling station, the construction has just finishedand in November we hope to start up the station (solar plant integratedwith hydrogen devices)

� Hercules Project Consortium would like to implement the experienceslearnt during the project in any activities related to hydrogen filling stationand hybrid vehicle based on fuel cell systems

Page 34: Hércules-GES-028 Hercules Project

34Hércules-GES-028

HYNERGREEN

Hercules Project:

• Introduction• Objectives• Results• Problems encountered• Possibilities for future collaboration• Follow up activities

Page 35: Hércules-GES-028 Hercules Project

35Hércules-GES-028

HYNERGREEN Follow up activities

• Hercules Project should be finished by the end of 2009 but due to thedelay the time for the final test has not been enough. For this reason, theConsortium has decided to continue with the evaluation of the hydrogenstation and the vehicle for a year (beyond the timetable)

Page 36: Hércules-GES-028 Hercules Project

36Hércules-GES-028

HYNERGREEN

Renewable Hydrogen Production by means of Solar Energy as a Fuel for a Hybrid Vehicle based on a

Fuel Cell System

Fuel Cells and Hydrogen Joint Undertaking (FCH JU) 2nd Stakeholders General Assembly

Brussels, 26th October

Verónica Mesa – Hynergreen Technologies, S.A.